Page 1: BLACK START RESTORATION
Page 2: BLACK START RESTORATION
Page 3: BLACK START RESTORATION

““A large piece of stone could be taken A large piece of stone could be taken to the top of hill with Combined efforts to the top of hill with Combined efforts of many people successfully but the of many people successfully but the same could roll down in no time with a same could roll down in no time with a small mistake on the part of an small mistake on the part of an individual”individual”

““Aropyate Shila ShaleAropyate Shila Shale

Yatnena mahata YathaYatnena mahata Yatha

Nipatyate Kshanena dhastaNipatyate Kshanena dhasta

Thatatma Gunadoshayo”Thatatma Gunadoshayo”

Page 4: BLACK START RESTORATION

Integrated Power SystemIntegrated Power SystemSpreads over thousands of square kilometers Spreads over thousands of square kilometers

Hundreds of Generating UnitsHundreds of Generating Units

Thousands of Circuit Kilometers of LinesThousands of Circuit Kilometers of Lines

Tens of Thousands of DevicesTens of Thousands of Devices

SINGLE LARGEST COMPLEX MACHINESINGLE LARGEST COMPLEX MACHINE

100% Reliability IMPOSSIBLE100% Reliability IMPOSSIBLE

Page 5: BLACK START RESTORATION
Page 6: BLACK START RESTORATION

YEAR NO. OF DISTURBANCES

1991-92 3

1992-93 2

1993-94 7

1994-95 14

1995-96 6

1996-97 10

1997-98 9

1998-99 14

1999-20 14

2000-01 16

2001-02 9

AVERAGE 10

DISTURBANCES IN SR

Page 7: BLACK START RESTORATION

LINKSMODES OF OPERATION RESTORATION

PROBLEMSRESTORATION OBJECTIVES

RESTORATION TASKS BUILD DOWNRESTORATIONSTRATEGIES

BUILD UP SPECIAL CONSIDERATIONS

RESTORATION PLANNING

FORMULATIONOF ASSUMPTIONS

LOGISTICS ANDCOMMUNICATIONS

ESTABLISHMENT OF GOALS

COMMANDOGROUP

TRAININGAUDITS AND

UPDATES

DOCUMENTAION THUMB RULESPHILOSOPHY OF

ISLANDING

Page 8: BLACK START RESTORATION

RESTORATION LINKSBLACK START

RESTORATION IN SRSC LEVELS

MAPTYPICAL

PROBLEMS

23 JAN 02 DISTURBANCEPOWER SWING SPARE

SYNCH FREQ CURVE14TH MAY DIST

PROCEDURES FOR SOUTHERN REGION

RESTORATIONPROCEDURE:MAPS

GENERALGUIDELINES SR

RESTORATIONPROCEDURE:KAPS START UP FOR

NTPCRESTORATION

PROCEDURE:NLC

LIST OF SUBSTATIONS WITH BS

CAPABILITYCURVE GEN

LIST OF GENERATORSWITH BLACK START

NTPC STARTUPSCENARIOS

STARTUP DIAGRAMKARNATAKA

STARTUP DIAGRAMAP

Page 9: BLACK START RESTORATION

NORMAL

A L E R T

EMERGENCY

RESTORATIVE

Page 10: BLACK START RESTORATION

  RESTORING NORMAL SYSTEM OPERATION AS QUICKLY AS POSSIBLE

SYNCHRONISING OF AT LEAST ONE UNIT AT ALL POWER STATION

RESTORING ESSENTIAL LOADS

ESTABLISHING ALL INTERCONNECTIONS

STARTING ECONOMIC DISPATCH

STARTING ALLOCATION OF C. S SHARE

MINIMIZING AMOUNT OF UNSERVED ENERGY

RESTORATION OBJECTIVES

Page 11: BLACK START RESTORATION

IMPAIRED COMMUNICATIONS, LIMITED

INFORMATION.

RE-ASSEMBLING TIE ELEMENTS OF

POWER SYSTEM.

        UNFAMILIARITY WITH THE SITUATION

(DOES NOT OCCUR REGULARLY)

TIME CONSTRAINTS

INFORMATION TO BE FURNISHED TO

AUTHORITIES- PRESSURE ON OPERATOR

RESTORATION PROBLEMS

Page 12: BLACK START RESTORATION

RESTORATION TASKS

SYSTEM STATUS DETERMINATION

 PLANT PREPARATION SERVICES/START-UP

 NETWORK PREPARATION

 NETWORK ENERGISATION

 LOAD RESTORATION

SYSTEM REBUILDING

Page 13: BLACK START RESTORATION

EXTENT OF BLACK OUT AND ACTUAL REQUIREMENT

IDENTIFICATION OF BOUNDARIES OF ENERGISED AREAS

ASCERTAINING FREQUENCY & VOLTAGE OF ENERGISED

AREA

STATUS OF GENERATING PLANTS(HOT/COLD/HOUSELOAD )

NON AVAILABILITY OF ELEMENTS(LC/FAULT ETC)

OVERLOADING OF ELEMENTS

 LOADS INTERRUPTED BY UNDER- FREQUENCY RELAY

OPERATION OR DIRECT TRIPPING

STATUS OF BREAKERS

SYSTEM STATUS DETERMINATION

Page 14: BLACK START RESTORATION

CONSIDERATION OF TIME-CRITICAL BOILER- TURBINE START-UP CHARACTERISTICS (FOR PREDOMINANTLY THERMAL SYSTEMS)

SURVIVAL POWER SUPPLY TO THE PLANTS AT THE EARLIEST WITH AVAILABLE ARRANGEMENT (DG SETS) FOR       

Turbine emergency oil pump

. Jacking oil pumps

. Barring gear of the turbine

. Lubricating oil pumps

. Emergency lighting

. Battery charger

Compressor for CB

PLANT SURVIVAL AND START UP

THUMB RULES

THUMB RULES

Page 15: BLACK START RESTORATION

ALL DG/GT’S TO RUN TO PROVIDE START UP POWER.

ESTIMATION OF TOTAL START UP POWER REQUIRED TO RUN AT LEAST ONE MACHINE OF EACH POWER STATIONS.

TAKING CARE NOT TO LOAD THE GENERATOR SUPPLYING START-UP POWER BEYOND 80% OF ITS CAPACITY.

RELEASING AUXILIARY POWER IN STEPS.

THE CAPACITY (I.E. FAULT LEVEL) OF ISLAND (SUPPLYING START UP POWER) TO SUSTAIN- STARTING CURRENT 0F BFP ETC. TO BE CHECKED.

PLANT SURVIVAL AND START UP

Page 16: BLACK START RESTORATION

CLEARING ALL DE-ENERGISED BUSES

GLOBAL OPENING OF ALL THE BREAKERS

ELSE:-SELECTIVE BREAKER OPERATION AFTER CAREFUL CONSIDERATION

SECTIONALISING A SYSTEM INTO SUB-SYSTEMS TO ENABLE PARALLEL RESTORATION OF ISLANDS

AUTOMATICALLY SWITCHED CAPACITORS AND UNDER FREQUENCY RELAYS MAY HAVE TO BE KEPT OUT OF SERVICE AT THE INITIAL STAGE

NETWORK PREPARATION

Page 17: BLACK START RESTORATION

NETWORK ENERGISATION • IDENTIFY THE IMPORTANT AND

ESSENTIAL LOADS TO BE RESTORED FIRST• AT EVERY STAGE WE SHOULD BE ABLE

TO SATISFY– REACTIVE POWER BALANCE– LOAD GENERATION BALANCE– PROTECTION AND PLANT CONTROL SYSTEM

REQUIREMENTS• HVDC IMPORT – ONLY WHEN MIN FAULT

LEVEL IS AVAILABLE.• AVOID PARALLELING ISLANDS THROUGH

WEAK LINKS

THUMB RULES

THUMB RULES

Page 18: BLACK START RESTORATION

NETWORK ENERGISATION

 PLANT CONTROL SYSTEM CHARACTERISTICS

A) MECHANICAL CONSIDERATIONS

REGULATION OF RATE OF CHANGE OF TEMPERATURE TO BE

KEPT MANUAL

CONTROL FEED WATER WITH THE SOLE OBJECTIVE OF

MAINTAINING DRUM LEVEL AT SET POINT

PLANTS HAVING FEED WATER REGULATING VALVES

PREFERABLE TO THOSE HAVING TURBINE-DRIVEN FEED PUMPS

TWO FUEL SUPPLY SYSTEMS - ONE (OR NONE) AUTOMATIC

AND ONE (OR BOTH) IN MANUAL.  

Page 19: BLACK START RESTORATION

NETWORK ENERGISATION B) ELECTRICAL CONSIDERATIONS

VOLTAGE REGULATOR TO BE SWITCHED TO

AUTOMATIC CONTROL (FROM MANUAL) ONLY WHEN

THE UNIT REACHES A MIN. OPERATING POINT AND A

SUFFICIENT VAR GENERATION 1S ESTABLISHED

PROTECTIVE RELAYS SUCH AS VOLTS PER HZ,

OUT OF STEP, UNDER EXCITATION, DISTANCE,

FREQUENCY & FIELD. FORCING CAN INITIATE AN

UNDESIRABLE REGULATOR RESPONSE OR

GENERATOR TRIP DURING START UP

Page 20: BLACK START RESTORATION

NETWORK ENERGISATION STRUCTURAL

SYSTEM SIZE

METROPOLITAN OR RURAL

COMPACT OR EXTENSIVE GENERATION

TRANSMISSION VOLTAGE LEVELS

TYPES AND SIZES OF LOAD BLOCKS

AVAILABILITY OF INTERCONNECTION

ASSISTANCE  

Page 21: BLACK START RESTORATION

NETWORK ENERGISATION DYNAMICS

REACTIVE CAPABILITIES OF GENERATORS /SYNCHRONOUS CONDENSERS UNDER NORMAL AND EMERGENCY OPERATING CONDITIONS.

SHUNT REACTOR AND CAPACITOR SIZES, LOCATIONS AND MODES OF CONTROL.

CHARGING CURRENTS AND MAXIMUM SUSTAINABLE OVERVOLTAGE, TRANSFORMER REACTANCES, TAP RANGES AND MODES OF CONTROL

GENERATOR MAXIMUM AND MINIMUM OUTPUTS UNDER DIFFERENT CONDITIONS

Page 22: BLACK START RESTORATION

REACTIVE POWER BALANCESOURCE GENERATION ABSORPTION

GENERATOR YES YES

LINE CHARGING YES

SHUNT CAPACITOR YES

SHUNT REACTOR YES

SYN CONDENSOR YES YES

STATIC VAR COMPENSATOR

YES YES

NETWORK ENERGISATION

THUMB RULESTHUMB RULES

Page 23: BLACK START RESTORATION

LOAD GENERATION BALANCE

• TYPE OF THE LOAD– PEAK OR OFF PEAK– COLD LOAD INRUSH

• GENERATOR CAPACITY

• MINIMUM LOADING OF GENERATOR

• RESPONSE TO SUDDEN LOAD PICKUP

• TIME ELAPSED(HOT START)

NETWORK ENERGISATION

Page 24: BLACK START RESTORATION

LOAD RESTORATION • DURING RESTORATION EFFECT OF EACH

RESTORATION ACTION ON FOLLOWING TO BE CONSIDERED– GENERATOR LOADING– TRANSMISSION LINE LOADING– LOAD ANGLE– RATE OF LOADING– RESPONSE OF THE GEN TO LOAD CHANGE– CHANGE IN SYSTEM FREQ AND OPERATION OF

UFR’S– FLUCTUATING LOADS- EX. TRACTION,

FURNACE ETC.

THUMB RULES

THUMB RULES

Page 25: BLACK START RESTORATION

RESTORATION STRATEGIES

BUILD DOWN OR

SEQUENTIAL STRATEGY

BUILD UP OR

PARALLEL STRATEGY

Page 26: BLACK START RESTORATION

RE-ENERGIZATION OF BULK POWER NETWORK

BALANCED STEP-BY-STEP RESTORATION OF LOADS AND GENERATION

SUITABLE FOR

SMALL SYSTEMS NOT HAVING LONG EHV LINES

OR PREDOMINANTLY HYDRO SYSTEMS WITH HIGH REACTIVE ABSORPTION CAPABILITY

OR FOR LARGE SYSTEMS WITH VERY COMPACT SERVICE TERRITORIES

USUALLY SELECTED WHEN STRONG NEIGHBOURING INTERCONNECTION ASSISTANCE 1S AVAILABLE

INTERCONNECTION STATUS IS TO BE ASSESSED, HENCE TIME CONSUMING AND TASKING.

BUILD DOWN OR SEQUENTIAL STRATEGY

Page 27: BLACK START RESTORATION

SIMULTANEOUS RESTORATION OF ISLANDS/ SUBSYSTEMS FOLLOWED BY THEIR MUTUAL SYNCHRONIZATION

USUALLY SELECTED IN CASE OF A COMPLETE SYSTEM COLLAPSE AND LACK OF INTERCONNECTION ASSISTANCE

RELATIVELY QUICK PROCESS

REQUIRES SEVERAL OPERATING TEAMS AND ADEQUATE COMMUNICATION FACILITIES FOR MUTUAL COORDINATION

BUILD UP STRATEGY

Page 28: BLACK START RESTORATION

BUILD UP EXAMPLE- AP SYSTEM RESTORATION

VTS+GAS

NSR+SSLM

RyTPP+ CUDDAPAH RADIAL ON TN

Page 29: BLACK START RESTORATION

SPECIAL CONSIDERATIONS

FIRM TRANSMISSION IN THE INTERCONNECTION BETWEEN SUBSYSTEMS AND FIRM GENERATION CAPACITY IN EACH SUB SYSTEM TO BE ENSURED DURING EARLY STAGES OF RESTORATION

DEACTIVATION OF AUTOMATIC LOAD SHEDDING AND AUTOMATIC SWITCHED CAPACITORS DURING INITIAL STAGES,

RESTORATION OF SMALLER RADIAL LOADS FOLLOWED BY LOW VOLTAGE AC NETWORK LOADS WHILE MAINTAINING REASONABLY CONSTANT REAL TO REACTIVE POWER RATIO

PICKING UP SMALL BLOCKS OF LOADS FOLLOWED BY AS LARGE AS POSSIBLE, WITHOUT RISKING DANGEROUS DECLINE OF FREQUENCY, AS RESTORATION PROCEEDS.

KEEPING GENERATOR TERMINAL VOLTAGES RELATIVELY LOW INITIALLY, AND ADJUSTING TRANSFORMER TAPS, SUBSEQUENTLY AS RESTORATION

PROCEEDS

Page 30: BLACK START RESTORATION

 RESTORATION PLANNING

GENERAL GUIDELINES

FORMATION OF A PLANNING TEAMFORMATION OF A PLANNING TEAM

• PARTICIPATION OF EXPERIENCED/KNOWLEDGEABLE

PERSONNEL FROM RESPECTIVE FIELDS LIKE

PROTECTION, COMMUNICATION, OPERATIONS,

SYSTEM ANALYSIS ETC.

• REVIEW OF SYSTEM CHARACTERISTICS (RELEVANT

TO RESTORATION)

Page 31: BLACK START RESTORATION

RESTORATION PLANNING

COMMON CONCERNS

• TIME CONSUMING NATURE OF SWITCHING OPERATION

• START-UP TIMINGS OF THERMAL UNITS

• FREQUENCY RESPONSE OF PRIME MOVERS TO SUDDEN LOAD PICK UP

• COLD LOAD INRUSH, POWER FACTORS AND COINCIDENT DEMAND FACTORS

• AVAILABILITY OF GOVERNOR FACILITIES OF UNITS

Page 32: BLACK START RESTORATION

FORMULATION OF ASSUMPTIONS

WORST POSSIBLE SCENARIO TO BE CONSIDERED USING

SYSTEM OPERATORS EXPERIENCE AND JUDGEMENT

CONSTRAINTS MAY DIFFER WIDELY FOR PEAK AND LEAN

CONDITIONS

COORDINATION OF LOAD PICKUP WITH GENERATOR

RESPONSE AND ARRESTING FALL OF FRFQUFNCY, BEYOND

PRIME MOVER RECOVERY CAPABILITY UNDER PEAK

CONDITION

BLACK-START FACILITIES MAY NOT BE AVAILABLE DURING

WEEK END LEAN PERIOD

Page 33: BLACK START RESTORATION

ESTABLISHMENT OF GOALS

LOCAL CONDITIONS LIKE GENERATIOR MIX TYPE OF LOAD AND

CONTRACTUAL OBLIGATIONS PLAY A DECISIVE ROLE

IMMEDIATE OBJECTIVE (SYSTEM SPECIFIC) COULD BE.

RE-ENERGIZING THE BULK POWER NETWORK

OR ATTAINING A CERTAIN LEVEL OF ACTIVE AND REACTIVE

CAPABILITY

OR PICKING UP A DOWNTOWN LOAD

OR SUPPLYING TIME-CRITICAL INDUSTRIAL LOADS

OR ENERGIZING EHV LINE TO A REMOTE, LARGE GENERATING

STATION

Page 34: BLACK START RESTORATION

VALIDATION OF ASSUMPTIONS

• PROPER MODELLING OF STEADY STATE AND DYNAMIC BEHAVIOUR OF

POWER SYSTEM

• CONFIRMING THE FEASIBILITY AND SECURITY OF PROPOSED ACTIONS

USING A VARIETY OF ANALYSIS AND SIIMULATION TOOLS LIKE STEADY-

STATE POWER FLOW, TRANSIENT AND DYNAMIC STABILITY ANALYSIS AND

ELECTROMAGNETIC TRANSIENT SIMULATIONS

• LOAD DATA, GENERATION DATA ETC. TO BE PREPARED CAREFULLY

ITERATION

TWO ITERATIONS ARE INVOLVED -

1. MODELS HAVE TO BE VALIDATED AGAINST MEASURED AND TELEMETERED

DATA

2. THE RESTORATION PLAN (TACTICS) DEVELOPED TO BE CHECKED AGAINST

THE INITIAL STRATEGY FOR CONFORMITY AND FEASIBILITY

Page 35: BLACK START RESTORATION

LOGISTICS AND COMMUNICATION

CLOSE AND CONTINUAL CO-ORDINATION AMONG POWER

SYSTEM POWER PLANT AND FIELD OPERATORS

NEIGHBOURING UTILITIES, AUTHORITIES TO BE

INFORMED TIME TO TIME ABOUT THE PROGRESS OF

RESTORATION.

TO DEPEND MORE ON THE UTILITIES’ OWN

COMMUNICATION FACILITIES

FALL BACK ARRANGEMENT IN CASE OF

COMMUNICATION FAILURE.

Page 36: BLACK START RESTORATION

EXPERT / COMMANDO GROUP

COMMANDO GROUP TO BE FORMED AS THE

SYSTEM COMPLEXITY GROWS.

GROUP SHOULD CONSIST OF ENGINEERS FROM

DIFFERENT FIELDS AND BELONGING TO DIFFERENT

UTIILITIES.

PERFECT UNDERSTANDING IN THIS CORE GROUP

IT ENCHANCES THE MORAL STRENGTH OF FIELD

OFFICERS AS WELL AS REDUCES RESTORATION TIME

Page 37: BLACK START RESTORATION

AUIDITS AND UPDATES

A TECHNICAL PERSON OUTSIDE THE RESTORATION

TEAM SHOULD AUDIT THE ACTIVITIES.

AUDITED RESTORATION PLAN MUST BE UPDATED.

DOCUMENTS MUST BE REVISED REGULARLY TO

REFLECT THE LATEST CHARACTERISTICS OF THE SYSTEM.

CHANGES IN THE SCADA/EMS INSTALLATION OR

MAJOR PLANT CONTROL, AVAILABLE TOOLS ALSO TO BE

INCORPORATED.

Page 38: BLACK START RESTORATION

TRAINING

INSTRUCTION MANUALS OR AUDIO –VISUAL TAPES, FOR INDEPENDENT STUDY

CLASSROOM INSTRUCTIONS

LEARNING FROM PAST EXPERIENCE DURING RESTORATION.

OPERATOR TRAINING SIMULATOR.

ROLE PLAY

OPERATOR’ S PROBLEM SOLVING CAPABILITY CAN ALSO BE EXPLORED AND DEVELOPED.

ALTERNATIVE, SOURCE OF FINDING NEW IDEAS.

DETAILED INTERACTION WITH THE PERSONS INVOLVED IN RESTORATION

Page 39: BLACK START RESTORATION

DOCUMENTATION

PURPOSE: TRAINING- REFERENCE, IMPROVEMENT OF

RESTORATION PROCEDURES.

SHOULD BE READILY ACCESSIBLE AND EASILY

UNDERSTOOD.

SHOULD BE STORED IN A CONVENIENT MEDIA FOR

QUICK PROCESSING.

SHOULD BE ILLUSTRATED WITH FAMILIAR DIAGRAMS

AND CHARTS

ACTIONS REJECTED AND INCORPORATED IN THE

PLAN MUST BE RECORDED

Page 40: BLACK START RESTORATION

BLACK START RESTORATION

IN SOUTHERN REGION

Page 41: BLACK START RESTORATION

BLACK START RESTORATIONIN SOUTHERN REGION

SUMMARY

• MOSTLY PARALLEL APPROACH FOLLOWED.

• ASSISTANCE FROM WR FOR START UP OF RAMAGUNDAM UNITS ON AC BYPASS MODE

• ISTS USED FOR INTEGRATION OF SYSTEM

Page 42: BLACK START RESTORATION

BLACK START RESTORATIONIN SOUTHERN REGION:

PROBLEMS

47.7

HZ

51.5

HZ• LOW INERTIA OF ISLANDS-

FREQUENCY FLUCTUATION• LOW SC LEVELS- LARGE VOLTAGE

EXCURSIONS• CHARGING LONG LINES – HIGH

VOLTAGES AND MVAR ABSORBTION BY GENERATORS

• V/f SETTING OF TRANSFORMERSSC LEVELSSC LEVELS