BID CLARIFICATION #3 June 19, 2019 DUE DATE: June 25, 2019 TIME: 2:00 p.m. PROJECT: Tech Quad Phase III Innovation Partnership Building Project Number: 90661 LOCATION: University of Connecticut Capital Projects & Facilities Procurement 3 Discovery Drive Storrs, CT 06269 Attn: Walt Dalia Please note the following information must be incorporated into your proposal for the Tech Quad Phase III Innovation Partnership Building, Project #901661: 1) Attached is the Christopher Williams Architects Addendum #3 including Drawing G-004 End of Bid Clarification #3
3
Embed
BID CLARIFICATION #1 · reference specification section 12-2400 window shades. 2. reference architectural rcp's & interior elevations & details for more specific information and extent
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
BID CLARIFICATION #3 June 19, 2019 DUE DATE: June 25, 2019 TIME: 2:00 p.m. PROJECT: Tech Quad Phase III Innovation Partnership Building Project Number: 90661 LOCATION: University of Connecticut Capital Projects & Facilities Procurement 3 Discovery Drive Storrs, CT 06269 Attn: Walt Dalia Please note the following information must be incorporated into your proposal for the Tech Quad Phase III Innovation Partnership Building, Project #901661:
1) Attached is the Christopher Williams Architects Addendum #3 including Drawing G-004
End of Bid Clarification #3
06/19/2019 IPB 901 661 ADDENDUM 3 Page 1 of 1
ADDENDUM #3
VIA EMAIL ................................................ Date: Jun 19, 2019 Project: 1905 – Tech Quad Phase III Innovation Partnership Building UCONN Project No: 901 661 Re: Constructions Documents - Additional 3rd Floor Window Treatments Issued by: Christopher Williams Architects LLC
85 Willow Street, Building 54 New Haven, CT 06511 (203) 776-0184
To: Antoaneta Fedeles AIA,
LEED AP Project Manager / Facilities and Space Planner - UCONN University Planning, Design and Construction
No. of pages: 1 Notice to all Bidders: This Addendum forms a part of and modifies the original documents issued for bidding, dated May 10, 2019 to the extent noted herein. This Addendum supersedes all previous Drawings, General Documents, Specifications, Instructions and Addenda pertaining to these items. Acknowledge receipt of this Addendum on the submitted Bid. Item #1: Revised Architectural Drawings G-004 Level 3 - Overall Plan –Addition of Window shades to rooms 301, 302, 304 and 305 and notes clarifying extent of window treatments throughout this project.
DETAILS FOR MORE SPECIFIC INFORMATION AND EXTENT IN SPACES OTHER THAN IN ROOMS 301, 302, 304 AND 305
3
3
3
3 3
CDEFGH
3
4
5
6
7
8
10
11
12
13
B
11.7
FREIGHT ELEVATOR FOR ACCESS
OCCUPIED OFFICES - NIC
OCCUPIED OFFICES - NIC
OCCUPIED OFFICES - NIC
OCCUPIED OFFICES - NIC
OCCUPIED OFFICES - NIC
OCCUPIED OFFICES - NIC
SHELL SPACE313
SHELL SPACE316
ELEC.325A
ELECTRICAL325
EXISTING
315A
EXISTING
315BEXISTING315
PROJECT:
UN
IVE
RSIT
Y O
F CO
NN
ECT
ICU
T A
RCH
ITE
CTU
RAL
& E
NG
INE
ERI
NG
BU
ILD
ING
SE
RVIC
ES
31 L
ED
OY
T RO
AD
UN
IT 3
038
STO
RRS,
CO
NN
ECT
ICU
T 06
269-
3038
TE
LEPH
ON
E:
(860
) 486
-312
7 F
ACS
IMIL
E:
(860
) 486
-317
7
SCALE:DATE:
DRAFTER:
SHEET TITLE:
WORK ORDER NO:FILE NAME:
SHEET:
SHEET: of
CERTIFICATION:
STATUS:
AUTHOR:
CONSULTANT:
CHRISTOPHER WILLIAMS ARCHITECTS
85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com
PROJECT NO:
A
B
C
D
E
A
B
C
D
E
6 5 4 3 2 1
6 5 4 3 2 1
1. The intent of the Contract Documents is to include all items necessary for the proper execution and completion of all Work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all. Where a conflict within the Contract Documents exists, the Contractor shall provide the better quality or greater quantity of work in accordance with the Architect's resolution without any increase in the Contract sum. Organization of the Specifications into divisions, sections and articles, and arrangement of sheets shall not control the Contractor in dividing the work among subcontractors, or in establishing the extent of Work to be performed by any trade.
2. REFERENCE KEY NOTES and SHEET KEY NOTES are intended to indicate and clarify the extent and requirements of the Work; they do not indicate every location or occurence of required Work. The lack of a key note to an individual item of Work will not relieve the Contractor of responsibility to execute that Work as part of the Contract when the requirement for that Work can be logically inferred by other parts of the Contract Documents
3. Do not scale drawings, except for estimation and approximation purposes.
4. This is an existing building; all conditions and critical dimensions must be field verified.
GENERAL NOTES
1/16" = 1'-0"
6/19/2019 12:31:15 PMC:\U
sers\AW
illiams\D
ocuments\1905 - 3RD
FLR FITOU
T UCO
NN
-IBP_Central_awilliam
s@cw
architectsllc.com.rvt
OVERALL THIRD FLOORPLAN
G-004
04/03/19
901-661
Tech Quad Phase III-InnovationPartnership Building
159 Discovery DriveStorrs, CT 06269
ISSUED FORBID
05/10/19
TRUE NORTH
PROJECT NORTH
0' 8' 16' 32' 48'4'NOT TO SCALEA6 OVERALL THIRD FLOOR PLAN-NEW WORKNOT TO SCALEA3 PARTIAL THIRD FLOOR EXISTING CONDITIONS
0' 8' 16' 32' 48'4'
TRUE NORTH
PROJECT NORTH
EXISTING & OCCUPIED
315A
315B 315
2
KEYNOTESE2.05 COORDINATE PULL CHAINS LOCATIONS PER ROOM CONDITION- CONFIRM
IN THE SUBMITTALE2.06 COORDINATE FULL SHADE LENGTH PER LOCATION.E2.07 NEW AUTOMATIC WINDOW SHADES (TYP)E2.08 EXTEND SHADES BEHIND COLUMNS, (TYP)E2.16 PROVIDE WINDOW SHADES-FULL HEIGHT OF GLASS, MATCH MULLION
SPACING, APP WINDOW HEIGHT=9'8" .E2.17 PROVIDE WINDOW SHADES-FULL HEIGHT OF GLASS, MATCH MULLION