for Archi t ec tural Engin e ers
a n d F i r e S p r i n k l e r C o n t r a c t o r s
Now Listed and Approved
for more types of
applications than any other
non-metallic system
Page 2
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 2/32
Introduction.3
Combination.of.BlazeMaster ® .Products..with.Other.CPvC.and.Solent.Cements .3
Where.to.Use.BlazeMaster ® ..Fire.Sprinkler.Systems. 3
Concealed.Installations.4
Exposed.Installations.(Where.Sprinklers.are.Required).4
Standard Coverage and Residential Sprinklers .......................4
Light Hazard or Residential Pendent Sprinklers ...................4
Light Hazard or Residential Horizontal
Sidewall Sprinklers ...................................................................4
Light Hazard Upright Sprinklers ..............................................4
Light Hazard Extended Coverage
and Residential Sprinklers ...........................................................4
Light Hazard Extended Coverage or
Residential Pendent Sprinklers ..............................................5
Light Hazard Extended Coverage or Residential Horizontal Sidewall Sprinklers .............................5
Unfinished Basements 5
Factory.Mutual.10
The.Loss.Preention.Council.10
Sprinkler.Head.Temperature.Ratings.11
Temperature/Pressure.Ratings.11
Combustible.Concealed.Installations.11
NFPA 13R and 13D .11
Air.Plenums. 11
Canadian Installations .11
Ordinary.Hazard.Installations. 12
Garage.Installations. 12
System.Risers.in.NFPA.13,.13R..and.13D.Applications.12
Underground.Water.Pressure.Serice.13
Thrust Blocking . 13
Trenching .14
Snaking of Pipe .14
Backfilling .15
Outdoor. Installations. 15
Updated.UL.Listing.Information.15
Product.Rating,.Capabilities.and..Material.Properties. 15
Pressure.Rating.15
Pipe.Dimensions.and.Weights.15
Physical.and.Thermal.Properties.of.BlazeMaster ® .CPvC.16
Hydraulic.Design.16
C Factor .16
Pipe Friction Loss .16
Fittings Friction Loss .16
Thermal.Expansion.and.Contraction.17
Pipe.Deflection.18
Handling.and.Storage.20
Joining.BlazeMaster ® .Pipe.and.Fittings.with..Red.One-Step.Solent.Cement.20
Cutting. 20
Deburring.20Fitting.Preparation. 20
Solent.Cement.Application.20
Assembly.21
Set.and.Cure.Times.21
Pressure.Testing.23
Estimating.One-Step.Solent.Cement.Requirements.23
Cut-In.Procedure.for.System..Modification.or.Repairs. 24
Hangers.and.Supports .26
Penetration.of.Studs.and.Joists.27Wooden.Studs.and.Joists.27
Metal.Studs.27
Transition.to.Other.Materials .27
Support.27
Threaded.Connections.27
Flanged.Connections. 27
Recommended Bolt Torque .27
Grooed.Coupling.Adapters.28
Other.Design.Criteria . 28
Chemical.Compatibility.28
A.Note.on.Microbiologically.Influenced.Corrosion.(MIC)29
Freeze.Protection.29
Batt Insulation . 29
Antifreeze Solutions .29
Estimating Antifreeze Solution Requirements .29
Painting30
Maintenance. 30
Penetrating.Fire.Rated.Walls.and.Partitions.30
Earthquake.Bracing.30
Summary.30
Dos.and.Don’ts. 31
2Lubrizol
Table of Contents
Page 3
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 3/32
Introduction
BlazeMaster ® .pipe.and.fittings.are.designed.
specifically.for.fire.sprinkler.systems..They.are.
made.from.a.specialty.thermoplastic.known.
chemically.as.post-chlorinated.polyinyl.chloride.
(CPvC)..BlazeMaster ® .pipe.and.fittings.proide.
unique.adantages.in.sprinkler.installations.
including.superior.hydraulics,.ease.of.joining,.
increased.hanger.spacing.in.comparison.to.other.
thermoplastics.and.ease.of.assembly..They.also.
are.based.on.a.technology.with.a.continuous.and.
proen.serice.history.of.more.than.40.years..
This.installation.manual.proides.instructions.for.
handling.and.installing.a.BlazeMaster ® .fire.sprinkler.
system.as.well.as.information.regarding.system.
design..It.is.intended.as.a.supplement.to.basic,.
fundamental.knowledge.relating.to.the.installation.and/or.repair.of.CPvC.fire.sprinkler.systems..It.also.
is.intended.to.supplement.installation.instructions.
published.by.manufacturers.of.pipe.and.fittings..
Before.commencing.installation,.a.user.should.
understand.and.confirm.applicable.National.Fire.
Protection.Association.(NFPA).guidelines.and.local.
code.approal.and.installation.requirements.for.
CPvC.fire.sprinkler.systems..
BlazeMaster ® .CPvC.pipe.and.fittings.carry.the.
markings.of.Underwriters.Laboratories,.Inc.(UL.&.C-UL).and.Underwriters’.Laboratories.of.Canada.
(ULC),.Factory.Mutual.(FM)*,.The.Loss.Preention.
Council.(LPC),.and.the.NSF.International.(NSF).
for.use.with.potable.water..Refer.to.indiidual.
manufacturers’.installation.instructions.for..
specific.listings.and.approals
Lubrizol.produces.and.sells.CPvC.compounds..
to.licensed.manufacturers.of.BlazeMaster ® .pipe.&.
fittings.(see.back.coer.for.contact.information)..
When.this.design.manual.states,."refer.to.manufacturer’s.installation.instructions".please.refer.
to.the.indiidual.installation.instructions.published.
by.each.pipe.and/or.fittings.manufacturer
For.additional.information.regarding.the.
BlazeMaster ® .product.line,.please.refer.to.the.
internet.website,.wwwblazemastercom..An.
electronic.ersion.of.this.installation.guide,.the.
most.current.product.compatibility.information,.
the.BlazeMaster ® .Blaster.newsletter,.and.other.
BlazeMaster ® .fire.sprinkler.systems.information.can.
be.found.at.this.site
Combination of BlazeMaster® Products
with Other CPVC and Solvent Cements
All.BlazeMaster ® .pipe,.fittings.and.solent.cements.hae.been.ealuated.and.are.listed.
for.combination.regardless.of.the.licensed.
manufacturer.that.produces.the.products
The.BlazeMaster ® .products’.listing.does.not.include.
the.combination.of.BlazeMaster ® .CPvC.pipe.with.
other.types.of.specially.listed.CPvC.fire.sprinkler.
pipes,.fittings.and.solent.cements
Where to Use BlazeMaster®
Fire Sprinkler Systems
BlazeMaster ® .CPvC.pipe.and.fittings.are..
Listed by Underwriters Laboratories (UL & C-UL)
and Underwriters Laboratories of Canada (ULC)
for use in:
•. Light.Hazard.occupancies.as.defined.in.the.
Standard.for.Installation.of.Sprinkler.Systems,.NFPA.
13
•. Residential.occupancies.as.defined.in.the.
Standard.for.Installation.of.Sprinkler.Systems.in.
Residential.Occupancies.up.to.Four.Stories.in.
Height,.NFPA.13R
•. Residential.occupancies.as.defined.in.the.
Standard.for.Sprinkler.Systems.in.One.and.Two.
Family.Dwellings.and.Manufactured.Homes,.NFPA.
13D
•. Air.plenums,.as.defined.by.the.Installation.of.Air.
Conditioning.and.ventilating.Systems,.NFPA.90A
•. Installation.of.Priate.Fire.Serice.Mains.and.Their.
Appurtenances,.NFPA.24.
•. System.risers.in.residential.buildings.up.to.four.
stories.in.height,.NFPA.13R.and.13D
•. See.UL.Fire.Protection.Equipment.Directory,.
categories.vIWT.and.HFYH
BlazeMaster ® .fire.sprinkler.systems.shall.be.employed.
in.wet-pipe.systems.(A.wet-pipe.system.contains.
water.and.is.connected.to.a.water.supply.so.
that.the.water.will.discharge.immediately.when.
3 Lubrizol
*As.manufactured.by.Harel,.IPEX,.Nibco,.Tyco.and.viking
Page 4
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 4/32
the.sprinkler.is.opened).BlazeMaster ® .CPvC.
pipe.and.fittings.must.neer.be.used.in.a.system.
using.compressed.air.or.other.gases..National.
Fire.Protection.Association.Standards.13,.13R,.13D,.
and.NFPA.24.must.be.referenced.and.followed.for.
design.and.installation.requirements.in.conjunction.
with.this.design.manual
Concealed Installations
With.concealed.installation.the.minimum.
protection.shall.consist.of.one.layer.of.3/8".(95.mm).
gypsum.wallboard,.or.a.suspended.membrane.
ceiling.with.lay-in.panels.or.tiles.haing.a.weight.
of.not.less.than.035.pounds.per.square.foot.(17.
kg.per.square.meter).when.installed.with.metallic.
support.grids,.or.1/2".(127.mm).plywood.soffits..
For.residential.occupancies.defined.in.NFPA.13R.
and.13D,.the.minimum.protection.may.consist.of.one.layer.of.1/2".(127.mm).plywood..During.
periods.of.remodeling.and.renoation,.appropriate.
steps.must.be.taken.to.protect.the.piping.from.fire.
exposure.if.the.ceiling.is.temporarily.remoed.
Exposed Installations
(Where Sprinklers are Required)
Note:..It.is.always.acceptable.to.install.
BlazeMaster ® .products.in.areas.where.sprinklers..
are.not.required..Refer.to.the.manufacturer’s.
installation.instructions
As.an.alternatie.to.the.protection.requirements,.
BlazeMaster ® .CPvC.pipe.and.fittings.may.be.
installed.without.protection.(exposed).when.
subject.to.the.following.additional.limitations:
A. Standard Coverage and Residential Sprinklers
. These.installations.shall.be.below.a.smooth,..
flat,.horizontal.ceiling.construction.and.require.
the.use.of.BM-5,.CSC-500,.TFP-500.or.HvC-
500.one.step.solent.cement..Pendent.and.horizontal.sidewall.sprinkler.[170°F.(77°C).
maximum.temperature.rated].installations..
may.use.CSC-400.or.TFP-400.one.step.
solent.cement..Upright.sprinkler.installations.
[155°F(68°C).maximum.temperature.rated].may.
use.CSC-400.or.TFP-400.one.step.solent.cement
1.. Light Hazard or Residential Pendent
Sprinklers
. Listed.quick.response,.170°F.(77°C).maximum.
temperature.rated,.pendent.sprinklers.haing.
deflectors.installed.within.8.inches.(203.mm).
from.the.ceiling.or.Listed.residential,.170°F.
(77°C).maximum.temperature.rated,.pendent.
sprinklers.located.in.accordance.with.their.Listing.and.a.maximum.distance.between.
sprinklers.not.to.exceed.15.feet.(457.m)..The.
piping.shall.be.mounted.directly.to.the.ceiling
2.. Light Hazard or Residential Horizontal
Sidewall Sprinklers
. Listed.quick.response,.200°F.(93°C).
maximum.temperature.rated,.horizontal.
sidewall.sprinklers.haing.deflectors.installed.
within.12.inches.(304.mm).from.the.ceiling.
and.within.6.inches.(152.mm).from.the.sidewall.or.Listed.residential,.200°F.(93°C).
maximum.temperature.rated,.horizontal.
sidewall.sprinklers.located.in.accordance.
with.their.Listing.and.a.maximum.distance.
between.sprinklers.not.to.exceed.14.feet.
(427.m)..The.piping.shall.be.mounted.
directly.to.the.sidewall
3.. Light Hazard Upright Sprinklers
. Listed.quick.response,.155°F.(68°C).maximum.
temperature.rated,.upright.sprinklers.haing.deflectors.installed.within.4.inches.(101.mm).
from.the.ceiling.and.a.maximum.distance.
between.sprinklers.not.to.exceed.15.feet.
(457.m)..The.maximum.distance.from.the.
ceiling.to.the.centerline.of.the.main.run.of.
pipe.shall.not.exceed.7-1/2.inches.(190.mm).
and.the.distance.from.the.centerline.of.a.
sprinkler.head.to.a.hanger.shall.be..
3.inches.(76.mm)
B. Light Hazard Extended Coverage and Residential Sprinklers
. These.installations.shall.be.below.a.smooth,..
flat,.horizontal.ceiling.construction,.are.limited.to.
unobstructed.construction,.require.the.use..
of.Schedule.80.fittings.for.sizes.1-1/2.in.and.
greater,.and.require.the.use.of.BM-5,.CSC-500,..
.
.
.
.
4Lubrizol
Page 5
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 5/32
TFP-500,.or.HvC-500.one.step.solent.cement...
For.pendent.sprinkler.installations,.the.piping.
shall.be.mounted.directly.to.the.ceiling...
For.horizontal.sidewall.sprinkler.installations,.the.
piping.shall.be.mounted.directly.to.the.sidewall
1.. Light Hazard Extended Coverage or
Residential Pendent Sprinklers. Listed.light.hazard,.extended.coerage,.
quick.response,.155°F.(68°C).maximum.
temperature.rated,.pendent.sprinklers.
haing.deflectors.installed.within.8.inches.
(203.mm).from.the.ceiling,.a.maximum.
distance.between.sprinklers.not.to.exceed.
20.feet.(609.m),.and.an.application.density.
not.less.than.010.gpm/ft2.(408.ml/min)
. Listed.residential,.155°F.(68°C).maximum.
temperature.rated,.pendent.sprinklers.haing.deflectors.installed.within.8.inches.
(203.mm).from.the.ceiling,.a.maximum.
distance.between.sprinklers.not.to.exceed.
20.feet.(609.m),.and.an.application.density.
not.less.than.010.gpm/ft2.(408.ml/min)
2.. Light Hazard Extended Coverage or
Residential Horizontal Sidewall Sprinklers
. Listed.light.hazard,.extended.coerage,.
quick.response,.175°F.(79°C).maximum.
temperature.rated,.horizontal.sidewall.sprinklers.haing.deflectors.installed.within.
12.inches.(304.mm).from.the.ceiling.and.
within.6.inches.(152.mm).from.the.sidewall,.a.
maximum.distance.between.sprinklers..
not.to.exceed.16.feet.(487.m),.and.an.
application.density.not.less.than..
010.gpm/ft2.(408.ml/min)
. Listed.residential,.165°F.(74°C).maximum.
temperature.rated,.horizontal.sidewall.
sprinklers.haing.deflectors.installed.within.12.inches.(304.mm).from.the.ceiling.and.
within.6.inches.(152.mm).from.the.sidewall,.
a.maximum.distance.between.sprinklers.
not.to.exceed.18.feet.(548.m),.and.an.
application.density.not.less.than.010.gpm/
ft2.(408.ml/min)
. .
.
Listed.light.hazard,.extended.coerage,.
quick-response,.165°F.(74°C).maximum.
temperature.rated,.horizontal.sidewall.
sprinklers.haing.deflectors.installed.within.
12.inches.(304.mm).from.the.ceiling.and.
within.6.inches.(152.mm).from.the.sidewall,.
a.maximum.distance.between.sprinklers.
not.to.exceed.18.feet.(548.m),.and.an.application.density.not.less.than.010.gpm/
ft2.(408.ml/min)
. Listed.light.hazard,.extended.coerage,..
quick.response,.155°F.(68°C).maximum.
temperature.rated,.horizontal.sidewall.
sprinklers.(manufactured.by.Reliable.
Automatic.Sprinkler.Co.Inc,.SIN.RA0362).
haing.deflectors.installed.within.12.inches.
(304.mm).from.the.ceiling.and.within.
6.inches.(152.mm).from.the.sidewall,.a.maximum.distance.between.sprinklers.not.
to.exceed.24.feet.(731.m),.and.a.flow.not.
less.than.40.gpm.(152.L/min).per.sprinkler
C. Unfinished Basements
. BlazeMaster ® .CPvC.pipe.and.fittings.may..
be.installed.without.protection.(exposed).in.
unfinished.basements.in.accordance.with..
NFPA.13D.when.subject.to.the.following.
additional.limitations:
1. .The.ceiling.shall.be.horizontal.and.
constructed.utilizing.nominal.2.in.x.10.in.
solid.wood.joists.on.16.in.centers
. OR
. .The.ceiling.shall.be.horizontal.and.
constructed.utilizing.nominal.2.in.x.12.in.
solid.wood.joists.on.16.in.centers.When.
installing.BlazeMaster ® .CPvC.pipe.and.
fittings.in.conjunction.with.2.in.x.12.in.solid.
wood.joists,.the.maximum.system.working.
pressure.under.flowing.conditions.shall.not.
exceed.100.psi.and.the.maximum.system.
working.pressure.under.static.(nonflowing).
conditions.shall.not.exceed.175.psi
2. .The.distance.from.the.floor.to.the.bottom..
of.the.solid.wood.joists.shall.be.between..
7.ft.and.8.ft
.
5 Lubrizol
Page 6
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 6/32
For Exposed BlazeMaster ® Applications
(Use in unfinished basements, system risers and mechanical tees and crosses are not included by this table)
Maximum Maximum Maximum
Spacing Deflector Deflector Sprinkler Application
Sprinkler Typeof Between DistanceFrom DistanceFrom Temperature Density Additional
Configuration Sprinkler Sprinklers(ft.) Ceiling(in.) Sidewall(in.) Rating(°F) (gpm/sq.ft.) Limitations
ExtendedCoverageSprinklers
Pendent LightHazard, ≤20 8 n/a 155 0.10
QuickResponse
Horizontal LightHazard ≤16 12 6 175 0.10
Sidewall QuickResponse
≤18 12 6 165 0.10
LightHazard, ≤24 12 6 155 flowrateof
QuickResponse 40gpmand
ListedReliable maximum
Sprinkler coverageareaof (SINRA0362) 24'x14'
ResidentialSprinklers
Pendent Residential ≤15 persprinkler n/a 170
Listing
≤20 8 n/a 155 0.10
Horizontal Residential ≤14 persprinkler persprinkler 200
Sidewall Listing Listing
≤18 12 6 165 0.10
StandardCoverageSprinklers
Pendent QuickResponse ≤15 8 n/a 170
Horizontal QuickResponse ≤14 12 6 200
Sidewall
Upright QuickResponse ≤15 4 155
inadditionthe ahangermust
distancefrom beinstalled
theceilingto 3inchesfromthe
centerlineof centerlineofthe
pipemustbea sprinklerhead
maximumof
71/2inches
6Lubrizol
Page 7
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 7/32
3. .Listed.residential.pendent.sprinklers.with.a.
maximum.temperature.rating.of.155°F.and.
a.minimum.K-factor.of.30.are.to.be.used.
for.this.type.of.installation.The.maximum.
sprinkler.spacing.shall.not.exceed.
12.feet.The.system.is.to.be.designed.
based.upon.the.Listed.flows.for.the.
sprinkler.selected.except.that.the.flow.for.
a.single.sprinkler.or.for.multiple.sprinklers.
flowing.is.to.be.not.less.than.11.gpm.per.
sprinkler.The.sprinklers.are.to.be.installed..
with.their.deflectors.a.maximum.of.13/4.in.
below.the.bottom.of.the.solid.wood.joists..
in.anticipation.of.future.installation.of.a..
finished.ceiling.(reference.NFPA.13D,..
Section.824,.2007.Edition)
4. .All.system.mains.shall.be.run.perpendicular..
to.the.joists.All.branch.lines.shall.be.run..
parallel.to.the.joists..Schedule.80.fittings.shall.be.used.for.sizes.1-1/2.inch.and.larger.
5. .All.solent.cement.joints.shall.be.made.
with.BlazeMaster.One.Step.Solent.
Cement.(TFP-500,.BM-5,.CSC-500,.or.HvC-500)
6. .When.the.total.protected.area.exceeds..
1,000.square.feet,.blocking.shall.be.utilized.
to.diide.the.area.into.indiidual.compart-
ments.not.exceeding.1,000.square.feet..
The.maximum.length.along.the.joist.shall.not.
exceed.32.feet.When.the.length.exceeds..
32.feet,.blocking.shall.be.utilized.The.
blocking.shall.be.constructed.of.minimum.1/2.in.plywood.and.shall.be.the.full.depth.
of.the.wood.joists.
7 Lubrizol
Basement Installation
with Center Wall Riser
with Center Room
Main
Page 8
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 8/32
Lubrizol 8
Basement Installation
with Riser in Corner
Basement Installation
with Center Wall Riser
with Main at Wall
Page 9
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 9/32
. .It.is.acceptable.for.items.such.as.piping,.
wires,.ducts,.etc.to.penetrate.the.blocking.
The.gap.between.the.item.penetrating.
the.blocking.and.the.blocking.should.be.
minimized.For.installations.where.the.gap.
exceeds.1/4.in,.the.gap.shall.be.filled..
with.insulation,.caulking,.or.other..
suitable.material
7. .When.installing.BlazeMaster ® .CPvC.pipe.
and.fittings.perpendicular.(system.mains)..
to.the.solid.wood.joists,.listed.support.
deices.for.thermoplastic.sprinkler.piping..
or.other.listed.support.deices.shall.be..
used.which.mount.the.piping.directly.to..
the.bottom.of.the.solid.wood.joists.As.an.
alternatie.to.mounting.the.pipe.and..
fittings.below.the.solid.wood.joists,.it.is.also.
acceptable.to.cut.holes.in.the.solid.wood.
joists.at.or.below.the.center.of.the.depth..of.the.solid.wood.joist.for.support.-.the..
holes.should.be.oersized.to.allow.for.
moement.and.located.to.not.impair..
the.structural.integrity.of.the.joists.
. .CAUTION:.When.drilling.holes.in.the.solid..
wood.joists,.the.structural.integrity.must..
be.maintained.Consult.the.Authority..
Haing.Jurisdiction.(AHJ).or.building.code..
for.requirements
8. .When.installing.BlazeMaster ® .CPvC.pipe.
and.fittings.parallel.(branch.lines).to.the.
solid.wood.joists,.the.pipe.and.fittings.shall.
be.installed.in.the.caity.below.the.bottom.
of.the.ceiling.and.aboe.the.bottom.of.the.
joist.The.branch.lines.shall.be.located.at.or.
below.the.center.of.the.depth.of.the.solid.
wood.joist.The.pipe.shall.be.installed.utilizing.
listed.support.deices.for.thermoplastic.
sprinkler.piping.or.other.listed.support.
deices.which.mount.the.piping.directly.to.
nominal.2.in.wood.blocking.or.listed.support.
deices.for.thermoplastic.sprinkler.piping.
which.offset.the.pipe.a.nominal.distance.of.
11/2.in.from.the.solid.wood.joists.
. .Use.of.BlazeMaster ® .CPvC.pipe.and.fittings.
is.limited.to.basements.where.the.quantity.
and.combustibility.of.contents.is.low.and.
fires.with.relatiely.low.rates.of.heat.release.
are.expected.For.additional.information.
regarding.the.assembly.and.installation.of.
BlazeMaster ® .CPvC.pipe.and.fittings,..
please.refer.to.the.manufacturer's.
installation.instructions
9 Lubrizol
Branches Supported with Blocking
Branches Supported with Hangers
Page 10
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 10/32
Factory Mutual.
In.Factory.Mutual.insured.properties.BlazeMaster ® .
CPvC.pipe.and.fittings.are.permitted.to.be.
installed.exposed.(without.protection).when.the.
following.conditions.are.met
•.The.occupancy.classification.must.be.....
...Miscellaneous.Nonmanufacturing.as.defined.in..
...FM.Data.Sheet.3-26,.Fire.protection.Water..
...Demands.for.Nonstorage.Sprinklered.Properties,..
...Table.2,.section.L..
•.Only.wet.pipe.sprinkler.systems.are.to.be.used..
...with.BlazeMaster ® .pipe.and.fittings
•.Sprinklers.must.hae.quick.response.thermal..
...sensing.elements
Factory.Mutual.standards.do.not.permit.the.use.
of.nonmetallic.fire.sprinkler.piping.in.areas.where.
seismic.protection.is.required
The.design.and.installation.details.are.as.follows:
(a)..Occupancy.must.be.per.Data.Sheet.3-26,.Table..
2,.Section.L,.with.smooth.flat.horizontal.ceilings,..
a.maximum.ceiling.height.of.10.ft.(3.m),.and..
other.installation.details.per.FM.Data.Sheet.2-.
8N,.Installation.of.Sprinkler.Systems..Examples.of..
these.occupancies.include.apartments,..
restaurants,.schools,.hospitals,.libraries,.offices,.etc
(b).The.following.FM.Approed.sprinklers.must.be.used:
. 1).Extended.coerage.light.hazard.(ECLH)..
. control.mode.specific.application..
. sprinklers.with.minimum.flow.or.pressure..
. established.for.the.sprinkler.as.coered..
. in.Data.Sheet.2-8N
. 2).Quick.response.control.mode.density..
. area.sprinklers.with.a.minimum.density..
. of.01.gpm/ft2.(4.mm/min)
. 3).Residential.sprinklers.with.a.minimum.
. 01.gpm/ft2.(4.mm/min)
Note:.The.EC-25.extended.coerage.control.mode.
density.area.sprinkler.is.excluded
For.extended.coerage,.light.hazard.sprinklers,.
locate.the.sprinklers.as.recommended.in.Data.
Sheet.2-8N.For.quick.response,.non-extended.
coerage.sprinklers,.locate.the.sprinklers.so.the.
deflectors.are.no.more.than.8.in.(100.mm).below.
the.ceiling.For.residential.sprinklers,.locate.the.
sprinklers.per.the.manufacturer’s.instructions
. (c).BlazeMaster ® .fire.sprinkler.products.may.
be.used.exposed.as.a.ertical.riser..In.this.
installation,.there.needs.to.be.a.sprinkler.(of.
the.same.type.as.in.the.area.being.protected).
located.adjacent.to.and.no.further.than.1.ft.
(03.m).from.the.riser.The.design.flow.is.the...
same.as.for.the.other.sprinklers;.howeer,.this.
sprinkler.cannot.be.used.as.part.of.the.design.
area,.but.its.flow.must.be.included.in.the.total.
hydraulic.design
. Fire-rated,.non-remoable.ceilings.are.not.
required.
. In.addition.Factory.Mutual.has.approed.the.
use.of.BlazeMaster ® .CPvC.pipe.in.combination.
with.the.Soffi-SteelTM*.coering.system.Soffi-Steel.
is.manufactured.by.Grice.Engineering.
The Loss Prevention Council
Use of BlazeMaster ® CPVC Fire Sprinkler Systems
in Accordance with The Loss Prevention Council
(LPC) Section 21.1: Part 5 “List of Approved Fire and
Security Products and Services” and Section 5 of BS
5306: Part II
The.Loss.Preention.Certification.Board.Listing.is.as.
follows:.
1..The.‘scope.of.use’.of.plastic.pipe.should.be...
agreed.between.the.purchaser,.authority.haing..
jurisdiction,.and/or.insurer.
2..Use.of.plastic.pipe.and.fittings.is.subject.to.water..
authority.agreement.for.the.territory.concerned.
3..LPCB.Approed.quick.response.sprinklers.shall.be...
used.with.exposed.(ie.fire.exposure).plastic..
pipe.and.fittings.
4..Plastic.pipe.and.fittings.are.suitable.for.use.only..
with.wet.pipe.systems.
5..Care.should.be.exercised.to.ensure.that.joints..
are.adequately.cured,.in.accordance.with.the..
manufacturer’s.installation.instructions,.prior.to..
pressurization.
6..Plastic.pipe.and.fittings.shall.not.be.installed..
outdoors.
7..Where.plastic.pipe.and.fittings.are.exposed..
(ie.fire.exposure),.the.system.shall.be.installed.
close.to.a.flat.ceiling.construction.
10Lubrizol
*Soffi-Steel.is.a.trademark.of.Grice.Engineering
Page 11
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 11/32
8..Sprinkler.systems.which.employ.plastic.pipe.and..
fittings.shall.be.designed.where.possible.to..
ensure.no.‘no.flow’.sections.of.pipework.in.the..
eent.of.sprinkler.operation
The.Loss.Preention.Certification.Board.listing.applies.
to.Light.Hazard.Classifications.BS.5306:.Part.2,.Section.
two,.paragraph.52.which.fall.within.the.scope.of.
NFPA.13,.13R.and.13D
In.addition,.BlazeMaster ® .fire.sprinkler.systems..
can.be.installed.in.certain.ordinary.classification..
(BS.5306:.Part.2,.Section.two,.paragraph.53).such.
as.offices,.retail.shops.and.department.stores.when.
installed.in.accordance.with.Section.211:.Part.5.
of.LPC.“List.of.Approed.Fire.and.Security.Products.
and.Serices”
BlazeMaster ® .pipe.and.fittings.should.not.be..
used.in.high.hazard.applications.(BS.5306:.Part.2,..
Section.two,.paragraph.54).and.ordinary.hazard.
applications.where.the.fuel.load.or.rate.of.heat.
release.is.high,.such.as.boiler.rooms,.kitchens,.
manufacturing.areas,.and.certain.warehouse.
applications
Sprinkler Head Temperature Ratings
BlazeMaster ® .pipe.and.fittings.shall.be.used.
in.sprinkler.systems.employing.sprinkler.heads.
rated.225°F.(107°C).when.installed.concealed.
(protected).in.accordance.with.the.Listing.Sprinkler.
temperature.ratings.for.exposed.installations.are.indicated.in.the.indiidual.sections.of.this.manual
Temperature/Pressure Rating
BlazeMaster ® .pipe.and.fittings.(3/4".–.3".(20.–.80.mm).
are.rated.for.continuous.serice.of.175.psi.(1207.
kPa).at.150°F.(65°C)..BlazeMaster ® .pipe.and..
fittings.are.suitable.for.use.in.areas.where.ambient.
temperatures.are.within.the.range.of.35°F.(2°C).to.
150°F.(65°C)..BlazeMaster ® .pipe.can.be.installed.in.
an.area,.such.as.an.attic,.where.the.temperature.
will.exceed.150°F.(65°C).if.entilation.is.proided.or.
if.insulation.is.used.around.the.pipe.to.maintain.a.
cooler.enironment..BlazeMaster ® .piping.systems.
must.be.laid.out.so.that.the.piping.is.not.closely.
exposed.to.deices.that.generate.heat.in.excess..
of.150°F.(65°C).such.as.light.fixtures,.ballasts.and.
steam.lines..If.the.installation.is.in.an.area.subject.
to.freezing.temperatures,.the.sprinkler.system.must..
be.protected.from.freezing..A.frozen.system.will.not.
only.be.deactiated,.but.the.pressures.that.may.
build.up.can.cause.the.sprinkler.heads.to.open.or.
damage.the.pipes.
Combustible Concealed Installations
BlazeMaster ® .pipe.and.fittings.must.neer.be.
installed.in.combustible.concealed.spaces.
requiring.sprinklers,.as.referenced.in.NFPA.13..
EXCEPTION:.Specially.listed.sprinkler.heads.exist.that.hae.been.tested.and.are.listed.for.
use.with.BlazeMaster ® .products.in.combustible.
concealed.spaces.requiring.sprinklers..
When.using.BlazeMaster ® .products.in.these.
applications.always.follow.the.sprinkler.head.
manufacturers’.installation.guidelines.
Similarly.there.are.specially.listed.sprinkler.
heads.that.hae.been.tested.and.are.listed.
for.use.with.BlazeMaster ® .products.in.attics.
that.require.sprinklers.The.sprinkler.head.
manufacturers’.installation.guidelines.must.be.followed.when.using.BlazeMaster ® .pipe.and.
fittings.with.these.sprinkler.heads
NFPA 13R and 13D
NFPA.13R.and.13D.permit.the.omission.of.sprinklers.
from.combustible.concealed.spaces.and.
BlazeMaster ® .pipe.and.fittings.may.be.installed.
in.these.areas.when.sprinklering.residential.
occupancies.according.to.these.standards
Air PlenumsBlazeMaster ® .pipe.and.fittings.are.approed.for.use.
in.air.plenums..BlazeMaster ® .pipe.and.fittings.hae.
been.inestigated.by.UL.per.the.requirements.of.UL.
1887.and.found.to.comply.with.the.combustibility.
requirements.for.thermoplastic.sprinkler.pipe.as.
described.in.the.Standard.for.Installation.of.Air.
Conditioning.and.ventilating.Systems,.NFPA.90A.
and.arious.model.mechanical.codes
Note:.BlazeMaster ® .pipe.and.fittings.may.be.
installed.in.the.plenum.adjacent.to,.but.not.oer,.an.opening.in.the.ceiling.such.as.entilation.grills
Canadian Installations (ULC & C-UL)
BlazeMaster ® .CPvC.products.are.listed.under.CAN/
ULC.Standard.S1022M.for.flame.spread.of.5,.smoke.
deelopment.of.15,.and.fuel.contribution.of.
0,.meeting.the.National.Building.Code.of.Canada
11 Lubrizol
Page 12
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 12/32
Ordinary Hazard Installations
Section.6362.of.NFPA.13.(2007.Edition).permits..
the.use.of.pipe.or.tube.listed.for.light.hazard.
occupancies.to.be.installed.in.ordinary.hazard.
rooms.of.otherwise.light.hazard.occupancies.
where.the.room.does.not.exceed.400.ft 2.(37.
m2)..BlazeMaster ® .CPvC.pipe.and.fittings.can.be.
installed.in.these.installations.in.accordance.with.
the.manufacturer’s.installation.instructions.and.this.
design.manual
Garage Installations
When.installed.concealed,.BlazeMaster ® .CPvC.
pipe.and.fittings.may.be.used.to.protect.13R.
garages.per.the.following.requirements:
1. Minimum.protection.shall.consist.of.either..
one.layer.of.3/8".(95.mm).thick.gypsum.or..
1/2".(127.mm).thick.plywood
2. Listed.pendent.or.sidewall.sprinklers.with.a.
maximum.temperature.rating.of.225°F.(107°C).
shall.be.utilized..All.sprinklers.shall.be..
installed.per.the.manufacturer’s.published.
installation.instructions
3. The.system.shall.be.installed.per.the.
requirements.of.NFPA.13R
4. The.BlazeMaster ® .CPvC.sprinkler.pipe.and.
fittings.shall.be.installed.per.the.manufacturer’s.installation.instructions.and.this.design.manual
Note:..NFPA.13D,.Section.864.(2007.Edition)..
states:.“Sprinklers.shall.not.be.required.in.garages,.
open.attached.porches,.carports,.and.similar.
structures"..Since.sprinklers.are.not.required.in.NFPA.
13D.garages,.these.installations.do.not.fall.within.
the.scope.of.the.Listing..Howeer,.BlazeMaster ® .
CPvC.pipe.and.fittings.may.be.installed.in.NFPA.13D.
garages.with.the.approal.of.the.local.authority.
haing.jurisdiction
System Risers in NFPA 13, 13R and13D Applications
BlazeMaster ® .CPvC.pipe.and.fittings.may.be.used.
as.system.risers.in.accordance.with.NFPA.13,.13D.
and.13R.when.subject.to.the.following.limitations:
1. When.installed.protected.(concealed),.the.
minimum.protection.shall.consist.of.either.one.
layer.of.3/8.in.(95.mm).thick.gypsum.wallboard.
or.1/2.in.(127.mm).thick.plywood
2. When.installed.without.protection.(exposed),.
the.following.limitations.shall.apply:
Note:.Only.NFPA.13R.and.13D.applications.may.be.
installed.without.protection.(exposed)
a). The.riser.shall.be.installed.below.a.smooth,..
flat,.horizontal.ceiling.construction.A.Listed.
residential.pendent.sprinkler.is.to.be.installed.
with.its.deflector.at.the.distance.from.the.
ceiling.specified.in.the.sprinkler.Listing
OR
. The.riser.shall.be.installed.below.a.horizontal.
unfinished.basement.ceiling.(in.accordance.
with.NFPA.13D).constructed.utilizing.nominal..
2.in.x.10.in.or.nominal.2.in.x.12.in.exposed.solid.
wood.joists.on.16.in.centers..A.Listed.residential.pendent.sprinkler.is.to.be.installed.with.its.
deflector.a.maximum.of.1-3/4.in..
below.the.bottom.of.the.solid.wood.joist..
in.anticipation.of.future.installation.of.a..
finished.ceiling
. •..When.installing.BlazeMaster ® .CPvC.pipe.and..
fittings.in.conjunction.with.2.in.x.12.in.solid..
wood.joists,.the.maximum.system.working.
pressure.under.flowing.conditions.shall.not.
exceed.100.psi.and.the.maximum.system.working.pressure.under.static.(nonflowing).
conditions.shall.not.exceed.175.psi.
b). A.Listed.residential.pendent.sprinkler.is.to.hae.
a.maximum.temperature.rating.of.155°F.and.a.
minimum.K-factor.of.30.and.is.to.be.installed.
at.a.maximum.horizontal.distance.of.12.inches.
from.the.centerline.of.the.riser.The.system.is.to.
be.designed.based.upon.the.Listed.flows.for.
the.sprinkler.selected.except.that.the.flow.for.a.
single.sprinkler.or.for.multiple.sprinklers.flowing..
is.to.be.not.less.than.11.gpm.per.sprinkler.
c). The.riser.shall.be.supported.ertically.within..
2.feet.of.the.ceiling.or.bottom.of.the.joist.
d). The.minimum.riser.diameter.shall.be.1.in.and.
the.maximum.riser.diameter.shall.be.2.in
e). The.maximum.distance.between.the.wall(s)..
and.the.outside.surface.of.the.riser.pipe.shall..
be.11 ⁄ 2.in
12Lubrizol
Page 13
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 13/32
f). All.solent.cement.joints.shall.be.made.with.
BlazeMaster ® .One.Step.Solent.Cement..
(TFP-500,.CSC-500,.HvC-500,.BM-5)
3. The.system.shall.be.installed.per.the.
requirements.of.NFPA.13,.Sections.925..
(2007.Edition),.Support.of.Risers
4. The.BlazeMaster ® .CPvC.sprinkler.pipe.and.
fittings.shall.be.installed.per.the.manufacturer's.
installation.and.design.manual
5. Risers.shall.be.supported.by.pipe.clamps.or.by.
hangers.located.on.the.horizontal.connection.
close.to.the.riser.Only.Listed.hangers.and.
clamps.shall.be.used
6. vertical.lines.must.be.supported.at.interals,.
described.in.7.&.8.below,.to.aoid.placing.
excessie.load.on.a.fitting.at.the.lower.end..
Do.this.by.using.riser.clamps.or.double.bolt.pipe.
clamps.Listed.for.this.serice.The.clamps.must.not.exert.compressie.stresses.on.the.pipe..
It.is.recommended.that.the.clamps.should..
be.located.just.below.a.fitting.so.that.the.
shoulder.of.the.fitting.rests.against.the.clamp..
If.necessary,.a.coupling.can.be.modified..
and.adhered.to.the.pipe.as.a.bearing.support.
such.that.the.shoulder.of.the.fitting.rests.on..
the.clamp.Follow.the.manufacturer's.
recommended.cure.time
.
WARNING:.Modified.riser.collar.shall.only.be.
used.to.proide.support.to.the.riser.and.shall.not.be.used.to.join.two.pieces.of.pipe
7. Do.not.use.riser.clamps.that.squeeze.the.pipe.
and.depend.on.compression.of.the.pipe.to.
support.the.weight
8. Hangers.and.straps.shall.not.compress,.distort,.
cut.or.abrade.the.piping.and.shall.allow.for.
free.moement.of.the.pipe.to.allow.for.thermal.
expansion.and.contraction
9. Maintain.ertical.piping.in.straight.alignment.
with.supports.at.each.floor.leel,.or.at.10.feet.
(305.m).interals,.whicheer.is.less
10. CPvC.risers.in.ertical.shafts.or.in.buildings.with.
ceilings.oer.25.feet.(762.m),.shall.be.aligned.
straightly.and.supported.at.each.floor.leel,.or.at.10.feet.(305.m).interals,.whicheer.is.less
Underground Water Pressure Service
Both.pipe.and.fittings.may.be.used.in.underground.
water.pressure.serice.installations.per.the.following.
requirements:
1. ASTM.D.2774,.Standard.Recommended.
Practice.for.Underground.Installation.of.
Thermoplastic.Pressure.Piping,
2. ASTM.F.645,.Standard.Guide.for.Selection,.
Design.and.Installation.of.Thermoplastic.Water.
Pressure.Piping.Systems
3. The.system.shall.be.installed.per.the.
requirements.of.NFPA.24
4. The.BlazeMaster ® .CPvC.sprinkler.pipe.and.
fittings.shall.be.installed.per.the.manufacturer’s.
installation.instructions.and.this.design.manual
Thrust Blocking
If.thrust.blocks.are.utilized.they.should.be.designed.
per.NFPA.24,.Section.1082.(2007.Edition)
Note:..BlazeMaster ® .fire.sprinkler.systems.utilize.a.
solent.cement.joining.method..As.such,.thrust.
blocks.are.not.required.with.BlazeMaster ® .CPvC.
pipe.and.fittings.in.underground.water.pressure.
serice..Reference.NFPA.24,.Section.A10811..
(2007.Edition).
13 Lubrizol
Side View
Cut Perpendicular to Seat
Top View
CutAboveSeat
Figure 1: Field Modification for Riser Collar for Vertical Use
Figure 2: Coupling Modification for Riser Collar
Modified
BlazeMaster ® CPVC
Coupling Adhered
to Pipe
Snug but not Tight
Strut to Wall
Plastic
Coupling
or Collar
Adhered
to Pipe
Page 14
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 14/32
Trenching
The.trench.should.be.of.adequate.width.to.allow.
conenient.installation,.while.at.the.same.time.
being.as.narrow.as.possible..Minimum.trench.
widths.may.be.utilized.by.joining.pipe.outside.of.
the.trench.and.lowering.it.into.the.trench.after.
adequate.joint.strength.has.been.achieed..
(NOTE:.Refer.to.the.recommended.set.and.cure.time.tables.for.solent.cement.joints)..Trench.widths.
will.hae.to.be.wider.where.pipe.is.joined..
in.the.trench.or.where.thermal.expansion.and.
contraction.is.a.factor.See.section.titled.“Snaking..
of.Pipe”
•. Water.filled.pipe.should.be.buried.at.least..
12.inches.(305.mm).below.the.maximum.
expected.frost.line
•. It.is.recommended.that.BlazeMaster ® .piping.
be.run.within.a.metal.or.concrete.casing.when.it.is.installed.beneath.surfaces.that.are.subject.
to.heay-weight.or.constant.traffic.such.as.
roadways.and.railroad.tracks
The.trench.bottom.should.be.continuous,.
relatiely.smooth.and.free.of.rocks..Where.ledge.
rock,.hardpan.or.boulders.are.encountered,.it.is.
necessary.to.protect.the.pipe.from.damage..Use..
a.minimum.of.4.inches.(102.mm).of.clean.soil,..
sand,.crushed.stone.or.other.approed.material.as.
referenced.in.ASTM.D.2774
Sufficient.coer.must.be.maintained.to.keep.external.
stress.leels.below.acceptable.design.stress.Reliability.
and.safety.of.serice.is.of.major.importance.in.
determining.minimum.coer..Local,.state.and.
national.codes.may.also.goern
Snaking of Pipe
After.BlazeMaster ® .CPvC.pipe.has.been.solent.
welded,.it.is.adisable.to.snake.the.pipe.according.
to.the.below.recommendations.beside.the.trench.
during.its.required.curing.time..BE ESPECIALLY
CAREFUL NOT TO APPLY ANY STRESS THAT WILL
DISTURB THE UNDRIED JOINT...This.snaking.is.
necessary.in.order.to.allow.for.any.anticipated.
thermal.moement.that.could.take.place.in.the.
newly.joined.pipeline
Snaking.is.particularly.necessary.on.the.lengths.
that.hae.been.solent.welded.during.the.late.
afternoon.of.a.hot.day,.because.their.drying.time.
will.extend.through.the.cool.of.the.night.when.
thermal.contraction.of.the.pipe.could.stress.
the.joints.to.the.point.of.pull.out..This.snaking.is.
also.especially.necessary.with.pipe.that.is.laid.in.its.trench.(necessitating.wider.trenches.than.
recommended).and.is.back-filled.with.cool.earth.
before.the.joints.are.thoroughly.dry
14Lubrizol
2 Loop Lengths
1 Loop Length
Offset
Offset
CenterlinePipe
Figure 3: Snaking of Pipe
Loop Offset in Inches for Contraction:
Maximum Temperature Variation, °F, Between Time of Solvent Welding and Final Use
Loop Length 10° 20° 30° 40° 50° 60° 70° 80° 90° 100°
.20.Feet. 3". 4". 5". 5". 6". 6". 7". 7". 8". 8"
.50.Feet. 7". 9". 11". 13". 14". 16". 17". 18". 19". 20"
.100.Feet. 13". 18". 22". 26". 29". 32". 35". 37". 40". 42"
Loop Offset in mm for Contraction:
Maximum Temperature Variation, °C, Between Time of Solvent Welding and Final Use
Loop Length 5° 10° 15° 20° 25° 30° 35° 40° 45° 50°
.5.Meters. 65. 83. 95. 105. 114. 123. 133. 143. 154. 164
.15.Meters. 164. 219. 266. 307. 343. 377. 409. 440. 469. 498
.30.Meters. 314. 424. 522. 609. 687. 758. 823. 884. 943. 999
Page 15
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 15/32
Backfilling
Note: Underground pipe shall be thoroughly
inspected and tested for leaks prior to backfilling.
Backfill material should be placed over pipe
sections only, leaving the joints exposed during
testing...
Ideally,.backfilling.should.only.be.done.early.in.the.
morning.during.hot.weather.when.the.line.is.fully.
contracted.and.there.is.no.chance.of.insufficiently.
dried.joints.being.subjected.to.contraction.stresses
The.pipe.should.be.uniformly.and.continuously.
supported.oer.its.entire.length.on.firm,.stable.
material..Blocking.should.not.be.used.to.change.
pipe.grade.or.to.intermittently.support.pipe.across.
excaated.sections
Pipe.is.installed.in.a.wide.range.of.sub-soils..These.
soils.should.not.only.be.stable.but.applied.in.such.a.
manner.to.physically.shield.the.pipe.from.damage..
Attention.should.be.gien.to.local.pipe.laying.
experience.that.may.indicate.particular.pipe.
bedding.problems
Backfill.materials.free.of.rocks.with.a.particle.
size.of..1/2".(127.mm).or.less.should.be.used.to.
surround.the.pipe.with.6".(152.mm).to.8".(203.mm).
of.coer..It.should.be.placed.in.layers..Each.soil.
layer.should.be.sufficiently.compacted.to.uniformly.
deelop.lateral.passie.soil.forces.during.the.backfill.
operation..It.may.be.adisable.to.hae.the..
pipe.under.hydraulic.pressure,.15.to.25.psi..
(103.–.172.kPa).during.the.backfilling..
vibratory.methods.are.preferred.when.compacting.
sand.or.grael.Best.results.are.obtained.when.the.
soils.are.in.a.nearly.saturated.condition..Where.
water.flooding.is.used,.the.initial.backfill.should.be.
sufficient.to.insure.complete.coerage.of.the.pipe..
Additional.material.should.not.be.added.until.the.
water.flooded.backfill.is.firm.enough.to.walk.on..
Care.should.be.taken.to.aoid.floating.the.pipe
Sand.and.grael.containing.a.significant..
proportion.of.fine-grained.material,.such.as.silt.and.
clay,.should.be.compacted.by.hand.or,.preferably.
by.mechanical.tamper
The.remainder.of.the.backfill.should.be.placed..
and.spread.in.approximately.uniform.layers.in.such.
a.manner.to.fill.the.trench.completely.so.that.there.will.be.no.unfilled.spaces.under.or.about.the.rocks.
or.lumps.of.earth.in.the.backfill..Large.or.sharp.
rocks,.frozen.clods.and.other.debris.greater.than..
4".(102.mm).in.diameter.should.be.remoed..
Rolling.equipment.or.heay.tampers.should.only..
be.used.to.consolidate.the.final.backfill
Outdoor Installations
BlazeMaster ® .pipe.and.fittings.are.not.listed.for.
exposed,.outdoor.applications
Updated UL Listing Information
BlazeMaster ® .fire.sprinkler.system’s.listings..
can.change.For.a.current.list.log.on.to.www
blazemastercom
Product Rating, Capabilities andMaterial Properties
Pressure Rating
BlazeMaster ® .pipe.and.fittings.(3/4".(20mm).–..
3".(80.mm)).are.rated.for.continuous.serice.of..175.psi.(1207.kPa).at.150°F.(65°C)
Pipe Dimensions and Weights
BlazeMaster ® .pipe.is.produced.in.SDR.135.
dimensions.SDR,.or.standard.dimensional.
ratio,.means.the.pipe.wall.thickness.is.directly.
proportional.to.the.outside.diameter..This.results.in.
all.diameters.carrying.the.same.pressure.capability..
BlazeMaster ® .pipe.is.produced.to.the.specifications.
of.ASTM.F.442..BlazeMaster ® .fittings.are.produced.
to.ASTM.F.437,.F.438,.or.F.439.specifications.depending.on.the.size.and.configuration
15 Lubrizol
Page 16
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 16/32
Hydraulic Design
C Factor
Hydraulic.calculations.for.the.sizing.of.BlazeMaster ® .
pipe.and.fitting.shall.be.calculated.using.the.
Hazen-Williams.C.factor.of.150
Pipe Friction Loss
Pipe.friction.loss.calculations.shall.be.made.
according.to.NFPA.13.Section.224.(2007.Edition)
Fittings Friction Loss
The.following.table.shows.the.allowance.for.friction.
loss.for.fittings,.expressed.as.equialent.length..
of.pipe
16Lubrizol
Physical and Thermal Properties of BlazeMaster ® CPVC
Property CPVC ASTM
.Specific.Graity. 153. D.792
.IZOD.Impact.Strength.(ft.lbs/inch,.notched). 30. D.256A
.Modulus.of.Elasticity,[email protected] °F,.psi. 423.x.105. D.638
.Ultimate.Tensile.Strength,.psi. 8,000. D.638
.Compressie.Strength,.psi. 9,600. D.695
.Poisson’s.Ratio. 35.-.38. -
[email protected] °F,.psi. 2,000. D.1598
.Hazen-Williams.C.Factor. 150. _
.Coefficient.of.Linear.Expansion.in/(in.°F). 34.x.10-5.. D.696
.Thermal.Conductiity.BTU/hr/ft2/°F/in. 095.. C.177
.Limiting.Oxygen.Index. 60%. D.2863
.Electrical.Conductiity. Non.Conductor
Allowance for Friction Loss in Fittings
(SDR 13.5 Equivalent Pipe)
3/4" (20mm) 1" (25mm) 1 1/4" (32mm) 1 1/2" (40mm) 2" (50mm) 2 1/2" (65mm) 3" (80mm)
.Tee.Branch. 3'.(0914m). 5'.(152m). 6'.(183.m). 8'.(244m). 10'.(305m). 12'.(366m). 15'.(457m)
.Elbow.90°. 7'.(213m). 7'.(213m). 8'.(244m). 9'.(274m). 11'.(335m). 12'.(366m). 13'.(396m)
.Elbow.45°. 1'.(0305m). 1'.(0305m). 2'.(0610m). 2'.(0610m). 2'.(0610m). 3'.(0914m). 4'.(1220m)
.Coupling. 1'.(0305m). 1'.(0305m). 1'.(0305m). 1'.(0305m). 1'.(0305m). 2'.(0610m). 2'.(0610m)
.Tee.Run. 1'.(0305m). 1'.(0305m). 1'.(0305m). 1'.(0305m). 1'.(0305m). 2'.(0610m). 2'.(0610m)
BlazeMaster ® Pipe Dimensions and Weights
SDR 13.5 (ASTM F 442)
Nominal Average Average Pounds Kilograms Pounds Kilograms
Size OD ID Per Foot Per Meter Per Foot Per Meter
Inches mm Inches mm Inches mm Empty Empty H2O Filled H2O Filled
. 3/4. 200. 1050. 267. 874. 222. 0168. 0250. 0428. 0637
. 1. 250. 1315. 334. 1101. 280. 0262. 0390. 0675. 1005
. 1.1/4. 320. 1660. 422. 1394. 354. 0418. 0622. 1079. 1606
. 1.1/2. 400. 1900. 483. 1598. 406. 0548. 0816. 1417. 2109
. 2. 500. 2375. 603. 2003. 509. 0859. 1278. 2224. 3310
. 2.1/2. 650. 2875. 730. 2423. 615. 1257. 1871. 3255. 4844
. 3. 800. 3500. 889. 2950. 750. 1867. 2778. 4829. 7186
Note:.The.aboe.aerage.OD.and.aerage.ID.information.is.per.ASTM.F442.Check.with.indiidual.manufacturers.for.actual.OD.and.ID.information
Page 17
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 17/32
Lubrizol17
Thermal Expansion and Contraction
BlazeMaster ® .CPvC.pipe,.like.all.piping.materials,.
expand.and.contract.with.changes.in.temperature.
The.coefficient.of.linear.expansion.is:..00000340.
inch/inch-°F.(0000061.cm./.cm.°C)..Lineal.
expansion.is.the.same.for.all.pipe.diameters
A 25°F change in temperature will cause an
expansion of 1/2 inch for a 50 foot straight run
of BlazeMaster ® pipe...For.most.operating.and.
installation.conditions,.expansion.and.contraction.
can.be.accommodated.at.changes.in.direction.
of.the.pipe.run..Howeer,.in.certain.instances,.
expansion.loops.or.offsets.may.be.required.when.
installing.long,.straight.runs.of.pipe
Thermal Expansion in Centimeters
Length of Run in Meters
. 1. 2. 4. 6. 8. 10. 12. 14. 16. 18. 20. 30. 40. 50
Thermal Expansion ∆ L (cm.)
. 10. 006. 012. 024. 037. 049. 061. 073. 086. 098. 110. 122. 184. 245. 306
.. 15. 009. 018. 037. 055. 073. 092. 110. 129. 147. 165. 184. 275. 367. 459.
. 20. 012. 024. 049. 073. 098. 122. 147. 171. 196. 220. 245. 367. 490. 612.
. 25. 015. 031. 061. 092. 122. 153. 184. 214. 245. 275. 306. 459. 612. 765.
. 30. 018. 037. 073. 110. 147. 184. 220. 257. 294. 330. 367. 551. 734. 918.
. 35. 021. 043. 086. 129. 171. 214. 257. 300. 343. 386. 428. 643. 857. 1071.
. 40. 024. 049. 098. 147. 196. 245. 294. 343. 392. 441. 490. 734. 979. 1224.
Temp.Change∆ T °C
Thermal Expansion in Inches
Length of Run in Feet
. 5. 10. 15. 20. 25. 30. 35. 40. 45. 50. 70. 90. 120. 160
Thermal Expansion ∆ L (in.)
. 20. 04. 08. 12. 16. 20. 24. 29. 33. 37. 41. 57. 73. 98. 131
. 30. 06. 12. 18. 24. 31. 37. 43. 49. 55. 61. 86. 110. 147. 196
. 40. 08. 16. 24. 33. 41. 49. 57. 65. 73. 82. 114. 147. 196. 261
. 50. 10. 20. 31. 41. 51. 61. 71. 82. 92. 102. 143. 184. 245. 326
. 60. 12. 24. 37. 49. 61. 73. 86. 98. 110. 122. 171. 220. 294. 392
. 70. 14. 29. 43. 57. 71. 86. 100. 114. 129. 143. 200. 257. 343. 457
. 80. 16. 33. 49. 65. 82. 98. 114. 131. 147. 163. 228. 294. 392. 522
. 90. 18. 37. 55. 73. 92. 110. 129. 147. 165. 184. 257. 330. 441. 588
. 100. 20. 41. 61. 82. 102. 122. 143. 163. 184. 204. 286. 367. 490. 653
Temp.Change∆ T °F
The formula to calculate the amount of thermal expansion or contraction is ∆L = 12 x e x L x ∆T
Where:.e.=.34.x.10-5.inch/inch-°F;.L.=.Length.of.run.in.feet;.
............∆T.=.Temperature.change.°F;.∆L.=.Change.in.length.due.to.change.in.temperature.
Page 18
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 18/32
Lubrizol
Pipe Deflection
BlazeMaster ® .fire.sprinkler.piping.is.inherently.
ductile.allowing.it.to.be.deflected,.within.
permissible.limits,.around.or.away.from.objects.
during.installation,.which.can.reduce.installation.
time..This.ductility.allows.for.greater.freedom.of.
design.and.lower.installed.cost..The.maximum.
installed.deflections.for.BlazeMaster ® .piping.are.as.
follows:
Maximum Installed Deflections
(One End Restrained)
18
6"
MIN
6"
MIN
= Hanger or Guide
= Restraint
Long Run of Pipe
Loop Offset Change of Direction
2/5
1/4
1/41/5
1/2
Figure 4: Expansion Loop and Offset Configuration
Figure 5: One End Restrained
L ft. (m)
d in.(cm)
Modulus of Elasticity & Stress vs. Temperature
Temperature F 73 80 90 100 110 120 140 150
Modulus ofElasticity 4.23 4.14 3.99 3.85 3.70 3.55 3.23 3.08“E” x 105 (psi)
WorkingStress 2,000 1,875 1,715 1,560 1,415 1,275 1,000 875
“S” (psi)
=
= Loop length (in.)
= Modulus of elasticity at maximum temperature (psi)
= Working stress at maximum temperature (psi)
= Outside diameter of the pipe (in.)
= Change in length due to change in temperature (in.)
3 ED (∆L)
2S
∆L
E
S
D
Expansion Loop Formula
Page 19
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 19/32
Lubrizol19
. 2’. 5’. 7’. 10’. 12’. 15’. 17’. 20’. 25’. 30’. 35’. 40’. 45’. 50’
Permissible Bending Deflections SDR 13.5 (73°F) in Inches
. 13. 78. 154. 313. 451. 705. 906. 1254. 1959. 2821. 3839
. 10. 63. 123. 250. 360. 563. 723. 1001. 1564. 2252. 3066. 4004
. 08. 50. 97. 198. 285. 446. 573. 793. 1239. 1784. 2428. 3172. 4014
. 07. 43. 85. 173. 249. 390. 501. 693. 1082. 1559. 2122. 2771. 3507. 4330
. 06. 35. 68. 139. 200. 312. 400. 554. 866. 1247. 1697. 2217. 2806. 3464
. 05. 29. 56. 114. 165. 258. 331. 458. 715. 1030. 1402. 1831. 2318. 2862
. 04. 24. .46. 94. 135. 212. 272. 376. 588. 846. 1152. 1504. 1904. 2351
Pipe Length in Feet
Pipe
Size
3/4"
1"
1.1/4"
1.1/2"
2"
2.1/2"
3"
Pipe Length in Meters
. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14
Permissible Bending Deflections SDR 13.5 (23°C) in cm
20.mm. 86. 343. 771. 1371. 2142. 3084. 4198. 5483. 6940. 8567.1,0367
25.mm. 68. 274. 616. 1095. 1710. 2463. 3352. 4378. 5541. 6841. 8278. 9851
32.mm. 54. 217. 488. 867. 1355. 1951. 2655. 3468. 4390. 5419. 6557. 7804. 9158
40.mm. 47. 189. 426. 758. 1184. 1704. 2320. 3030. 3835. 4735. 5729. 6818. 8002. 9280
50.mm. 38. 152. 341. 606. 947. 1364. 1856. 2424. 3068. 3788. 4583. 5454. 6401. 7424
65.mm. 31. 125. 282. 501. 782. 1126. 1533. 2003. 2534. 3129. 3786. 4506. 5288. 6133
80.mm. 26. 103. 231. 411. 643. 925. 1259. 1645. 2082. 2570. 3110. 3701. 4344. 5038
. 3. 20. 38. 78. 113. 176. 226. 311. 490. 705. 960. 1254. 1587. 1959
. 3. 16. 31. 63. 90. 141. 181. 250. 391. 563. 766. 1001. 1267. 1564
. 2. 12. 24. 50. 71. 112. 143. 198. 310. 446. 607. 793. 1004. 1239
. 2. 11. 21. 43. 62. 97. 125. 173. 271. 390. 530. 693. 877. 1082
. 1. 9. 17. 35. 50. 78. 100. 139. 216. 312. 424. 554. 701. 866
. 1. 7. 14. 29. 41. 64. 83. 114. 179. 258. 351. 458. 579. 715
. 1. 6. 12. 24. 34. 53. 68. 94. 147. 212. 288. 376. 476. 588
Pipe Length in Feet
Pipe
Size
3/4"
1"
1.1/4"
1.1/2"
2"
2.1/2"
3"
. 2'. 5'. 7'. 10'. 12'. 15'. 17'. 20'. 25'. 30'. 35'. 40'. 45'. 50'
Permissible Bending Deflections SDR 13.5 (73°F) in Inches
Maximum Installed Deflections
(Both Ends Restrained)
Figure 6: Both Ends Restrained
L ft.(m)
d in.(cm)
Pipe
Size
Page 20
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 20/3220Lubrizol
Pipe Length in Meters
. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14
Permissible Bending Deflections SDR 13.5 (23°C) in cm
20.mm. 21. 86. 193. 342. 535. 771. 1049. 1370. 1734. 2141. 2590. 3082. 3618. 4195
25.mm. 17. 68. 154. 274. 428. 616. 838. 1095. 1386. 1711. 2071. 2464. 2892. 3354
32.mm. 14. 54. 122. 217. 339. 488. 664. 867. 1097. 1354. 1639. 1950. 2289. 2654
40.mm. 12. 47. 106. 189. 296. 426. 580. 757. 958. 1183. 1432. 1704. 2000. 2319
50.mm. 09. 38. 85. 152. 237. 341. 464. 607. 768. 948. 1147. 1365. 1602. 1858
65.mm. 08. 31. 70. 125. 196. 282. 384. 501. 634. 783. 947. 1127. 1323. 1535
80.mm. 06. 26. 58. 103. 161. 231. 315. 411. 521. 643. 778. 926. 1086. 1260
Handling and Storage
BlazeMaster ® .CPvC.is.a.tough,.corrosion.resistant.
material,.but.does.not.hae.the.mechanical.
strength.of.steel..Reasonable.care.must.be.
exercised.in.handling.BlazeMaster ® .pipe.and.
fittings..They.must.not.be.dropped.or.hae.objects.
dropped.on.them..If.improper.handling.results.in.
scratches,.splits,.or.gouges,.the.damaged.section.
shall.be.cut.out.and.discarded
BlazeMaster ® .pipe.must.be.coered.with.a.non-
transparent.material.when.stored.out.of.doors.for.
extended.periods.of.time..Brief.exposure.to.direct.
sunlight.on.the.job.site.may.result.in.color.fade.but.
will.not.affect.physical.properties..BlazeMaster ® .
fittings.should.be.stored.in.their.original.containers.
to.keep.them.free.from.dirt.and.reduce.the.
possibility.of.damage..Caution.should.be.taken.
not.to.oerstack.boxes.of.BlazeMaster ® .fittings.in.
extreme.temperature.enironments.(>150°F)
Joining BlazeMaster® Pipe and Fittings
with Red One-Step Solvent Cement
Note: One-Step Cement requires no cleaner
or primer. Refer to individual manufacturers’installation instructions.
Cutting
BlazeMaster ® .pipe.can.
be.easily.cut.with.a.
ratchet.cutter,.a..
wheel-type.plastic.
tubing.cutter,.a.power.
saw.or.a.fine.toothed.
saw..To.ensure.the.pipe.
is.cut.square,.a.miter.box.is.recommended.when.
using.a.saw..A.square.cut.proides.the.surface.of.the.
pipe.with.maximum.bonding.area..If.any.indication.
of.damage.or.cracking.is.eident.at.the.pipe.end,.cut.
off.at.least..
2.inches.(508.mm).beyond.any.isible.crack.
Deburring
Burrs.and.filings.can.
preent.proper.
contact.between.
pipe.and.fitting..
during.assembly,.and.
must.be.remoed.
from.the.outside.and.
the.inside.of.the.pipe..
A.chamfering.tool.or.a.file.is.suitable.for.this.
purpose..A.slight.beel..
shall.be.placed.at.the.end.of.the.pipe.to.ease.
entry.of.the.pipe.into.the.socket.and.minimize.the.
chances.of.wiping.solent.cement.from.the.fitting.
during.insertion
Fitting Preparation
Using.a.clean,.dry.rag,.wipe.loose.dirt.and.moisture.
from.the.fitting.socket.and.pipe.end..Moisture.can.
slow.the.cure.time.and.at.this.stage.of.assembly,.
excessie.water.can.reduce.joint.strength..Check.
the.interference.fit.of.the.pipe.and.fitting..The.pipe.
should.enter.the.fitting.socket.easily.1/4.to.3/4.of.the.
way..At.this.stage,.the.pipe.should.not.bottom.out.in..
the.socket
Solvent Cement Application
Cement.shall.be.applied.(worked.into.pipe).with.an.
applicator.half.the.nominal.size.of.the.pipe.diameter..
Apply.a.heay,.een.coat.of.cement.to.the.outside.
Pipe
Size
Page 21
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 21/3221 Lubrizol
pipe.end.Apply.a.medium.
coat.to.the.fitting.socket..
Pipe.sizes.11/4.inches..
(32.mm).and.aboe.shall.
always.receie.a.second.
cement.application.on.the.
pipe.end..(Apply.cement.
on.the.pipe.end,.in.the.fitting.socket,.and.on.the.pipe.again)..Only.use.solent.cements.that.hae.
been.specifically.inestigated.and.tested.for.use.with.
BlazeMaster ® .CPvC.systems.
and.approed.by.the.pipe.
and.fitting.manufacturers..
Too.much.cement.can.
cause.clogged.waterways..
Do.not.allow.excess.cement.
to.puddle.in.the.pipe.and.
fitting.assembly
Special.care.shall.be.exercised.when.assembling.BlazeMaster ® .systems.in.extremely.low.temperatures.
(below.40°F.(4°C)).or.extremely.high.temperatures.
(aboe.100°F.(38°C))..Extra.set.time.shall.be.allowed.
in.colder.temperatures..When.cementing.pipe..
and.fittings.in.extremely.cold.temperatures,.make.
certain.that.the.cement.has.not.become.lumpy.or.
has.“gelled”..Gelled.cement.must.be.discarded..In.
extremely.hot.temperatures,.make.sure.both.surfaces.
to.be.joined.are.still.wet.with.cement.when.putting..
them.together
Assembly
After.applying.
cement,.immediately.
insert.the.pipe.into.
the.fitting.socket,.
while.rotating.the.
pipe.one-quarter.
turn..Properly.align.
the.fitting.for.the.
installation.at.this.time..Pipe.must.bottom.to.the.
stop..Holding.the.assembly.for.10.to.15.seconds.to.ensure.initial.bonding..A bead of cement should be
evident around the pipe and fitting juncture. If this
bead is not continuous around the socket shoulder,
it may indicate that insufficient cement was applied...
If.insufficient.cement.is.applied,.the.fitting.must.be.
cut.out.and.discarded.
Cement.in.excess.of.the.bead.can.be.wiped.off..
with.a.rag..Care.shall.be.exercised.when.installing.
sprinkler.heads..Sprinkler.head.fittings.shall.be.
allowed.to.cure.for.a.minimum.of.30.minutes.prior.to.
installing.the.sprinkler.head..When.installing.sprinkler.
heads,.be.sure.to.anchor.or.hold.the.pipe.drop.
securely.to.aoid.rotating.the.pipe.in.preiously.
cemented.connections..Preiously.cemented.fittings.shall.also.be.permitted.to.cure.for.a.minimum.of..
30.minutes
Warning:.Sprinkler.heads.shall.be.installed.only.after.
all.the.CPvC.pipe.and.fittings,.including.the.sprinkler.
head.adapters,.are.solent.welded.and.allowed.to.
cure.for.a.minimum.of.30.minutes..Sprinkler.head.
fittings.should.be.isually.inspected.and.probed.with.
a.wooden.dowel.to.ensure.that.the.water.way.and.
threads.are.clear.of.any.excess.cement..Once.the.
installation.is.complete.and.cured.per.Table.I,.II.or.III,.
the.system.shall.be.hydrostatically.tested..Sprinklers.shall.not.be.installed.in.the.fittings.prior.to.the.fittings.
being.cemented.in.place
Note:.Safety.and.Health.Precautions..Prior.to.
using.CPvC.solent.cements,.reiew.and.follow.all.
precautions.found.on.the.container.labels,.material.
safety.data.sheet,.and.Standard.Practice.for.Safe.
Handling.ASTM.F.402
Set and Cure Times
Solent.cement.set.
and.cure.times.are.a.function.of.pipe.
size,.temperature,.
relatie.humidity,.and.
tightness.of.fit..Curing.
time.is.faster.for.drier.
enironments,.smaller.
pipe.sizes,.higher.
temperatures.and.tighter.fits..Cure.times.should.be.
increased.when.moisture.is.present.such.as.during.
cut-ins.to.lie.sprinkler.lines..The.assembly.must.be.
allowed.to.set,.without.any.stress.on.the.joint,.for.1.to.5.minutes,.depending.on.pipe.size.and.temperature..
Following.the.initial.set.period,.the.assembly.can.be.
handled.carefully, avoiding significant stresses to
the joint...Refer.to.the..
following.tables.for.minimum.cure.times.prior.to.
pressure.testing
Page 22
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 22/32
Note.1:.For.these.sizes,.the.solent.cement.can..
be.applied.at.temperatures.below.40°F.(45°C),.
howeer,.the.sprinkler.system.temperature.must..be.raised.to.a.temperature.of.40°F.(45°C).or..
aboe.and.allowed.to.cure.per.the.aboe.
recommendations.prior.to.pressure.testing
22Lubrizol
TABLE I
225 psi (1552 kPa) Test Pressure (maximum)
Ambient Temperature During Cure Period..
. 60°F.to.120°F. 40°F.to.59°F. 0°F.to.39°F.
Pipe.Size. (16°C.to.49°C). (4°C.to.15°C). (-18°C.to.4°C)
3/4".(20.mm). 1.hr. 4.hrs. 48.hrs
1".(25.mm). 11/2.hrs. 4.hrs. 48.hrs
11/4".&.11/2".(32.&.40.mm). 3.hrs. 32.hrs. 10.days
2".(50.mm). 8.hrs. 48.hrs. Note.1
21/2".&.3".(65.&.80.mm). 24.hrs. 96.hrs. Note.1
TABLE II
200 psi (1379 kPa) Test Pressure (maximum)
Ambient Temperature During Cure Period..
. 60°F.to.120°F. 40°F.to.59°F. 0°F.to.39°F.
Pipe.Size. (16°C.to.49°C). (4°C.to.15°C). (-18°C.to.4°C)
3/4".(20.mm). 45.mins. 11/2.hrs. 24.hrs
1".(25.mm). 45.mins. 11/2.hrs. 24.hrs
11/4".&.11/2".(32.&.40.mm). 11/2.hrs. 16.hrs. 120.hrs
2".(50.mm). 6.hrs. 36.hrs. Note.1
21/2".&.3".(65.&.80.mm). 8.hrs. 72.hrs. Note.1
TABLE III
100 psi (690 kPa) Test Pressure (maximum)
Ambient Temperature During Cure Period..
. 60°F.to.120°F. 40°F.to.59°F. 0°F.to.39°F.
Pipe.Size. (16°C.to.49°C). (4°C.to.15°C). (-18°C.to.4°C)
3/4".(20.mm). 15.mins. 15.mins. 30.mins
1".(25.mm). 15.mins. 30.mins. 30.mins
11/4".(32.mm). 15.mins. 30.mins. 2.hrs
Page 23
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 23/3223 Lubrizol
Pressure Testing
Once.an.installation.is.completed.and.cured,.per.
the.aboe.recommendations,.the.system.should.be.
pressure.tested.at.200.psi.(1379.kPa).for.2.hours..
See.Table.II.for.curing.conditions.in.this.case..The.
system.should.be.pressure.tested.at.50.psi.(345.kPa).
in.excess.of.maximum.pressure.when.the.maximum.
system.pressure.is.to.be.maintained.in.excess.of..150.psi.(1034.kPa)..See.Table.I.for.curing.conditions.
in.this.case..This.is.in.accordance.with.the.
requirements.established.by.NFPA.Standard.13,.
Section.2421.(2007.Edition)..Sprinkler.systems.in.
one-.and.two-family.dwellings.and.mobile.homes.
may.be.tested.at.line.pressure,.Table.III.curing.
conditions,.in.accordance.with.the.requirements.
established.by.NFPA.13D,.Section.43.(2007.Edition)..
When.pressure.testing,.the.sprinkler.system.shall.be.
slowly.filled.with.water.and.the.air.bled.from.the.
highest.and.farthest.sprinkler.heads.before.pressure.testing.is.applied..Air.must.be.remoed.from.piping.
systems.(plastic.or.metal).to.preent.it.from.being.
locked.in.the.system.when.pressure.is.applied..
Entrapped.air.can.generate.excessie.surge.
pressures.that.are.potentially.damaging,.regardless.
of.the.piping.materials.used..Air.or.compressed.gas.
should.neer.be.used.for.pressure.testing..If.a.leak.
is.found,.the.fitting.must.be.cut.out.and.discarded..
A.new.section.can.be.installed.using.couplings.or.
a.union.Unions.should.be.used.in.accessible.areas.only
Estimating One-Step Solvent Cement Requirements
The.following.guidelines.are.proided.to.allow.
estimation.of.one-step.solent.cement.quantities.
needed
Fitting Size Number Number
of Joints of Joints
Per Quart Per Liter
. 3/4".(20.mm). 270. 285
. 1".(25.mm). 180. 190
.11/4".(32.mm). 130. 137
.11/2".(40.mm). 100. 106
. 2".(50.mm). 70. 74
.21/2".(65mm). 50. 53
. 3".(80mm). 40. 42
Page 24
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 24/32
At.times.it.may.become.necessary.to.make.
modifications.to.existing.CPvC.fire.sprinkler..
systems.This.can.be.done.safely.when.the..
proper.procedures.are.followed.The.following.
procedure.has.been.deeloped.to.assure.that..
the.modifications.are.done.successfully
Prior.to.making.system.cut-ins.on.existing.
systems,.care.should.be.used.to.reiew.proper.
joining.procedures.and.to.FOLLOW.CUT-IN.CURE.
SCHEDULES.to.ensure.the.highest.system.integrity.
Seeral.methods.can.be.utilized.to.tie.into.an.
existing.system.using.a.socket.style.tee.fitting.in.
combination.with.the.use.of.socket.unions,.grooed.
coupling.adapters,.and.flanges.Regardless.of.the.
method.used,.the.following.points.must.be.followed.
to.ensure.the.highest.integrity:
•. Using.proper.tools,.the.cut-in.should.be.made.
on.the.smallest.diameter.pipe.section.(that.is.
capable.of.adequately.supplying.the.system.
changes).in.close.proximity.to.the.modification.
being.made.This.approach.will.expedite.cure.
times.prior.to.pressure.testing
•. The.cut-in.connection.to.the.existing.system.
should.be.made.first,.prior.to.proceeding.with.
additional.work
•. Existing.lines.must.be.drained.adequately.prior.
to.solent.cementing.Use.a.Drain.vac.unit.to.
be.sure.all.water.is.remoed.from.the.system.
(moisture.can.slow.the.cure.time.and.reduce.
joint.strength)..One.method.to.erify.that.the.
water.has.been.drained.from.the.system.is.to.
remoe.the.sprinkler.heads.on.each.side.of.the.
cut-in.and.allow.any.remaining.water.to.drain
•. Carefully.reiew.and.follow.manufacturer’s.
solent.cementing.procedures.for.proper.joining.
techniques.prior.to.commencing.with.cut-in.
(pipe.must.be.cut.square.to.proper.length,.
deburred,.beeled.and.dry.to.ensure.proper.
insertion.depth.and.highest.integrity)
•. Carefully.measure.and.cut.pipe.to.proper..
length.to.ensure.complete.insertion.during.
assembly.(check.the.interference.fit.of.the.
components.being.joined)
•. Note:.During.assembly.of.the.cut-in.tee.(and.
other.components).it.is.important.to.make.a..
one-quarter.turn.when.inserting.the.pipe.into..
the.fitting.per.the.manufacturer’s.assembly.
instructions,.particularly.on.11
⁄ 2
".pipe.sizes.and.larger.This.may.require.the.use.of.seeral.
components.assembled.in.combination.with..
the.cut-in.tee.to.create.a.short.spool.piece.
assembly.This.can.be.accomplished.by.using.
socket.unions,.flanges,.or.grooed.coupling.
adapters.that.will.ensure.that.a.one-quarter..
turn.can.be.obtained.on.all.pipe.connections.
being.joined
•. Prior.to.applying.the.solent.cement,.use.a.
clean.dry .rag.to.wipe.moisture.and.dirt.from.the.fitting.socket.and.the.pipe.end.(the.presence.of.
moisture.on.the.joining.surfaces.will.reduce..
joint.integrity)
•. Use.a.new.can.of.solent.cement.when.making.
cut-in.connections.(erify.expiration.dates.
stamped.on.can.prior.to.use)
24Lubrizol
Cut-In Procedure for System Modification or Repairs
Page 25
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 25/32
•. After.all.work.is.completed,.the.cut-in.joints.must.
be.allowed.to.cure.properly.prior.to.pressure.
testing.as.shown.in.the.table.below
•. After.work.is.completed.and.cut-in.cure.times.
are.met,.inspect.work.for.proper.alignment.and.
hanger.placement.prior.to.pressure.testing•. After cut-in cure times are met,.the.system..
must.be.slowly.filled.with.water.and.the.air..
bled.from.the.furthest.and.highest.sprinkler..
heads.before.test.pressure.is.applied.(refer..
to.manufacturer’s.installation.instructions.
regarding.Hydrostatic.Testing)
•. After cut-in cure times are met and the air is bled
from the system,.it.is.recommended.that.portion.
of.the.sprinkler.system.containing.the.cut-in.tee.
be.pressure.tested.Prior.to.pressure.testing,.the.
system.must.be.sectioned.off.to.its.smallest.area.
using.floor.ales,.etc,.to.isolate.the.cut-in.area.
It.is.further.recommended.that.the.test.pressure.
applied.should.not.exceed.50.psi.oer.the.
system.pressure.This.approach.will.minimize.the.
potential.for.water.damage.should.a.leak.occur
. WARNING: AIR OR COMPRESSED GAS MUST NEVER
BE USED FOR PRESSURE TESTING
25 Lubrizol
Cut-In Procedure for System Modification or Repairs cont.
Cut-InsMinimum Cure Prior to Pressure Testing
Ambient Temperature During Cure
Pipe Size 60°F to 120°F 40°F to 59°F 0°F to 39°F
3/4". 1.hour. 4.hour. 48.hour
1". 11 ⁄ 2.hour. 4.hour. 48.hour
11 ⁄ 4".&.11 ⁄ 2". 3.hour. 32.hour. 10.days
2". 8.hour. 48.hour. *
21 ⁄ 2".&.3". 24.hour. 96.hour. *
*..Solent.cement.can.be.applied.at.temperatures.below.40°F.for.pipe.2".in.size.and.larger,.howeer.the.temperature.of.the.system.must.be.raised..
to.40°F.or.higher.and.allowed.to.cure.per.the.aboe.recommendations.prior.to.pressure.testing.When.bringing.cement,.pipe.or.fittings.in.from.the..
outside,.be.sure.they.are.brought.up.to.room.temperature.before.using.the.60°F.to.120°F.cure.schedule
Page 26
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 26/32
Hangers and Supports
Because.BlazeMaster ® .pipe.is.rigid,.it.requires.fewer.
supports.than.flexible.plastic.systems.The.support.
spacing.is.shown.in.the.following.table
Most.hangers.designed.for.metal.pipe.are.
suitable.for.BlazeMaster ® .pipe.Do.not.use.
undersized.hangers.Hangers.with.sufficient.
load.bearing.surface.shall.be.selected.based.
on.pipe.size,.ie,.1.1/2".hangers.for.1.1/2".
pipe..The.hanger.shall.not.hae.rough.or.
sharp.edges.that.come.in.contact.with.the.
pipe..The.pipe.hangers.must.comply.with.the.
requirements.in.NFPA.13,.13R,.and.13D..
For.Quick.Response.upright.sprinkler.heads,.rigid.
hangers.secured.to.the.ceiling.shall.be.used
When.a.sprinkler.head.actiates,.a.significant.
reactie.force.can.be.exerted.on.the.pipe..With.
a.pendent.head,.this.reactie.force.can.cause.
the.pipe.to.lift.ertically.if.it.is.not.properly.secured,.
especially.if.the.sprinkler.drop.is.from.small.diameter.pipe..The.closest.hanger.shall.brace.the.pipe.
against.ertical.lift-up..See.Tables.B.&.C
Any.of.a.number.of.techniques.can.be.used.to.
brace.the.pipe..Four.acceptable.approaches.
would.be.to.use.a.standard.band.hanger.
positioning.the.threaded.support.rod.to.1/16.inch.
(1588.mm).aboe.the.pipe,.a.split-ring.hanger,.a.
wrap-around.U.hanger,.or.a.special.escutcheon.
which.preents.upward.moement.of.the.sprinkler.
through.the.ceiling
26Lubrizol
Any distance
between supports
(Reference Table B)
(Reference Table A)
(Ref. Table C)
Support Support
Finished Ceiling Line
Figure 7: Support Spacing Drop Elbow and Drop Tee
TABLE C
Maximum Support Spacing Distance End Line
Sprinkler Head Drop Elbow
Nominal Pipe Size Less than 100 psi (690 kPa) More than 100 psi (690 kPa)
. 3/4".(20.mm). 9".(229.mm). 6".(152.mm)
. 1".(25.mm). 12".(305.mm). 9".(229.mm)
. 11/4".(32.mm). 16".(406.mm). 12".(305.mm)
. 11/2".-.3".(40.–.80.mm). 24".(610.mm). 12".(305.mm)
TABLE B
Maximum Support Spacing Distance In Line
Sprinkler Head Drop Tee
Nominal Pipe Size Less than 100 psi (690 kPa) More than 100 psi (690 kPa)
. 3/4".(20.mm). 4'.(122.m). 3'.(091.m)
. 1".(25.mm). 5'.(152.m). 4'.(122.m)
. 11/4".(32.mm). 6'.(183.m). 5'.(152.m)
. 11/2".-.3".(40.–.80.mm). 7'.(213.m). 7'.(213.m)
. Nominal MaximumSize Support Spacing
inches mm feet meters
. 3/4. 200. 51/2. 17
. 1. .250. 6. 18
. 11/4. 320. 61/2. 20
. 11/2. 400. 7. 21
. 2. 500. 8. 24
. 21/2. 650. 9. 27
. 3. 800. 10. 30.
TABLE A
Page 27
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 27/32
Penetration of Studs and Joists
Wooden Studs and Joists
It.is.acceptable.to.cut.holes.in.wood.studs.for.
support.The.holes.should.be.oersized.to.allow..
for.moement.
Metal StudsBlazeMaster ® .pipe.and.fittings.should.be.protected.
from.sharp.edges.when.passing.through.metal.studs.
Transition to Other Materials
Support
Additional.support.should.be.added.at.the.metal.
side.of.a.BlazeMaster ® .CPvC-metal.transition.to.
support.the.weight.of.the.metal.system
Threaded ConnectionsBlazeMaster ® .CPvC.male.and.female.threaded.
adapters.or.flanges.are.listed.for.connecting.a.
BlazeMaster ® .fire.sprinkler.system.to.other.materials,.
ales,.and.appurtenances.
A.thread.sealant.shall.be.used.in.making.threaded.
connections..TFE.(Teflon ® ).thread.tape.is.the.
recommended.sealant..Some thread sealants
other than TFE thread tape contain solvents or other
materials that may be damaging to CPVC. Refer
to manufacturers’ installation instructions for specificrecommendations on thread sealants. Always
consult with the manufacturer of the material for
compatibility with BlazeMaster ® CPVC pipe and
fittings or reference the Chemical Compatibility
and FGG/BM ® System Compatible program
sections of www.blazemaster.com for additional
information.
Care.shall.be.exercised.when.
transitioning.between.BlazeMaster ® ..
pipe.and.fittings.and.metal..Care..must.be.taken.to.aoid.oer-torquing...
Refer.to.manufacturers’.installation.
instructions.for.torque.requirements
Flanged Connections
Flange.Make-Up:..Once.a.flange.is.joined.to.pipe,.
the.method.for.joining.two.flanges.is.as.follows:
1. Piping.runs.joined.to.the.flanges.must.be.
installed.in.a.straight.line.position.to.the.
flange.to.aoid.stress.at.the.flange.due.to.
misalignment..Piping.must.also.be.secured.and.supported.to.preent.lateral.moement.that.
can.create.stress.and.damage.the.flange
2. With.gasket.in.place,.align.the.bolt.holes.of.the.
mating.flanges.by.rotating.the.ring.into.position..
(Consideration.should.be.gien.to.alignment.of.
one-piece.flange.prior.to.joining.with.pipe)
3. Insert.all.bolts,.washers.(two.standard.flat.
washers.per.bolt),.and.nuts
4. Make.sure.the.faces.of.the.mating.surfaces..
are.flush.against.gasket.prior.to.bolting.down.
the.flanges
5. Tighten.the.nuts.by.hand.until.they.are.snug..
Establish.uniform.pressure.oer.the.flange.face.
by.tightening.the.bolts.in.5.ft-lb.(68.Newton-m).
increments.according.to.the.sequence.shown.
in.Figure 8: Bolt Tightening Sequence .following.a.
180°.opposing.sequence
6. Care.must.be.taken.to.aoid.“bending”.the.
flange.when.joining.a.flange.to.a.“raised.face”.
flange,.or.a.wafer-style.ale..Do.not.use.bolts.
to.bring.together.improperly.mated.flanges
Caution:..Oer-torquing.will.damage.the.flange.
Torque.gien.is.for.dry,.non-lubricated.bolt,.
standard.washers,.neoprene..
1/8".(318.mm).thick.full.face.gasket..
If.lubricant..(non-petroleum.based).is.used,.torque.leels.may.ary..Actual..
field.conditions.may.require.a.ariation..
in.these.recommendations
27 Lubrizol
Recommended Bolt Torque
Flange Size Bolt Diameter Torque
. 3/4".-.1.1/2".(20.–.40mm). 1/2".(127.mm). 10.–.15.ft.lbs.(136.–.203.Newton-m)
. 2".–.3".(50.–.80.mm). 5/8".(159.mm). 20.–.30.ft.lbs.(271.–.407.Newton-m)
1
43
2
Figure 8: Bolt
Tightening Sequence
Page 28
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 28/32
Grooved Coupling Adapters
The.following.procedures.are.recommended.for.
proper.assembly.of.the.Grooed.Coupling.Adapter..
READ THESE INSTRUCTIONS CAREFULLY BEFORE
BEGINNING INSTALLATION.
1. Inspect.the.fittings.and.pipe.to.insure.that.
they.are.sufficiently.free.from.indentations,.projections.or.roll-marks.on.the.gasket.seating.
areas.of.the.fitting.and.pipe..The.pipe.should.
be.squarely.cut.with.any.loose.scale,.paint,.
and/or.dirt.remoed.from.the.grooe..
and.seating.surface..Use a standard grade
E*, EPDM compound that is suitable for wet fire
sprinkler service. A flexible coupling shall
be used with grooved coupling adapters.
Caution: Use of rigid style couplings may
damage the grooved coupling adapter.
Consult the coupling manufacturer forproper selection.
. *See.manufacturer.for.temperature.ratings
2. Make.sure.the.gasket.is.clean.and.free.of.any.
cracks,.cuts.or.other.defects..which.may.cause.
leaks..Lubricate.the.gasket.with.a.egetable.
soap-based.gasket.lubricant..Caution: Use of
petroleum based lubricants will damage the
gasket and adapter resulting in stress failure of
the CPVC adapter. A gasket/joint lubricant isrecommended to prevent pinching the gasket
and to assist in seating the gasket during the
alignment process. Apply the appropriate
lubricant to the gasket lips and exterior surface
of the gasket.
3. Place.the.gasket.oer.the.metal.pipe.ends,.
being.sure.gasket.lip.does.not.oerhang.the.
pipe.end..Insert.the.CPvC.grooed.coupling.
adapter.into.the.gasket..Make.sure.that.the.
gasket.is.centered.between.the.two.grooes..No.portion.of.the.gasket.should.extend.into.the.
grooes..Caution: Make sure the gasket is not
pinched between the pipe and the fitting.
4. Place.the.metal.housing.oer.the.gasket,.
making.sure.the.metal.housing.key.is.into.the.
grooes.on.the.metal.pipe.and.the.CPvC.
coupling.adapter..Insert.the.bolts.and.hand..
tighten..Tighten.the.bolts.alternately.and.
equally.until.the.bolt.pads.are.touching.metal-
to-metal..In.completing.a.proper.joint,.the.
gasket.is.also.slightly.compressed,.adding.
to.the.strength.of.the.seal.from.the..
gasket’s.durometer
5. Inspect.the.joints.before.and.after.pressure.
testing..Look.for.gaps.between.the.bolt..
pads.and.for.housing.keys.that.are.not.inside.
the.grooes
Other Design Criteria
Chemical Compatibility
CPvC.domestic.water,.fire.sprinkler,.and.industrial.
piping.systems.hae.been.used.successfully.for.more.
than.40.years.in.new.construction,.re-pipe.and.repair..
CPvC.products.are.ideally.suited.for.these.applications.
due.to.their.outstanding.corrosion.resistance..
Occasionally,.howeer,.CPvC.can.be.damaged.by.
contact.with.chemicals.found.in.some.construction.
products.(and.site.preparations)..This.may.result.in.
damage.to.property,.people,.or.the.BlazeMaster ® .
CPvC.fire.sprinkler.system.Reasonable care needs to
be taken to insure that products coming into contact
with CPVC systems are chemically compatible.
Lubrizol.recommends.that.chemical.compatibility.
with.CPvC.be.confirmed.with.the.manufacturer.of.
the.product.in.contact.with.CPvC.piping.systems.
If.chemical.compatibility.with.CPvC.is.in.question,.
Lubrizol.recommends.isolating.the.suspect.product.
from.contact.with.CPvC.pipe.or.fittings.
Lubrizol.maintains.a.list.of.products.that.hae.been.
shown.to.be.UNACCEPTABLE.for.(unprotected.use).
contact.with.CPvC.systems.Chemically.incompatible.
products.are.added.to.this.list.as.they.are.brought.to.
our.attention.For.the.most.current.list.of.chemically.
incompatible.products,.contact.Lubrizol.or.refer.to.the.Chemical.Compatibility.Section.under.Design.
&.Installation.at.www.blazemaster.com.A.product's.
absence.from.this.list.does.not.imply.or.insure.CPvC.
chemical.compatibility
The.FGG/BM ® .System.Compatible.program.
identifies.products.that.hae.been.determined.
to.be.compatible.with.CPvC.compounds.
28Lubrizol
Page 29
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 29/32
manufactured.by.Lubrizol,.such.as.BlazeMaster ® .
CPvC.Products.included.in.this.program.carry.
the.FGG/BM ® .System.Compatible.logo.on.their.
label..Additional.information.on.this.program.can.
be.found.on.the.internet.at.wwwblazemastercom.
under.Design.and.Specifications
ALWAYS CHECK THE PRODUCT MANUFACTURER'S RECOMMENDATION IN THIS REGARD.
A Note on Microbiologically Influenced
Corrosion (MIC).
In.areas.where.water.supplies.are.known.to.hae.
contributed.to.MIC,.NFPA.requires.metallic.fire.
sprinkler.system.water.supplies.to.be.tested.and.
appropriately.treated..Reference.Section.2315.of.
NFPA.13.(2007.Edition)..This.testing.and.treatment.
is.not.required.when.using.BlazeMaster ® .CPvC.
products..BlazeMaster ® .CPvC.is.not.susceptible.to.
MIC.because:
1. CPvC.surfaces.discourage.the.adherence.of.
the.bacteria.associated.with.MIC..In.metallic..
systems,.colonies.form.around.the.bacteria.that.
entrap.organic.acids.against.the.wall,.causing.
the.pitting.which.is.common.with.MIC
2. As.the.bacteria.associated.with.MIC.cannot.
adhere.to.the.inner.surface.of.CPvC,.the.
bacteria.will.not.propagate.as.rapidly
3. The.organic.acids.produced.by.the.MIC.
bacteria.promote.the.oxidation.of.metals.but.
do.not.affect.CPvC..In.fact,.the.compounds.
that.comprise.BlazeMaster ® .pipe.and.fittings..
are.known.to.be.unaffected.in.extreme.acid.
enironments.far.more.seere.than.those.
enironments.associated.with.MIC.
Note: Metal.components.within.non-metallic.fire.
sprinkler.systems.are.not.immune.to.MIC
Freeze Protection
Freeze.protection.can.be.proided.in.a.ariety..
of.methods.including.system.design,.insulation,..
and.antifreeze..
Batt Insulation
Many.jurisdictions.recommend.the.use.of.batt.
insulation.for.freeze.protection.in.place.of.
antifreeze.solutions.These.jurisdictions.typically.
publish.batt.insulation.guidelines.that.proide.
the.minimum.thickness.of.insulation.to.be.utilized.
Reference.NFPA.13D.Section.831.(2007.Edition).for.
additional.recommendations
Antifreeze Solutions
Glycerin.antifreeze.solutions.are.acceptable.for..
use.with.BlazeMaster
®
.piping.Glycol.antifreeze.solutions.are.not.recommended.for.use.with.
BlazeMaster ® .pipe.and.fittings..Always.install.
antifreeze.systems.per.the.NFPA.guidelines..Refer.to.
Section.762.of.NFPA.13.(2007.Edition)
The.following.considerations.should.be.
incorporated.into.the.system.design.when.
proiding.for.freeze.protection:
•. Always.follow.the.manufacturers’.installation.
instructions.proided.by.the.BlazeMaster ® .pipe.
and.fittings.manufacturer..This.is.especially.important.with.regard.to.the.torque..
requirements.for.sprinkler.installation,.the.specific.
type.and.use.of.Teflon ® .tape,.and.the.specific.
type.and.use.of.a.thread.paste.sealant
•. Use.only.high.quality.Teflon ® .tape.or.a.thread.
paste.sealant.that.is.chemically.compatible..
with.CPvC.and.recommended.by.the.sealant.
manufacturer..Reference.the.Chemical.
Compatibility.and.FGG/BM ® .System.Compatible.
program.sections.of.wwwblazemastercom.for.
additional.information..Neer.combine.both.Teflon ® .tape.and.thread.paste.sealants
•. Follow.NFPA.13.Section.7633.(2007.Edition).
requirement.regarding.the.installation.and.use.of.
expansion.chambers.when.backflow.preention.
deices.are.installed.with.steel,.copper,.and.
CPvC..NOTE:.Most.existing.backflow.preention.
deices.do.not.allow.entrapped.pressure.to.be.
relieed
•. Consider.the.use.of.glycerin.and.water.solution.
antifreeze.loops.rather.than.the.practice.of.installing.glycerin.and.water.solutions.into.the.
entire.sprinkler.system
29 Lubrizol
Page 30
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 30/32
Estimating Antifreeze Solution Requirements
Painting
Water-based.acrylic.latex.paint.is.the.preferred.and.
recommended.paint.to.use.on.BlazeMaster ® .CPvC.
pipe.and.fittings.Oil.or.solent-based.paints.may.
be.chemically.incompatible
Certain.types.of.oil.or.solent-based.paints.
may,.howeer,.be.used.proided.that.it.is.a. light.
coating.that.dries.quickly..These.paints.should.
not.be.allowed.to.puddle.or.pool.on.the.surface..
Application.of.solent-based.paints.must.be.
indiidually.reiewed.as.there.are.certain.types.
of.paints.and.stains.that.contain.drying.oils.and.
should.not.be.used.at.all.on.CPvC.
Maintenance
Maintenance.of.a.BlazeMaster ® .fire.sprinkler.system.shall.be.in.accordance.with.the.Standard.
for.Inspection,.Testing.and.Maintenance.of.Water.
Based.Extinguishing.Systems.as.defined.by.NFPA.25
Penetrating Fire Rated Walls and Partitions
Before.penetrating.fire.rated.walls.and.partitions,.
consult.building.codes.and.authorities.haing.
jurisdiction.in.your.area..Seeral.classified.through-
penetration.firestop.systems.are.approed.for.use.
with.CPvC.pipe..Consult.the.pipe.manufacturer.or.
BlazeMaster ® .fire.sprinkler.system.representatie.for.further.information..Warning: Some firestop sealants
or wrap strips contain solvents or plasticizers that
may be damaging to CPVC. Always consult
the manufacturer of the firestop material for
compatibility with BlazeMaster ® CPVC pipe and
fittings. To avoid compatibility issues, reference
the Chemical Compatibility and FGG/BM ® System
Compatible program sections of www.blazemaster.
com for additional information.
Earthquake Bracing
Since.BlazeMaster ® .CPvC.pipe.is.more.ductile.than.
metallic.sprinkler.pipe,.it.has.a.greater.capacity.to.
withstand.earthquake.damage..In.areas.subject..
to.earthquakes,.BlazeMaster ® .fire.sprinkler.systems.
shall.be.designed.and.braced.in.accordance.with.
local.codes.or.NFPA.13,.Section.93.(2007.Edition)
NFPA.13.recognizes.the.unique.properties.of.
nonmetallic.fire.sprinkler.piping..Section.9347.of.
the.2007.edition.of.NFPA.13.permits.nonmetallic.fire.
sprinkler.pipe.to.penetrate.a.wall,.floor,.platform,.
or.foundation.without.allowing.for.clearance.in.an.
opening.if.the.pipe.has.the.inherent.flexibility.equal.
to.or.greater.than.the.flexibility.proided.by.flexible.
couplings.located.within.1.foot.of.each.side.of.the.
wall,.floor,.platform,.or.foundation
BlazeMaster ® .CPvC.fire.sprinkler.pipe.has.the.
flexibility.to.meet.this.criteria..The.permissible.
bending.deflection.alues.for.BlazeMaster ® .
CPvC.pipe.can.be.found.in.the.tables.in.the.Pipe.
Deflection.section.of.this.manual
When it is required to earthquake brace
BlazeMaster ® piping, it is important to use fittings,
fasteners or clamps that do not have sharp edges
or apply excessive compressive forces sufficient to
distort the pipe.
Copyright Notice...All.pages.of.this.Manual.are:..Copyright.2007.The.
Lubrizol.Corporation..All.rights.resered.
Warranty Disclaimer...This.Manual.and.all.of.the.information.it.contains.are.
proided."as.is".without.warranty.of.any.kind,.whether.express.or.implied...
It.may.contain.generalizations,.technical.inaccuracies,.or.typographical.
errors..LUBRIZOL DISCLAIMS ALL WARRANTIES, EXPRESS OR IMPLIED,
INCLUDING, WITHOUT LIMITATION, THE IMPLIED WARRANTIES OF
MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, AND ANY
WARRANTY OF NONINFRINGEMENT.
Limitation of Liability. USE OF THIS MANUAL OR ANY INFORMATION IT
CONTAINS IS AT THE SOLE RISK OF THE USER...Under.no.circumstances.will.
Lubrizol.be.liable.to.any.party.for.any.direct,.indirect,.special.incidental,.consequential.or.other.damages.based.on.any.use.of.this.Manual.
including,.without.limitation,.any.lost.profits.or.business.interruption,.een.if.
Lubrizol.has.been.specifically.adised.of.the.possibility.of.such.damages
No rights or license...Information.proided.herein.is.for.the.conenience.of.
users.of.BlazeMaster ® .fire.sprinkler.systems.and.is.not.being.published.for.
commercial.use..No.rights.are.granted.to.users.in.any.Lubrizol.trademarks,.
copyrights.or.other.intellectual.property.or.technical.data
Summary
BlazeMaster ® .pipe.and.fittings,.designed.specifically.for.fire.sprinkler.
systems,.proide.unique.adantages..Long-term.performance.of.a.
BlazeMaster ® .system.will.be.maximized.if.it.is.properly.installed.and.
maintained.in.accordance.with.applicable.NFPA.guidelines
30Lubrizol
. Fitting Gallons per Liters per
Size Foot of Pipe Meter of Pipe
3/4".(20.mm). 0031. 0387
1".(25.mm). 0049. 0614
1.1/4".(32.mm). 0079. 0985
1.1/2".(40.mm). 0104. 1294
2".(50.mm). 0164. 2033
2.1/2".(65mm). 0240. 2975
3".(80mm). 0355. 4409
Page 31
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 31/32
Dos◆. Install.product.according.to.the.manufacturer’s..
installation.instructions
◆. Follow.recommended.safe.work.practices
◆. Make.certain.that.thread.sealants,.gasket.lubricants,..
or.fire.stop.materials.are.compatible.with..
BlazeMaster ® .CPvC
◆. Use.only.latex-based.paints.if.painting.is.desired
◆. Keep.pipe.and.fittings.in.original.packaging.until.needed
◆. Coer.pipe.and.fittings.with.an.opaque.tarp.if..
stored.outdoors
◆. Follow.proper.handling.procedures
◆. Use.tools.specifically.designed.for.use.with.plastic..
pipe.and.fittings
◆. Use.proper.solent.cement.and.follow.application..
instructions
◆. Use.a.drop.cloth.to.protect.interior.finishes
◆. Cut.the.pipe.ends.square
◆. Deburr.and.beel.the.pipe.end.before.solent.cementing
◆. Rotate.the.pipe.1/4.turn.when.bottoming.pipe.in..
fitting.socket
◆. Aoid.puddling.of.solent.cement.in.fittings.and.pipe
◆. Make.certain.that.solent.cement.does.not.run.and..
plug.the.sprinkler.head.orifice
◆. Follow.the.manufacturer’s.recommended.cure.times.prior.to.
pressure.testing
◆. Fill.lines.slowly.and.bleed.the.air.from.the.system.prior.to.
pressure.testing
◆. Support.sprinkler.head.properly.to.preent.lift.up.of.
the.head.through.the.ceiling.when.actiated
◆. Keep.threaded.rod.within.1⁄16".of.the.pipe
◆. Install.BlazeMaster ® .CPvC.pipe.and.fittings.in.wet..
systems.only
◆. Use.only.insulation.and/or.glycerin.&.water.solutions..for.freeze.
protection
◆. Allow.for.moement.due.to.expansion.and.contraction
◆. Renew.your.BlazeMaster ® .CPvC.pipe.and.fittings..
installation.training.eery.two.years
Don’ts
◆. Do.not.use.edible.oils.such.as.Crisco
®
.as.a..gasket.lubricant
◆. Do.not.use.petroleum.or.solent-based.paints,.sealants,.
lubricants.or.fire.stop.materials
◆. Do.not.use.any.glycol-based.solutions.as.an.anti-freeze
◆. Do.not.mix.glycerin.and.water.solution.in.contaminated.
containers
◆. Do.not.use.both.Teflon ® .tape.and.thread.sealants..
simultaneously
◆. Do.not.use.solent.cement.that.exceeds.its.shelf.life..
or.has.become.discolored.or.gelled
◆. Do.not.allow.solent.cement.to.plug.the.sprinkler..
head.orifice
◆. Do.not.connect.rigid.metal.couplers.to.BlazeMaster ® .CPvC.
grooed.adapters
◆. Do.not.thread.or.grooe.BlazeMaster ® .CPvC.pipe
◆. Do.not.use.solent.cement.near.sources.of.heat,..
open.flame,.or.when.smoking
◆. Do.not.pressure.test.until.recommended.cure..
times.are.met
◆. Do.not.use.dull.or.broken.cutting.tool.blades..
when.cutting.pipe
◆. Do.not.use.BlazeMaster ® .CPvC.pipe.that.has.been.stored.
outdoors,.unprotected.and.is.faded.in.color
◆. Do.not.allow.threaded.rod.to.come.in.contact..
with.the.pipe
◆. Do.not.install.BlazeMaster ® .CPvC.pipe.in.cold.weather.
without.allowing.for.expansion
◆. Do.not.install.BlazeMaster ® .CPvC.pipe.and.fittings..
in.dry.systems
31 Lubrizol
Dos and Don’ts
While.not.a.complete.list,.the.following.is.intended.to.highlight.many.of.the.“Dos”.and.“Don’ts”.addressed.
in.this.manual
Page 32
7/30/2019 Blaze Ng
http://slidepdf.com/reader/full/blaze-ng 32/32
Lubrizol Advanced Materials, Inc.BlazeMaster ® .CPvC.Marketing.Department9911.Brecksille.RoadCleeland.OH.44141-3201.USA
216-447-5000.1-888-234-2436.
Fax:.216-447-5750
Chaussée.de.Ware,.19451160.BrusselsBelgium
32-2-678-19-11Fax:.32-2-678-19-90
1107-1110.Shui.On.Centre.6-8.Harbour.Road.Wan.Chai,.Hong Kong
852-2508-1021.Fax:.852-2512-2241
The.information.contained.herein.is.belieed.to.be.reliable,.based.on.extensie.laboratory.testing.and.thousands.of.successful.CPvC.system.installations.dating. from. 1960,. but.no. representations,. guarantees. or.warranties. of. any.kind. are.made. as. to. its.accuracy,. suitability. for. particular.application.or.the. results. to. be. obtained. therefrom. The. information. is. based. on. laboratory. work. with. small-scale. equipment. and. does. not. necessarily. indicate.end.product. performance. Because. of. the. ariations. in. methods,. conditions. and. equipment. used. commercially. in. processing. these. materials,. no.warranties.or.guarantees.are.made.as. to.the.suitability.of. the.products.for.the.applications.disclosed.Full-scale.testing.and.end.product.performance.are. the. responsibility. of.the. user. Lubrizol.Adanced.Materials,. Inc. shall. not. be.liable.for.and. the. customer.assumes.all. risk. and. liability. of.any. use.or. handling. of. any. material. beyond. Lubrizol. Adanced. Materials,. Inc’s. direct. control. THE. SELLER. MAKES. NO.WARRANTIES,. EXPRESS. OR. IMPLIED,.INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF MERCHANTABILITYAND FITNESS FOR A PARTICULAR PURPOSE Nothing contained herein is
Harvel Plastics, Inc.P.0. Box 757Kuebler RoadEaston, PA 18044610/252-7355
Fax: 610/253-4436www.harvel.com
Tyco Fire & Building Products451 N. Cannon AvenueLansdale, PA 19446215/362-0700Fax: 215/362-5385www.tyco-fire.com
IPEX, Inc.2441 Royal Windsor DriveMississauga, OntarioCanada, L5J 4C7905/403-0264
Fax: 905/403-9195www.ipexinc.com
NIBCO, Inc.1516 Middlebury StreetP.O. Box 1167Elkhart, IN 46515-1167800-343-5455
FAX: 800-541-3841www.nibco.com
The Viking Corporation210 N. Industrial Park DriveHastings, MI 49058269.945.9501Fax: 269.945.4495www.vikinggroupinc.com
*As.manufactured.by.Harel,.IPEX,.Nibco,.Tyco.and.viking
Lubrizol produces and sells CPVC compounds to licensed manufacturers of BlazeMaster pipe and fittings (see above for contact information).
Refer to individual installation instructions published by each pipe and/or fittings manufacturer for their corresponding agency Listing and approvals.
*
For.a.complete.listing.of.regional.sales.representaties.and.manufacturers,..
please.isit.our.website.at.www.blazemaster.com