Table 3.1 shows the crop residues yield for the major crops considered in this survey.
Table 3.1 Biomass Residue Generation in Tons per Ha per year in Rajasthan
S.No Crop Biomass Average Yield1 CRR2
1 Paddy Paddy Straw 5.48 1.70
2 Jowar Jowar Stalks 3.93 2.40
3 Bajra Bajra Stalks 7.75 2.63
4 Maize Maize Stalks 9.28 2.30
5 Moong Moong Stalks 0.77 1.25
6 Urad Urad Stalks 0.99 1.30
1 2010-11, 2011-12 & 2012-13 Average Yield G-Return Statistical Department of Rajasthan State, Jaipur. The year 2013-14 , 2014-2015 data are not available during our survey in January 2015. 2 CGPL,Indian Institute of Science, Bangalore and Agricultural Department, Rajasthan
Biomass Fuel Supply Study
Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
8
7 Moth Moth Stalks 1.25 1.80
8 Seasamum Seasamum Stalks 0.78 1.50
9 Ground Nut Ground Nut Stalks 9.57 2.30
10 Soya Bean Soya Bean Stalks 4.25 1.70
11 Castor Castor Stem 23.79 4.00
12 Cotton Cotton Stalks 7.08 3.80
13 Guar Guar Stalks 1.65 1.80
14 Wheat Wheat Stalks 7.81 1.50
15 Barley Barley Stalks 4.96 1.30
16 Gram Gram Stalks 1.05 1.10
17 Mustard Mustard Stalks & husk 4.48 1.80
Table 3.1 shows the Crop to Residue Ratio (CRR) provided by Indian Institute of
Science, Bangalore, this data has again been vetted in the field by not only gathering
details from landowners, but also by field measurement. Estimation of biomass
availability was made for both the Rabi & the Khariff seasons using secondary data,
where in important details like residue generation and area of cultivation for each crop
are available. The data gives the average yield expected per hectare for the representative
crop grown in the study area. Table 3.2 shows the list of major crops of the state of
Rajasthan, area of cultivation of each crop.
Table 3.2 Last Three Years Average Cultivated Area in Rajasthan3
S.No Name of Crop Area of Cultivation ( Ha )
1 Paddy 130,366
2 Jowar 653,696
3 Bajra 4,834,322
3 Source: 2010-11, 2011-12 & 2012-13 G-Return Statistical Department of Rajasthan State, Jaipur. The year 2013-
14 , 2014-2015 cultivation area data is not available during our survey in January 2015.
Biomass Fuel Supply Study
Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
9
4 Maize 1,057,067
5 Moong 1,037,301
6 Urad 200,360
7 Moth 1,258,492
8 Seasamum 492,013
9 Ground Nut 388,417
10 Soya Bean 900,782
11 Castor 227,009
12 Cotton 475,495
13 Guar 3,534,394
14 Wheat 3,011,536
15 Barley 304,648
16 Gram 1,486,524
17 Mustard 2,552,034
Total 22,544,455
Table 3.3 computes the biomass generation from the agricultural activity using the
residue generation per ha per year and cultivated area provided by Statistical Department,
Rajasthan.
Table 3.3 Biomass Generations From Agricultural Activity in Rajasthan4
4 Calculated value from the data of 2010-11, 2011-12 & 2012-13 years average cultivated area , average crop yield of year 2010-11, 2011-12 & 2012-13 & Crop to Residue Ratio. The year 2013-14 , 2014-2015 data are not available during our survey in January 2015.
Biomass Fuel Supply Study
Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
11 2010-11, 2011-12 & 2012-13 G-Return Statistical Department of Rajasthan State, Jaipur. The years 2013-14 , 2014-2015 cultivation area data is not available during our survey in January 2015.
Biomass Fuel Supply Study
Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
13 2010-11, 2011-12 & 2012-13 G-Return Statistical Department of Rajasthan State, Jaipur. The year 2013-14 , 2014-2015 cultivation area data is not available during our survey in January 2015.
Biomass Fuel Supply Study
Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
15 2010-11, 2011-12 & 2012-13 G-Return Statistical Department of Rajasthan State, Jaipur. The year 2013-14 , 2014-2015 cultivation area data is not available during our survey in January 2015.
Biomass Fuel Supply Study
Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
17 2010-11, 2011-12 & 2012-13 G-Return Statistical Department of Rajasthan State, Jaipur. The year 2013-14 , 2014-2015 cultivation area data is not available during our survey in January 2015.
Biomass Fuel Supply Study
Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
19 2010-11, 2011-12 & 2012-13 G-Return Statistical Department of Rajasthan State, Jaipur. The year 2013-14 , 2014-2015 cultivation area data is not available during our survey in January 2015.
Biomass Fuel Supply Study
Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
21 2010-11, 2011-12 & 2012-13 G-Return Statistical Department of Rajasthan State, Jaipur. The year 2013-14 , 2014-2015 cultivation area data is not available during our survey in January 2015.
Biomass Fuel Supply Study
Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
35
Cotton Stalks are available abundance in Ganganager and Hanumangarh districts. The
estimated surplus cotton stalks is around 3,50,720 tons /year within the study area.
Cotton Stalks are harvested during month Nov-Jan.
Table 5.13 District wise Cotton Stalks Generation Consumption and Surplus in Rajasthan22
23 2010-11, 2011-12 & 2012-13 G-Return Statistical Department of Rajasthan State, Jaipur. The year 2013-14 , 2014-2015 cultivation area data is not available during our survey in January 2015.
Biomass Fuel Supply Study
Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Total 1406 1544 1528 1728 1706 1911 Average 1475 1628 1706
Price Escalation 10.36 % 11.09 %
Based on the three-year price data, the average price variation of cotton stalks is
between Rs.1400 to Rs.1800. The percentage variation in the cost of cotton stalks is
10.36% for the period 2012-13 and 11.09% for the period 2013-14 is. Thus, it is clear
from the data that the cost of biomass has got fluctuated in the increasing trend.
Biomass Fuel Supply Study
52 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The following figure shows the district wise price variation of Cotton Stalks in Rajasthan for the last three years.
0
500
1000
1500
2000
2500
Ajm
er
Jaip
ur
Daus
a To
nk
Sika
r Jh
unjh
unu
Nag
aur
Alw
ar
Bhar
atpu
r Dh
olpu
r S.
Mad
hopu
r Ka
roli
Bika
ner
Chur
u Ja
isal
mer
Ga
ngan
agar
H
anum
anga
rh
Jodh
pur
Barm
er
Jalo
re
Pali
Siro
hi
Kota
Ba
ran
Bund
i Jh
alw
ar
Bans
war
a Du
ngar
pur
Udai
pur
Prat
apga
rh
Bhilw
ara
Chitt
ore
Rajs
aman
d
2012
2013
2014
Biomass Fuel Supply Study
53 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
6.5 BIOMASS POWER PLANT FUEL MIX The biomass power plants located in the Rajasthan state are using the biomass
residues in the form of mixture. The biomass fuel mix includes mustard stalks &
husk, guar stalks, prosopis juliflora wood, cotton stalks and other agro residues. As
discussed in the previous section, it is clear that the mustard stalks & husk are
consumed in huge quantity. There are totally 10 biomass power plant in Rajasthan
and the fuel mix of the below listed power plants are discussed in this section.
1. Satyam Green Power Private Limited
2. Transtech Green Power Private Limited
3. S M Environmental Technologies Private Limited
4. Kalpataru Power Transmission Ltd, Ganganagar
5. Kalpataru Power Transmission Ltd, Tonk
6. Sanjog Sugars & Eco Power Private Limited
7. Orient Green Power Company (Rajasthan) Private Limited. Kishanganj
8. Suryaa Chamball Power Limited
9. Sambhav Energy Limited
10. Amrit Environmental Technologies
Out of the ten power plants, two power plants namely Sambhav Energy Limited and
Amrit Environmental Technologies are not in operation for the last two years because
of drastic increase in fuel price. The reason for the increase in the fuel price is due to
the increase in the number of biomass consuming industries nearby the power plant
location. Since the year 2012 both of these power plants are not able to compete the
market by procuring the biomass fuel at higher price and that resulted in the
permanent shutdown of these power plants. As the biomass price study requires a
minimum of three-year historical data, both these power plants are not considered for
the analysis due to the unavailability of fuel procurement data.
The summary of fuel consumption pattern in last three years for the biomass power
plants in operation in Rajasthan is given below.
Biomass Fuel Supply Study
54 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The total quantity of individual biomass in the biomass fuel mix of the power plants for
the year 2012 is presented in the above table. Based on a close view on the values of
individual biomass fuel quantity consumed, it can be observed that the total quantity of
mustard stalks & husk is at the higher range and that resulted in higher percentage of
77.30%. The biomass fuel mix also includes 13.40% of Agro waste, 7.05% of Prosopis
Juliflora wood and 2.25%. of Cotton Stalks.
Table 6.7 Power Plant Fuel Mix in the year 2013 (Tons/Year)
Power Plant Fuel Mix
Mustard Stalks & Husk
Guar Stalks
Cotton Stalks
Juliflora Wood
Agro Waste Total
Satyam Green Power 60957 0 7052 0 5566 73575 Transtech Green Power 160 0 0 752 21739 22651 S M Environmental 59297 0 0 0 0 59297 Kalpataru-Ganganagar 37257 28385 0 0 0 65642 Kalpataru-Tonk 98082 0 0 0 0 98082 Sanjog Sugars 6622 0 769 0 978 8369
Table 6.6 Biomass Power Plant Fuel Mix in the year 2012 (Tons/Year)
Power Plant Fuel Mix
Mustard Stalks &
Husk Guar Stalks
Cotton Stalks
Prosopis Juliflora
Wood Agro
Waste Total Satyam Green Power 27949 0 6799 0 18176 52924 Transtech Green Power 15098 0 0 26058 21684 62840 S M Environmental 59222 0 0 0 0 59222 Kalpataru-Ganganagar 62202 0 0 0 0 62202 Kalpataru-Tonk 40185 0 0 0 0 40185 Sanjog Sugars 37560 0 1526 0 6982 46068 Orient Green-Kishanganj 0 0 0 0 0 0 Suryaa Chamball Power 43526 0 0 0 2702 46228 Total 285742 0 8325 26058 49544 369669
% 77.30 0.00 2.25 7.05 13.40 100.00
Biomass Fuel Supply Study
55 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Orient Green-Kishanganj 23,939 0 0 0 0 23,939 Suryaa Chamball Power 72042 0 0 0 1758 73800 Total 358356 28385 7821 752 30041 401416 % 84.25 6.67 1.84 0.18 7.06 100.00 For the year 2013, it can be noted that the contribution of guar stalks is increased to
6.67% while comparing with the last year. However, the contribution of juliflora
wood and agro waste in the fuel mix has got reduced drastically comparing with the
last year. The Juliflora wood has contributed 0.18% that is 6.87% lower than previous
year and the agro residue has contributed 7.06% that is 6.34% lower than the previous
year. Therefore, based on the observation it is quite clear that the Mustard Stalks &
Husk has scored the higher percentage of 84.25% among the fuel mix and that is
6.95% higher than previous year.
Table 6.8 Power Plant Fuel Mix in 2014 (Tons /Year)
Power Plant Fuel Mix
Mustard Stalks &
Husk Guar Stalks
Cotton Stalks
Juliflora Wood
Agro Waste Total
Satyam Green Power 45741 0 4500 0 1112 51353 Transtech Green Power 8958 0 0 12029 16170 37157 S M Environmental 67920 0 0 0 0 67920 Kalpataru-Ganganagar 48941 40053 0 0 0 88994 Kalpataru-Tonk 90088 0 0 0 0 90088 Sanjog Sugars 2129 0 880 0 2853 5862 Orient Green-Kishanganj 42881 0 0 0 0 42881 Suryaa Chamball Power 65280 0 0 0 793 66073 Total 371938 40053 5380 12029 20928 450328 % 82.59 8.89 1.19 2.67 4.65 100.00
For the year 2014, it can be noted that the contribution of mustard stalks & husk is
reduced in a small margin. The contribution of Guar stalks is increased to 8.89%. The
Juliflora wood has contributed 2.67% and the agro residue has contributed 4.65%.
Biomass Fuel Supply Study
56 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Based on the last three years data of Power Plant Fuel Mix, it can be concluded that
the Mustard Stalks & Husk acts as the most predominant and stable fuel for all the
power plants.
Table 6.10 Average Fuel Mix Biomass Price in the year 2013
Biomass % of use in Biomass
Power Plants
Average Biomass
Price in 2013
Average Biomass Price
in Rs based on % of
use
Mustard Stalks
84.25 % 2229 1878
Guar Stalks 6.67% 2006 141
Juliflora Wood
0.18% 2697 5
Cotton Stalks
1.84 % 1628 31
Total 92.94 % 2055
For 92.94 % 2055
For 100 % (= 2055 / 0.9252 ) = 2197 2211
Table 6.9 Average Fuel Mix Biomass Price in the year 2012
Biomass % of use in Biomass
Power Plants
Average Biomass
Price in 2012
Average Biomass
Price based on % of
use
Mustard Stalks 77.30 % 2009 1552
Guar Stalks 0 1853 0
Juliflora Wood 7.05 % 2458 173
Cotton Stalks 2.25 % 1475 33
Total 86.6 % 1758
For 86.6 % 1758
For 100 % (= 1758 / 0.866 ) = 2030 2030
Biomass Fuel Supply Study
57 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Table 6.11 Average Fuel Mix Biomass Price based on 2014
Biomass % of use in Biomass
Power Plants
Average Biomass
Price in 2014
Average Biomass
Price in Rs based on
% of use
Mustard Stalks
82.59 2494 2059
Guar Stalks 8.89 2334 207 Juliflora Wood
2.67 2982 79
Cotton Stalks 1.19 1808 21
Total 95.34 2366
For 95.34 % 2366
For 100 % (= 2366 / 0.9534 ) = 2481 2481
Based on the Fuel Mix of biomass power plants the average cost of Biomass in the
year 2012 is 2030.
The average cost of Biomass in year 2013 is Rs 2211. In the year 2013 price was
increased 8.22 %.
Based on the Fuel Mix of biomass power plants the average cost of Biomass in 2014
is 2481.
The average cost of Biomass in 2013 was increased 12.92% in 2014.
Year Average Biomass Cost in
Rs based on Power Plant
Fuel Mix
% of increase in
price
2012 2030
2013 2211 8.92%
2014 2481 12.21 %
Average 10.57 %
Biomass Fuel Supply Study
58 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The expected price increase in 2015 is 10.57%. The 10.57 % increase in Rs 2481 will
be 2015 price. Hence biomass cost in 2015 will be Rs.2743.
Biomass Fuel Supply Study
59 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Chapter 7
BIOMASS STACKING & FEEDING COST.
7.0 INTRODUCTION:
Once biomass received in the power plant gate, the following activities required to further
feeding it in to Boiler.
Stacking & Covering Cost
Feeding Cost
7.1 STACKING& COVERING COST:
The major biomass available for biomass power plant in Rajasthan is mustard stalks &
husk, which is available between February to May. So the biomass power plants are purchase
and stoking biomass at storage yard with in the power plant or nearby by collection centers. The
primary purpose for the stacking will be to retain the biomass in good condition in a convenient
place for it to be transferred to the next stage of processing or feeding. Stacking, Covering,
Transportation and Feeding are some of the important operations to be carried out before the fuel
use. Depending on the size of operation and relative cost of labour and capital, varying degree of
automation could be adopted for each of the above operations.
LDPE Plastic Sheets are used to cover the biomass residues from rain and other climate
factors. This means protecting it from direct ingress of rain, but also from groundwater. From
stock yard to feeding site, biomass are transfer by small trucks. The following table 7.1 shows
the Stacking Cost, Covering Cost & Feeding Cost of various power plants.
Table 7.1 Stacking Cost, Covering Cost & Feeding Cost of various power plants.
S.No Biomass Power Plant Stacking & Covering Cost Rs/Ton
Feeding Cost Rs/Ton
1 Surya Chamball 65 96
2 S M Environmental 60 140
3 Orient Green-Kishanganj 80 120
Average Cost 68 119
Total Average Cost 187
Biomass Fuel Supply Study
60 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The average Stacking & Covering and Feeding Cost of Biomass is around Rs 187 per tons.
7.2 BIOMASS STORAGE LOSSESS
Three types of losses considered during the storage of biomass in the biomass yard.
1 Land Settlement :
Biomass at bottom of heap gets mixed with sand and cannot be used in boiler.
However, with leveling of ground and proper drainage system, land settlement loss
can be reduced to about 0.4 %
2 Loss of Fuel during Sand Storm:
This loss can be completely eliminated by covering the biomass with tarpaulin.
3 GCV Loss due to decaying of biomass
Decaying loss can be reduced to about 1.5% by covering the biomass with tarpaulin
and proper drainage
Total Storage loss of biomass is around 2 %
Biomass Fuel Supply Study
61 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Chapter 8
CALORIFIC VALUE OF MAJOR BIOMASS.
8.0 INTRODUCTION:
The major biomass consumed in the biomass power plants in the study area are mustard
stalks & husk, gaur stalks, prosopis Juliflora Wood, Cotton Stalks. Based on the data collection
from all the biomass power plants in this area the calorific value was given below.
8.1 CALORIFIC VALUE OF MUSTARD STALKS AND HUSK:
Mustard Stalks and Husk is the main biomass in this study area. The calorific value of Mustard
Stalks and Husk was given below.
Table 8.1 Orient Green Power Company (Rajasthan) Private Limited.
(Kishanganj)
Mustard Stalks and Husk
S.No Month Moisture % GCV in ARB kCal/kg
1 January-2014 12.80 3,236
2 February--2014 11.30 3,230
3 March--2014 11.49 3,195
4 April--2014 9.01 3,399
5 May--2014 6.37 3,389
6 June--2014 9.09 3,392
7 July--2014 10.39 3,376
8 August--2014 12.08 3,382
9 September--2014 10.30 3,374
10 October--2014 11.15 3,370
11 November--2014 11.09 3,387
12 December--2014 15.29 3,258
Average 10.86 3332
Biomass Fuel Supply Study
62 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Table 8.2 S M Environmental Technologies Private Limited
Mustard Stalks and Husk
S.No Month Moisture % GCV in ARB kCal/kg
1 January-2014 30.54 2,304
2 February--2014 25.76 2,792
3 March--2014 5.63 3,197
4 April--2014 6.58 3,357
5 May--2014 6.57 3,395
6 June--2014 5.88 3,386
7 July--2014 15.20 3,283
8 August--2014 21.94 3,255
9 September--2014 15.47 3,331
10 October--2014 11.59 3,390
11 November--2014 12.45 3,397
12 December--2014 20.86 3,326
Average 14.87 3201
Table 8.3 Suryaa Chamball Power Limited
Mustard Stalks and Husk
S.No Month GCV in ARB kCal/kg
1 April--2014 3153
2 May--2014 3459
3 June--2014 3491
4 July--2014 3244
5 August--2014 2884
Biomass Fuel Supply Study
63 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Average Calorific value of Mustard Stalks and Husk from all the above power plant is 3300 k Cal/kg
and the ash content is around 4.21 % as per the data provided Suryaa Chamball Power Limited
6 September--2014 2745
7 October--2014 3118
8 November--2014 3035
9 December--2014 3083
10 January-2015 3080
11 February--2015 2914
12 March--2015 3040
Average 3104
Ash Content 4.21 %
Table 8.4 Satyam Green Power Private Limited
Biomass GCV in ARB kCal/kg
Mustard Stalks and Husk 3250
Table 8.5 Kalpataru Power Transmission Ltd, Ganganagar
Biomass GCV in ARB kCal/kg
Mustard Stalks and Husk 3614
Biomass Fuel Supply Study
64 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
8.2 CALORIFIC VALUE OF OTHER BIOMASS:
Guar Stalks, Cotton Stalks and Prosopis Juliflora Wood also used in Biomass power plants. The
calorific value of Guar Stalks, Cotton Stalks and Prosopis Juliflora Wood is given in below.
Table 8.6 Other major Biomass Calorific Value, ash content AND Moisture Content
Sl.No Biomass Calorific
Value
GCV in
ARB
kCal/kg
Moisture
Content
Ash Content Provided by
1 Guar Stalks 3750 12.55 % 7.22 %
Kalpataru Power
Transmission Ltd,
Ganganagar
2 Cotton
Stalks
3250 14.2 % 12.13% Satyam Green Power
Private Limited
3 Prosopis Juliflora Wood
3167
23.38 %
1.43% Suryaa Chamball
Power Limited
Biomass Fuel Supply Study
65 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Chapter 9
BIOMASS POWER PLANTS IN RAJASTHAN
9.0 INTRODUCTION
The Rajasthan state consists of 33 districts and the average cultivated area of Rajasthan state for
the past three years is coming around 225,44,455 Ha. The residues of Mustard, Guar, Cotton and
Prosopis Juliflora are considered by the biomass power plants as the main fuel for power
generation. The biomass power plants are managing their fuel requirement by mixing the
available crop residues like mustard stalks & husk, guar stalks, cotton stalks, other agro residues
and waste land biomass like Prosopis Juliflora wood. The generation of the mustard stalks &
husk, guar stalks, cotton stalks are quite stable and predictable. There are totally 10 biomass
power plant in Rajasthan and the fuel procurement and consumption of the below listed power
plants are discussed in this section,
1. Satyam Green Power Private Limited
2. Transtech Green Power Private Limited
3. S M Environmental Technologies Private Limited
4. Kalpataru Power Transmission Ltd-Ganganagar
5. Kalpataru Power Transmission Ltd-Tonk
6. Sanjog Sugars & Eco Power Private Limited
7. Orient Green Power Company (Rajasthan) Private Limited. Kishanganj
8. Suryaa Chamball Power Limited
9. Sambhav Energy Limited
10. Amrit Environmental Technologies.
Out of the ten power plants, two power plants namely Sambhav Energy Limited and Amrit
Environmental Technologies are not in operation for the last two years because of drastic
increase in fuel price. The reason for the increase in the fuel price is due to the increase in the
number of consuming industries nearby the power plant location. Since 2012 both these power
plants are not able to compete the market by procuring the biomass fuel at higher price and that
resulted in the permanent shutdown of these power plants. As the biomass price study requires
Biomass Fuel Supply Study
66 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
a minimum of last three-year historical data, both these power plants are not considered for this
study due to the unavailability of fuel procurement data.
9.1 SATYAM GREEN POWER PRIVATE LIMITED, NAGAUR DISTRICT.
9.1.1 TECHNICAL DETAILS OF POWER PLANT:
Satyam Green Power Private Limited has implemented a biomass power plant in Merta
Road, Nagaur district, Rajasthan. The installed capacity of this biomass power plant is 10
MW. The project was commissioned in March 2011 and the technical specifications of
the key equipment’s in the power plant are as follows:
Table 9.1
Parameters Details
Capacity of the plant 10 MW
Boiler Capacity 50 TPH
Type of Boiler Water Tube, Traveling Grate
Stocker
Make of Boiler Walchand Nagar
Main Stream Pressure 65 kg/cm2
Main Steam Temperature 475 ±5ºc
Make of The Turbine SIEMENS LTD
Inlet Steam Flow 45TPH
Type of Cooling Tower Air Cooled
9.1.2 BIOMASS PROCURED AND COST OF PURCHASE: The below table shows the average landed cost of biomass at factory gate for the year
2012.
Biomass Fuel Supply Study
67 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Table 9.2 Year of procurement: 2012
Months of
procurement
Procured Quantity in
MT
Total Cost of
Purchase (at
factory gate) in
Rs
Purchase Cost
(at factory gate)
in Rs/MT
Jan 8 11687 1450
Feb 195 311458 1597
Mar 32 51235 1600
Apr 1483 2118340 1428
May 11267 15878948 1409
Jun 3023 4345328 1438
Jul 1330 1978760 1488
Aug 288 345480 1200
Sep 3077 4923488 1600
Oct 5432 8691680 1600
Nov 7361 16503030 2242
Dec 19430 41525904 2137
Total 52927 96685338
Average Cost of Purchase (at factory gate) in Rs/MT 1,827
Biomass Fuel Supply Study
68 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The below chart shows the average landed cost of biomass at factory gate for the year 2012
The below table shows the average landed cost of biomass at factory gate for the year 2013
Table 9.3 Year of procurement: 2013
Months of procurement
Procured Quantity in MT
Total Cost of Purchase (at factory gate) in Rs
Purchase Cost (at factory gate) in Rs/MT
Jan 6901 18222971 2641
Feb 6011 12989295 2161
Mar 13037 27414344 2103
Apr 25333 52696883 2080
May 17700 35704191 2017
Jun 248 446346 1800
Jul 0 0 0
Aug 0 0 0
Sep 0 0 0
Oct 22 39060 1800
Nov 1299 2386922 1838
Dec 3026 7575095 2503
Total 73577 157475106
0
500
1000
1500
2000
2500
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
69 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Average Cost of Purchase (at factory gate) in Rs /MT 2140
The below chart shows the average landed cost of biomass at factory gate for the year 2013.
The below Table shows the average landed cost of biomass at factory gate for the year 2014
Table 9.4 Year of procurement: 2014
Months of
procurement
Procured Quantity in
MT
Total Cost of
Purchase (at
factory gate) in
Rs
Purchase Cost
(at factory gate)
in Rs /MT
Jan 128 276706 2164
Feb 262 589055 2252
Mar 8 18653 2250
Apr 16047 40117175 2500
May 20297 50742825 2500
Jun 6944 17359225 2500
Jul 1430 3217433 2250
Aug 0 0 0
Sep 80 184138 2300
Oct 0 0 0
Nov 3096 5263744 1700
Dec 3064 6807165 2222
Total 51356 124576118
0
500
1000
1500
2000
2500
3000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
70 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Average Cost of Purchase (at factory gate) in Rs /MT 2426
The below chart shows the average landed cost of biomass at factory gate for the year 2014.
Table 9.5
Year Total quantity
Procured (MT)
Total Amount
(Rs)
Average
Landed cost
at factory
Gate (Rs/MT)
% increase in
price with respect
to previous year in
%
2012 52927 96685338 1827
2013 73577 157475106 2140 17.16
2014 51356 124576118 2426 13.34
The landed cost of biomass in 2012 is around Rs 1827. The landed cost of biomass in 2013 is
around Rs 2140.The % of increase in biomass cost over 2012 to 2013 is 17.16%.
The landed cost of biomass in 2013 is around Rs 2140. The landed cost of biomass in 2014 is
around Rs 2426.The % of increase in biomass cost over 2013 to 2014 is 13.34%.
The following graph shows the last three years Biomass Quantity Procured.
0
500
1000
1500
2000
2500
3000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
71 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The following graph shows the last three years biomass price trend.
9.2 TRANSTECH GREEN POWER PRIVATE LIMITED
9.2.1 TECHNICAL DETAILS OF POWER PLANT:
Transtech Green Power Private Limited has implemented a biomass power plant in
Ganganagar district with an installed capacity of 12 MW. The project was commissioned
in 28/07/2010 and the technical specifications of the key equipment’s in the power plant
are as follows
Table 9.5
Parameters Details
Capacity of the plant 12.0 MW
52927
73577
51356
0
20000
40000
60000
80000
2012 2013 2014
MT
MT
0
500
1000
1500
2000
2500
3000
2012 2013 2014
Rs/MT
Rs/MT
Biomass Fuel Supply Study
72 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Boiler Capacity 60 TPH
Make of Boiler Thermodyne
Boiler Steam Pressure (kg/cm2) 66
Main Steam Temperature ºc 485
Make of The Turbine Triveni Engineering
Type of Cooling Tower Air Cooled
9.2.2 BIOMASS PROCURED AND COST OF PURCHASE: The below table shows the average landed cost of biomass at factory gate for the year 2012.
Table 9.6 Year of procurement: 2012
Months of
procurement
Procured Quantity in
MT
Total Cost of
Purchase (at
factory gate) in
Rs
Purchase Cost
(at factory gate)
in Rs/MT
Jan 9019 20816858 2308
Feb 7602 17821518 2344
Mar 4962 11572308 2332
Apr 9287 22007646 2370
May 6982 16443830 2355
Jun 3273 7408823 2264
Jul 5835 13479682 2310
Aug 6210 15405235 2481
Sep 1978 4656648 2354
Oct 3237 7620027 2354
Nov 2725 6581515 2415
Dec 1730 3991090 2307
Total 62840 147805180
Average Cost of Purchase (at factory gate) in Rs/MT 2352
Biomass Fuel Supply Study
73 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The below chart shows the average landed cost of biomass at factory gate for the year 2012
The below Table shows the average landed cost of biomass at factory gate for the year 2013.
Table 9.7 Year of procurement: 2013
Months of
procurement
Procured
Quantity in MT
Total Cost of Purchase
(at factory gate) in Rs
Purchase Cost (at
factory gate) in
Rs/MT
Jan 754 1844092 2446
Feb 232 601750 2594
Mar 2230 5793868 2598
Apr 4379 11385400 2600
May 4842 12589200 2600
Jun 2054 5340400 2600
Jul 0 0 0
Aug 1689 4391400 2600
Sep 1778 4622800 2600
Oct 1807 4698200 2600
Nov 1707 4438200 2600
Dec 1185 3081000 2600
Total 22657 58786310
Average Cost of Purchase (at factory gate) in Rs /MT 2595
2150
2200
2250
2300
2350
2400
2450
2500
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
74 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The below chart shows the average landed cost of biomass at factory gate for the year 2013.
The below Table shows the average landed cost of biomass at factory gate for the year 2014
Table 9.8 Year of procurement: 2014
Months of
procurement
Procured Quantity in
MT
Total Cost of
Purchase (at
factory gate) in
Rs
Purchase Cost
(at factory gate)
in Rs /MT
Jan 0 0 0
Feb 0 0 0
Mar 0 0 0
Apr 1469 3731100 2540
May 5909 15115476 2558
Jun 4947 12834618 2594
Jul 4048 11169546 2759
Aug 4293 12376978 2993
Sep 4536 13373388 2948
Oct 3289 9362638 2847
Nov 3360 9947721 2961
0
500
1000
1500
2000
2500
3000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
75 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Dec 5306 15216557 2868
Total 37157 103128022
Average Cost of Purchase (at factory gate) in Rs /MT 2775
The below chart shows the average landed cost of biomass at factory gate for the year 2014.
Table 9.9
Year Total quantity
Procured (MT)
Total Amount
(Rs)
Average
Landed cost
at factory
Gate (Rs/MT)
% increase in
price with respect
to previous year in
%
2012 62840 147805180 2352
2013 22657 58786310 2595 10.31
2014 37157 103128022 2775 6.97
The landed cost of biomass in 2012 is around Rs 2352. The landed cost of biomass in 2013
is around Rs 2595.The % of increase in biomass cost over 2012 to 2013 is 10.31%. The
0
500
1000
1500
2000
2500
3000
3500
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
76 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
landed cost of biomass in 2013 is around Rs 2595. The landed cost of biomass in 2014 is
around Rs 2775.The % of increase in biomass cost over 2013 to 2014 is 6.97%.
The following graph shows the last three years Biomass Quantity Procured.
The following graph shows the last three years Biomass Price Trend.
62840
22657
37157
0
10000
20000
30000
40000
50000
60000
70000
2012 2013 2014
MT
MT
2100
2200
2300
2400
2500
2600
2700
2800
2900
2012 2013 2014
Rs/MT
Rs/MT
Biomass Fuel Supply Study
77 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
9.3 S M ENVIRONMENTAL TECHNOLOGIES PRIVATE LIMITED
9.3.1 TECHNICAL DETAILS OF POWER PLANT:
S M Environmental Technologies Private Limited has implemented a biomass power
plant in Baran district with an installed capacity of 8.0 MW. The project was
commissioned in 19/02/2010 and the technical specifications of the key equipment’s
in the power plant are as follows
Table 9.10
Parameters Details
Capacity of the plant 8.0 MW
Boiler Capacity 40 TPH
Type of Boiler Bidrum, Water tube, Travelling
Grate Boiler
Make of Boiler M/s Cheema Boilers limited,
Mohali, India
Boiler Steam Pressure (kg/cm2) 45
Boiler Steam Temperature ºc 420
Make of The Turbine M/s Hangzhou Steam Turbine Co.
Ltd,China
Type of Cooling Tower Water Cooled
9.3.2 BIOMASS PROCURED AND COST OF PURCHASE: The below table shows the average landed cost of biomass at factory gate for the year 2012.
Table 9.11 Year of procurement: 2012
Months of
procurement
Procured Quantity in
MT
Total Cost of
Purchase (at
Purchase Cost
(at factory gate)
Biomass Fuel Supply Study
78 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
factory gate) in
Rs
in Rs/MT
Jan 6166 11407581 1850
Feb 6487 12001505 1850
Mar 11743 20550513 1750
Apr 17879 31287865 1750
May 5050 8837010 1750
Jun 266 491767 1850
Jul 380 857408 2258
Aug 0 0 0
Sep 945 2220022 2350
Oct 4780 10993784 2300
Nov 3186 7583808 2380
Dec 2340 5160406 2205
Total 59222 111391667
Average Cost of Purchase (at factory gate) in Rs/MT 1881
The below chart shows the average landed cost of biomass at factory gate for the year 2012
Biomass Fuel Supply Study
79 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The below Table shows the average landed cost of biomass at factory gate for the year 2013.
Table 9.12 Year of procurement: 2013
Months of
procurement
Procured
Quantity in MT
Total Cost of
Purchase (at
factory gate) in Rs
Purchase Cost
(at factory gate)
in Rs/MT
Jan 117 183424 1569
Feb 264 444192 1680
Mar 19318 43464400 2250
Apr 26019 58542165 2250
May 7962 17913848 2250
Jun 1759 3957345 2250
Jul 0 0 0
Aug 0 0 0
Sep 0 0 0
Oct 1121 2521778 2250
Nov 1225 2756115 2250
Dec 1513 3404543 2250
Total 59297 133187808
Average Cost of Purchase (at factory gate) in Rs /MT 2246
0
500
1000
1500
2000
2500
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
80 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The below chart shows the average landed cost of biomass at factory gate for the year 2013.
The below Table shows the average landed cost of biomass at factory gate for the year 2014
Table 9.13 Year of procurement: 2014
Months of procurement
Procured Quantity in MT
Total Cost of Purchase (at factory gate) in Rs
Purchase Cost (at factory gate) in Rs /MT
Jan 4500 10125000 2250
Feb 4634 10425600 2250
Mar 19020 46169982 2428
Apr 31554 76598444 2428
May 6286 15258498 2428
Jun 150 362936 2428
Jul 0 0 0
Aug 0 0 0
Sep 0 0 0
Oct 0 0 0
Nov 410 996270 2428
Dec 1367 3318210 2428
Total 67920 163254940
Average Cost of Purchase (at factory gate) in Rs /MT 2404
0
500
1000
1500
2000
2500
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
81 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The below chart shows the average landed cost of biomass at factory gate for the year 2014.
Table 9.14
Year Total quantity
Procured (MT)
Total Amount
(Rs)
Average
Landed cost
at factory
Gate (Rs/MT)
% increase in
price with respect
to previous year in
%
2012 59297 133187808 1881
2013 59222 111391667 2246 19.42%
2014 67920 163254940 2404 7.01%
The landed cost of biomass in 2012 is around Rs 1881. The landed cost of biomass in 2013 is
around Rs 2246.The % of increase in biomass cost over 2012 to 2013 is 19.42%.The landed cost
of biomass in 2013 is around Rs 2246. The landed cost of biomass in 2014 is around Rs
2404.The % of increase in biomass cost over 2013 to 2014 is 7.01%.
The following graph shows the last three years Biomass Quantity Procured.
0
500
1000
1500
2000
2500
3000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
82 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The following graph shows the last three years Biomass Price Trend.
9.4 KALPATARU POWER TRANSMISSION LTD. (GANGANAGAR)
9.4.1 TECHNICAL DETAILS OF POWER PLANT: Kalpataru Power Transmission Ltd has implemented a biomass power plant in
Ganganagar district with an installed capacity of 7.8 MW. The project has got
commissioned in 15/07/2003 and the technical specifications of the key equipment’s in
the power plant are as follows
Table 9.15
59297 59222
67920
54000
56000
58000
60000
62000
64000
66000
68000
70000
2012 2013 2014
MT
MT
0
500
1000
1500
2000
2500
3000
2012 2013 2014
Rs/MT
Rs/MT
Biomass Fuel Supply Study
83 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Parameters Value
Capacity of the plant 7.8 MW
Boiler Capacity 35 TPH
Boiler Steam Presure 66 kg/cm2
Boiler Steam Temperature 490o
Boiler Make Thermax
TG Set Make Shin Nippon
Type of Cooling Tower Water Cooled
9.4.2 BIOMASS PROCURED AND COST OF PURCHASE:
The below table shows the average landed cost of biomass at factory gate for the year
2012.
Table 9.16 Year of procurement: 2012
Months of
procurement
Procured
Quantity in MT
Total Cost of
Purchase (at factory
gate) in Rs
Purchase Cost
(at factory gate)
in Rs/MT
Jan 0 0 0
Feb 0 0 0
Mar 0 0 0
Apr 27066 60194784 2224
May 34545 68917275 1995
Jun 591 1126446 1906
Jul 0 0 0
Aug 0 0 0
Sep 0 0 0
Oct 0 0 0
Nov 0 0 0
Dec 0 0 0
Total 62,202 130,238,505
Biomass Fuel Supply Study
84 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Average Cost of Purchase (at factory gate) in Rs/MT 2,094
The below chart shows the average landed cost of biomass at factory gate for the year 2012
The below table shows the average landed cost of biomass at factory gate for the year 2013.
Table 9.17 Year of procurement: 2013
Months of
procurement
Procured Quantity in
MT
Total Cost of
Purchase (at
factory gate) in
Rs
Purchase Cost
(at factory gate)
in Rs/MT
Jan 0 0 0
Feb 0 0 0
Mar 0 0 0
Apr 15136 33692736 2226
May 15464 39495056 2554
Jun 1977 4651881 2353
0
500
1000
1500
2000
2500
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
85 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Jul 1910 5579110 2921
Aug 630 1609650 2555
Sep 2140 6783800 3170
Oct 10751 23867220 2220
Nov 13984 33253952 2378
Dec 3650 9106750 2495
Total 65,642 15,80,40,155
Average Cost of Purchase (at factory gate) in Rs/MT 2,408
The below chart shows the average landed cost of biomass at factory gate for the year 2013.
0
500
1000
1500
2000
2500
3000
3500
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
86 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The below table shows the average landed cost of biomass at factory gate for the year
2014.
Table 9.17 Year of procurement: 2014
Months of
procurement
Procured
Quantity in MT
Total Cost of
Purchase (at factory
gate) in Rs
Purchase Cost
(at factory gate)
in Rs/MT
Jan 157 398309 2537
Feb 111 283938 2558
Mar 12 30108 2509
Apr 38700 109791900 2837
May 8536 22628936 2651
Jun 591 1531872 2592
Jul 808 2402184 2973
Aug 174 521304 2996
Sep 132 376860 2855
Oct 31418 72732670 2315
Nov 8322 18050418 2169
Dec 33 82269 2493
Total 88994 228830768
Average Cost of Purchase (at factory gate) in Rs/MT 2,571
The below chart shows the average landed cost of biomass at factory gate for the year 2014.
Biomass Fuel Supply Study
87 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Table 9.18
Year Total quantity Procured (MT)
Total Amount (Rs)
Average Landed cost at factory Gate (Rs/MT)
% increase in price with respect to previous year in %
2012 62202 130238505 2094
2013 65642 158040155 2408 14.99
2014 88994 228830768 2571 6.80
The landed cost of biomass in 2012 is around Rs 2094. The landed cost of biomass in 2013
is around Rs 2408. The % of increase in biomass cost over 2012 to 2013 is 14.99%. The
landed cost of biomass in 2014 is around Rs 2571.The % of increase in biomass cost over
2013 to 2014 is 6.80%.
The following graph shows the last three years Biomass Quantity Procured.
0
500
1000
1500
2000
2500
3000
3500
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
88 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The following graph shows the last three years Biomass Price Trend.
62202 65642
88994
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
100000
2012 2013 2014
MT
MT
0
500
1000
1500
2000
2500
3000
2012 2013 2014
Rs/MT
Rs/MT
Biomass Fuel Supply Study
89 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
9.5 KALPATARU POWER TRANSMISSION LTD. (TONK): 9.5.1 TECHNICAL DETAILS OF POWER PLANT This biomass power plant is located in Tonk District with an installed capacity of 8 MW.
The project has got commissioned in 10/11/2006 and the technical specifications of the
key equipment’s in the power plant are as follows
Table 9.19
Parameters Value
Capacity of the plant 8 MW
Boiler Capacity 38 TPH
Boiler Steam Pressure 42 kg/cm2
Boiler Make Sitson
Boiler Steam Temperature 4100
TG Set Make Hangzhou
Type of Cooling Tower Water Cooled
9.5.2 BIOMASS PROCURED AND COST OF PURCHASE:
The below table shows the average landed cost of biomass at factory gate for the year
2012.
Table 9.20 Year of procurement: 2012
Months of
procurement
Procured Quantity in
MT
Total Cost of
Purchase (at
factory gate) in
Rs
Purchase Cost
(at factory gate)
in Rs/MT
Jan 0 0 0
Feb 0 0 0
Mar 0 0 0
Apr 31580 72097140 2283
Biomass Fuel Supply Study
90 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
May 6771 14070138 2078
Jun 190 406600 2140
Jul 0 0 0
Aug 0 0 0
Sep 0 0 0
Oct 175 330225 1887
Nov 568 857112 1509
Dec 901 1394748 1548
Total 40185 89155963
Average Cost of Purchase (at factory gate) in Rs/MT 2219
The below chart shows the average landed cost of biomass at factory gate for the year 2012
The below Table shows the average landed cost of biomass at factory gate for the year 2013.
Table 9.21 Year of procurement: 2013
Months of
Procurement
Procured
Quantity in MT
Total Cost of
Purchase (at
factory gate) in Rs
Purchase Cost
(at factory gate)
in Rs/MT
Jan 101 160287 1587
0
500
1000
1500
2000
2500
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
91 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Feb 0 0 0
Mar 28413 68077548 2396
Apr 55933 109013417 1949
May 8635 16691455 1933
Jun 4566 8958492 1962
Jul 180 273420 1519
Aug 0 0 0
Sep 0 0 0
Oct 143 217217 1519
Nov 111 168609 1519
Dec 0 0 0
Total 98082 203560445
Average Cost of Purchase (at factory gate) in Rs /MT 2075
The below chart shows the average landed cost of biomass at factory gate for the year 2013.
0
500
1000
1500
2000
2500
3000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
92 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The below Table shows the average landed cost of biomass at factory gate for the year 2014
Table 9.22 Year of procurement: 2014
Months of
procurement
Procured
Quantity in MT
Total Cost of
Purchase (at factory
gate) in Rs
Purchase Cost
(at factory gate)
in Rs /MT
Jan 0 0 0
Feb 0 0 0
Mar 13250 29216250 2205
Apr 52577 106626156 2028
May 8841 18141732 2052
Jun 2041 4292223 2103
Jul 0 0 0
Aug 0 0 0
Sep 0 0 0
Oct 3135 6307620 2012
Nov 5377 10490527 1951
Dec 4867 9305704 1912
Total 90088 184380212
Average Cost of Purchase (at factory gate) in Rs /MT 2047
The below chart shows the average landed cost of biomass at factory gate for the year 2014.
Biomass Fuel Supply Study
93 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Table 9.23
Year Total quantity Procured (MT)
Total Amount (Rs)
Average Landed cost at factory Gate (Rs/MT)
% increase in price with respect to previous year in %
2012 40185 89155963 2219
2013 98082 203560445 2075 -6.46
2014 90088 184380212 2047 -1.38
The landed cost of biomass in 2012 is around Rs 2219. The landed cost of biomass in
2013 is around Rs 2075. The variation of biomass cost over 2012 to 2013 is -6.46%.
The landed cost of biomass in 2014 is around Rs 2047. The variation of biomass cost
over 2013 to 2014 is -1.38%, because the last three years the mustard crop cultivation
area increased and the consumption of biomass not increased.
The following graph shows the last three years Biomass Quantity Procured.
0
500
1000
1500
2000
2500
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
94 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The following graph shows the last three years Biomass Price Trend.
40185
9808290088
0
20000
40000
60000
80000
100000
120000
2012 2013 2014
MT
MT
1950
2000
2050
2100
2150
2200
2250
2012 2013 2014
Rs/MT
Rs/MT
Biomass Fuel Supply Study
95 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
9.6 SANJOG SUGARS & ECO POWER PRIVATE LIMITED:
9.6.1 TECHNICAL DETAILS OF POWER PLANT This biomass power plant of Sanjog Sugars & Eco Power Private Limited is located in
Hanumangargh District with an installed capacity of 10 MW. The project has got
commissioned in 07/10/2011 and the technical specifications of the key equipment’s in
the power plant are as follows.
Table 9.24
Parameters Value
Capacity of the plant 10 MW
Boiler Capacity 47 TPH
Boiler Make ISGEC JOHN THOMPSON
Boiler Steam Temperature 4750
Boiler Steam Pressure 66 kg/cm2
TG Set Make Triveni Engineering
Type of Cooling Tower Air Cooled
9.6.2 BIOMASS PROCURED AND COST OF PURCHASE:
The below table shows the average landed cost of biomass at factory gate for the year
2012.
Table 9.25 Year of procurement: 2012
Months of
procurement
Procured Quantity
in MT
Total Cost of
Purchase (at
factory gate) in Rs
Purchase Cost (at
factory gate) in
Rs/MT
Jan 0 0 0
Feb 0 0 0
Mar 0 0 0
Apr 6148 13952534 2269
May 12816 26802580 2091
Biomass Fuel Supply Study
96 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Jun 4442 8308308 1870
Jul 3783 6587747 1741
Aug 5383 9431758 1752
Sep 2406 4308815 1791
Oct 5616 9161058 1631
Nov 6260 9399876 1502
Dec 12944 17517457 1353
Total 59798 105470133
Average Cost of Purchase (at factory gate) in Rs/MT 1764
The below chart shows the average landed cost of biomass at factory gate for the year 2012
The below Table shows the average landed cost of biomass at factory gate for the year 2013.
Table 9.26 Year of procurement: 2013
Months of
procurement
Procured
Quantity in MT
Total Cost of
Purchase (at
factory gate) in Rs
Purchase Cost
(at factory gate)
in Rs/MT
Jan 2951 7654631 2594
Feb 775 2100590 2710
0
500
1000
1500
2000
2500
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
97 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Mar 1590 2877142 1810
Apr 147 289369 1968
May 2749 6458173 2349
Jun 157 293470 1869
Jul 9 22173 2464
Aug 0 0 0
Sep 0 0 0
Oct 0 0 0
Nov 0 0 0
Dec 0 0 0
Total 8378 19695548
Average Cost of Purchase (at factory gate) in Rs /MT 2351
The below chart shows the average landed cost of biomass at factory gate for the year 2013.
The below Table shows the average landed cost of biomass at factory gate for the year 2014
0
500
1000
1500
2000
2500
3000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
98 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Table 9.27 Year of procurement: 2014
Months of
procurement
Procured
Quantity in MT
Total Cost of
Purchase (at factory
gate) in Rs
Purchase Cost
(at factory gate)
in Rs /MT
Jan 0 0 0
Feb 0 0 0
Mar 0 0 0
Apr 0 0 0
May 205 695309 3392
Jun 71 242875 3421
Jul 0 0 0
Aug 1312 3702335 2822
Sep 885 2587133 2923
Oct 1940 3615912 1864
Nov 1449 2846354 1964
Dec 0 0 0
Total 5862 13689918
Average Cost of Purchase (at factory gate) in Rs /MT 2335
The below chart shows the average landed cost of biomass at factory gate for the year 2014.
0
1000
2000
3000
4000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
99 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Table 9.28
Year
Total quantity Procured (MT)
Total Amount (Rs)
Average Landed cost at factory Gate (Rs/MT)
% increase in price with respect to previous year in %
2012 59798 105470133 1764
2013 8378 19695548 2351 33.29
2014 5862 13689918 2335 -0.66
The landed cost of biomass in 2012 is around Rs 1764. The landed cost of biomass in 2013
is around Rs 2351. The % of increase in biomass cost over 2012 to 2013 is 33.29%.
The landed cost of biomass in 2014 is around Rs 2335. The variation in % of biomass cost
over 2013 to 2014 is -0.66%.
The following graph shows the last three years Biomass Quantity Procured.
59798
83785862
0
10000
20000
30000
40000
50000
60000
70000
2012 2013 2014
MT
MT
Biomass Fuel Supply Study
100 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The following graph shows the last three years Biomass Price Trend.
9.7 ORIENT GREEN POWER COMPANY (RAJASTHAN) PRIVATE LIMITED.
9.7.1 TECHNICAL DETAILS OF POWER PLANT
OGPL (Rajasthan) Pvt. Limited has implemented a biomass power plant in Baran
District with an installed capacity of 8 MW. The project has got commissioned in
October 2013 and the technical specifications of the key equipment’s in the power plant
are as follows
Table 9.29
Parameters Details
Capacity of the plant 8 MW
Boiler Capacity 40 TPH
0
500
1000
1500
2000
2500
2012 2013 2014
Rs/MT
Rs/MT
Biomass Fuel Supply Study
101 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Boiler Make Thermax Limited
Boiler Steam Temperature 4800
Boiler Steam Pressure 66 kg/cm2
TG Set Make Triveni Engineering
Type of Cooling Tower Air Cooled
9.7.2 BIOMASS PROCURED AND COST OF PURCHASE
The below table shows the average landed cost of biomass at factory gate for the year
2013.
Table 9.30 Year of procurement: 2013
Months of
procurement
Procured
Quantity in MT
Total Cost of
Purchase (at factory
gate) in Rs
Purchase Cost
(at factory gate)
in Rs /MT
Jan 0 0
0
Feb 0 0
0
Mar 0 0
0
Apr 19244 45801524
2380
May 4134 9838082
2380
Jun 455 1084071
2380
Jul 0 0
0
Aug 0 0
0
Sep 105 249900
2380
Oct 0 0
0
Nov 0 0
0
Dec 0 0
0
Total 23938 56973578
2380
Average Cost of Purchase (at factory gate) in Rs /MT 2380
The below chart shows the average landed cost of biomass at factory gate for the year 2013.
Biomass Fuel Supply Study
102 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The below table shows the average landed cost of biomass at factory gate for the year
2014.
Table 9.31 Year of procurement: 2014
Months of
procurement
Procured
Quantity in MT
Total Cost of
Purchase (at factory
gate) in Rs
Purchase Cost
(at factory gate)
in Rs /MT
Jan 0 0 0
Feb 0 0 0
Mar 8256 22002069 2665
Apr 14736 39270401 2665
May 2423 6456461 2665
Jun 1343 3579942 2665
Jul 2614 6965511 2665
Aug 0 0 0
Sep 0 0 0
Oct 4344 11575979 2665
Nov 4464 11895526 2665
0
500
1000
1500
2000
2500
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
103 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Dec 4703 12532485 2665
Total 42,881 114,278,374
Average Cost of Purchase (at factory gate) in Rs /MT 2665
The below chart shows the average landed cost of biomass at factory gate for the year 2014.
Table 9.32
Year Total quantity
Procured (MT)
Total Amount
(Rs)
Average
Landed cost
at factory
Gate (Rs/MT)
% increase in
price with respect
to previous year in
%
2013 23938 56973578 2380
2014 42,881 114,278,374 2665 11.97
The landed cost of biomass in 2013 is around Rs 2380. The landed cost of biomass in 2014is
around Rs 2665.The % of increase in biomass cost over 2013 to 2014 is 11.97%.
The following graph shows the last two years Biomass Quantity Procured.
0
500
1000
1500
2000
2500
3000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
104 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
The following graph shows the last two years Biomass Price Trend.
9.8 SURYA CHAMBALL POWER LIMITED
9.8.1 TECHNICAL DETAILS OF POWER PLANT:
Suryaa Chamball Power Limited has implemented a biomass power plant in Kota district
with an installed capacity of 7.5 MW. The project was commissioned in 31/03/2006 and
the technical specifications of the key equipment’s in the power plant are as follows
0
10000
20000
30000
40000
50000
2013 2014
MT
MT
2200
2250
2300
2350
2400
2450
2500
2550
2600
2650
2700
2013 2014
Rs/MT
Rs/MT
Biomass Fuel Supply Study
105 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Table 9.31
Parameters Details
Capacity of the plant 7.5 MW
Boiler Capacity 38 TPH
Make of Boiler Sitson
Boiler Steam Pressure (kg/cm2) 63
Main Steam Temperature ºc 450
Make of The Turbine Triveni Engineering
Type of Cooling Tower Water Cooled
9.8.2 BIOMASS PROCURED AND COST OF PURCHASE: The below table shows the average landed cost of biomass at factory gate for the year 2012.
Table 9.32 Year of procurement: 2012
Months of
procurement
Procured Quantity in
MT
Total Cost of
Purchase (at
factory gate) in
Rs
Purchase Cost
(at factory gate)
in Rs/MT
Jan 63 87171 1384
Feb 1278 2444346 1913
Mar 31784 65564373 2063
Apr 6178 10860924 1758
May 899 1468966 1634
Jun 130 206310 1587
Jul 3289 5509075 1675
Aug 0 0 0
Sep 14 22400 1600
Oct 2107 2949800 1400
Nov 435 639450 1470
Biomass Fuel Supply Study
106 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Dec 51 77928 1528
Total 46228 89830743
Average Cost of Purchase (at factory gate) in Rs/MT 1943
The below chart shows the average landed cost of biomass at factory gate for the year 2012
The below Table shows the average landed cost of biomass at factory gate for the year 2013.
Table 9.33 Year of procurement: 2013
Months of
procurement
Procured
Quantity in MT
Total Cost of Purchase
(at factory gate) in Rs
Purchase Cost (at
factory gate) in
Rs/MT
Jan 2 3200 1600
Feb 4285 10725445 2503
Mar 34393 64449432 1874
Apr 14670 22239288 1516
May 9730 14595000 1500
Jun 1114 1671000 1500
Jul 3493 5239500 1500
Aug 293 443895 1515
Sep 0 0 0
0
500
1000
1500
2000
2500
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
107 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Oct 1998 3637288 1820
Nov 1653 3304917 1999
Dec 2169 5224998 2409
Total 73800 131533963
Average Cost of Purchase (at factory gate) in Rs /MT 1782
The below chart shows the average landed cost of biomass at factory gate for the year 2013.
The below Table shows the average landed cost of biomass at factory gate for the year 2014
Table 9.34 Year of procurement: 2014
Months of
procurement
Procured Quantity in
MT
Total Cost of
Purchase (at
factory gate) in
Rs
Purchase Cost
(at factory gate)
in Rs /MT
Jan 1509 3555243 2356
Feb 4649 9914984 2133
Mar 14285 38469505 2693
0
500
1000
1500
2000
2500
3000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
108 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Apr 33673 76404037 2269
May 3861 7528950 1950
Jun 2351 4523324 1924
Jul 196 382200 1950
Aug 0 0 0
Sep 0 0 0
Oct 1265 2231475 1764
Nov 292 510600 1749
Dec 3992 9523740 2386
Total 66073 153044058
Average Cost of Purchase (at factory gate) in Rs /MT 2316
The below chart shows the average landed cost of biomass at factory gate for the year 2014.
0
500
1000
1500
2000
2500
3000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rs/MT
Rs/MT
Biomass Fuel Supply Study
109 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Table 9.35
Year Total quantity
Procured (MT)
Total Amount
(Rs)
Average
Landed cost
at factory
Gate (Rs/MT)
% increase in
price with respect
to previous year in
%
2012 46228 89830743 1943
2013 73800 131533963 1782 -8.28
2014 66073 153044058 2316 29.96
The landed cost of biomass in 2012 is around Rs 1943. The landed cost of biomass in 2013
is around Rs 1782.The % of decrease in biomass cost over 2012 to 2013 is 8.28%. The
landed cost of biomass in 2013 is around Rs 1782. The landed cost of biomass in 2014 is
around Rs 2316.The % of increase in biomass cost over 2013 to 2014 is 29.96%.
The following graph shows the last three years Biomass Quantity Procured.
The following graph shows the last three years Biomass Price Trend.
46228
7380066073
0
10000
20000
30000
40000
50000
60000
70000
80000
2012 2013 2014
MT
MT
Biomass Fuel Supply Study
110 Abi Energy Consultancy Services Pvt Ltd Rajasthan Renewable Energy Corporation Ltd
Out of the ten power plants, two power plants namely Sambhav Energy Limited and Amrit
Environmental Technologies are not in operation for the last two years because of increase in
fuel price.
0
500
1000
1500
2000
2500
2012 2013 2014
Rs/MT
Rs/MT
Biomass Fuel Supply
111 Abi Energy Consultancy Services Private Limited Rajasthan Renewable Energy Corporation Limited
Chapter 10
CONCLUSIONS
1. The net quantity of surplus biomass available for power generation to renewable power
projects in different districts is given below(Refer Annexure-1):
Net Quantity Available For Power Generation to Renewable Power Projects S.No Districts Major Biomass Surplus /Deficit Net