BIM based visualization of wall BIM-based visualization of wall demolition work, Phase 2 BIM Safety research project, Pilot 2 Kristiina Sulankivi Kristiina Sulankivi VTT Technical Research Centre of Finland
14

bim safety visualization of wall demolition pilot2 phase2 ...

Apr 03, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: bim safety visualization of wall demolition pilot2 phase2 ...

BIM based visualization of wallBIM-based visualization of wall demolition work, Phase 2

BIM Safety research project, Pilot 2 Kristiina SulankiviKristiina SulankiviVTT Technical Research Centre of Finland

Page 2: bim safety visualization of wall demolition pilot2 phase2 ...

207/10/2011

4D-visualization of wall demolition work, phase 2 Background and modelling principles

Another visualization was conducted later concerning demolition work of the upper section of the same wall. Two alternative sequences of demolition work were visualized for decision-making. The latest Tekla tools available were tested for BIM based modellingThe latest Tekla tools available were tested for BIM-based modelling of the demolition parts: “Wall manager” and “Seam controller” tools being developed for concrete element walls by Tekla corporation. 4D-visualization with new (unlimited) color options were tested:

– natural colors for existing building parts (e.g. the used white color has not been available in previous versions of Tekla software.)

– irrelevant parts were left in the background using the gray color– the key issues were highlighted using chosen highlighting colors

Page 3: bim safety visualization of wall demolition pilot2 phase2 ...

307/10/2011

DEMOLITION PARTS: Modelled with help of Wall manager and Seam controller tools / Tekla Structures 17.1 alfa2

Wall has been split into ”elements” > position of theelements -> position of the seams (saw cuts in this case) can be adjusted by movingthe seam components.

Page 4: bim safety visualization of wall demolition pilot2 phase2 ...

407/10/2011

Colors in the 4D-visualization of the ll d liti k h 2

The original colors in the project’st t l T kl d l

COLORS:

wall demolition work, phase 2structural Tekla model

Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT

Page 5: bim safety visualization of wall demolition pilot2 phase2 ...

507/10/2011

Sequence A: Demolition part 1

Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT

Page 6: bim safety visualization of wall demolition pilot2 phase2 ...

607/10/2011

Sequence A: Demolition part 2

Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT

Page 7: bim safety visualization of wall demolition pilot2 phase2 ...

707/10/2011

Sequence A: Demolition part 3

Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT

Page 8: bim safety visualization of wall demolition pilot2 phase2 ...

807/10/2011

Sequence A: Demolition part 4

Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT

Page 9: bim safety visualization of wall demolition pilot2 phase2 ...

907/10/2011

Sequence A: Demolition part 5

Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT

Page 10: bim safety visualization of wall demolition pilot2 phase2 ...

1007/10/2011

Sequence A: Demolition part 6

Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT

Page 11: bim safety visualization of wall demolition pilot2 phase2 ...

1107/10/2011

Sequence A: Demolition part 11

Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT

Page 12: bim safety visualization of wall demolition pilot2 phase2 ...

1207/10/2011

Sequence A: Demolition part 16

Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT

Page 13: bim safety visualization of wall demolition pilot2 phase2 ...

1307/10/2011

Sequence A: Demolition part 17Sequence A: Demolition part 17together with scaffoldings 1)

Case –building project: Industrial building TVO, Finland , Structural engineering and modelling: Pöyry Civil Oy, Site modelling and visualizations: VTT1) Modelling test covering part of scaffoldings was tested with help of Layher components (Tekla Custom components made in Tekla Inc. )

Page 14: bim safety visualization of wall demolition pilot2 phase2 ...

1407/10/2011

VTT creates business fromVTT creates business from technology