Click icon to add picture Biomass CHP Project at Pilgrim Hospital Boston United Lincolnshire Hospitals NHS Trust
6

Biomass CHP Project at Pilgrim Hospital Boston United Lincolnshire Hospitals NHS Trust.

Dec 31, 2015

Download

Documents

Oswin Cain
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Biomass CHP Project at Pilgrim Hospital Boston United Lincolnshire Hospitals NHS Trust.

Click icon to add picture

Biomass CHP Project at Pilgrim Hospital Boston

United Lincolnshire Hospitals NHS Trust

Page 2: Biomass CHP Project at Pilgrim Hospital Boston United Lincolnshire Hospitals NHS Trust.

Issues

— Steam Plant 40 years old— A desire to reduce environmental impact and costs— Capital Availability ??

Trust’s Solution

— Tender under PFI rules to include Finance— Transfer Risk— Increased Efficiency— Carbon Management

Background: Energy & Sustainability Issues facing the Trust

Page 3: Biomass CHP Project at Pilgrim Hospital Boston United Lincolnshire Hospitals NHS Trust.

3

Pilgrim Hospital Energy Centre, Boston

15 year contract for Energy Supply and Operation

Awarded in April 2008

Design, build and operation of Energy Centre

Steam raising biomass, gas & CHP

Updated control system

New water treatment plant

First installation of steam biomass boiler supplied to the NHS within the UK

Page 4: Biomass CHP Project at Pilgrim Hospital Boston United Lincolnshire Hospitals NHS Trust.

3D Animation Video

https://www.youtube.com/watch?v=j7MiMCQJMvE

https://www.youtube.com/watch?v=j7MiMCQJMvE

Page 5: Biomass CHP Project at Pilgrim Hospital Boston United Lincolnshire Hospitals NHS Trust.

5

Success Factors

Capital Avoidance

— £750,000 Gas Mains Upgrade

Technical Solution

— Biomass Infrastructure Costs— Increased Size of Biomass— Fuel Diversity— Carbon Reduction

Cost Effective Solution

— Cost Reduction— New Efficient Plant— Carbon Trading Benefit

Continual Improvement

— 2 MW Gas Boiler Now Added

Page 6: Biomass CHP Project at Pilgrim Hospital Boston United Lincolnshire Hospitals NHS Trust.

6

Summary

Lowest Life Cycle Cost

Fuel Diversity

Continual Improvement

Reduced Environmental Impact

Reduced Costs of Operation

Strong Partnership