Top Banner
Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works
26

Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Jun 25, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Bicycle/Pedestrian Master Plan2011 Update

Progress Report January 21, 2014

Engineering DivisionDepartment of Public Works

Page 2: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

• We all love our cars• In 1995 streets were for cars, sidewalks for

people

Background

• Walking and biking was difficult

• Bicycle and Pedestrian Advisory Committee (BPAC) formed

• Steady progress, future plans

Page 3: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

• 1998 - BPAC established• 2002 - Bike/Ped Master Plan adopted• 2011 - Bike/Ped Master Plan Update

adopted

Background

Page 4: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Why a Plan?• Eligible for BTA

grants (5 years)• A guide to build the

best bike/pednetwork possible

Background

Page 5: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Main Goals• Make bicycle &

pedestrian travel an integral part of daily life

• Make San Rafael a model city of alternate transportation

Background

Page 6: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Bicycle Facilities

Class I – Bike Path• Two-way travel separated from any street

Page 7: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Bicycle Facilities

Class II – Bike Lane• Striped lane for one-way travel on a street

Page 8: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Bicycle Facilities

Class III – Bike Route• Shared use with pedestrian or motor vehicle• sometimes marked with “sharrows”

Page 9: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Total Bicycle Facilities

Bicycle Facilities Installed or under design

What does this look like?

Class I Class II Class III TotalPre 2002 2.93 3.89 0 6.822002-2011 3.88 3.47 22.63 29.982011-Now 3.14 3.48 4.05 10.67Total 9.95 10.84 26.68 47.47

Page 10: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Installed Pre 2002 (Original Bike Plan Adoption)

Installed between 2002 and 2011 (Bike Plan Update)

Projects Currently under designComplete Bike PlanLEGEND

Class I Bike Path

Class II Bike Lane

Class III Bike Route

Page 11: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Installed Pre 2002 (Original Bike Plan Adoption)

Installed between 2002 and 2011 (Bike Plan Update)

Projects Currently under designComplete Bike Plan

LEGEND

Class I Bike Path

Class II Bike Lane

Class III Bike Route

Page 12: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Pedestrians

Types of Projects• Install sidewalk• Install crosswalks• Install bridges• Install/Improve curb ramps• Relocate traffic signal poles• Install count-down pedestrian signal heads

Page 13: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Pedestrians

Near Term

Mid Term

Long Term

Total

Proposed 16 9 6 31In Design 8 2 0 10Partially Complete

2 0 0 2

Complete 1 0 0 1% in design or complete

68.8% 22.2% 0.0% 41.9%

What have we done?

Page 14: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Pedestrians

Curb Ramps671 (2005-2011) started to keep track in 2005105 (Since 2011)

34 (Shovel Ready)53 (Currently under design)

863 Ramps Total

Page 15: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Funding

Who pays for all this?

45% - Grant (NTPP, HSIP, OBAG, SRTS, etc.)50% - Other Entity (SMART, Northgate Mall)5% - Local Funds (Gas Tax, etc.)

Page 16: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Grants

• Staff Time (590 hours in 2013)• Local Match sometimes required (Gas Tax,

Measure A)• Not always awarded

Amount Requested

Amount Awarded

All Grants $9,657,173 $3,369,669Local Match $276,720

Page 17: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Other Projects

• Work with other Agencies– County of Marin– SMART

• Implement other Plans– Canal Neighborhood Community-Based

Transportation Plan– Downtown Station Area Plan– Climate Change Action Plan

Page 18: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Other Projects

• County of Marin

Civic Center Drive

Class I and Class II

Funding: OBAG Grant & Marin County

Page 19: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Other Projects

• County of Marin

Bicycle Detection Improvements

Camera Installations at 6 intersections

Funding: NTPP (County)

Page 20: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Other Projects

• Canal Based Neighborhood Transportation Plan– 13 Identified Transportation Solutions– 9 of which City to take the lead– 4 complete– 2 in progress– Other projects are long range (highway

crossing)

Page 21: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Other Projects

• Canal Based Neighborhood Transportation Plan

Street Lighting, curb extensions & high visibility crosswalks

Bus shelters (with Marin Transit)

Page 22: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Current Projects

NTPP Puerto Suello Hill Path to Transit Center Connector

Class I

Grant Funded

Page 23: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Current Projects

Grand Avenue Bike/Ped Bridge

Class I

Design Funding: ABAG Grant

Construction: Unfunded

Page 24: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

Current Projects

Regional Transportation System

Enhancements

Pedestrian Facilities & Traffic Operations

Design Funding: Local

Construction: OBAG

Page 25: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars

• Director of Public Works issued a ‘Complete Streets Directive’– Multi-Modal approach to all projects

• Incorporate Bike/Ped improvements in CIP• Apply for Grants (all opportunities)• Seek Funding to Maintain Facilities• Continue to meet with BPAC

– 2 times per year (minimum)– As needed (met 4 times in 2013)

• Update Plan in 2016

What’s Next?

Page 26: Bicycle/Pedestrian Master Plan...Bicycle/Pedestrian Master Plan 2011 Update Progress Report January 21, 2014 Engineering Division Department of Public Works • We all love our cars