Top Banner
18

Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

Dec 13, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.
Page 2: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

Blade Fold & Prepare for shipment by C5

Page 3: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

Blade Fold• Prep for shipment.

– Blade fold • Tail rotor

• Main rotor

– Struts• Main

• Tail

Page 4: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

• Prep for shipment.(con’t)– Stabilator

– Step fairings• Install tow plates

Page 5: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

M/R Fold

• Alignment of Swashplate– Line up yellow index

– Inbd T/R horizontal

(If The swashplate is not lined up you will not be able to put in the support pole )

Page 6: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

Take all commands from the guy on the head

Page 7: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

M/R Fold• Fwd left (red)• Fwd right (black)• Aft left (blue)• Aft right (yellowyellow)

Page 8: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

Take all commands from the guy on the head

Page 9: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

T/R Fold• Remove 12 OTBD RET plate bolts• Remove balance washers

– Install both on star plate and hang as they came off

• Disconnect P/C rods at pitch beam& deice• Rotate • Pad

Page 10: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

Struts

Connect HYD cart before opening kneeling

valve!

Page 11: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

Struts

• Main– Hyd cart. – Lower stage only.– Record exposed strut. (eliminates servicing)– Raise cargo floor to 30 inches.

Page 12: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

Struts

Connect HYD cart before opening kneeling

valve!

Page 13: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

Struts

• Tail– Remove tail access panel.– Record exposed strut.– Lower until no silver showing.– If tail loaded first upper stage may need to be

lowered requiring complete servicing.

Page 14: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

Struts

Connect HYD cart before opening kneeling

valve!

Page 15: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

Tow plates

• Remove step fairing

• Install & torque bolts on tow plate

• 1 left & 1 right

• Rotate WSPS

Page 16: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

STAB

• Remove tail cone!!!!!

• Remove STAB and rack it

Page 17: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

Antenna

• Remove FM whip

• Stow lower anti-collision light

Page 18: Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

FODCONTROL

• BAG ALL PARTS

• Attach bag to ACFT or in fold box – Step fairing screws and stab bolts end up

missing– T/R star plates attach and label to acft– Tools