BIM and Public Procurement – Insights from The Netherlands Dr. Evelien Bruggeman 2017 Annual Conference of the European Society of Construction Law University of Fribourg Switzerland
BIMand PublicProcurement –Insights from TheNetherlands
Dr.Evelien Bruggeman
2017AnnualConferenceof the EuropeanSocietyof Construction LawUniversityof FribourgSwitzerland
BIMandpublicprocurement– InsightsfromTheNetherlands
EvelienBruggeman
Outline ofmy presentation
§ Anoverview ofprocurement law inTheNetherlands
§ Threeexamples ofBIMinTheNetherlands
§ Threeaspects ofthe procurement process and BIM§ thespecificationsofthetender:thetenderdocumentsandrequirements§ theuseofcriteriaforselectiontofindasuitabletenderer§ theawardcriteriaasameanstofindthebestbidregardingBIM
§ Conclusions and final remarks
2
ProcurementlawinTheNetherlands
§Directive2014/24/EU
§ Procurement Act2016- Aanbestedingswet2016
§ Proportionality Guide2016– GidsProportionaliteit2016Bilateral guide,regulations,‘comply orexplain’
3
ThreeexamplesofBIMinTheNetherlands
§NationalRoadandWaterwaysAuthority,Rijkswaterstaatthefrontrunner
§ TheProvinceofGelderlandafollower
§ CentralGovernmentRealEstateAgency,RijksvastgoedbedrijfintheearlystagesofprocuringandusingBIM
4
Thelock programme
# 5
SluisEefdeenBeatrixsluis
Rijnlandroute
# 6
TraverseDieren
#RoadshowEvelien 7
Thespecificationsofthetender:threesubjects§ Specifications:
practicalandlegalaspectsofthetenderprocessandthetechnicalspecificationsfortheproject
§ EmployersInformationRequirement(EIR),orInformatie LeveringSpecificatie (ILS)
§ ContractdocumentsorcontractualclausesregardingBIM
§ TheuseofBIMdataroomoraBIMmodel
8
Employers InformationRequirement (EIR)
§ Programme ofRequirements for the digitaldemandsThecore ofthe informationdemands
§ Technical,process orprojectmanagement,and commercialrequirements
§ Formsofthe EIR(Rijkswaterstaat,Rijksvastgoedbedrijf)
# 9
Contractdocuments and contractual clauses§ Extraobligations for the contractor
§ DeliveryofaBIMmodelorBIMdata§ Another working method orprocess
§ Contractual implications ofthe use ofBIM
§ Content:ownershiporuserrightsregardingthemodel,penaltyclausesforlateorincompletedatadropsetc.
§ Form:other contractdocuments inthe formofappendices,protocols,executionplans ornewclauses inexisting contracts
10
ABIMdataroomorBIMmodel§ BIMmodel(s)aspartofthe procurement documents ortenderspecifications§ Wishes,sketches,impressions,preliminiarydesigns,alternativesolutionsetc.
§ BIMdataroomRijkswaterstaat§ Models§ Other digitalinformation(location,supply routes,soil orsurface etc.)§ Based ontheir OTL
§ Two problems:§ amount ofinformation§ hierachy ofthe information
11
BIMand the tenderspecifications
§ Principle oftransparancy
§ Principle ofproportionality (art.1.10Aw)
Regulation 3.9AProportionality Guide(allocation fo risks)Regulation 3.9BProportionalityGuide(contractual clauses)Regulation3.9CProportionalityGuide(deviationofcontractmodels)Regulation3.9.1ProportionalityGuide(transferofintellectualpropertyrights)
12
TenderspecificationsandBIM:conclusions
BIMcanbringnewchallengesintheprocurementphase,suchas
§ theneedforacontractingauthoritytothoroughlyassesshowitanticipatesusingBIMandwhatdatait(really)needs
§ theoverloadofinformationinBIMmodelsandadataroomaspartofthetenderprocedure,causingproblemsoftransparencyandhierarchyofinformation
§ thenecessitytochangestandardcontractualclauses
13
Criteriafor selection
§Grounds for exclusion
§ Suitability requirements
#RoadshowEvelien 14
Criteriafor selection:grounds for exclusion
§ art.2.87lid1subgAw:exclusiongroundforpastperformancesignificantorpersistentdeficiencies intheperformanceofanysubstantiverequirementunderapriorcontract
#RoadshowEvelien 15
Criteriafor selection:the suitability requirements
§ Limitativeenumerationinart.2.90Aw.leveloftechnicalcompetenceorprofessionalaptitude
§ RelevantsubjectsforBIM:§ referenceworks:essentialaspectoftheworkoracorecompetence
§ certificationandeducation:personnelandtechnicalresources
§ theuseofperformanceindicators
#RoadshowEvelien 16
CriteriaforselectionandBIM:conclusions
§NotyetusedinTheNetherlands...BUT
§ IncreasingimportanceofBIMfortheprocurementprocess
§Offersgreatpotentialtofindasuitabletenderer
#RoadshowEvelien 17
Awardcriteria:theBIMExecutionPlan
§ TheUKBIMExecution Plan(preand postBEP)practice
§ TheDutchExecution Planmodel(Uitvoeringsplan)theory
#RoadshowEvelien 18
Theexecutionplanasapartoftheawardphase:conclusions
§Not yetusedinTheNetherlands
§Gainingmomentumduetoincreasinguseand importance ofBIM
§ ExecutionPlanmodelavailable
#RoadshowEvelien 19
Conclusions
§ Thesituation inTheNetherlands
§ Threeaspects ofprocurement§ Specification ofthe BIMrequirements§ Criteriafor selection§ Awardcriteriaand the BIMExecution Plan
§ Thefuture ofBIMinprocurement…