SITE LOCATION DATE: NOVEMBER 23, 2021 AREA LOCATION MAP ARCHITECT / ENGINEER : HR: 150-2931 BID PACKAGE B: EAST ALTON WOOD RIVER CUSD #14 EAST ALTON WOOD RIVER HIGH SCHOOL EAST ALTON, MADISON COUNTY, ILLINOIS EAST ST. LOUIS, IL MARION, IL ARNOLD, MO NEOSHO, MO NASHVILLE, TN 1400 E. TREMONT STREET HILLSBORO, IL PH: 217.532.3959 Hurst-Rosche, Inc. PROFESSIONAL DESIGN NUMBER: 184-000298 www.hurst-rosche.com EAST BUILDING HVAC REPLACEMENT 112 N. KANSAS STREET EDWARDSVILLE, IL 62025 P: 618-659-8709 P: 618-656-8353 ENGINEERS, LLC CONSULTANT: SHEET INDEX: G-101 COVER SHEET A-101 FLOOR PLAN AND ROOF PLAN S-001 GENERAL NOTES S-101 FRAMING PLAN AND DETAILS M-101 MECHANICAL PLAN - SECOND FLOOR M-102 MECHANICAL PLAN - ROOF M-601 HVAC SCHEDULES, NOTES & DETAILS E-101 ELECTRICAL PLAN - FIRST FLOOR E-102 ELECTRICAL PLAN - ROOF E-601 ELECTRICAL DETAILS
10
Embed
BID PACKAGE B: EAST BUILDING HVAC REPLACEMENT EAST …
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
SITE LOCATION
DATE: NOVEMBER 23, 2021
AREA LOCATION MAP
ARCHITECT / ENGINEER :
HR
: 150
-293
1
BID PACKAGE B:
EAST ALTON WOOD RIVER CUSD #14EAST ALTON WOOD RIVER HIGH SCHOOLEAST ALTON, MADISON COUNTY, ILLINOIS
G-101 COVER SHEETA-101 FLOOR PLAN AND ROOF PLANS-001 GENERAL NOTESS-101 FRAMING PLAN AND DETAILSM-101 MECHANICAL PLAN - SECOND FLOORM-102 MECHANICAL PLAN - ROOFM-601 HVAC SCHEDULES, NOTES & DETAILSE-101 ELECTRICAL PLAN - FIRST FLOORE-102 ELECTRICAL PLAN - ROOFE-601 ELECTRICAL DETAILS
AutoCAD SHX Text
COOK
AutoCAD SHX Text
DU PAGE
AutoCAD SHX Text
KANE
AutoCAD SHX Text
DE KALB
AutoCAD SHX Text
LEE
AutoCAD SHX Text
WHITESIDE
AutoCAD SHX Text
OGLE
AutoCAD SHX Text
CARROLL
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
MC HENRY
AutoCAD SHX Text
BOONE
AutoCAD SHX Text
WINNEBAGO
AutoCAD SHX Text
STEPHENSON
AutoCAD SHX Text
JO DAVIES
AutoCAD SHX Text
PUTNAM
AutoCAD SHX Text
MARSHALL
AutoCAD SHX Text
LIVINGSTON
AutoCAD SHX Text
IROQUOIS
AutoCAD SHX Text
KANKAKEE
AutoCAD SHX Text
WILL
AutoCAD SHX Text
GRUNDY
AutoCAD SHX Text
KENDALL
AutoCAD SHX Text
LASALLE
AutoCAD SHX Text
BUREAU
AutoCAD SHX Text
HENRY
AutoCAD SHX Text
STARK
AutoCAD SHX Text
PEORIA
AutoCAD SHX Text
KNOX
AutoCAD SHX Text
WARREN
AutoCAD SHX Text
HENDERSON
AutoCAD SHX Text
MERCER
AutoCAD SHX Text
ROCK ISLAND
AutoCAD SHX Text
MACON
AutoCAD SHX Text
MOULTRIE
AutoCAD SHX Text
DOUGLAS
AutoCAD SHX Text
COLES
AutoCAD SHX Text
EDGAR
AutoCAD SHX Text
CLARK
AutoCAD SHX Text
CUMBERLAND
AutoCAD SHX Text
SHELBY
AutoCAD SHX Text
CHRISTIAN
AutoCAD SHX Text
MONTGOMERY
AutoCAD SHX Text
MACOUPIN
AutoCAD SHX Text
JERSEY
AutoCAD SHX Text
GREENE
AutoCAD SHX Text
CALHOUN
AutoCAD SHX Text
PIKE
AutoCAD SHX Text
SCOTT
AutoCAD SHX Text
MORGAN
AutoCAD SHX Text
SANGAMON
AutoCAD SHX Text
MENARD
AutoCAD SHX Text
CASS
AutoCAD SHX Text
BROWN
AutoCAD SHX Text
ADAMS
AutoCAD SHX Text
SCHUYLER
AutoCAD SHX Text
MASON
AutoCAD SHX Text
LOGAN
AutoCAD SHX Text
DEWITT
AutoCAD SHX Text
PIATT
AutoCAD SHX Text
VERMILION
AutoCAD SHX Text
CHAMPAIGN
AutoCAD SHX Text
FORD
AutoCAD SHX Text
MCLEAN
AutoCAD SHX Text
WOODFORD
AutoCAD SHX Text
TAZEWELL
AutoCAD SHX Text
FULTON
AutoCAD SHX Text
MC DONOUGH
AutoCAD SHX Text
HANCOCK
AutoCAD SHX Text
WABASH
AutoCAD SHX Text
EDWARDS
AutoCAD SHX Text
GALLATIN
AutoCAD SHX Text
SALINE
AutoCAD SHX Text
WILLIAMSON
AutoCAD SHX Text
JACKSON
AutoCAD SHX Text
RANDOLPH
AutoCAD SHX Text
PERRY
AutoCAD SHX Text
FRANKLIN
AutoCAD SHX Text
HAMILTON
AutoCAD SHX Text
WHITE
AutoCAD SHX Text
WAYNE
AutoCAD SHX Text
JEFFERSON
AutoCAD SHX Text
WASHINGTON
AutoCAD SHX Text
MONROE
AutoCAD SHX Text
ST. CLAIR
AutoCAD SHX Text
CLINTON
AutoCAD SHX Text
MARION
AutoCAD SHX Text
CLAY
AutoCAD SHX Text
RICHLAND
AutoCAD SHX Text
LAWERENCE
AutoCAD SHX Text
CRAWFORD
AutoCAD SHX Text
JASPER
AutoCAD SHX Text
EFFINGHAM
AutoCAD SHX Text
FAYETTE
AutoCAD SHX Text
BOND
AutoCAD SHX Text
MADISON
AutoCAD SHX Text
MASSAC
AutoCAD SHX Text
PULASKI
AutoCAD SHX Text
ALEXANDER
AutoCAD SHX Text
UNION JOHNSON POPE HARDIN
ROOF BELOW
5 6
TYP.OF 2
5 6 TYP.OF 12
67
TYP.OF 2
8
TYP.OF 2
8
8
2
1
3A-
101
TYP.
4A-101TYP.
3
4
4
ROOF BELOW
EXISTING INSULATION
EXISTING ROOF MEMBRANEAND FLASHINGS
8'' M
INIM
UM
FLAS
HIN
G H
EIG
HT
TOP COAT
FULLY REINFORCEDBASE COAT
NOTE:1. PRIOR TO SPLICING, CLEAN EXISTING PIB MEMBRANE BY SCRUBBING THE
SPLICE AREA WITH WEATHERED MEMBRANE CLEANER AND ALLOW TO DRY.
MECHANICAL FASTENER ASRECOMMENDED BY THE ROOFSYSTEM MANUFACTURER
EXIST. METAL DECK
RIGID INSULATION
PIB MEMBRANE(SEE NOTE 1)
5'-5
"+/-
4'-0"+/-
6'-1
"+/-
3'-0"
3'-0
"
NORTH
A-101
TLDGBSTLD
FLOOR PLAN ANDROOF PLAN
SCALE:FLOOR PLAN
A-1011
1/16"=1'-0"
GENERAL NOTES:
1. ROOF IS EXISTING PIB MEMBRANE WITH EXPIRED WARRANTY #77724 FROMREPUBLIC POWDERED METALS, INC. / TREMCO, INC.
2. PROVIDE AND INSTALL NEW SLIP RESISTANT MEMBRANE WALKPADS AT THEPERIMETER OF NEW ROOF TOP EQUIPMENT.
3. CONTRACTOR SHALL INCLUDE A CASH ALLOWANCE OF $10,000 IN THEIR BID TOCOVER THE REMOVAL AND REINSTALLATION OF DATA WIRING, ELECTRICALWIRING, CONDUIT, PIPING AND OTHER POTENTIAL CONFLICTS ABOVE CEILINGSOF EAST BUILDING TO ALLOW FOR THE INSTALLATION OF NEW STRUCTURALSTEEL FRAMING. CONTRACTOR SHALL DOCUMENT THE WORK THROUGH TIMEAND MATERIAL RECORDS. SEE SPEC SECTION 01 20 00 FOR ADDITIONAL INFO.
4. PROVIDE AND INSTALL NEW SLIP RESISTANT MEMBRANE WALKPADS AT THEPERIMETER OF NEW ROOF TOP EQUIPMENT.
KEYED NOTES:
1. RTU AND CURB - SEE M-SHEETS AND DETAILS, THIS SHEET.
2. 1/2":12" TAPERED CRICKET. SEE DETAILS, THIS SHEET.
3. REMOVE EXISTING TRANSLUCENT PANEL FROM VERTICAL WALL OF SKYLIGHT. PROVIDE / INSTALL NEW TRANSLUCENT PANEL WITH 36BY 36" ROUGH OPENING (WITH TRIPLE I-BEAM PERIMETER) FOR ROUTING OF NEW DUCTWORK. EXISTING PANEL IS AND NEW PANEL SHALLBE KALWALL. CONTACT NATHAN HOMANN AT MAYS MAUNE McWARD AT 1.636.349.1645. SEE ELEVATION BELOW FOR APPROX. PANEL SIZE.
4. PREP, PRIME AND PAINT GAS PIPING. COLOR TO BE SAFETY YELLOW, PROVIDE AND INSTALL RUBBER PIPE SUPPORTS (MIFAB C-PORT PIPESUPPORTS OR APPROVED EQUAL AT 10'-0" O.C.) - SEE M-SHEETS FOR CONTINUATION OF PIPING.
5. SALVAGE EXG. CEILING PANELS FOR REINSTALLATION. DEMO AND REMOVE EXG. CEILING GRID TO ALLOW FOR STRUCTURAL STEEL WORK.PROVIDE / INSTALL NEW CEILING GRID AND INSTALL SALVAGED CEILING PANELS AFTER OTHER WORK IS COMPLETE.
6. TEMPORARILY REMOVE EXISTING LIGHT FIXTURE AS REQUIRED FOR INSTALLATION OF STRUCTURAL WORK FOR NEW ROOF TOP UNITS.REINSTALL SALVAGED LIGHT FIXTURE AFTER OTHER WORK IS COMPLETE.
7. TEMPORARILY REMOVE EXISTING EXIT SIGN AS REQUIRED FOR INSTALLATION OF STRUCTURAL WORK FOR NEW ROOF TOP UNITS.REINSTALL SALVAGED EXIT SIGN AFTER OTHER WORK IS COMPLETE.
8. TEMPORARILY REMOVE EXISTING SMOKE DETECTOR AS REQUIRED FOR INSTALLATION OF STRUCTURAL WORK FOR NEW ROOF TOP UNITS.REINSTALL SALVAGED SMOKE DETECTOR AFTER OTHER WORK IS COMPLETE.
A. CODES AND STANDARDSALL DESIGN AND CONSTRUCTION WORK FOR THIS PROJECT SHALL CONFORM TO THE 2015
INTERNATIONAL BUILDING CODE.B. LIVE LOAD DATA
ROOF...............................................................................................................................20 PSFALL LIVE LOADS NON-REDUCIBLE
C. WIND LOAD DATABASIC WIND SPEED...................................................................................................120 MPHIMPORTANCE FACTOR.......................................................................................................1.0EXPOSURE CLASSIFICATION............................................................................................"C"
D. SEISMIC LOAD DATAMAPPED SPECTRAL ACCELERATIONS
0.2 SECOND PERIOD (Ss).....................................................................................0.3851.0 SECOND PERIOD (S1).....................................................................................0.145
SPECTRAL RESPONSE COEFFICIENTS0.2 SECOND PERIOD (SDs)...................................................................................0.3831.0 SECOND PERIOD (SD1)...................................................................................0.223
F. IN CASE OF CONFLICT BY GOVERNING CODES, THE MOST STRINGENT REQUIREMENT SHALL GOVERN.
2. STRUCTURAL STEEL:
A. ALL STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED, AND ERECTED IN ACCORDANCE WITH THE AISC CODE OF STANDARD PRACTICE, EXCEPT AS MODIFIED IN THESE NOTES AND THE PROJECT SPECIFICATIONS.
B. U.N.O. THE MINIMUM PLATE THICKNESS SHALL BE 1/4", THE MINIMUM BOLT DIAMETER SHALL BE 5/8", THE MINIMUM WELD SHALL BE 3/16" AND THE MINIMUM DESIGN LOAD ON ANY CONNECTION SHALL BE 10 KIPS. BOLT HOLES SHALL BE STANDARD 1/16" DIAMETER LARGER THAN BOLT.
C. ALL STRUCTURAL STEEL EXPOSED TO VIEW ON INTERIOR OR EXTERIOR OF THE BUILDING SHALL CONFORM TO THE REQUIREMENTS OF ARCHITECTURALLY EXPOSED STEEL OF AISC CODE OF STANDARD PRACTICE SECTION 10.
D. ALL EXTERIOR EXPOSED STEEL SHALL BE HOT-DIPPED GALVANIZED PER ASTM A123, U.N.O.E. BOLTED CONNECTIONS:
1. ALL EXTERIOR EXPOSED BOLTS, NUTS, AND WASHERS SHALL BE TYPE 3 U.N.O.2. SHOP DRAWINGS SHALL INDICATE THE TYPE OF BOLT USED IN EACH CONNECTION AND THE
DESIGN VALUES USED FOR THE VARIOUS BOLT TYPES.F. ALL WELDS EXPOSED TO VIEW SHALL BE GROUND SMOOTH.G. SPLICING OF STEEL MEMBERS, UNLESS SHOWN ON THE DRAWINGS, IS PROHIBITED WITHOUT
WRITTEN APPROVAL OF THE ARCHITECT/ENGINEER.H. NO CHANGE IN SIZE OR POSITION OF STRUCTURAL ELEMENTS SHALL BE MADE AND HOLES, SLOTS,
CUTS, ETC. ARE NOT PERMITTED THROUGH ANY MEMBER UNLESS THEY ARE APPROVED BY THE ARCHITECT/ENGINEER.
I. NO FINAL BOLTING OR WELDING SHALL BE MADE UNTIL AS MUCH OF THE STRUCTURE AS WILL BE STIFFENED THEREBY HAS BEEN PROPERLY ALIGNED.
J. FABRICATE ALL BEAMS WITH THE MILL CAMBER UPK. ALL CONNECTIONS TO BE SHOP WELDED AND FIELD BOLTED WHERE PRACTICALLY POSSIBLE
EXCEPT AS INDICATED ON DRAWINGS.L. ALL STRUCTURAL STEEL SHALL HAVE ONE SHOP COAT OF RUST INHIBITING PRIMER PAINT
CONFORMING TO PROJECT SPECIFICATIONS. FIELD TOUCH UP ALL UNPAINTED AREAS.M. ALL DETAILS, SECTIONS, AND NOTES SHOWN ON DRAWINGS ARE INTENDED TO BE TYPICAL AND
SHALL APPLY TO SIMILAR SITUATIONS ELSEWHERE.N. ALL ADDITIONAL STEEL OR OTHER MATERIALS REQUIRED BY THE CONTRACTOR FOR ERECTION
PURPOSES AND SITE ACCESS OF STOCKPILED MATERIALS SHALL BY PROVIDED AT NO COST TO THE OWNER. ALL SUCH ADDITIONAL MATERIALS SHALL BE REMOVED BY THE CONTRACTOR UNLESS APPROVED BY THE OWNER IN WRITING.
4. MECHANICAL AND ADHESIVE ANCHORS:
A. ALL MECHANICAL AND ADHESIVE ANCHORS TO HAVE CURRENT ICC REPORTS FOR USE ON THIS PROJECT.
B. ALL ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH ICC AND MANUFACTURE RECOMMENDATIONS.
C. CONFIRM FINAL ANCHOR LOCATIONS PRIOR TO FABRICATING PLATES, MEMBERS, OR OTHER STEEL ASSEMBLIES ATTACHED WITH MECHANICAL OR ADHESIVE ANCHORS.
5. ITEMS ANCHORED TO PRIMARY STRUCTURE:
A. DESIGN PRE-ENGINEERED STRUCTURES AND ITEMS TO BE ANCHORED TO THE PRIMARY STRUCTURE IN ACCORDANCE WITH 2015 INTERNATIONAL BUILDING CODE.
B. PROVIDE COMPLETE DESIGN FOR GRAVITY AND SEISMIC FORCES. SUBMIT TO OWNER'S REPRESENTATIVE CALCULATIONS AND DRAWINGS SHOWING ALL ATTACHMENT DETAILS TO PRIMARY STRUCTURE AND LOCATION, DIRECTION, AND MAGNITUDE OF ALL GRAVITY AND SEISMIC LOADS TRANSMITTED TO PRIMARY STRUCTURE IN EXCESS OF 250 LBS.
C. CONNECTIONS OF ITEMS TO THE PRIMARY STRUCTURE SHALL NOT RESULT IN TORSION IN THE SUPPORTING STRUCTURAL MEMBERS.
D. ALL HANGERS FOR DUCTWORK, PIPE WORK, ETC. SHALL BE HUNG DIRECTLY FROM STRUCTURAL MEMBERS OR SUPPLEMENTARY MEMBERS. THE LOCATION AND ORIENTATIONS OF THESE HANGERS SHALL NOT IMPAIR THE LOAD CAPACITY OF THE STRUCTURAL MEMBERS.
E. THE RESPECTIVE TRADES SHALL DESIGN AND PROVIDE REINFORCING OR SUPPLEMENTAL FRAMING AS REQUIRED FOR THEIR CONNECTIONS.
F. SEE ARCHITECTURAL AND MECHANICAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
6. EXISTING CONDITIONS:
A. BECOME FAMILIAR WITH EXISTING CONDITIONS PRIOR TO BIDDING. PROVIDE NECESSARY MEANS AND METHODS TO ACCOMPLISH THE SPECIFIED WORK.
B. FIELD VERIFY CONDITIONS, SIZES, SPACING, AND DIMENSIONS OF EXISTING STRUCTURE TO FABRICATIONS AND NEW CONSTRUCTION. CONTACT THE STRUCTURAL ENGINEER IF EXISTING CONDITIONS, ETC. VARY FROM THOSE SHOWN ON THESE DRAWINGS.
C. CONTRACTOR IS RESPONSIBLE FOR TEMPORARY REMOVAL AND REPLACEMENT/RELOCATION OF ANY NON-STRUCTURAL ELEMENTS NECESSARY TO COMPLETE THE STRUCTURAL WORK. FOLLOW ALL APPLICABLE CODES AND REQUIREMENTS OF AFFECTED TRADES. PROVIDE FOR THIS REQUIREMENT IN THE BID.
D. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EXCAVATION INCLUDING LAGGING, SHORING , UNDERPINNING, AND PROTECTION OF EXISTING CONSTRUCTION.
7. MISCELLANEOUS:
A. STRUCTURAL DRAWINGS ARE INTENDED TO BE USED WITH ARCHITECTURAL AND MECHANICAL DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SUCH REQUIREMENTS, SHOP DRAWINGS, AND WORK.
B. NO OPENING SHALL BE MADE IN ANY STRUCTURAL MEMBER WITHOUT THE WRITTEN APPROVAL OF THE ARCHITECT/ENGINEER.
C. NO CHANGE IN SIZE OR DIMENSION OF STRUCTURAL MEMBERS SHALL BE MADE WITHOUT THE WRITTEN APPROVAL OF THE ARCHITECT/ENGINEER.
D. THE CONTRACTOR IS RESPONSIBLE FOR LIMITING THE AMOUNT OF CONSTRUCTION LOAD IMPOSED UPON STRUCTURAL FRAMING. CONSTRUCTION LOADS SHALL NOT EXCEED THE DESIGN CAPACITY OF THE FRAMING AT THE TIME LOADS ARE IMPOSED.
E. THE STRUCTURE IS DESIGNED TO FUNCTION AS A UNIT UPON COMPLETION. THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING ALL TEMPORARY BRACING AND/OR SUPPORT THAT MAY BE REQUIRED AS THE RESULT OF THE CONTRACTOR'S CONSTRUCTION METHODS AND/OR SEQUENCES.
F. UNLESS OTHERWISE NOTED, FIREPROOFING METHODS AND MATERIALS FOR STRUCTURAL MEMBERS ARE NOT SHOWN ON STRUCTURAL DRAWINGS. REFER TO ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR FIRE RATING REQUIREMENTS, FIRE PROOFING METHODS, AND MATERIALS.
G. DO NOT SCALE THESE DRAWINGS, USE DIMENSIONS.H. CONTRACTOR'S CONSTRUCTION AND/OR ERECTION SEQUENCES SHALL RECOGNIZE AND CONSIDER
THE EFFECTS OF THERMAL MOVEMENTS OF STRUCTURAL ELEMENTS DURING THE CONSTRUCTION PERIOD. EXPANSION JOINTS SHOWN ON THE DRAWINGS HAVE BEEN DESIGNED TO ACCOMMODATE ANTICIPATED THERMAL MOVEMENT AFTER THE BUILDING IS COMPLETE.
I. THE CONTRACTOR SHALL INFORM THE ARCHITECT IN WRITING OF ANY DEVIATION FROM THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL NOT BE RELIEVED OF THE RESPONSIBILITY FOR SUCH DEVIATION BY THE ARCHITECT'S APPROVAL OF SHOP DRAWINGS, PRODUCT DATA, ETC., UNLESS HE/SHE HAS SPECIFICALLY INFORMED THE ARCHITECT OF SUCH DEVIATION AT THE TIME OF SUBMISSION, AND THE ARCHITECT HAS GIVEN WRITTEN APPROVAL TO THE SPECIFIC DEVIATION.
J. ALL THINGS WHICH, IN THE OPINION OF THE CONTRACTOR, APPEAR TO BE DEFICIENCIES, OMISSIONS, CONTRADICTIONS, OR AMBIGUITIES, IN THE PLANS AND SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. PLANS AND/OR SPECIFICATIONS WILL BE CORRECTED, OR WRITTEN INTERPRETATION OF THE ALLEGED DEFICIENCY, OMISSION, CONTRADICTION OR AMBIGUITY WILL BE MADE BY THE ARCHITECT/ENGINEER BEFORE THE AFFECTED WORK PRECEDES.
K. FURNISH ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE THE WORK SHOWN OR INFERRED BY THESE DRAWINGS.
L. SEE ARCHITECTURAL DRAWINGS FOR DIMENSIONS NOT SHOWN.M. REFERENCE THE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.N. DETAILS LABELED "TYPICAL DETAILS" ON THE DRAWINGS SHALL APPLY TO ALL SITUATIONS
OCCURRING ON THE PROJECT THAT ARE THE SAME OR SIMILAR TO THOSE SPECIFICALLY DETAILED. THE APPLICABILITY OF THE DETAIL TO ITS LOCATION ON THE PLANS CAN BE DETERMINED BY THE TITLE OF THE DETAIL. SUCH DETAILS SHALL APPLY WHETHER OR NOT THEY ARE KEYED IN AT EACH LOCATION. DECISIONS REGARDING APPLICABILITY OF TYPICAL DETAILS SHALL BE DETERMINED BY THE ARCHITECT/ENGINEER.
O. REVIEW OF THE SHOP DRAWINGS SHALL NOT BE CONSTRUED AS AN AUTHORIZATION TO DEVIATE FROM CONTRACT DOCUMENTS.
3. STEEL JOISTS:
A. BRIDGING:• LH SERIES JOISTS: UNLESS NOTED OTHERWISE, BRIDGING SHALL BE
DESIGNED AND SPACED IN ACCORDANCE WITH S.J.I. SPECIFICATIONS.B. UNLESS NOTED OTHERWISE, JOISTS SHALL BE ATTACHED TO SUPPORTING STEEL
WORKS AS FOLLOWS:• LH SERIES JOISTS: TWO 3/16" FILLET WELDS (ONE EACH SIDE) 3" LONG OR
EQUIVALENT.C. BRIDGING THAT TERMINATES AT, OR IS INTERRUPTED BY, STRUCTURAL STEEL
BEAMS, SHALL BE ATTACHED TO TOP FLANGE BY FIELD WELDING OR BOLTING.D. JOISTS SHALL BE STOCKPILED AT THE JOBSITE IN A VERTICAL POSITION, RESTING
ON THEIR TOP OR BOTTOM CHORDS, AND SHALL BE ADEQUATELY SUPPORTED WITH WOOD BLOCKING, KEEP JOISTS FREE OF MUD AND DIRT.
E. IT SHALL BE THE ERECTOR'S RESPONSIBILITY TO SEE THAT JOISTS WHICH ARE DAMAGED, KINKED, BENT, OR WITH BROKEN WELDS, ARE NOT PLACED IN THE STRUCTURE.
F. IF A CONCENTRATED LOAD OCCURS BETWEEN PANEL POINTS, THE CONTRACTOR SHALL PROVIDE AN ADDITIONAL WEB MEMBER FROM THE LOAD POINT TO THE NEAREST PANEL POINT ON THE OPPOSITE CHORD. SEE 4/S-101.
G. SUBMIT SHOP DRAWINGS FOR JOISTS INDICATING SIZE, SPACING, AND BRIDGING AS REQUIRED BY THE SPECIFICATIONS.
H. DESIGN OF ROOF JOISTS AND BRIDGING SHALL CONSIDER A NET UPLIFT FROM WIND OR 18 PSF (UNFACTORED).
I. CONTRACTOR TO HAVE METAL SHIMS AVAILABLE FOR ANY NECESSARY JOIST BEARING ELEVATION ADJUSTMENT.
EDWARDSVILLE, IL 62025P: 618-659-8709P: 618-656-8353
11-23-2021150-2931
JJCNALCJC
S-001
GENERAL NOTES
BID
PACK
AGE
B:EA
ST B
UILD
ING
GYM
HVA
C RE
PLAC
EMEN
TEA
ST A
LTON
WOO
D RI
VER
CUSD
#14
EAST
ALT
ON W
OOD
RIVE
R HI
GH S
CHOO
LEA
ST A
LTON
, MAD
ISON
COU
NTY,
ILLI
NOIS
11-23-2021
N
KEY PLANSOUTH SIDE
N
EXISTING 3 1/2"Ø PIPE
EXISTING 5 1/2"Ø PIPE
2 SPLICES EACH
4 NEW 24LH03SP
3 NEW 24LH03 SP, 1 SPLICE EACH
2S-101
2S-101
EXISTING W21X82
CR
OSS
BR
ACIN
G@
7'-6
" TYP
.
EXISTING W21X82
JOIST SPLICE LOCATION, TYP.
EXISTING 24LH03 @ 4'-0"
5S-101
7S-101
TO B
E FI
ELD
VER
IFIE
D
+/- 2
2'-5
"
TO B
E FI
ELD
VER
IFIE
D
+/- 9
'-4"
EXISTING PIPEPROPOSED SPLICED OWSJ
24LH03 SP
DEAD LOAD = 20 PSF
ROOF LIVE LOAD = 20 PSF
SNOW LOAD = 22 PSF
MAX = 52 PSFRTU WEIGHT SHALL BE VERIFIED BY CONTRACTOR ONCE IT HAS BEEN SELECTED PRIOR TO OWSJ FABRICATION
C BEARING @ NORTH SUPPORTL
12'-6"
4'-0" 7'-6"
RTU = 1,150 LBS RTU = 1,370 LBS
SNOW DRIFT
JOIST MANUFACTUERER TO DESIGN JOIST TO SUPPORT UNFACTORED LOADS AS SHOWN ABOVE.
LOAD
PROVIDE AT ALL MECHANICAL UNITS AT CURBS WHERE CURBS CROSS JOISTS.
"A"
"A"1/4 1
STEEL JOISTSSEE PLANPLAN
WHERE DIMENSION "A" IS EQUAL TO OR GREATER THAN 3" FIELD INSTALL L2 1/2x2 1/2x1/4 EACH SIDE OF JOIST AS SHOWN
LOAD
LOAD
NOTE: THE ANGLE STRUT SHOWN TO TRANSFER THE LOAD TO A PANEL POINT ON THE OPPOSITE CHORD SHALL NOT BE REQUIRED, PROVIDED THE SUM OF THE CONCENTRATED LOADS WITHIN A CHORD PANEL DOES NOT EXCEED 100 POUNDS AND THE ATTACHMENTS ARE CONCENTRIC TO THE CHORD.
METAL DECK
ANGLE FRAME3/16
7S-101
8S-101
METAL DECK NOTSHOWN FOR CLARITY
THE
OPE
NIN
G E
ACH
EN
D
CR
OSS
FR
AMIN
G 6
'-0" M
AX.
1ST
JOIS
T PA
NEL
BEY
ON
D
(6'-0" MAX)
JOIST SPACING (SEE PLAN)
NOTE: VERIFY LOCATION& DIMS W/ MECH DRWGS.
L 3 1/2x3 1/2x1/4
EXISTING 24LH03
L3 1/2X3X1/4, TYP.
COPE ANGLE AS REQUIRED, TYP.
1/4TYP.
24LH03 SP
EXISTING W21X82
BEARING DEPTH MAY BE DECREASED BY 1/4" WITH THE ADDITION OF A FIELD INSTALLED 1/4" A36 STEEL PLATE FOR EASE OF CONSTRUCTION
3/16" 3"
5"
TOP CHORD OF NEWLY INSTALLED OWSJ SHALL BE BRACED EVERY 2'-0" O.C. MIN. WITH FIELD INSTALLED L3 1/2X3 1/2X1/4.
REMARKS:1. UNIT HAS R-410A REFRIGERANT.2. UNIT HAS 115 VOLT FACTORY WIRED CONVENIENCE OUTLET.3. UNIT HAS PREMIUM EFFICIENCY MOTORS WITH VFD'S.4. UNIT IS SINGLE ZONE VAV WITH BYPASS.5. UNIT HAS 4" 95% EFFICIENCY MERV 14 FILTER.6. UNIT HAS COMPRESSOR ISOLATION VALVES, SIGHT GLASS, VFD CONDENSER FAN - HEAD PRESSURE CONTROL.7. UNIT HAS NON-FUSED DISCONNECT SWITCH.8. UNIT HAS PHASE & BROWN OUT PROTECTION.9. UNIT HAS CONDENSER COIL GUARDS.10. UNIT HAS STAINLESS STEEL NATURAL GAS HEAT EXCHANGER.11. UNIT HAS HIGH TURNDOWN MODULATING GAS TEMPERATURE CONTROL.12. UNIT HAS MODULATING HOT GAS REHEAT.13. UNIT HAS DIFFERENTIAL ENTHALPY ECONOMIZER.14. UNIT HAS DUCT MOUNTED CO2 SENSOR.15. UNIT HAS DUCT MOUNTED HUMIDITY SENSOR.16. PROVIDE ON SINGLE TD5 TOUCHSCREEN DISPLAY FOR CONTROL OF BOTH RTU'S.
GENERAL HVAC NOTES:A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.
B. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPEAND GENERAL ARRANGEMENT ONLY.
C. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'SRECOMMENDATIONS, CONTRACT DOCUMENTS AND APPLICABLE CODES AND REGULATIONS.
D. ALL TESTS SHALL BE COMPLETED BEFORE ANY EQUIPMENT, DUCTWORK OR PIPING INSULATION IS APPLIED.
E. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS & CONTROLS.
F. BALANCE AIR FLOW TO ALL NEW HVAC EQUIPMENT, AS SPECIFIED AND INDICATED ON PLANS.
G. ALL HVAC EQUIPMENT AND ASSOCIATED DISCONNECTS SHALL BE LABELED WITH THE EQUIPMENT NUMBERPERMANENTLY AFFIXED WITH AN ENGRAVED PLASTIC LABEL.
H. PROVIDE VIBRATION ISOLATION TO ALL MECHANICAL EQUIPMENT TO PREVENT TRANSMISSION OF VIBRATION TO BUILDINGSTRUCTURE.
I. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE NOTDEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BESTCONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS. DO NOT SCALE DRAWINGS.
J. LOCATIONS AND SIZES OF ALL FLOOR, WALL AND ROOF OPENINGS SHALL BE COORDINATED WITH ALL OTHER TRADESINVOLVED.
K. INSTALL ALL EXTERIOR VENTS, EXHAUSTS, AND OUTSIDE-AIR INTAKES SO THAT ANY OUTSIDE-AIR INTAKE IS EITHER 2'-0"LOWER THAN ANY EXHAUST OR VENT WITHIN 15' OR 15' CLEAR OF ANY EXHAUST OR VENT AT THE SAME HEIGHT.COORDINATE WITH PLUMBING WORK FOR PLUMBING VENTS. OUTSIDE AIR EXHAUST AND INTAKE OPENINGS SHALL BEPROTECTED WITH CORROSION-RESISTANT SCREENS, LOUVERS OR ROOF/WALL CAPS, AS SHOWN AND SPECIFIED.OPENINGS SHALL BE PROTECTED AGAINST ALL LOCAL WEATHER CONDITIONS.
L. CONTRACTOR SHALL FLASH AND SEAL ALL NEW ROOF PENETRATIONS AND OPENINGS CREATED BY PROJECT SCOPE PERROOFING MANUFACTURERS RECOMMENDATIONS.
M. USE RADIUS ELBOWS ON ALL SUPPLY DUCTWORK. IF SPACE LIMITATIONS REQUIRE THE USE OF SQUARE ELBOWS, USETURNING VANES.
N. ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE STOPPED.
O. ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR DIMENSIONS.
P. ALL DUCTWORK MUST BE SEALED IN ACCORDANCE WITH SMACNA. PRESSURE SENSITIVE TAPE SHALL NOT BE USED ASTHE PRIMARY SEALANT.
Q. INSTALL ALL DUCTS AS PER SMACNA AND NFPA 90A. ENSURE THAT DUCT FASTENERS AND SEALANTS ARE USED. SEALALL LONGITUDINAL SEAMS AND ALL TRANSVERSE SEAMS.
R. CONTRACTOR TO PROVIDE OWNER WITH OPERATION AND MAINTENANCE MANUALS FOR ALL HVAC SYSTEMS WITHIN 90DAYS OF PROJECT COMPLETION.
S. CONTRACTOR TO PROVIDE OWNER WITH AS-BUILT RECORD DRAWINGS WITHIN 90 DAYS OF PROJECT COMPLETION.
T. WHEN MECHANICAL WORK IS SUBCONTRACTED, IT SHALL BE THE MECHANICAL CONTRACTOR'S RESPONSIBILITY TOCOORDINATE SUBCONTRACTORS AND THE ASSOCIATED CONTRACTS.
U. SOME ASSUMPTIONS WERE MADE REGARDING DUCT CONFIGURATION DURING DESIGN. THIS CONTRACTOR ISRESPONSIBLE FOR VERIFYING ALL FIELD CONDITIONS PRIOR TO THE PURCHASE OF ANY MATERIALS ANDCOMMENCEMENT OF ANY WORK AND IS TO NOTIFY THE ARCHITECT OF ANY DISCREPANCIES FOR RESOLUTION.
V. PROVIDE SUFFICIENT ACCESS TO SERVICE ALL MECHANICAL EQUIPMENT.
W. ALL CONTROL WORK TO BE PER MECHANICAL EQUIPMENT LIST. PROVIDE ANY NECESSARY TRANSFORMERS FOR LOWVOLTAGE CONTROL CIRCUITS. LOW VOLTAGE (24V) WIRING TO BE BY M.C.
X. COORDINATE ALL ELECTRICAL REQUIREMENTS WITH ELECTRICAL CONTRACTOR PRIOR TO INSTALLATION.
Y. ALL REFRIGERANT LINES GET INSULATED WITH 1/2" ELASTOMERIC CELL INSULATION (ARMACELL/RUBATEX, ETC). ANYLINES EXTERIOR TO THE BUILDING SHALL HAVE AN ALUMINUM JACKET FOR WEATHER PROTECTION.