Page 1
G R A N D S U M M A R Y
1.0 GENERAL REQUIREMENTS
PART A FACILITIES FOR THE ENGINEER 1 l.s.
PART B OTHER GENERAL REQUIREMENTS 1 l.s.
TOTAL - GENERAL REQUIREMENTS
2.0 LANDSIDE - Site Development Works
Part C Earthworks 1 l.s.
Part H Miscellaneous Structures 1 l.s.
2.1 Water Supply Wells 1 l.s.
TOTAL - LANDSIDE CIVIL WORKS
3.0 OTHER BUILDINGS
3.1 ADMINISTRATION BUILDING 1 l.s.
3.2 CARGO TERMINAL BUILDING 1 l.s.
3.3 AIR TRAFFIC CONTROL BUILDING 1 l.s.
3.4 CRASH FIRE RESCUE BUILDING 1 l.s.
3.5 POWER HOUSE BUILDING 1 l.s.
3.6 MAINTENANCE BUILDING 1 l.s.
3.7 MATERIAL RECOVERY FACILITIES 1 l.s.
3.8 PUMP ROOM AND WATER RESERVOIR 1 l.s.
3.9 CHILLED WATER PUMPHOUSE 1 l.s.
3.10 FUEL STORAGE TANK 1 l.s.
3.11 CHLORINATION HOUSE 1 1 l.s.
3.12 CHLORINATION HOUSE 2 1 l.s.
3.13 GUARD HOUSES
3.13A GUARD HOUSES ( 4 Units ) 1 l.s.
3.13B GUARD HOUSES WITH SEPTIC TANK 1 l.s.
3.14 DOTC-CAAP QUARTER 1 l.s.
TOTAL - BUILDINGS
TOTAL CONSTRUCTION COST - Package 2A
UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
Package 2A - CONSTRUCTION OF LANDSIDE FACILITIES ( Site Development and other Buildings )
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT
Grand Summary Page 1 of 77
Page 2
UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
Package 2A - CONSTRUCTION OF LANDSIDE FACILITIES ( Site Development and other Buildings )
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT
Grand Summary Page 2 of 77
Page 3
S U M M A R Y
3.1 ADMINISTRATION BUILDING
DIV-02 SITE CONSTRUCTION l.s.
DIV-03 CONCRETE WORKS l.s.
DIV-04 MASONRY WORKS l.s.
DIV-05 METAL WORKS l.s.
DIV-06 WOOD AND PLASTIC l.s.
DIV-07 THERMAL AND MOISTURE PROTECTION l.s.
DIV-08 DOORS AND WINDOWS l.s.
DIV-09 FINISHES l.s.
DIV-10 SPECIALTIES l.s.
DIV-13 SPECIAL CONSTRUCTION l.s.
DIV-15 MECHANICAL WORKS
15.1 PLUMBING WORKS l.s.
15.2 VENTILATING AND AIRCONDITIONING WORKS l.s.
DIV 16 ELECTRICAL WORKS l.s.
TOTAL COST - ADMINISTRATION BUILDING
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
Administration Building
Page 3 of 77
Page 4
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
3.1 ADMINISTRATION BUILDING
DIV-02 SITE CONSTRUCTION
2.1 SITE WORKS
2.1.1 Building Layout 505 sq.m.
2.1.2 Structure Excavation 706 cu.m.
2.1.3 Backfilling and filling
2.1.3.1 Backfill excavations with suitable excavated materials 588 cu.m.
2.1.3.2 Gravel base; 150 mm thk 114 cu.m.
2.1.4 Soil Disposal
2.1.4.1 Remove surplus excavated material from site 118 cu.m.
2.1.5 Subgrade Preparation 505 sq.m.
2.1.6 Anti-termite treatment to surfaces of ground and sides and bottoms of excavations 2,363 sq.m.
Sub-total "2.1" - SITE WORKS
DIV-03 CONCRETE WORKS
3.1 Cast-In-Place Structural Concrete
3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa
3.1.1.1 Columns and Pedestal 72 cu.m.
3.1.1.2 Suspended Beams 70 cu.m.
3.1.1.3 Footing Tie Beam 28 cu.m.
3.1.1.4 Suspended Slab, ramp and canopy 69 cu.m.
3.1.1.5 Stiffeners columns, lintel and bond beam (Exterior Wall) 6 cu.m.
3.1.1.6 Column/Pedestal Footing 45 cu.m.
3.1.1.7 Wall Footing 14 cu.m.
3.1.1.8 Stairs 5 cu.m.
3.1.1.9 Counter top 1 cu.m.
3.1.2 Reinforced concrete; 3000 psi or 21 Mpa
3.1.2.1 Slab-on-grade /fill 53 cu.m.
3.2 Reinforcement in concrete
3.2.1Steel bar reinforcement including cutting and bending, links, stirrups, binders, and tie wires, etc;
grade 60
3.2.1.1 Columns and Pedestal 9,585 kg
3.2.1.2 Suspended Beams 7,912 kg
3.2.1.3 Stiffeners columns, lintel and bond beam (Exterior Wall) 42 kg
3.2.1.4 Column and Wall Footing 1,741 kg
3.2.1.5 Footing Tie Beam 2,072 kg
3.2.2Steel bar reinforcement including cutting and bending, links, stirrups, binders, and tie wires, etc;
grade 40
3.2.2.1 Columns and Pedestal 11,313 kg
3.2.2.2 Suspended Beams 5,663 kg
3.2.2.3 Suspended Slab, ramps and canopy 7,194 kg
3.2.2.4 Slab on Grade 2,373 kg
3.2.2.5 Stairs 739 kg
3.2.2.6 Stiffeners columns, lintel and bond beam (Exterior Wall) 1,222 kg
3.2.2.7 Column and Wall Footing 1,789 kg
3.2.2.8 Footing Tie Beam 1,570 kg
3.2.2.9 Counter top 96 kg
3.3 Formwork
3.3.1 Columns and Pedestal 639 sq.m.
3.3.2 Suspended Beams 742 sq.m.
3.3.3 Suspended Slab, ramps and canopy 551 sq.m.
3.3.4 Slab on Grade /fill 20 sq.m.
3.3.5 Stairs 42 sq.m.
3.3.6 Stiffeners columns, lintel and bond beam (Exterior Wall) 94 sq.m.
3.3.7 Counter top 12 sq.m.
3.3.8 Column and Wall Footing 151 sq.m.
3.3.9 Footing Tie Beam 208 sq.m.
3.4 Concrete Accessories
3.4.1 Expansion joint with sealant; pre-formed type; 12 x 200mm
3.4.1.1 At Slab-on-grade 296 l.m.
3.4.1.2 At Masonry Wall 756 l.m.
3.4.2 PVC Waterstop 27 l.m.
Total "DIV-03" - CONCRETE WORKSAdministration Building
Page 4 of 77
Page 5
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
DIV-04 MASONRY WORKS
4.1 Accessories
4.1.1 Concrete Grout, 2000 psi 77 cu.m.
4.1.2Concrete lintel and bond beams inclusive of formworks and Steel reinforcements, Grade 40 (For
Interior Walls)18 cu.m.
4.1.3 CHB steel reinforcements, PNS 275 (Grade 40) 7,296 kg
4.2 CHB
4.2.1 150mm thk (1000 psi) - Exterior Wall 431 sq.m.
4.2.2 150mm thk (700 psi) - Interior Wall 269 sq.m.
4.2.3 100mm thk (350 psi / 2.5 N/mm2) 408 sq.m.
Total "DIV-04" - MASONRY WORKS
DIV-05 METAL WORKS
5.1
Fabrication, delivery and erection of structural steel roof framing including columns, main girders,
beams, trusses, rafters, struts, purlins, sag rods, cross bracings with turn buckles, bolts, plates and
all other incidentals to complete
44,129 kg
5.2 Steel Railings
5.2.138mm dia. Stainless steel handrail (H=900mm) with vertical and horizontal members including all
incidentals to complete at Ramp (supply and install)5 l.m.
5.2.238mm dia. Stainless Steel Stair rail with vertical and horizontal members including all incidentals to
complete (supply and install)19 l.m.
5.3 Miscellaneous Metals
5.3.1 Brass Stair Nosing 44 l.m.
Total "DIV-05" - METAL WORKS
DIV-06 WOOD AND PLASTIC
6.1 Finish Carpentry
6.1.1
20mm thick plyboard overhead cabinet, plastic laminated finish with heavy concealed hinges,
handles, supports and standard accessories inclusive of all incidentals to complete, (H=700mm,
W=350mm) at Pantry
1 set
6.1.2
20mm thick plyboard base cabinet, plastic laminated finish with heavy concealed hinges, handles,
supports and standard accessories inclusive of all incidentals to complete, (H=900mm, W=600mm)
at Pantry
1 set
Total "DIV-06" - WOOD AND PLASTIC
DIV-07 THERMAL AND MOISTURE PROTECTION
7.1 Dampproofing and Waterproofing
7.1.1 Damproofing vapor barriers, 1 layer 6 mils thick @ Slab on Grade 516 sq.m.
7.1.2 Waterproofing
7.1.2.1 Elastomeric Membrane Waterproofing
7.1.2.1.1 25 mils for Canopy and Gutter 15 sq.m.
7.1.2.1.2 40 mils for Toilet 49 sq.m.
7.3 Insulation
7.3.1Roof Insulation - 50mm thk Mineral Wool Insulation with two sided aluminum including chicken wire
support and other consumable accessories to complete647 sq.m.
7.4 Roofing and Accessories
7.4.1Banawe Roof, 0.60mm thick pre-painted longspan metal roofing, inclusive of all bended materials,
hardware accessories and all incidentals to complete (Refer to Roofing Plan and Details)647 sq.m.
Total "DIV-07"-THERMAL AND MOISTURE PROTECTION
DIV-08 DOORS AND WINDOWS
8.1 WINDOWS
8.1.1Swing window with Fixed transom in Aluminum Powder coated frame with 6mm thk tinted glass
and complete accessories
8.1.1.1 W-1, 1.80 x 1.80m 52 set
8.1.1.2 W-2, 1.20 x 1.80m 2 set
8.1.1.3 W-3, 4.60 x 1.80m 1 set
Administration Building
Page 5 of 77
Page 6
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
8.1.2Awning window with fixed glass in Aluminum Powder coated frame with 6mm thk tinted glass and
complete accessories
8.1.2.1 W-4, 1.20 x 0.90m 7 set
8.1.3Fixed window in Aluminum Powder coated frame with 6mm thk tinted glass and complete
accessories
8.1.3.1 W-5, 2.70 x 0.90m 1 set
Sub-total "8.1" - WINDOWS
8.2 DOORS AND PANELS
8.2.1 Aluminum Doors
8.2.1.1Powder coated aluminum door with 6mm thk. Tinted tempered glass with fixed aluminum window
with 6mm thk. Tinted glass with 2m x 38mmø Stainless Steel Pull Handle (per panel)
8.2.1.1.1 D1 - 1.80 x 2.70 / 1.35 x 1.80m (2) 1 set
8.2.1.2Single leaf swing powder coated aluminum door using 6mm thk. Tinted Tempered Glass with fixed
transom window
8.2.1.2.1 D-3, 0.90 x 2.15m with push and pull handle 1 set
8.2.1.3 Double leaf powder coated aluminum swing door with 6mm thk. Tinted tempered glass
8.2.1.3.1 D-13, 1.80 x 2.10m 1 set
8.2.2 Wood Doors
8.2.2.1 45mm thk. Single leaf flush hollow core wood door with view glass
8.2.2.1.1 D-2 /9-10 /23, 0.90 x 2.10m 4 set
8.2.2.1.2 D-14, 0.80 x 2.10m with bottom louver 1 set
8.2.2.1.3 D-22 /25, 0.80 x 2.10m 2 set
8.2.2.2 Double leaf flush hollow core wood door with view glass painted finish
8.2.2.2.1 D-6 /11 /17 /20-21, 1.80 x 2.10m 5 set
8.2.2.3 Single leaf flush hollow core plywood door painted finish
8.2.2.3.1 D-7-8 /18-19, 0.80 x 2.10m 4 set
8.2.2.3.2 D-8a, 1.0 x 2.10 at PWD Toilet 1 set
8.2.2.3.3 D-24, 0.70 x 2.10m with view glass 1 set
8.2.2.4 Single leaf flush hollow core marine plywood with bottom louver painted finish
8.2.2.4.1 D-15, 0.80 x 2.10m 1 set
8.2.3 Metal Doors
8.2.3.1 Double leaf swing metal louver door including door jamb with stainless steel insect screen painted
finish
8.2.3.1.1 D-4, 2.50 x 2.65m 1 set
8.2.3.2 Single leaf hollow metal fire exit door, 1 hour fire rated with wired glass
8.2.3.2.1 D-5 , 0.8 x 2.10m 1 set
8.2.3.2.2 D-12, 0.8 x 2.65m 1 set
8.2.3.3 Double leaf metal swing door painted finish
8.2.3.3.1 D-16, 1.80 x 2.10m 1 set
8.2.3.4 Double leaf demountable steel louver door painted finish
8.2.3.4.1 L-1, 2.60 x 2.70m 1 set
Sub-total "8.2" - DOORS AND PANELS
8.3 HARDWARES
8.3.1 LOCKSET
8.3.1.1 Panic device type 3 function 11 (with lever, key locks or unlocks control lever) 2 set
8.3.1.2 Lockset series 4000 F82, Grade 1 6 set
8.3.1.3 Lockset series 4000 F91, Grade 1 7 set
8.3.1.4 DEADLOCK
8.3.1.4.1 Cylinder deadlock F-16, Grade 1 2 set
8.3.1.4.2 Deadlock series 1000 F17, Grade 1 8 set
8.3.2 Closer
8.3.2.1 Overhead door closer CO 2012 2 set
8.3.2.2 Overhead Surface Closer CO 2012 8 set
8.3.2.3 Overhead Concealed Closer 6 set
Administration Building
Page 6 of 77
Page 7
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
8.3.3 Hinges
8.3.3.1 Butt hinges 100mm x 100mm (4 x 4 ) 21 pair
8.3.3.2 Butt hinges 114mm x 114mm (4 1/2 x 4 1/2) 32 pair
8.3.3.3 Center pivot ( top & bottom) 3 pair
8.3.4 Door Accessories
8.3.4.1 Door Handle
8.3.4.1.1 Push & pull bars (customized) 4 set
8.3.4.1.2 Push & pull bars (door manufacturer's standard) 3 set
8.3.4.2 Push and Pull plate 8 set
8.3.4.3 Flushbolt (top and bottom of inactive door leaf) 8 set
8.3.4.4 Threshold
8.3.4.4.1 Panic threshold 2 set
8.3.4.4.2 Aluminum threshold 2 set
Sub-total "8.3" - HARDWARES
Total "DIV-08" - DOORS AND WINDOWS
DIV-09 FINISHES
9.1 FLOOR FINISHES
9.1.1 Plain cement concrete steel trowel finish 36 sq.m
9.1.2 Plain cement concrete steel trowel finish (to receive vinyl flooring) 798 sq.m
9.1.3 Homogeneous Vinyl Floor Tiles, 300 x 300 x 3 mm thk 798 sq.m
9.1.4 Mortar topping for waterproof area 63 sq.m
9.1.5 600 x 600 Non-skid Homogeneous Tiles (including mortar bed) 17 sq.m
9.1.6 300 x 300 Unglazed Ceramic Tiles (including mortar bed) 68 sq.m
Sub-total "9.1" - FLOOR FINISHES
9.2 WALL FINISHES
9.2.1 Plain cement plaster wall Painted Finish 2,136 sq.m
9.2.2 20mm groove line 347 l.m
9.2.3 300 x 300mm Glazed ceramic wall tiles (including mortar bed) 245 sq.m
9.2.4 9mm thk. Fiber cement board double face wall partition panel on light weight metal frame 5 sq.m
Sub-total "9.2" - WALL FINISHES
9.3 CEILING FINISHES
9.3.1 12mm thk. Ordinary Gypsum Board on metal frame 280 sm
9.3.2 12mm thk. Moisture Resistant Gypsum Board on metal frame 81 sm
9.3.3 Exposed Construction Painted Finish 80 sm
9.3.4 Metal Linear Ceiling 169 sm
9.3.5 600 x 600 x 15 Acoustic Board on Powder coated t-runner 528 sm
Sub-total "9.3" - CEILING FINISHES
9.4 BASE BOARD FINISHES
9.4.1 100mm high painted base 43 l.m.
9.4.2 100mm high Vinyl base board 465 l.m.
Sub-total "9.4" - BASE BOARD FINISHES
9.5 PAINTING WORKS
9.5.1 At Floor
9.5.1.1 Epoxy paint 58 sq.m.
9.5.2 At Wall
9.5.2.1 Semi-gloss paint finish 1,100 sq.m.
9.5.2.2 Painting on wooden surfaces
9.5.2.2.1 Acrylic paint finish 842 sq.m.
9.5.2.2.2 Latex paint flat finish 112 sq.m.
9.5.3 At Ceiling
9.5.3.1 Semi-gloss paint finish 80 sq.m.
9.5.3.2 Painting on Gypsum board surfaces 361 sq.m.
9.5.4 Painting on metal surfaces (metal doors, railings, gratings, grilles) - Epoxy Paint 47 sq.m.
9.5.5 Painting on wood doors 127 sq.m.
9.5.6 Painting on steel trusses
9.5.6.1 Covered Steel/Metal 2,946 sq.m.
Sub-total "9.5" - PAINTING WORKS
Total "DIV-09" - FINISHES
DIV-10 SPECIALTIES
10.1 6mm thick Facial mirror on 6mm thick marine plywood backing inclusive all incidentals to completeAdministration Building
Page 7 of 77
Page 8
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
10.1.1 8800x1000mm 1 set
10.1.2 2150 x 800mm 2 set
10.1.3 1450 x 800mm 1 set
10.1.4 1250 x 800mm 1 set
10.1.5 950 x 800mm 1 set
10.1.6 600 x 800mm 1 set
10.2 Stainless Steel Grab bar at PWD Toilet 4 set
10.3
Toilet compartments/cubicles - comprising 12mm thk intermediate panels, doors, and urinal
partitions/compartments with tissue holder and clothes hook (compact laminated phenolic board)
including all hardwares and accessories in nylon finish and all other incidentals to complete
64 sq.m
10.4 Countertops
10.4.1 Granite Countertop W=600mm 12 sq.m
10.4.2 Ceramic Tiles Countertop 7 sq.m
10.5 Supply and installation of aluminum compopsite panel including all incidentals to complete 418 sq.m.
Total "DIV-10" - SPECIALTIES
Administration Building
Page 8 of 77
Page 9
S U M M A R Y
3.2 CARGO TERMINAL BUILDING
DIV-02 SITE CONSTRUCTION l.s.
DIV-03 CONCRETE WORKS l.s.
DIV-04 MASONRY WORKS l.s.
DIV-05 METAL WORKS l.s.
DIV-07 THERMAL AND MOISTURE PROTECTION l.s.
DIV-08 DOORS AND WINDOWS l.s.
DIV-09 FINISHES l.s.
DIV-10 SPECIALTIES l.s.
DIV-13 SPECIAL CONSTRUCTION l.s.
DIV-15 MECHANICAL WORKS
15.1 PLUMBING WORKS l.s.
15.2 VENTILATING AND AIRCONDITIONING WORKS l.s.
DIV 16 ELECTRICAL WORKS l.s.
TOTAL COST - CARGO TERMINAL BUILDING
BILL OF QUANTITITES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
Cargo Terminal Building Page 9 of 77
Page 10
BILL OF QUANTITITES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
3.2 CARGO TERMINAL BUILDING
DIV-02 SITE CONSTRUCTION
2 SITE WORKS
2.1.1 Building Layout 273 sq.m.
2.1.2 Structure Excavation 326 cu.m.
2.1.3 Backfilling and filling
2.1.3.1 Backfill excavations with suitable excavated materials 326 cu.m.
2.1.3.2 Gravel base; 150 mm thk 56 cu.m.
2.1.3.3 Imported Soil to Fill (Borrow Embankment) - FGL to FFL 160 cu.m.
2.1.4 Subgrade Preparation 273 sq.m.
2.1.5 Anti-termite treatment to surfaces of ground and sides and bottoms of excavations 890 sq.m.
Sub-total "2.1" - SITE WORKS
DIV-03 CONCRETE WORKS
3.1 Cast-In-Place Structural Concrete
3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa
3.1.1.1 Columns and Pedestal 23 cu.m.
3.1.1.2 Suspended Beams 10 cu.m.
3.1.1.3 Footing Tie Beam 10 cu.m.
3.1.1.4 Suspended Slab, ramp and canopy 7 cu.m.
3.1.1.5 Stiffeners columns, lintel and bond beam (Exterior Wall) 4 cu.m.
3.1.1.6 Column/Pedestal Footing 17 cu.m.
3.1.1.7 Wall Footing 7 cu.m.
3.1.1.8 Stairs 2 cu.m.
3.1.2 Reinforced concrete; 3000 psi or 21 Mpa
3.1.2.1 Slab-on-grade /fill 41 cu.m.
3.2 Reinforcement in concrete
3.2.1Steel bar reinforcement including cutting and bending, links, stirrups, binders, and tie wires, etc;
grade 60
3.2.1.1 Columns and Pedestal 4,581 kg
3.2.1.2 Suspended Beams 893 kg
3.2.1.3 Stiffeners columns, lintel and bond beam (Exterior Wall) 285 kg
3.2.1.4 Column and Wall Footing 1,277 kg
3.2.1.5 Footing Tie Beam 878 kg
3.2.2Steel bar reinforcement including cutting and bending, links, stirrups, binders, and tie wires, etc;
grade 40
3.2.2.1 Columns and Pedestal 4,464 kg
3.2.2.2 Suspended Beams 1,118 kg
3.2.2.3 Suspended Slab, ramps and canopy 594 kg
3.2.2.4 Slab on Grade 2,150 kg
3.2.2.5 Stairs 143 kg
3.2.2.6 Stiffeners columns, lintel and bond beam (Exterior Wall) 488 kg
3.2.2.7 Column and Wall Footing 643 kg
3.2.2.8 Footing Tie Beam 476 kg
3.3 Formwork
3.3.1 Columns and Pedestal 192 sq.m.
3.3.2 Suspended Beams 110 sq.m.
3.3.3 Suspended Slab, ramps and canopy 39 sq.m.
3.3.4 Slab on Grade 22 sq.m.
3.3.5 Stairs 13 sq.m.
3.3.6 Stiffeners columns, lintel and bond beam (Exterior Wall) 48 sq.m.
3.3.7 Column and Wall Footing 59 sq.m.
3.3.8 Footing Tie Beam 56 sq.m.
3.4 Concrete Accessories
3.4.1 Expansion joint with sealant; pre-formed type; 12 x 200mm
3.4.1.1 At Slab-on-grade 247 l.m.
3.4.1.2 At Masonry Wall 158 l.m.
3.4.2 PVC Waterstop 8 l.m.
Total "DIV-03" - CONCRETE WORKS
DIV-04 MASONRY WORKS
4.1 Accessories
4.1.1 Concrete Grout, 2000 psi 32 cu.m.
Cargo Terminal Building Page 10 of 77
Page 11
BILL OF QUANTITITES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
4.1.2Concrete lintel and bond beams inclusive of formworks and Steel reinforcements, Grade 40 (For
Interior Walls)1 cu.m.
4.1.3 CHB steel reinforcements, PNS 275 (Grade 40) 2,461 kg
4.2 CHB
4.2.1 150mm thk (1000 psi) - Exterior Wall 357 sq.m.
4.2.2 150mm thk (700 psi) - Interior Wall 6 sq.m.
4.2.3 100mm thk (350 psi / 2.5 N/mm2) 20 sq.m.
Total "DIV-04" - MASONRY WORKS
DIV-05 METAL WORKS
5.1
Fabrication, delivery and erection of structural steel roof framing including columns, main girders,
beams, trusses, rafters, struts, purlins, sag rods, cross bracings with turn buckles, bolts, plates and
all other incidentals to complete
14,885 kg
Cargo Terminal Building Page 11 of 77
Page 12
BILL OF QUANTITITES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
5.2 Steel Railings
5.2.138mm dia. Stainless steel handrail (H=900mm) with vertical and horizontal members including all
incidentals to complete at Ramp (supply and install)19 l.m.
5.2.238mm dia. Stainless Steel Stair rail with vertical and horizontal members including all incidentals to
complete (supply and install)3 l.m.
Total "DIV-05" - METAL WORKS
DIV-07 THERMAL AND MOISTURE PROTECTION
7.1 Dampproofing and Waterproofing
7.1.1 Damproofing vapor barriers, 1 layer 6 mils thick @ Slab on Grade 266 sq.m.
7.2 Insulation
7.2.1Roof Insulation - 50mm thk Mineral Wool Insulation with two sided aluminum including chicken wire
support and other consumable accessories to complete163 sq.m.
7.3 Roofing and Accessories
7.3.1Ga.24 preformed prepainted long span single rib metal roofing inclusive of all bended materials
and incidentals to complete.163 sq.m.
7.4 Siding
7.4.1 Preformed Metal Siding/Fascia 43 sq.m.
Total "DIV-07"-THERMAL AND MOISTURE PROTECTION
DIV-08 DOORS AND WINDOWS
8.1 WINDOWS
8.1.1Swing /casement window in aluminum powder coated frame with 6mm thk. Clear glass and
complete with accessories
8.1.1.1 W-1, 2.10 x 1.25m 2 set
8.1.2Awning window in Aluminum Powder coated frame with 6mm thk clear glass and complete
accessories
8.1.2.1 W-4, 0.725 x 0.55m 1 set
8.1.3Fixed window in Aluminum Powder coated frame with 6mm thk clear glass and complete
accessories
8.1.3.1 W-2, 4.0 x 0.60m 4 set
8.1.4Sliding window in Aluminum Powder coated frame with 6mm thk clear glass and complete
accessories
8.1.4.1 W-3, 1.0 x 1.20m 1 set
Cargo Terminal Building Page 12 of 77
Page 13
BILL OF QUANTITITES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
8.1.5 Fixed metal louver window with stainless steel insect screen painted finish
8.1.5.1 L-1, 5.0 x 0.60m 1 set
Sub-total "8.1" - WINDOWS
8.2 DOORS AND PANELS
8.2.1 Wood Doors
8.2.1.1 45mm thk. Single leaf flush hollow core wood door with view glass
8.2.1.1.1 D-4, 0.80 x 2.10m 1 set
8.2.3 Metal Doors
8.2.3.1 Single leaf hollow metal fire exit door, 1 hour fire rated with wired glass
8.2.3.1.1 D-2 , 0.90 x 2.10m 1 set
8.2.3.2 Metal roll-up door
8.2.3.2.1 D-1, 2.50 X 3.50m 1 set
8.2.3.2.2 D-5, 3.0 x 3.50m 1 set
8.2.4 PVC/Plastic Doors
8.2.4.1 PVC Flush door with bottom louver including hinges and privacy lockset
8.2.4.1.1 D-3, 0.70 x 2.10m 1 set
Sub-total "8.2" - DOORS AND PANELS
8.3 HARDWARES
8.3.1 LOCKSET
8.3.1.1 Panic device type 3 function 11 (with lever, key locks or unlocks control lever) 1 set
8.3.1.2 Lockset series 4000 F82, Grade 1 1 set
8.3.2 Closer
8.3.2.1 Overhead door closer CO 2012 1 set
8.3.2.2 Overhead Concealed Closer 1 set
8.3.3 Hinges
8.3.3.1 Butt hinges 100mm x 100mm (4 x 4 ) 2 pair
8.3.3.2 Butt hinges 114mm x 114mm (4 1/2 x 4 1/2) 2 pair
8.3.4 Door Accessories
8.3.4.1 Threshold
8.3.4.1.1 Panic threshold 1 set
Sub-total "8.3" - HARDWARES
Total "DIV-08" - DOORS AND WINDOWS
DIV-09 FINISHES
9.1 FLOOR FINISHES
9.1.1 Plain cement concrete steel trowel finish (to receive vinyl flooring) 8 sq.m
9.1.2 Homogeneous Vinyl Floor Tiles, 300 x 300 x 3 mm thk 8 sq.m
9.1.3 300 x 300 Unglazed Ceramic Tiles (including mortar bed) 5 sq.m
9.1.4 Plain cement concrete steel trowel finish with floor hardener 113 sq.m
9.1.5 Plain cement concrete steel trowel finish with floor hardener and groove 13 sq.m
9.1.6 50mm Abrasive strip 12 sq.m
Sub-total "9.1" - FLOOR FINISHES
9.2 WALL FINISHES
9.2.1 Plain cement plaster wall Painted Finish 732 sq.m
9.2.2 300 x 300mm Glazed ceramic wall tiles (including mortar bed) 15 sq.m
9.2.3 300 x 300mm Accent Glazed ceramic wall tiles (including mortar bed) 2 sq.m
Sub-total "9.2" - WALL FINISHES
9.3 CEILING FINISHES
9.3.1 12mm thk. Moisture Resistant Gypsum Board on metal frame 5 sm
9.3.2 Exposed Construction Painted Finish 36 sm
9.3.3 600 x 600 x 15 Acoustic Board on Aluminum t-runner 8 sm
9.3.4 6mm thk. Fiber cement ceiling board on metal frame 101 sm
Sub-total "9.3" - CEILING FINISHES
9.4 BASE BOARD FINISHES
9.4.1 100mm high painted base 40 l.m.
9.4.2 100mm high Vinyl base board 11 l.m.
9.4.3 100mm high epoxy base line paint 40 l.m.
Cargo Terminal Building Page 13 of 77
Page 14
BILL OF QUANTITITES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
Sub-total "9.4" - BASE BOARD FINISHES
9.5 PAINTING WORKS
9.5.1 At Floor
9.5.1.1 Epoxy paint 143 sq.m.
9.5.2 At Wall
9.5.2.1 Semi-gloss paint finish 355 sq.m.
9.5.2.2 Painting on wooden surfaces
9.5.2.2.1 Acrylic paint finish 425 sq.m.
9.5.3 At Ceiling
9.5.3.1 Semi-gloss paint finish 36 sq.m.
9.5.3.2 Painting on Fiber cement board surfaces 101 sq.m.
9.5.3.3 Painting on Gypsum board surfaces 5 sq.m.
9.5.4 Painting on metal surfaces (metal doors, railings, gratings, grilles) - Epoxy Paint 13 sq.m.
9.5.5 Painting on wood doors 6 sq.m.
9.5.6 Painting on steel trusses
9.5.6.1 Exposed Steel/Metal 1,008 sq.m.
Sub-total "9.5" - PAINTING WORKS
Total "DIV-09" - FINISHES
DIV-10 SPECIALTIES
10.1 6mm thick Facial mirror on 6mm thick marine plywood backing inclusive all incidentals to complete
10.1..1 600 x 800mm 1 set
10.2
Toilet compartments/cubicles - comprising 12mm thk intermediate panels, doors, and urinal
partitions/compartments with tissue holder and clothes hook (compact laminated phenolic board)
including all hardwares and accessories in nylon finish and all other incidentals to complete
4 sq.m
Total "DIV-10" - SPECIALTIES
Cargo Terminal Building Page 14 of 77
Page 15
S U M M A R Y
3.3 AIR TRAFFIC CONTROL BUILDING
DIV-02 SITE CONSTRUCTION l.s.
DIV-03 CONCRETE WORKS l.s.
DIV-04 MASONRY WORKS l.s.
DIV-05 METAL WORKS l.s.
DIV-06 WOOD AND PLASTIC l.s.
DIV-07 THERMAL AND MOISTURE PROTECTION l.s.
DIV-08 DOORS AND WINDOWS l.s.
DIV-09 FINISHES l.s.
DIV-10 SPECIALTIES l.s.
DIV-13 SPECIAL CONSTRUCTION l.s.
DIV-14 CONVEYING SYSTEM l.s.
DIV-15 MECHANICAL WORKS
15.1 PLUMBING WORKS l.s.
15.2 VENTILATING AND AIRCONDITIONING WORKS l.s.
DIV 16 ELECTRICAL WORKS l.s.
TOTAL COST - AIR TRAFFIC CONTROL BUILDING
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
Air Traffic Control Tower Building Page 15 of 77
Page 16
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
3.3 AIR TRAFFIC CONTROL BUILDING
DIV-02 SITE CONSTRUCTION
2 SITE WORKS
2.1.1 Building Layout 550 sq.m.
2.1.2 Structure Excavation 1,040 cu.m.
2.1.3 Backfilling and filling
2.1.3.1 Backfill excavations with suitable excavated materials 881 cu.m.
2.1.3.2 Gravel base; 150 mm thk 151 cu.m.
2.1.4 Soil Disposal
2.1.4.1 Remove surplus excavated material from site 159 cu.m.
2.1.5 Subgrade Preparation 550 sq.m.
2.1.6Anti-termite treatment to surfaces of ground and sides and bottoms of
excavations2,555 sq.m.
Sub-total "2.1" - SITE WORKS
DIV-03 CONCRETE WORKS
3.1 Cast-In-Place Structural Concrete
3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa
3.1.1.1 Columns and Pedestal 123 cu.m.
3.1.1.2 Suspended Beams 87 cu.m.
3.1.1.3 Footing Tie Beam 30 cu.m.
3.1.1.4 Suspended Slab, ramp and canopy 49 cu.m.
3.1.1.5 Stiffeners columns, lintel and bond beam (Exterior Wall) 11 cu.m.
3.1.1.6 Column/Pedestal Footing 87 cu.m.
3.1.1.7 Wall Footing 22 cu.m.
3.1.1.8 Stairs 11 cu.m.
3.1.1.9 Counter top 1 cu.m.
3.1.1.10 Parapet Wall 25 cu.m.
3.1.1.11 Elevator & Escalator Pit 6 cu.m.
3.1.2 Reinforced concrete; 3000 psi or 21 Mpa
3.1.2.1 Slab-on-grade /fill 58 cu.m.
3.2 Reinforcement in concrete
3.2.1Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 60
3.2.1.1 Columns and Pedestal 21,257 kg
3.2.1.2 Suspended Beams 11,615 kg
3.2.1.3 Stiffeners columns, lintel and bond beam (Exterior Wall) 66 kg
3.2.1.4 Column and Wall Footing 5,513 kg
3.2.1.5 Footing Tie Beam 2,681 kg
3.2.1.6 Elevator and Escalator Pit 1,196 kg
3.2.2Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 40
3.2.2.1 Columns and Pedestal 22,328 kg
3.2.2.2 Suspended Beams 7,174 kg
3.2.2.3 Suspended Slab, ramps and canopy 6,860 kg
3.2.2.4 Slab on Grade 2,778 kg
3.2.2.5 Stairs 2,750 kg
3.2.2.6 Stiffeners columns, lintel and bond beam (Exterior Wall) 2,767 kg
3.2.2.7 Column and Wall Footing 1,994 kg
3.2.2.8 Footing Tie Beam 1,788 kg
3.2.2.9 Counter top 102 kg
3.2.2.10 Structural/Parapet Wall 2,423 kg
3.3 Formwork
3.3.1 Columns and Pedestal 923 sq.m.
3.3.2 Suspended Beams 874 sq.m.
3.3.3 Suspended Slab, ramps and canopy 358 sq.m.
3.3.4 Slab on Grade /fill 17 sq.m.
3.3.5 Stairs 95 sq.m.
3.3.6 Stiffeners columns, lintel and bond beam (Exterior Wall) 176 sq.m.
3.3.7 Counter top 13 sq.m.
3.3.8 Structural/Parapet Wall 401 sq.m.
3.3.9 Column and Wall Footing 182 sq.m.
3.3.10 Footing Tie Beam 201 sq.m.
Air Traffic Control Tower Building Page 16 of 77
Page 17
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
3.3.11 Elevator and Escalator Pit 30 sq.m.
3.4 Concrete Accessories
3.4.1 Expansion joint with sealant; pre-formed type; 12 x 200mm
3.4.1.1 At Slab-on-grade 338 l.m.
3.4.1.2 At Masonry Wall 824 l.m.
3.4.3 PVC Waterstop 159 l.m.
Total "DIV-03" - CONCRETE WORKS
DIV-04 MASONRY WORKS
4.1 Accessories
4.1.1 Concrete Grout, 2000 psi 71 cu.m.
4.1.2Concrete lintel and bond beams inclusive of formworks and Steel
reinforcements, Grade 40 (For Interior Walls)5 cu.m.
4.1.3 CHB steel reinforcements, PNS 275 (Grade 40) 8,973 kg
4.2 CHB
4.2.1 150mm thk (1000 psi) - Exterior Wall 446 sq.m.
4.2.2 150mm thk (700 psi) - Interior Wall 29 sq.m.
4.2.3 100mm thk (350 psi / 2.5 N/mm2) 694 sq.m.
Total "DIV-04" - MASONRY WORKS
DIV-05 METAL WORKS
5.1
Fabrication, delivery and erection of structural steel roof framing including
columns, main girders, beams, trusses, rafters, struts, purlins, sag rods,
cross bracings with turn buckles, bolts, plates and all other incidentals to
complete
18,807 kg
5.2Fabrication, delivery and erection of structural steel members for Columns
and Beams including all incidentals to complete 6,420 kg
5.31.20mm thick Galvanized Steel Deck inclusive of bended materials and all
incidental to complete.57 sq.m.
5.4 Steel Railings
5.4.138mm dia. Stainless Steel Stair rail with vertical and horizontal members
including all incidentals to complete (supply and install)15 l.m.
5.4.250mmø Metal Pipe Railing including epoxy paint and all incidentals to
complete (supply and installation)26 l.m.
5.5 Miscellaneous Metals
5.5.1 Brass Stair Nosing 101 l.m.
5.5.2
20mmø Stainless steel ladder rung with 30 x 10mm steel side rail including
angle bar, expansion bolt, hand grab and all incidental to complete, H =
4.20m
1 set
5.5.3
20mmø Stainless steel ladder rung with 30 x 10mm steel side rail including
angle bar, expansion bolt, hand grab and all incidental to complete, H =
3.75m
1 set
Total "DIV-05" - METAL WORKS
DIV-06 WOOD AND PLASTIC
6.1 Finish Carpentry
6.1.1
Overhead Cabinet, 20mm thk. Plywood in wood frame including hardware,
expansion bolts, shelves, edging, duco paint and all incidentals to complete
at GF Pantry (L = 3.65m ; W = 0.30m ; H = 0.70m)
1 set
6.1.2
Sink Cabinet, 20mm thk. Plywood in wood frame including hardware,
expansion bolts, galvanized steel frame, shelves, edging, duco paint and
all incidentals to complete at GF Pantry (L = 2.85m ; W = 0.60m; H =
0.90m)
1 set
6.1.3
Overhead Cabinet, 20mm thk. Plywood in wood frame including hardware,
expansion bolts, shelves, edging, duco paint and all incidentals to complete
at 6F Pantry (L = 3.60m; W = 0.30m; H = 0.70m)
1 set
Air Traffic Control Tower Building Page 17 of 77
Page 18
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
6.1.4
Sink Cabinet, 20mm thk. Plywood in wood frame including hardware,
expansion bolts, galvanized steel frame, shelves, edging, duco paint and
all incidentals to complete at 6F Pantry (L = 3.60m; W = 0.60m; H = 0.90m)
1 set
6.1.5
Information counter cabinet, 20mm thk. Plywood in wood frame including
hardware, shelves, drawers, wood nailer, 50mmø SS pipe post, vinyl
laminate, duco paint and all incidentals to complete (L = 4.50m; W = 0.50m;
H = 0.75m)
1 set
Total "DIV-06" - WOOD AND PLASTIC
DIV-07 THERMAL AND MOISTURE PROTECTION
7.1 Dampproofing and Waterproofing
7.1.1 Damproofing vapor barriers, 1 layer 6 mils thick @ Slab on Grade 705 sq.m.
7.1.2 Waterproofing
7.1.2.1 Elastomeric Membrane Waterproofing
7.1.2.1.1 40 mils for Toilet 6 sq.m.
7.1.2.1.2 Exposed type for concrete slab and parapet wall 166 sq.m.
7.1.2.1.3 @ Elevator 14 sq.m.
7.3 Insulation
7.3.1
Roof Insulation - 50mm thk Mineral Wool Insulation with two sided
aluminum including chicken wire support and other consumable
accessories to complete
582 sq.m.
7.4 Roofing and Accessories
7.4.1Ga.24 preformed prepainted long span single rib metal roofing inclusive of
all bended materials and incidentals to complete.582 sq.m.
Total "DIV-07"-THERMAL AND MOISTURE PROTECTION
DIV-08 DOORS AND WINDOWS
8.1 WINDOWS
8.1.1Swing window with Fixed transom in Aluminum Powder coated frame with
6mm thk tinted tempered glass and complete accessories
8.1.1.1 W-1, 1.00 x 1.50m 37 set
8.1.1.2 W-7, 4.0 x 2.10m 3 set
8.1.2Swing /casement window with fixed glass in aluminum powder coated
frame with 6mm thk. Tinted tempered glass and complete with accessories
8.1.2.1 W - 4, 0.975 x 1.25m 3 set
8.1.3Awning window with fixed glass in Aluminum Powder coated frame with
6mm thk tinted tempered glass and complete accessories
8.1.3.1 W-3, 0.975 x 1.95m 12 set
8.1.3Awning window in Aluminum Powder coated frame with 6mm thk tinted
tempered glass and complete accessories
8.1.3.1 W-2, 1.0 x 0.60m 16 set
8.1.3.2 W-6, 1.80 x 0.60m 1 set
8.1.4
Fixed window in Aluminum powder coated frame with 2 - 12mm thk. Clear
float tempered insulated glass panel w/ 2mm airspace in silicone butt joint
and complete accessories
8.1.4.1 W-8, 3.60 /2.90 x 2.25m 8 set
8.1.5Sliding window with fixed glass in Aluminum powder coated frame with
6mm thk. Tinted Tempered glass and complete with accessories
Air Traffic Control Tower Building Page 18 of 77
Page 19
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
8.1.5.1 W-5, 1.50 x 1.25m 1 set
8.1.6 Fixed metal louver painted finish
8.1.6.1 L-1, 4.60 x 2.70m (4 Panels) 2 set
Sub-total "8.1" - WINDOWS
8.2 DOORS AND PANELS
8.2.1 Aluminum Doors
8.2.1.1 Double leaf powder coated aluminum swing door with 6mm thk. Clear
tempered glass
8.2.1.1.1 D-1, 1.80 x 2.10m 1 set
8.2.1.1.2 D-16, 1.70 x 2.10m 1 set
8.2.2 Wood Doors
8.2.2.1 45mm thk. Single leaf flush hollow core wood door with view glass
8.2.2.1.1 D-2/ 7/ 11/ 13/ 15/ 17/ 18/ 27/ 37, 0.80 x 2.10m 9 set
8.2.2.1.2 D-12, 0.90 x 2.10m 1 set
8.2.2.1.3 D-38, 0.70 x 2.10m 1 set
8.2.2.1.4 D-3/ 6/ 10, 1.80 x 2.10m 3 set
8.2.2.2 Single leaf flush hollow core plywood door painted finish
8.2.2.2.1 D-26, 0.90 x 2.10m 1 set
8.2.2.2.2 D-19/ 20, 0.80 x 2.10m 2 set
8.2.2.2.3 D-8, 0.70 x 2.10m 1 set
8.2.2.2.4 D-30/ 31/ 33 / 35 , 0.60 x 2.10m 4 set
8.2.2.2.5 D-14, 0.50 x 2.10m 1 set
8.2.2.3Single leaf flush hollow core marine plywood with bottom louver painted
finish
8.2.2.3.1 D-21 to 25, 0.80 x 2.10m 5 set
8.2.2.3.2 D-39, 0.70 x 2.10m 1 set
8.2.2.4 19mm thk. Plywood Door for Pipe Chase
8.2.2.4.1 D-46, 1.0 x 1.50m (Single leaf) 6 set
8.2.2.4.2 D-47, 0.50 x 1.50m (Double Leaf) 1 set
8.2.3 Metal Doors
8.2.3.1 Single leaf hollow metal fire exit door, 1 hour fire rated with wired glass
8.2.3.1.1 D-5/ 28/ 29/ 32/ 34/ 36/ 40 to 43, 0.80 x 2.10m 10 set
8.2.3.1.2 D-44 /45, 0.80 x 1.20m 2 set
8.2.3.2 Double leaf metal swing door painted finish
8.2.3.2.1 D-4, 1.80 x 2.10m 1 set
8.2.3.3 Sliding metal louver door, painted finish including track, hardware and
accessories to complete
8.2.3.3.1 D-9, 1.90 x 2.10m 1 set
8.2.5 GLAZING WORKS
8.2.5.1 Glass Blocks including adhesive and accessories to complete 3 sq.m.
Sub-total "8.2" - DOORS AND PANELS
8.3 HARDWARES
8.3.1 LOCKSET
8.3.1.1Panic device type 3 function 11 (with lever, key locks or unlocks control
lever)12 set
8.3.1.2 Lockset series 4000 F82, Grade 1 11 set
8.3.1.3 Lockset series 4000 F91, Grade 1 4 set
8.3.1.4 Storage Lockset function lever type 2 set
8.3.1.5 DEADLOCK
8.3.1.5.1 Cylinder deadlock F-16, Grade 1 2 set
8.3.1.5.2 Deadlock series 1000 F17, Grade 1 8 set
8.3.2 Closer
8.3.2.1 Overhead door closer CO 2012 12 set
8.3.2.2 Overhead Surface Closer CO 2012 8 set
8.3.2.3 Overhead Concealed Closer 13 set
8.3.3 Hinges
8.3.3.1 Butt hinges 100mm x 100mm (4 x 4 ) 32 pair
8.3.3.2 Butt hinges 114mm x 114mm (4 1/2 x 4 1/2) 40 pair
Air Traffic Control Tower Building Page 19 of 77
Page 20
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
8.3.3.3 Center pivot ( top & bottom) 4 pair
8.3.4 Door Accessories
8.3.4.1 Door Handle
8.3.4.1.1 Push & pull bars (customized) 8 set
8.3.4.2 Push and Pull plate 8 set
8.3.4.3 Flushbolt (top and bottom of inactive door leaf) 6 set
8.3.4.4 Threshold
8.3.4.4.1 Panic threshold 12 set
8.3.4.4.2 Aluminum threshold 2 set
Sub-total "8.3" - HARDWARES
Total "DIV-08" - DOORS AND WINDOWS
DIV-09 FINISHES
9.1 FLOOR FINISHES
9.1.1 Plain cement concrete steel trowel finish 154 sq.m
9.1.2 Plain cement concrete steel trowel finish (to receive vinyl flooring) 367 sq.m
9.1.3 Homogeneous Vinyl Floor Tiles, 300 x 300 x 3 mm thk 367 sq.m
9.1.4 Mortar topping for waterproof area 20 sq.m
9.1.550mm thk. Concrete topping with 25mmø x 50 x 50mm wiremesh
reinforcement166 sq.m
9.1.6 600 x 600 Homogeneous Polished Tiles (including mortar bed) 116 sq.m
9.1.7 300 x 300 Unglazed Ceramic Tiles (including mortar bed) 104 sq.m
9.1.8 200 x 200 Unglazed Ceramic Tiles (including mortar bed) 2 sq.m
9.1.9 Raised Flooring 38 sq.m
Sub-total "9.1" - FLOOR FINISHES
9.2 WALL FINISHES
9.2.1 Plain cement plaster wall Painted Finish 2,967 sq.m
9.2.2 300 x 300mm Glazed ceramic wall tiles (including mortar bed) 113 sq.m
9.2.3 200 x 200mm Glazed ceramic wall tiles (including mortar bed) 2 sq.m
9.2.412mm thk. Fiber cement board double face wall partition panel on light
weight metal frame81 sq.m
9.2.5 12mm groove line 313 l.m
Sub-total "9.2" - WALL FINISHES
9.3 CEILING FINISHES
9.3.1 12mm thk. Ordinary Gypsum Board on metal frame 252 sm
9.3.2 12mm thk. Moisture Resistant Gypsum Board on metal frame 106 sm
9.3.3 Exposed Construction Painted Finish 197 sm
9.3.4 600 x 600 x 15 Acoustic Board on Aluminum t-runner 285 sm
9.3.5 9mm thk. Fiber cement ceiling board on metal frame 98 sm
Sub-total "9.3" - CEILING FINISHES
9.4 BASE BOARD FINISHES
9.4.1 100mm high painted base 293 l.m.
9.4.2 100mm high Vinyl base board 209 l.m.
9.4.3 300 x 300mm high Glazed Ceramic Tile 75 sq.m.
9.4.4 200 x 200 mm high Unglazed ceramic tile 4 sq.m.
9.4.5 100 x 400mm Non-skid Homogeneous Tiles 101 sq.m.
Sub-total "9.4" - BASE BOARD FINISHES
9.5 PAINTING WORKS
9.5.1 At Floor
9.5.1.1 Epoxy paint 62 sq.m.
9.5.2 At Wall
9.5.2.1 Semi-gloss paint finish 1,702 sq.m.
9.5.2.2 Painting on wooden surfaces
9.5.2.2.1 Acrylic paint finish 1,083 sq.m.
9.5.3 At Ceiling
9.5.3.1 Semi-gloss paint finish 197 sq.m.
9.5.3.2 Painting on Fiber cement board surfaces 98 sq.m.
9.5.3.3 Painting on Gypsum board surfaces 357 sq.m.
9.5.4Painting on metal surfaces (metal doors, railings, gratings, grilles) - Epoxy
Paint134 sq.m.
9.5.5 Painting on wood doors 198 sq.m.
9.5.6 Painting on steel trusses
Air Traffic Control Tower Building Page 20 of 77
Page 21
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
9.5.6.1 Exposed Steel/Metal 1,350 sq.m.
Sub-total "9.5" - PAINTING WORKS
Total "DIV-09" - FINISHES
DIV-10 SPECIALTIES
10.16mm thick Facial mirror on 6mm thick marine plywood backing inclusive all
incidentals to complete
10.1.1 2400 x 900mm 2 set
10.1.2 1800 x 900mm 2 set
10.1.3 600 x 800mm 1 set
10.2 Stainless Steel Grab bar at PWD Toilet 4 set
10.3
Toilet compartments/cubicles - comprising 12mm thk intermediate panels,
doors, and urinal partitions/compartments with tissue holder and clothes
hook (compact laminated phenolic board) including all hardwares and
accessories in nylon finish and all other incidentals to complete
32 sq.m
10.4 Countertops
10.4.1 Granite Countertop W=600mm 15 sq.m
10.4.2 Monolithic Solid Surface Countertop 2 sq.m
10.5Supply and installation of aluminum compopsite panel including all
incidentals to complete77 sq.m.
Total "DIV-10" - SPECIALTIES
Air Traffic Control Tower Building Page 21 of 77
Page 22
S U M M A R Y
3.4 CRASH FIRE RESCUE BUILDING
DIV-02 SITE CONSTRUCTION l.s.
DIV-03 CONCRETE WORKS l.s.
DIV-04 MASONRY WORKS l.s.
DIV-05 METAL WORKS l.s.
DIV-06 WOOD AND PLASTIC l.s.
DIV-07 THERMAL AND MOISTURE PROTECTION l.s.
DIV-08 DOORS AND WINDOWS l.s.
DIV-09 FINISHES l.s.
DIV-10 SPECIALTIES l.s.
DIV-13 SPECIAL CONSTRUCTION l.s.
DIV-15 MECHANICAL WORKS
15.1 PLUMBING WORKS l.s.
15.2 VENTILATING AND AIRCONDITIONING WORKS l.s.
DIV 16 ELECTRICAL WORKS l.s.
TOTAL COST - CRASH FIRE RESCUE BUILDING
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
Crash Fire Rescue Building Page 22 of 77
Page 23
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
3.4 CRASH FIRE RESCUE BUILDING
DIV-02 SITE CONSTRUCTION
2 SITE WORKS
2.1.1 Building Layout 553 sq.m.
2.1.2 Structure Excavation 504 cu.m.
2.1.3 Backfilling and filling
2.1.3.1 Backfill excavations with suitable excavated materials 419 cu.m.
2.1.3.2 Gravel base; 150 mm thk 113 cu.m.
2.1.4 Soil Disposal
2.1.4.1 Remove surplus excavated material from site 85 cu.m.
2.1.5 Subgrade Preparation 553 sq.m.
2.1.6Anti-termite treatment to surfaces of ground and sides and bottoms of
excavations1,971 sq.m.
Sub-total "2.1" - SITE WORKS
DIV-03 CONCRETE WORKS
3.1 Cast-In-Place Structural Concrete
3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa
3.1.1.1 Columns and Pedestal 58 cu.m.
3.1.1.2 Suspended Beams 46 cu.m.
3.1.1.3 Footing Tie Beam 24 cu.m.
3.1.1.4 Suspended Slab and ramps 13 cu.m.
3.1.1.5 Stiffeners columns, lintel and bond beam (Exterior Wall) 4 cu.m.
3.1.1.6 Concrete Gutter (slab & parapet wall) 55 cu.m.
3.1.1.7 Column/Pedestal Footing 27 cu.m.
3.1.1.8 Wall Footing 6 cu.m.
3.1.1.9 Stairs 7 cu.m.
3.1.1.10 Counter top 1 cu.m.
3.1.2 Reinforced concrete; 3000 psi or 21 Mpa
3.1.2.1 Slab-on-grade /fill 78 cu.m.
3.2 Reinforcement in concrete
3.2.1Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 60
3.2.1.1 Columns and Pedestal 8,527 kg
3.2.1.2 Suspended Beams 5,619 kg
3.2.1.3 Stiffeners columns, lintel and bond beam (Exterior Wall) 57 kg
3.2.1.4 Column and Wall Footing 1,099 kg
3.2.1.5 Footing Tie Beam 2,179 kg
3.2.2Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 40
3.2.2.1 Columns and Pedestal 9,575 kg
3.2.2.2 Suspended Beams 2,904 kg
3.2.2.3 Suspended Slab, ramps and canopy 1,379 kg
3.2.2.4 Slab on Grade 3,467 kg
3.2.2.5 Stairs 810 kg
3.2.2.6 Stiffeners columns, lintel and bond beam (Exterior Wall) 788 kg
3.2.2.7 Column and Wall Footing 355 kg
3.2.2.8 Footing Tie Beam 1,327 kg
3.2.2.9 Concrete Gutter (slab & parapet wall) 5,195 kg
3.2.2.10 Counter top 109 kg
3.3 Formwork
3.3.1 Columns and Pedestal 472 sq.m.
3.3.2 Suspended Beams 409 sq.m.
3.3.3 Suspended Slab, ramps and canopy 103 sq.m.
3.3.4 Slab on Grade /fill 13 sq.m.
3.3.5 Stairs 49 sq.m.
3.3.6 Stiffeners columns, lintel and bond beam (Exterior Wall) 61 sq.m.
3.3.7 Concrete Gutter (slab & parapet wall) 680 sq.m.
3.3.8 Counter top 13 sq.m.
3.3.9 Column and Wall Footing 82 sq.m.
3.3.10 Footing Tie Beam 171 sq.m.
3.4 Concrete Accessories
3.4.1 Expansion joint with sealant; pre-formed type; 12 x 200mm
Crash Fire Rescue Building Page 23 of 77
Page 24
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
3.4.1.1 At Slab-on-grade 196 l.m.
3.4.1.2 At Masonry Wall 549 l.m.
3.4.2 PVC Waterstop 324 l.m.
Total "DIV-03" - CONCRETE WORKS
DIV-04 MASONRY WORKS
4.1 Accessories
4.1.1 Concrete Grout, 2000 psi 36 cu.m.
4.1.2Concrete lintel and bond beams inclusive of formworks and Steel
reinforcements, Grade 40 (For Interior Walls)2 cu.m.
4.1.3 CHB steel reinforcements, PNS 275 (Grade 40) 4,348 kg
4.2 CHB
4.2.1 150mm thk (1000 psi) - Exterior Wall 275 sq.m.
4.2.2 100mm thk (350 psi / 2.5 N/mm2) 273 sq.m.
Total "DIV-04" - MASONRY WORKS
DIV-05 METAL WORKS
5.1
Fabrication, delivery and erection of structural steel roof framing including
columns, main girders, beams, trusses, rafters, struts, purlins, sag rods,
cross bracings with turn buckles, bolts, plates and all other incidentals to
complete
32,187 kg
5.2 Steel Railings
5.2.1
50mm dia. Stainless Steel Stair rail, vertical and horizontal members with
38mm dia. Stainless steel subrail including all incidentals to complete
(supply and install)
17 l.m.
5.2.250mm dia. Stainless Steel wall mounted handrail including all incidentals to
complete (supply and install)15 l.m.
Total "DIV-05" - METAL WORKS
DIV-06 WOOD AND PLASTIC
6.1 Finish Carpentry
6.1.4.1
20mm thick Plywood base cabinet, with galvanized angle frame, handles,
supports and standard accessories inclusive of all incidentals and duco
paint finish to complete (H = 900mm, W=600mm) at Lecture Room CFR
Building
3 set
6.1.4.2
20mm thick Plywood base cabinet, with galvanized angle frame, handles,
supports and standard accessories inclusive of all incidentals and duco
paint finish to complete (H = 900mm, W=600mm) at Pantry
1 set
Total "DIV-06" - WOOD AND PLASTIC
DIV-07 THERMAL AND MOISTURE PROTECTION
7.1 Dampproofing and Waterproofing
7.1.1 Damproofing vapor barriers, 1 layer 6 mils thick @ Slab on Grade 553 sq.m.
7.1.2 Waterproofing
7.1.2.1 Elastomeric Membrane Waterproofing
7.1.2.1.1 25 mils for Canopy and Gutter 336 sq.m.
7.1.2.1.2 40 mils for Toilet 10 sq.m.
7.3 Insulation
7.3.1
Roof Insulation - 50mm thk Mineral Wool Insulation with two sided
aluminum including chicken wire support and other consumable
accessories to complete
608 sq.m.
7.4 Roofing and Accessories
7.4.1Ga.24 preformed prepainted long span single rib metal roofing inclusive of
all bended materials and incidentals to complete.608 sq.m.
7.4.2 Skylight Roofing 579 sq.m.
Total "DIV-07"-THERMAL AND MOISTURE PROTECTION
DIV-08 DOORS AND WINDOWS
8.1 WINDOWS
8.1.1Swing window with Fixed transom in Aluminum Powder coated frame with
6mm thk tinted glass and complete accessories
8.1.1.1 W-3, 1.0 x 1.50m 22 set
Crash Fire Rescue Building Page 24 of 77
Page 25
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
8.1.2Swing /casement window with fixed glass in aluminum powder coated
frame with 6mm thk. Tinted tempered glass and complete with accessories
8.1.2.1 W-2, 4.40 x 1.20m 4 set
8.1.2.2 W-6, 5.40 x 1.20m 2 set
8.1.3Awning window with fixed glass in Aluminum Powder coated frame with
6mm thk tinted glass and complete accessories
8.1.3.1 W-1, 1.475 x 6.60m 2 set
8.1.4Awning window in Aluminum Powder coated frame with 6mm thk tinted
glass and complete accessories
8.1.4.1 W-4, 2.20 x 0.60m 3 set
8.1.4.2 W-5, 0.80 x 0.60m 3 set
8.1.5 Fixed metal louver painted finish
8.1.5.1 L-1, 3.20 x 0.90m 5 set
Sub-total "8.1" - WINDOWS8.2 DOORS AND PANELS
8.2.1 Wood Doors
8.2.1.1 45mm thk. Single leaf flush hollow core wood door with view glass
8.2.1.1.1 D-8,9,11, 0.80 x 2.10m 3 set
8.2.1.1.2 D-14, 0.70 x 2.10m 1 set
8.2.1.2 Double leaf flush hollow core wood door with view glass painted finish
8.2.1.2.1 D-1,2, 1.80 x 2.10m 2 set
8.2.1.3Single leaf flush hollow core marine plywood with bottom louver painted
finish
8.2.1.3.1 D-3, 0.60 x 2.10m 1 set
8.2.1.3.2 D-4,15,17, 0.70 x 2.10m 3 set
8.2.1.3.3 D-5,7, 0.80 x 2.10m 2 set
8.2.2 Metal Doors
8.2.2.1 Single leaf hollow metal fire exit door, 1 hour fire rated with wired glass
8.2.2.1.1 D-6, 0.70 x 2.10m 1 set
8.2.2.1.2 D-13,16, 0.80 x 2.10m 2 set
8.2.2.2 Double leaf metal swing door painted finish
8.2.2.2.1 D-12, 1.80 x 2.10m 1 set
8.2.2.3 Metal roll-up door
8.2.2.3.1 D-10, 3.0 x 2.50m 1 set
Sub-total "8.2" - DOORS AND PANELS
8.3 HARDWARES
8.3.1 LOCKSET
8.3.1.1Panic device type 3 function 11 (with lever, key locks or unlocks control
lever)1 set
8.3.1.2 Lockset series 4000 F82, Grade 1 7 set
8.3.1.3 Lockset series 4000 F91, Grade 1 3 set
8.3.1.4 Storage Lockset function lever type 3 set
8.3.1.5 DEADLOCK
8.3.1.5.1 Deadlock series 1000 F17, Grade 1 2 set
8.3.2 Closer
8.3.2.1 Overhead door closer CO 2012 1 set
8.3.2.2 Overhead Surface Closer CO 2012 2 set
8.3.2.3 Overhead Concealed Closer 10 set
8.3.3 Hinges
8.3.3.1 Butt hinges 100mm x 100mm (4 x 4 ) 18 pair
8.3.3.2 Butt hinges 114mm x 114mm (4 1/2 x 4 1/2) 14 pair
8.3.4 Door Accessories
8.3.4.1 Door Handle
8.3.4.2 Push and Pull plate 2 set
8.3.4.3 Flushbolt (top and bottom of inactive door leaf) 3 set
8.3.4.4 Threshold
8.3.4.4.1 Panic threshold 1 set
Sub-total "8.3" - HARDWARES
Crash Fire Rescue Building Page 25 of 77
Page 26
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
Total "DIV-08" - DOORS AND WINDOWS
DIV-09 FINISHES
9.1 FLOOR FINISHES
9.1.1 Plain cement concrete steel trowel finish (to receive vinyl flooring) 127 sq.m
9.1.2 Homogeneous Vinyl Floor Tiles, 300 x 300 x 3 mm thk 127 sq.m
9.1.3 Mortar topping for waterproof area 346 sq.m
9.1.4 400 x 400 Non-skid Homogeneous Tiles (including mortar bed) 104 sq.m
9.1.5 300 x 300 Unglazed Ceramic Tiles (including mortar bed) 73 sq.m
9.1.6 200 x 200 Unglazed Ceramic Tiles (including mortar bed) 2 sq.m
9.1.7 Plain cement concrete finish with HD floor hardener 234 sq.m
9.1.8 Plain cement concrete wood trowel finish 59 sq.m
9.1.9 50mm Abrasive strip 56 sq.m
Sub-total "9.1" - FLOOR FINISHES
9.2 WALL FINISHES
9.2.1 Plain cement plaster wall Painted Finish 1,465 sq.m
9.2.2 300 x 300mm Glazed ceramic wall tiles (including mortar bed) 78 sq.m
9.2.3 200 x 200mm Glazed ceramic wall tiles (including mortar bed) 3 sq.m
9.2.4PVC Accordion Folding Door with track, panel and accessories to complete
(L=1.50m x 2.55m H)2 sq.m
Sub-total "9.2" - WALL FINISHES
9.3 CEILING FINISHES
9.3.1 12mm thk. Ordinary Gypsum Board on metal frame 94 sm
9.3.2 12mm thk. Moisture Resistant Gypsum Board on metal frame 67 sm
9.3.3 Exposed Construction Painted Finish 37 sm
9.3.4 600 x 600 x 15 Acoustic Board on Aluminum t-runner 41 sm
9.3.5 4.5mm thk. Fiber cement ceiling board on metal frame 412 sm
Sub-total "9.3" - CEILING FINISHES
9.4 BASE BOARD FINISHES
9.4.1 100mm high painted base 131 l.m.
9.4.2 100mm high Vinyl base board 51 l.m.
9.4.3 300 x 300mm high Glazed Ceramic Tile 37 sq.m.
9.4.4 200 x 200 mm high Unglazed ceramic tile 5 sq.m.
9.4.5 100 x 400mm Non-skid Homogeneous Tiles 63 sq.m.
Sub-total "9.4" - BASE BOARD FINISHES
9.5 PAINTING WORKS
9.5.1 At Floor
9.5.1.1 Epoxy paint 59 sq.m.
9.5.2 At Wall
9.5.2.1 Semi-gloss paint finish 506 sq.m.
9.5.2.2 Painting on wooden surfaces
9.5.2.2.1 Acrylic paint finish 741 sq.m.
9.5.2.2.2 Latex paint flat finish 122 sq.m.
9.5.3 At Ceiling
9.5.3.1 Semi-gloss paint finish 37 sq.m.
9.5.3.2 Painting on Fiber cement board surfaces 412 sq.m.
9.5.3.3 Painting on Gypsum board surfaces 161 sq.m.
9.5.4Painting on metal surfaces (metal doors, railings, gratings, grilles) - Epoxy
Paint80 sq.m.
9.5.5 Painting on wood doors 115 sq.m.
9.5.6 Painting on steel trusses
9.5.6.1 Covered Steel/Metal 1,634 sq.m.
Sub-total "9.5" - PAINTING WORKS
Total "DIV-09" - FINISHES
DIV-10 SPECIALTIES
10.16mm thick Facial mirror on 6mm thick marine plywood backing inclusive all
incidentals to complete
10.1.1 2400 x 800mm 1 set
10.1.2 800 x 800mm 3 set
Crash Fire Rescue Building Page 26 of 77
Page 27
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
10.2
Toilet compartments/cubicles - comprising 12mm thk intermediate panels,
doors, and urinal partitions/compartments with tissue holder and clothes
hook (compact laminated phenolic board) including all hardwares and
accessories in nylon finish and all other incidentals to complete
10 sq.m
10.3 Countertops
10.3.1 Granite Countertop W=600mm 4 sq.m
10.3.2 Monolithic Solid Surface Countertop 6 sq.m
Total "DIV-10" - SPECIALTIES
Crash Fire Rescue Building Page 27 of 77
Page 28
S U M M A R Y
3.5 POWER HOUSE BUILDING
DIV-02 SITE CONSTRUCTION l.s.
DIV-03 CONCRETE WORKS l.s.
DIV-04 MASONRY WORKS l.s.
DIV-05 METAL WORKS l.s.
DIV-07 THERMAL AND MOISTURE PROTECTION l.s.
DIV-08 DOORS AND WINDOWS l.s.
DIV-09 FINISHES l.s.
DIV-10 SPECIALTIES l.s.
DIV-13 SPECIAL CONSTRUCTION l.s.
DIV-15 MECHANICAL WORKS
15.1 PLUMBING WORKS l.s.
15.2 VENTILATING AND AIRCONDITIONING WORKS l.s.
DIV 16 ELECTRICAL WORKS l.s.
TOTAL COST - POWER HOUSE BUILDING
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
Power House Building Page 28 of 77
Page 29
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
3.5 POWER HOUSE BUILDING
DIV-02 SITE CONSTRUCTION
2 SITE WORKS
2.1.1 Building Layout 443 sq.m.
2.1.2 Structure Excavation 339 cu.m.
2.1.3 Backfilling and filling
2.1.3.1 Backfill excavations with suitable excavated materials 237 cu.m.
2.1.3.2 Gravel base; 150 mm thk 93 cu.m.
2.1.4 Soil Disposal
2.1.4.1 Remove surplus excavated material from site 102 cu.m.
2.1.5 Subgrade Preparation 443 sq.m.
2.1.6Anti-termite treatment to surfaces of ground and sides and bottoms of
excavations1,321 sq.m.
Sub-total "2.1" - SITE WORKS
DIV-03 CONCRETE WORKS
3.1 Cast-In-Place Structural Concrete
3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa
3.1.1.1 Columns and Pedestal 20 cu.m.
3.1.1.2 Suspended Beams 19 cu.m.
3.1.1.3 Footing Tie Beam 26 cu.m.
3.1.1.4 Stiffeners columns, lintel and bond beam (Exterior Wall) 4 cu.m.
3.1.1.5 Column/Pedestal Footing 18 cu.m.
3.1.1.6 Wall Footing 6 cu.m.
3.1.1.7 Equipment pad 30 cu.m.
3.1.1.8 Maintenance/Trench/Cable pit 18 cu.m.
3.1.2 Reinforced concrete; 3000 psi or 21 Mpa
3.1.2.1 Slab-on-grade /fill 55 cu.m.
3.1.2 Lean concrete; 2000 psi or 13.79 Mpa
3.1.2.1 Equipment pad 3 cu.m.
Power House Building Page 29 of 77
Page 30
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
3.2 Reinforcement in concrete
3.2.1Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 60
3.2.1.1 Columns and Pedestal 3,433 kg
3.2.1.2 Suspended Beams 2,029 kg
3.2.1.3 Stiffeners columns, lintel and bond beam (Exterior Wall) 476 kg
3.2.1.4 Column and Wall Footing 1,119 kg
3.2.1.5 Footing Tie Beam 1,857 kg
3.2.1.6 Equiipment Pad 1,582 kg
3.2.2Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 40
3.2.2.1 Columns and Pedestal 4,636 kg
3.2.2.2 Suspended Beams 1,275 kg
3.2.2.3 Slab on Grade 2,754 kg
3.2.2.4 Stiffeners columns, lintel and bond beam (Exterior Wall) 449 kg
3.2.2.5 Column and Wall Footing 788 kg
3.2.2.6 Footing Tie Beam 1,024 kg
3.2.2.7 Equipment pad 418 kg
3.2.2.8 Maintenance/Trench/Cable pit 1,228 kg
3.3 Formwork
3.3.1 Columns and Pedestal 188 sq.m.
3.3.2 Suspended Beams 178 sq.m.
3.3.3 Slab on Grade /fill 16 sq.m.
3.3.4 Stiffeners columns, lintel and bond beam (Exterior Wall) 51 sq.m.
3.3.5 Equipment pad 58 sq.m.
3.3.6 Maintenance/Trench/Cable pit 170 sq.m.
3.3.7 Column and Wall Footing 66 sq.m.
3.3.8 Footing Tie Beam 124 sq.m.
3.4 Concrete Accessories
3.4.1 Expansion joint with sealant; pre-formed type; 12 x 200mm
3.4.1.1 At Slab-on-grade 353 l.m.
3.4.1.2 At Masonry Wall 301 l.m.
Total "DIV-03" - CONCRETE WORKS
DIV-04 MASONRY WORKS
4.1 Accessories
4.1.1 Concrete Grout, 2000 psi 37 cu.m.
4.1.2Concrete lintel and bond beams inclusive of formworks and Steel
reinforcements, Grade 40 (For Interior Walls)4 cu.m.
4.1.3 CHB steel reinforcements, PNS 275 (Grade 40) 3,132 kg
4.2 CHB
4.2.1 150mm thk (1000 psi) - Exterior Wall 309 sq.m.
4.2.2 150mm thk (700 psi) - Interior Wall 7 sq.m.
4.2.3 100mm thk (350 psi / 2.5 N/mm2) 225 sq.m.
Total "DIV-04" - MASONRY WORKS
DIV-05 METAL WORKS
5.1
Fabrication, delivery and erection of structural steel roof framing including
columns, main girders, beams, trusses, rafters, struts, purlins, sag rods,
cross bracings with turn buckles, bolts, plates and all other incidentals to
complete
15,826 kg
5.2Fabrication, delivery and installation of Misc. Plates for Tank Base Plate
oncluding bolts and all incidentals to complete25 kg
Power House Building Page 30 of 77
Page 31
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
5.3Fabrication, delivery and installation of 6mm thk checkered plate cover
including support and frame to complete for trench & cable cover4,310 kg
5.4 Miscellaneous Metals
5.4.1100mm Chainlink with 50mmø G.I Pipe Frame, Epoxy Painted Finish (refer
to drawings for detailed design)18 sq.m.
Total "DIV-05" - METAL WORKS
DIV-07 THERMAL AND MOISTURE PROTECTION
7.1 Dampproofing and Waterproofing
7.1.1 Damproofing vapor barriers, 1 layer 6 mils thick @ Slab on Grade 463 sq.m.
7.2 Insulation
7.2.1
Roof Insulation - 50mm thk Mineral Wool Insulation with two sided
aluminum including chicken wire support and other consumable
accessories to complete
479 sq.m.
7.3 Roofing and Accessories
7.3.1Ga.24 preformed prepainted long span single rib metal roofing inclusive of
all bended materials and incidentals to complete.479 sq.m.
7.3.2 6mm thick fiber cement fascia board
7.3.2.1 940mm high 64 l.m.
7.4 Siding
7.4.1 4.5mm thk. Fiber cement board backing on furring channel 81 sq.m.
Total "DIV-07"-THERMAL AND MOISTURE PROTECTION
DIV-08 DOORS AND WINDOWS
8.1 WINDOWS
8.1.1Swing /casement window with fixed glass in aluminum powder coated
frame with 6mm thk. Tinted tempered glass and complete with accessories
8.1.1.1 W-2, 1.20 x 1.20m 1 set
8.1.2Awning window in Aluminum Powder coated frame with 6mm thk clear
glass and complete accessories
8.1.2.1 W-1, 1.60 x 0.6 2 set
8.1.2.2 W-6, 1.60 x 0.6 1 set
8.1.3Fixed window in Aluminum Powder coated frame with 6mm thk clear glass
and complete accessories
8.1.3.1 W-3, 6.0 x 1.2 1 set
8.1.3.2 W-4, 1. 3.0x1.2 1 set
8.1.3.3 W-5 2.0x1.2 1 set
8.1.4 Fixed metal louver window with stainless steel insect screen painted finish
8.1.4.1 L-1, 6x3 (demountable) 1 set
8.1.4.2 L-2, 3x3 (demountable) 4 set
Sub-total "8.1" - WINDOWS
Power House Building Page 31 of 77
Page 32
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
8.2 DOORS AND PANELS
8.2.1 Metal Doors
8.2.1.1 Single leaf swing metal louver door including door jamb with stainless steel
insect screen painted finish
8.2.1.1.1 D-5, 0.80 x 2.10m (1 hour fire rated) 1 set
8.2.1.2 Single leaf hollow metal fire exit door, 1 hour fire rated with wired glass
8.2.1.2.1 D-1, 0.90 x 2.10m 1 set
8.2.1.2.2 D-6, 0.90 x 2.10m 1 set
8.2.1.2.3 D-8,9, 0.90 x 2.10m 2 set
8.2.1.3 Metal roll-up door
8.2.1.3.1 D-7, 4.0 x 3.0m 1 set
8.2.1.4 Single leaf hollow metal door, 1 hour fire rated painted finish
8.2.1.4.1 D-2,3,4 0.80 x 2.10m 3 set
8.2.1.4.2 D-11, 0.80 x 2.10m 1 set
8.2.4 PVC/Plastic Doors
8.2.4.1 PVC Flush door with bottom louver including hinges and privacy lockset
8.2.4.1.1 D-10, 0.60 x 2.10m 1 set
Sub-total "8.2" - DOORS AND PANELS
8.3 HARDWARES
8.3.1 LOCKSET
8.3.1.1Panic device type 3 function 11 (with lever, key locks or unlocks control
lever)7 set
8.3.1.2 Lockset series 4000 F82, Grade 1 2 set
8.3.2 Closer
8.3.2.1 Overhead door closer CO 2012 7 set
8.3.2.2 Overhead Concealed Closer 2 set
8.3.3 Hinges
8.3.3.1 Butt hinges 100mm x 100mm (4 x 4 ) 3 pair
8.3.3.2 Butt hinges 114mm x 114mm (4 1/2 x 4 1/2) 14 pair
8.3.4 Door Accessories
8.3.4.1 Door Handle
8.3.4.2 Threshold
8.3.4.2.1 Panic threshold 7 set
Sub-total "8.3" - HARDWARES
Total "DIV-08" - DOORS AND WINDOWS
DIV-09 FINISHES
9.1 FLOOR FINISHES
9.1.1 Plain cement concrete steel trowel finish 23 sq.m
9.1.2 Plain cement concrete steel trowel finish (to receive vinyl flooring) 39 sq.m
9.1.3 Homogeneous Vinyl Floor Tiles, 300 x 300 x 3 mm thk 39 sq.m
9.1.4 Plain cement concrete steel trowel finish with groove 9 sq.m
Sub-total "9.1" - FLOOR FINISHES
9.2 WALL FINISHES
9.2.1 Plain cement plaster wall Painted Finish 1,234 sq.m
9.2.2 300 x 300mm Glazed ceramic wall tiles (including mortar bed) 11 sq.m
Sub-total "9.2" - WALL FINISHES
9.3 CEILING FINISHES
9.3.1 12mm thk. Moisture Resistant Gypsum Board on metal frame 3 sm
Power House Building Page 32 of 77
Page 33
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
PAY ITEM
NO.D E S C R I P T I O N UNIT COST
ESTIMATED
QTYUNIT
9.3.2 600 x 600 x 15 Acoustic Board on Aluminum t-runner 39 sm
9.3.3 6mm thk. Fiber cement ceiling board on metal frame 79 sm
Sub-total "9.3" - CEILING FINISHES
9.4 BASE BOARD FINISHES
9.4.1 100mm high Vinyl base board 26 l.m.
9.4.2 100mm high epoxy base line paint 152 l.m.
Sub-total "9.4" - BASE BOARD FINISHES
9.5 PAINTING WORKS
9.5.1 At Floor
9.5.1.1 Epoxy paint 459 sq.m.
9.5.2 At Wall
9.5.2.1 Semi-gloss paint finish 55 sq.m.
9.5.2.2 Painting on wooden surfaces
9.5.2.2.1 Acrylic paint finish 382 sq.m.
9.5.2.2.2 Latex paint flat finish 731 sq.m.
9.5.3 At Ceiling
9.5.3.2 Painting on Fiber cement board surfaces 224 sq.m.
9.5.3.3 Painting on Gypsum board surfaces 3 sq.m.
9.5.4Painting on metal surfaces (metal doors, railings, gratings, grilles) - Epoxy
Paint339 sq.m.
9.5.5 Painting on steel trusses
9.5.5.1 Exposed Steel/Metal 1,074 sq.m.
Sub-total "9.5" - PAINTING WORKS
Total "DIV-09" - FINISHES
DIV-10 SPECIALTIES
10.16mm thick Facial mirror on 6mm thick marine plywood backing inclusive all
incidentals to complete
10.1.1 600 x 800mm 1 set
Total "DIV-10" - SPECIALTIES
Power House Building Page 33 of 77
Page 34
S U M M A R Y
3.6 MAINTENANCE BUILDING
DIV-02 SITE CONSTRUCTION l.s.
DIV-03 CONCRETE WORKS l.s.
DIV-04 MASONRY WORKS l.s.
DIV-05 METAL WORKS l.s.
DIV-07 THERMAL AND MOISTURE PROTECTION l.s.
DIV-08 DOORS AND WINDOWS l.s.
DIV-09 FINISHES l.s.
DIV-10 SPECIALTIES l.s.
DIV-13 SPECIAL CONSTRUCTION l.s.
DIV-15 MECHANICAL WORKS
15.1 PLUMBING WORKS l.s.
15.2 VENTILATING AND AIRCONDITIONING WORKS l.s.
DIV 16 ELECTRICAL WORKS l.s.
TOTAL COST - MAINTENANCE BUILDING
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Maintenance Building Page 34 of 77
Page 35
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
3.6 MAINTENANCE BUILDING
DIV-02 SITE CONSTRUCTION
2 SITE WORKS
2.1.1 Building Layout 792 sq.m.
2.1.2 Structure Excavation 410 cu.m.
2.1.3 Backfilling and filling
2.1.3.1 Backfill excavations with suitable excavated materials 321 cu.m.
2.1.3.2 Gravel base; 150 mm thk 155 cu.m.
2.1.4 Soil Disposal
2.1.4.1 Remove surplus excavated material from site 89 cu.m.
2.1.5 Subgrade Preparation 792 sq.m.
2.1.6Anti-termite treatment to surfaces of ground and sides and bottoms of
excavations1,666 sq.m.
Sub-total "2.1" - SITE WORKS
DIV-03 CONCRETE WORKS
3.1 Cast-In-Place Structural Concrete
3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa
3.1.1.1 Columns and Pedestal 35 cu.m.
3.1.1.2 Suspended Beams 22 cu.m.
3.1.1.3 Footing Tie Beam 14 cu.m.
3.1.1.4 Suspended Slab and ramps 11 cu.m.
3.1.1.5 Stiffeners columns, lintel and bond beam (Exterior Wall) 4 cu.m.
3.1.1.6 Column/Pedestal Footing 48 cu.m.
3.1.1.7 Wall Footing 5 cu.m.
3.1.1.8 Counter top 0.3 cu.m.
3.1.1.9 Maintenance/Trench/Cable pit 9 cu.m.
3.1.2 Reinforced concrete; 3000 psi or 21 Mpa
3.1.2.2 Slab-on-grade /fill 118 cu.m.
3.2 Reinforcement in concrete
3.2.1Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 60
3.2.1.1 Columns and Pedestal 7,779 kg
3.2.1.2 Suspended Beams 1,476 kg
3.2.1.3 Stiffeners columns, lintel and bond beam (Exterior Wall) 19 kg
3.2.1.4 Column and Wall Footing 6,216 kg
3.2.1.5 Footing Tie Beam 752 kg
3.2.1.6 Maintenance/Trench/Cable pit 283 kg
3.2.2Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 40
3.2.2.1 Columns and Pedestal 8,270 kg
3.2.2.2 Suspended Beams 1,966 kg
3.2.2.3 Suspended Slab, ramps and canopy 962 kg
3.2.2.4 Slab on Grade 8,279 kg
3.2.2.5 Stiffeners columns, lintel and bond beam (Exterior Wall) 844 kg
3.2.2.6 Column and Wall Footing 684 kg
3.2.2.7 Footing Tie Beam 744 kg
3.2.2.8 Counter top 33 kg
Maintenance Building Page 35 of 77
Page 36
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
3.2.2.9 Maintenance/Trench/Cable pit 607 kg
3.3 Formwork
3.3.1 Columns and Pedestal 295 sq.m.
3.3.2 Suspended Beams 232 sq.m.
3.3.3 Suspended Slab, ramps and canopy 91 sq.m.
3.3.4 Slab on Grade /fill 35 sq.m.
3.3.5 Stiffeners columns, lintel and bond beam (Exterior Wall) 64 sq.m.
3.3.6 Counter top 4 sq.m.
3.3.7 Maintenance/Trench/Cable pit 77 sq.m.
3.3.8 Column and Wall Footing 101 sq.m.
3.3.9 Footing Tie Beam 87 sq.m.
3.4 Concrete Accessories
3.4.1 Expansion joint with sealant; pre-formed type; 12 x 200mm
3.4.1.1 At Slab-on-grade 347 l.m.
3.4.1.2 At Masonry Wall 466 l.m.
3.4.2 PVC Waterstop 28 l.m.
Total "DIV-03" - CONCRETE WORKS
DIV-04 MASONRY WORKS
4.1 Accessories
4.1.1 Concrete Grout, 2000 psi 45 cu.m.
4.1.2Concrete lintel and bond beams inclusive of formworks and Steel
reinforcements, Grade 40 (For Interior Walls)1 cu.m.
4.1.3 CHB steel reinforcements, PNS 275 (Grade 40) 3,855 kg
4.2 CHB
4.2.1 150mm thk (1000 psi) - Exterior Wall 433 sq.m.
4.2.2 150mm thk (700 psi) - Interior Wall 16 sq.m.
4.2.3 100mm thk (350 psi / 2.5 N/mm2) 161 sq.m.
Total "DIV-04" - MASONRY WORKS
DIV-05 METAL WORKS
5.1
Fabrication, delivery and erection of structural steel roof framing including
columns, main girders, beams, trusses, rafters, struts, purlins, sag rods,
cross bracings with turn buckles, bolts, plates and all other incidentals to
complete
31,434 kg
5.2Fabrication, delivery and installation of 6mm thk checkered plate cover
including support and frame to complete for Sumo pit frame97 kg
5.3 Miscellaneous Metals
5.3.1 Trench drain steel grating cover
5.3.1.1 200mm width 20 l.m.
5.3.1.2 600mm width 1 l.m.
5.3.2100mm Chainlink with 50mmø G.I Pipe Frame, Epoxy Painted Finish (refer
to drawings for detailed design)5 sq.m.
5.3.3150mmø GIP Guard Post including concrete filler, painting, installation and
accessories to complete16 set
Total "DIV-05" - METAL WORKS
DIV-07 THERMAL AND MOISTURE PROTECTION
7.1 Dampproofing and Waterproofing
7.1.1 Damproofing vapor barriers, 1 layer 6 mils thick @ Slab on Grade 829 sq.m.
7.2 Insulation
Maintenance Building Page 36 of 77
Page 37
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
7.2.1
Roof Insulation - 50mm thk Mineral Wool Insulation with two sided
aluminum including chicken wire support and other consumable
accessories to complete
730 sq.m.
7.3 Roofing and Accessories
7.3.1Ga.24 preformed prepainted long span single rib metal roofing inclusive of
all bended materials and incidentals to complete.730 sq.m.
7.3.2 6mm thick fiber cement fascia board
7.3.2.1 940mm high 64 l.m.
7.4 Siding
7.4.1 4.5mm thk. Fiber cement board backing on furring channel 84 sq.m.
Total "DIV-07"-THERMAL AND MOISTURE PROTECTION
DIV-08 DOORS AND WINDOWS
8.1 WINDOWS
8.1.1Swing /casement window with fixed glass in aluminum powder coated
frame with 6mm thk. Clear glass and complete with accessories
8.1.1.1 W-1, 3.20 x 1.80m 2 set
8.1.1.2 W-3, 1.60 x 1.80m 1 set
8.1.2Awning window with fixed glass in Aluminum Powder coated frame with
6mm thk clear glass and complete accessories
8.1.2.1 W-4, 1.60 x 1.0m 3 set
8.1.3Awning window in Aluminum Powder coated frame with 6mm thk clear
glass and complete accessories
8.1.3.1 W-5, 0.70 x 0.60m 1 set
8.1.4Fixed window in Aluminum Powder coated frame with 6mm thk clear glass
and complete accessories
8.1.4.1 W-6, 3.20 x 0.60m 1 set
8.1.5Sliding window in Aluminum Powder coated frame with 6mm thk clear glass
and complete accessories
8.1.5.1 W-2, 1.60 x 1.20m 2 set
8.1.6 Fixed metal louver with 6mm thk. Float glass transom painted finish
8.1.6.1 L-1, 3.20 x 1.80m 9 set
Sub-total "8.1" - WINDOWS
8.2 DOORS AND PANELS
8.2.1 Aluminum Doors
8.2.1.1 Single leaf powder coated aluminum door with 6mm thk. Clear glass
including push and pull bar (as per manufacturer's standard)
8.2.1.1.1 D-11, 0.80 x 2.10m 1 set
8.2.1.1.2 D-13,14,15, 0.80 x 2.10m 3 set
8.2.2 Wood Doors
8.2.2.1 Single leaf flush hollow core plywood door painted finish
8.2.2.1.1 D-8, 0.90 x 2.10m 1 set
8.2.2.2Single leaf flush hollow core marine plywood with bottom louver painted
finish
8.2.2.2.1 D-9,10, 0.80 x 2.10m 2 set
8.2.3 Metal Doors
8.2.3.1 Single leaf hollow metal fire exit door, 1 hour fire rated with wired glass
8.2.3.1.1 D-5,6, 0.80 x 2.10m with metal threshold 2 set
Maintenance Building Page 37 of 77
Page 38
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
8.2.3.1.2 D-16,17, 0.80 x 2.10m 2 set
8.2.3.2 Metal roll-up door
8.2.3.2.1 D-1,2,3,4, 4.50 x 4.45m 4 set
8.2.4 PVC/Plastic Doors
8.2.4.1 PVC Flush door with bottom louver including hinges and privacy lockset
8.2.4.1.1 D-12, 0.70 x 2.10m 1 set
Sub-total "8.2" - DOORS AND PANELS
8.3 HARDWARES
8.3.1 LOCKSET
8.3.1.1Panic device type 3 function 11 (with lever, key locks or unlocks control
lever)4 set
8.3.1.2 Lockset series 4000 F82, Grade 1 1 set
8.3.1.5 DEADLOCK
8.3.1.5.1 Cylinder deadlock F-16, Grade 1 4 set
8.3.1.5.2 Deadlock series 1000 F17, Grade 1 2 set
8.3.2 Closer
8.3.2.1 Overhead door closer CO 2012 4 set
8.3.2.2 Overhead Surface Closer CO 2012 2 set
8.3.2.3 Overhead Concealed Closer 1 set
8.3.3 Hinges
8.3.3.1 Butt hinges 100mm x 100mm (4 x 4 ) 5 pair
8.3.3.2 Butt hinges 114mm x 114mm (4 1/2 x 4 1/2) 8 pair
8.3.3.3 Center pivot ( top & bottom) 4 pair
8.3.4 Door Accessories
8.3.4.1 Door Handle
8.3.4.2 Push and Pull plate 2 set
8.3.4.4 Threshold
8.3.4.4.1 Panic threshold 4 set
8.3.4.4.2 Aluminum threshold 4 set
Sub-total "8.3" - HARDWARES
Total "DIV-08" - DOORS AND WINDOWS
DIV-09 FINISHES
9.1 FLOOR FINISHES
9.1.1 Homogeneous Vinyl Floor Tiles, 300 x 300 x 3 mm thk 57 sq.m
9.1.2 300 x 300 Unglazed Ceramic Tiles (including mortar bed) 35 sq.m
9.1.3 Plain cement concrete steel trowel finish with floor hardener 70 sq.m
9.1.4 Plain cement concrete steel trowel finish with floor hardener and groove 80 sq.m
9.1.5 Plain cement concrete finish with HD floor hardener 38 sq.m
Sub-total "9.1" - FLOOR FINISHES
9.2 WALL FINISHES
9.2.1 Plain cement plaster wall Painted Finish 1,446 sq.m
9.2.2 20mm groove line 176 l.m
9.2.3 300 x 300mm Glazed ceramic wall tiles (including mortar bed) 82 sq.m
Sub-total "9.2" - WALL FINISHES
9.3 CEILING FINISHES
9.3.1 12mm thk. Ordinary Gypsum Board on metal frame 26 sm
9.3.2 12mm thk. Moisture Resistant Gypsum Board on metal frame 35 sm
Maintenance Building Page 38 of 77
Page 39
TOTAL COST
BILL OF QUANTITIES
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
9.3.3 Exposed Construction Painted Finish 153 sm
9.3.4 600 x 600 x 15 Acoustic Board on Aluminum t-runner 48 sm
9.3.5 6mm thk. Fiber cement ceiling board on metal frame 96 sm
9.3.6 Vent Ceiling 4 set
Sub-total "9.3" - CEILING FINISHES
9.4 BASE BOARD FINISHES
9.4.1 100mm high painted base 46 l.m.
9.4.2 100mm high Vinyl base board 56 l.m.
9.4.3 100mm high epoxy base line paint 74 l.m.
Sub-total "9.4" - BASE BOARD FINISHES
9.5 PAINTING WORKS
9.5.1 At Floor
9.5.1.1 Epoxy paint 498 sq.m.
9.5.2 At Wall
9.5.2.1 Semi-gloss paint finish 758 sq.m.
9.5.2.2 Painting on wooden surfaces
9.5.2.3 Acrylic paint finish 629 sq.m.
9.5.3 At Ceiling
9.5.3.1 Semi-gloss paint finish 153 sq.m.
9.5.3.2 Painting on Fiber cement board surfaces 244 sq.m.
9.5.3.3 Painting on Gypsum board surfaces 60 sq.m.
9.5.4Painting on metal surfaces (metal doors, railings, gratings, grilles) - Epoxy
Paint178 sq.m.
9.5.5 Painting on wood doors 17 sq.m.
9.5.6 Painting on steel trusses
9.5.6.1 Exposed Steel/Metal 1,831 sq.m.
Sub-total "9.5" - PAINTING WORKS
Total "DIV-09" - FINISHES
DIV-10 SPECIALTIES
10.16mm thick Facial mirror on 6mm thick marine plywood backing inclusive all
incidentals to complete
10.1.1 2650 x 800mm 1 set
10.1.2 600 x 800mm 1 set
10.3
Toilet compartments/cubicles - comprising 12mm thk intermediate panels,
doors, and urinal partitions/compartments with tissue holder and clothes
hook (compact laminated phenolic board) including all hardwares and
accessories in nylon finish and all other incidentals to complete
19 sq.m
10.4 Countertops
10.4.1 Granite Countertop W=600mm 3 sq.m
Total "DIV-10" - SPECIALTIES
Maintenance Building Page 39 of 77
Page 40
S U M M A R Y
3.7 MATERIALS RECOVERY FACILITIES BUILDING
DIV-02 SITE CONSTRUCTION l.s.
DIV-03 CONCRETE WORKS l.s.
DIV-04 MASONRY WORKS l.s.
DIV-05 METAL WORKS l.s.
DIV-07 THERMAL AND MOISTURE PROTECTION l.s.
DIV-08 DOORS AND WINDOWS l.s.
DIV-09 FINISHES l.s.
DIV-15 MECHANICAL WORKS
15.1 PLUMBING WORKS l.s.
DIV 16 ELECTRICAL WORKS l.s.
TOTAL COST - MATERIALS RECOVERY FACILITIES
UNIT UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTY
Materials Recovery Facilities Page 40 of 77
Page 41
UNIT UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTY
3.7 MATERIALS RECOVERY FACILITIES BUILDING
DIV-02 SITE CONSTRUCTION
2 SITE WORKS
2.1.1 Building Layout 35 sq.m.
2.1.2 Structure Excavation 12 cu.m.
2.1.3 Backfilling and filling
2.1.3.1 Backfill excavations with suitable excavated materials 8 cu.m.
2.1.3.2 Gravel base; 150 mm thk 9 cu.m.
2.1.4 Soil Disposal
2.1.4.1 Remove surplus excavated material from site 4 cu.m.
2.1.5 Subgrade Preparation 35 sq.m.
2.1.6Anti-termite treatment to surfaces of ground and sides and bottoms of
excavations70 sq.m.
Sub-total "2.1" - SITE WORKS
DIV-03 CONCRETE WORKS
3.1 Cast-In-Place Structural Concrete
3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa
3.1.1.1 Columns and Pedestal 3 cu.m.
3.1.1.2 Suspended Beams 3 cu.m.
3.1.1.9 Stiffeners columns, lintel and bond beam (Exterior Wall) 1 cu.m.
3.1.2.3 Column/Pedestal Footing 3 cu.m.
3.1.2.4 Wall Footing 2 cu.m.
3.1.2 Reinforced concrete; 3000 psi or 21 Mpa
3.1.2.2 Slab-on-grade /fill 4 cu.m.
3.2 Reinforcement in concrete
3.2.1Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 40
3.2.1.1 Columns and Pedestal 386 kg
3.2.2.2 Suspended Beams 291 kg
3.2.2.4 Slab on Grade 239 kg
3.2.2.7 Stiffeners columns, lintel and bond beam (Exterior Wall) 135 kg
3.2.2.9 Column and Wall Footing 217 kg
3.3 Formwork
3.3.1 Columns and Pedestal 34 sq.m.
3.3.2 Suspended Beams 26 sq.m.
3.3.4 Slab on Grade /fill 2 sq.m.
3.3.8 Stiffeners columns, lintel and bond beam (Exterior Wall) 10 sq.m.
3.3.15 Column and Wall Footing 18 sq.m.
3.4 Concrete Accessories
3.4.1 Expansion joint with sealant; pre-formed type; 12 x 200mm
3.4.1.1 At Slab-on-grade 42 l.m.
At Masonry Wall 52 l.m.
Total "DIV-03" - CONCRETE WORKS
DIV-04 MASONRY WORKS
4.1 Accessories
4.1.1 Concrete Grout, 2000 psi 7 cu.m.
4.1.2Concrete lintel and bond beams inclusive of formworks and Steel
reinforcements, Grade 40 (For Interior Walls)0.20 cu.m.
Materials Recovery Facilities Page 41 of 77
Page 42
UNIT UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTY
4.1.3 CHB steel reinforcements, PNS 275 (Grade 40) 603 kg
4.2 CHB
4.2.1 150mm thk (1000 psi) - Exterior Wall 65 sq.m.
4.2.2 150mm thk (700 psi) - Interior Wall 17 sq.m.
4.2.4 Louver blocks 5 sq.m.
Total "DIV-04" - MASONRY WORKS
DIV-05 METAL WORKS
5.1
Fabrication, delivery and erection of structural steel roof framing including
columns, main girders, beams, trusses, rafters, struts, purlins, sag rods,
cross bracings with turn buckles, bolts, plates and all other incidentals to
complete
1,059 kg
Total "DIV-05" - METAL WORKS
DIV-07 THERMAL AND MOISTURE PROTECTION
7.1 Dampproofing and Waterproofing
7.1.1 Damproofing vapor barriers, 1 layer 6 mils thick @ Slab on Grade 35 sq.m.
7.2 Insulation
7.2.1
Roof Insulation - 50mm thk Mineral Wool Insulation with two sided
aluminum including chicken wire support and other consumable
accessories to complete
54 sq.m.
7.3 Roofing and Accessories
7.3.1Ga.24 preformed prepainted long span single rib metal roofing inclusive of
all bended materials and incidentals to complete.54 sq.m.
7.3.2 6mm thick fiber cement fascia board
7.3.2.1 300mm high 10 l.m.
7.4 Siding
7.4.1 4.5mm thk. Fiber cement board backing on furring channel 7 sq.m.
Total "DIV-07"-THERMAL AND MOISTURE PROTECTION
DIV-08 DOORS AND WINDOWS
8.2 DOORS AND PANELS
8.2.1 Metal Doors
8.2.1.1 Double leaf metal swing door painted finish
8.2.1.1.1 D-1, 1.25 x 2.10m 4 set
Sub-total "8.2" - DOORS AND PANELS
8.3 HARDWARES
8.3.1 LOCKSET
8.3.1.3 Lockset series 4000 F91, Grade 1 4 set
8.3.3 Hinges
8.3.3.2 Butt hinges 114mm x 114mm (4 1/2 x 4 1/2) 16 pair
8.3.4 Door Accessories
8.3.4.1 Door Handle
8.3.4.3 Flushbolt (top and bottom of inactive door leaf) 4 set
Sub-total "8.3" - HARDWARES
Total "DIV-08" - DOORS AND WINDOWS
Materials Recovery Facilities Page 42 of 77
Page 43
UNIT UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTY
DIV-09 FINISHES
9.1 FLOOR FINISHES
9.1.1 Plain cement concrete steel trowel finish 15 sq.m
9.1.2 Plain cement concrete steel trowel finish with groove 17 sq.m
Sub-total "9.1" - FLOOR FINISHES
9.2 WALL FINISHES
9.2.1 Plain cement plaster wall Painted Finish 194 sq.m
9.2.2 20mm groove line 13 l.m
Sub-total "9.2" - WALL FINISHES
9.3 CEILING FINISHES
9.3.8 6mm thk. Fiber cement ceiling board on metal frame 17 sm
Sub-total "9.3" - CEILING FINISHES
9.4 BASE BOARD FINISHES
9.4.1 100mm high painted base 35 l.m.
Sub-total "9.4" - BASE BOARD FINISHES
9.5 PAINTING WORKS
9.5.1 At Wall
9.5.1.1 Semi-gloss paint finish 106 sq.m.
9.5.1.2 Painting on wooden surfaces
9.5.1.2.1 Acrylic paint finish 93 sq.m.
9.5.3 At Ceiling
9.5.3.1 Painting on Fiber cement board surfaces 26 sq.m.
9.5.4Painting on metal surfaces (metal doors, railings, gratings, grilles) - Epoxy
Paint29 sq.m.
Sub-total "9.5" - PAINTING WORKS
Total "DIV-09" - FINISHES
Materials Recovery Facilities Page 43 of 77
Page 44
S U M M A R Y
3.8 PUMP ROOM AND WATER RESERVOIR
DIV-02 SITE CONSTRUCTION l.s.
DIV-03 CONCRETE WORKS l.s.
DIV-04 MASONRY WORKS l.s.
DIV-05 METAL WORKS l.s.
DIV-07 THERMAL AND MOISTURE PROTECTION l.s.
DIV-08 DOORS AND WINDOWS l.s.
DIV-09 FINISHES l.s.
DIV-13 SPECIAL CONSTRUCTION l.s.
DIV-15 MECHANICAL WORKS
15.1 PLUMBING WORKS l.s.
15.2 VENTILATING AND AIRCONDITIONING WORKS l.s.
DIV 16 ELECTRICAL WORKS l.s.
TOTAL COST - PUMP ROOM AND WATER RESERVOIR
UNIT UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTY
Pump Room And Water Reservoir Page 44 of 77
Page 45
UNIT UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTY
3.8 PUMP ROOM AND WATER RESERVOIR
DIV-02 SITE CONSTRUCTION
2 SITE WORKS
2.1.1 Building Layout 418 sq.m.
2.1.2 Structure Excavation 300 cu.m.
2.1.3 Backfilling and filling
2.1.3.1 Backfill excavations with suitable excavated materials 16 cu.m.
2.1.3.2 Gravel base; 150 mm thk 133 cu.m.
2.1.4 Soil Disposal
2.1.4.1 Remove surplus excavated material from site 284 cu.m.
2.1.5 Subgrade Preparation 418 sq.m.
2.1.6Anti-termite treatment to surfaces of ground and sides and bottoms of
excavations934 sq.m.
Sub-total "2.1" - SITE WORKS
DIV-03 CONCRETE WORKS
3.1 Cast-In-Place Structural Concrete
3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa
3.1.1.1 Columns and Pedestal 6 cu.m.
3.1.1.2 Suspended Beams 17 cu.m.
3.1.1.3 Suspended Slab and ramps 13 cu.m.
3.1.1.4 Stiffeners columns, lintel and bond beam (Exterior Wall) 1 cu.m.
3.1.1.5 Column/Pedestal Footing 9 cu.m.
3.1.1.6 Wall Footing 2 cu.m.
3.1.1.7 Water Tank/Fuel Tank 326 cu.m.
3.1.2 Reinforced concrete; 3000 psi or 21 Mpa
3.1.2.1 Slab-on-grade /fill 11 cu.m.
3.1.2 Lean concrete; 2000 psi or 13.79 Mpa
3.1.2.1 Concrete Tank Base 57 cu.m.
3.2 Reinforcement in concrete
3.2.1Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 60
3.2.1.1 Columns and Pedestal 1,076 kg
3.2.1.2 Suspended Beams 2,633 kg
3.2.1.3 Column and Wall Footing 691 kg
3.2.1.4 Suspended Slab 53 kg
3.2.1.5 Water Tank/Fuel Tank 24,100 kg
3.2.2Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 40
3.2.2.1 Columns and Pedestal 1,224 kg
3.2.2.2 Suspended Beams 1,436 kg
3.2.2.3 Suspended Slab, ramps and canopy 1,061 kg
3.2.2.4 Slab on Grade 577 kg
3.2.2.5 Stiffeners columns, lintel and bond beam (Exterior Wall) 143 kg
3.2.2.6 Column and Wall Footing 124 kg
3.2.2.7 Water Tank/Fuel Tank 9,642 kg
3.3 Formwork
3.3.1 Columns and Pedestal 63 sq.m.
3.3.2 Suspended Beams 179 sq.m.
Pump Room And Water Reservoir Page 45 of 77
Page 46
UNIT UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTY
3.3.3 Suspended Slab, ramps and canopy 113 sq.m.
3.3.4 Slab on Grade /fill 4 sq.m.
3.3.5 Water Tank/Fuel Tank 1,393 sq.m.
3.3.6 Stiffeners columns, lintel and bond beam (Exterior Wall) 10 sq.m.
3.3.7 Column and Wall Footing 30 sq.m.
3.4 Concrete Accessories
3.4.1 Expansion joint with sealant; pre-formed type; 12 x 200mm
3.4.1.1 At Slab-on-grade 58 l.m.
3.4.1.2 At Masonry Wall 37 l.m.
3.4.3 PVC Waterstop 221 l.m.
Total "DIV-03" - CONCRETE WORKS
DIV-04 MASONRY WORKS
4.1 Accessories
4.1.1 Concrete Grout, 2000 psi 5 cu.m.
4.1.2 CHB steel reinforcements, PNS 275 (Grade 40) 389 kg
4.2 CHB
4.2.1 150mm thk (1000 psi) - Exterior Wall 57 sq.m.
Total "DIV-04" - MASONRY WORKS
DIV-05 METAL WORKS
5.7 Miscellaneous Metals
5.7.1Caged ladder including steel rung, hoops, rail, painting and all incidentals
to complete1 set
5.7.230x10mm side rail stainless steel side rail with 16mm dia SS ladder rung
including SS bolts and all incidental tocomplete, H=5.24 set
5.7.3 Manhole Cover
5.7.3.1 0.95 x 0.95m Stainless Steel Cover 4 set
Total "DIV-05" - METAL WORKS
DIV-07 THERMAL AND MOISTURE PROTECTION
7.1 Dampproofing and Waterproofing
7.1.1 Damproofing vapor barriers, 1 layer 6 mils thick @ Slab on Grade 418 sq.m.
7.1.2 Waterproofing
7.1.2.1 Elastomeric Membrane Waterproofing
7.1.2.1.1 25 mils for Canopy and Gutter 12 sq.m.
7.1.2.1.2 60 mils for Roof Deck 79 sq.m.
7.1.2.2 Epoxy tank lining (@ Concrete Water Tank) 1,183 sq.m.
7.1.2.3 Capillary Waterproofing 355 sq.m.
Total "DIV-07"-THERMAL AND MOISTURE PROTECTION
DIV-08 DOORS AND WINDOWS
8.1 WINDOWS
8.1.1 Fixed metal louver window with stainless steel insect screen painted finish
Pump Room and Water Reservoir
8.1.1.1 L-1,1.5x2m 4 set
Sub-total "8.1" - WINDOWS
Pump Room And Water Reservoir Page 46 of 77
Page 47
UNIT UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTY
8.2 DOORS AND PANELS
8.2.1 Metal Doors
8.2.1.1 Double leaf swing metal louver door including door jamb with stainless
steel insect screen painted finish
Pump Room and Water Reservoir
8.2.1.1.1 D-1, 1.60 x 2.10m 1 set
Sub-total "8.2" - DOORS AND PANELS
8.3 HARDWARES
8.3.1 LOCKSET
8.3.1.1 Lockset series 4000 F91, Grade 1 1 set
8.3.3 Hinges
8.3.3.1 Butt hinges 114mm x 114mm (4 1/2 x 4 1/2) 4 pair
8.3.4 Door Accessories
8.3.4.1 Flushbolt (top and bottom of inactive door leaf) 1 set
Sub-total "8.3" - HARDWARES
Total "DIV-08" - DOORS AND WINDOWS
DIV-09 FINISHES
9.1 FLOOR FINISHES
9.1.150mm thk. Concrete topping with 25mmø x 50 x 50mm wiremesh
reinforcement79 sq.m
Sub-total "9.1" - FLOOR FINISHES
9.2 WALL FINISHES
9.2.1 Plain cement plaster wall Painted Finish 917 sq.m
9.2.2 20mm groove line 350 l.m
Sub-total "9.2" - WALL FINISHES
9.3 CEILING FINISHES
9.3.1 Exposed Construction Painted Finish 71 sm
Sub-total "9.3" - CEILING FINISHES
9.4 BASE BOARD FINISHES
9.4.1 100mm high painted base 32 l.m.
Sub-total "9.4" - BASE BOARD FINISHES
9.5 PAINTING WORKS
9.5.1 At Floor
9.5.1.1 Epoxy paint 60 sq.m.
9.5.2 At Wall
9.5.2.1 Painting on wooden surfaces
9.5.2.1.1 Acrylic paint finish 349 sq.m.
9.5.2.1.2 Latex paint flat finish 96 sq.m.
9.5.3 At Ceiling
9.5.3.1 Semi-gloss paint finish 71 sq.m.
9.5.4Painting on metal surfaces (metal doors, railings, gratings, grilles) - Epoxy
Paint36 sq.m.
Sub-total "9.5" - PAINTING WORKS
Total "DIV-09" - FINISHES
Pump Room And Water Reservoir Page 47 of 77
Page 48
S U M M A R Y
3.9 CHILLED WATER PUMPHOUSE
DIV-02 SITE CONSTRUCTION l.s.
DIV-03 CONCRETE WORKS l.s.
DIV-04 MASONRY WORKS l.s.
DIV-05 METAL WORKS l.s.
DIV-07 THERMAL AND MOISTURE PROTECTION l.s.
DIV-08 DOORS AND WINDOWS l.s.
DIV-09 FINISHES l.s.
DIV-13 SPECIAL CONSTRUCTION l.s.
DIV-15 MECHANICAL WORKS
15.1 PLUMBING WORKS l.s.
15.2 VENTILATING AND AIRCONDITIONING WORKS l.s.
DIV 16 ELECTRICAL WORKS l.s.
TOTAL COST - CHILLED WATER PUMPHOUSE
UNIT UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTY
Chilled Water Pumphouse Page 48 of 77
Page 49
UNIT UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTY
3.9 CHILLED WATER PUMPHOUSE
DIV-02 SITE CONSTRUCTION
2 SITE WORKS
2.1.1 Building Layout 436 sq.m.
2.1.2 Structure Excavation 53 cu.m.
2.1.3 Backfilling and filling
2.1.3.1 Backfill excavations with suitable excavated materials 53 cu.m.
2.1.3.2 Gravel base; 150 mm thk 78 cu.m.
2.1.3.3 Imported Soil to Fill (Borrow Embankment) - FGL to FFL 44 cu.m.
2.1.4 Subgrade Preparation 436 sq.m.
2.1.5Anti-termite treatment to surfaces of ground and sides and bottoms of
excavations565 sq.m.
Sub-total "2.1" - SITE WORKS
DIV-03 CONCRETE WORKS
3.1 Cast-In-Place Structural Concrete
3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa
3.1.1.1 Columns and Pedestal 7 cu.m.
3.1.1.2 Suspended Beams 5 cu.m.
3.1.1.3 Stiffeners columns, lintel and bond beam (Exterior Wall) 2 cu.m.
3.1.1.4 Column/Pedestal Footing 10 cu.m.
3.1.1.5 Wall Footing 7 cu.m.
3.1.1.6 Equipment pad 44 cu.m.
3.1.2 Reinforced concrete; 3000 psi or 21 Mpa
3.1.2.1 Slab-on-grade /fill 16 cu.m.
3.1.2 Lean concrete; 2000 psi or 13.79 Mpa
3.1.2.1 Equipment pad 7 cu.m.
3.2 Reinforcement in concrete
3.2.1Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 60
3.2.1.1 Columns and Pedestal 888 kg
3.2.1.2 Stiffeners columns, lintel and bond beam (Exterior Wall) 98 kg
3.2.1.3 Column and Wall Footing 321 kg
3.2.2Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 40
3.2.2.1 Columns and Pedestal 1,033 kg
3.2.2.2 Suspended Beams 637 kg
3.2.2.3 Slab on Grade 531 kg
3.2.2.4 Stiffeners columns, lintel and bond beam (Exterior Wall) 216 kg
3.2.2.5 Column and Wall Footing 516 kg
3.2.2.6 Equipment pad 3,638 kg
3.3 Formwork
3.3.1 Columns and Pedestal 90 sq.m.
3.3.2 Suspended Beams 49 sq.m.
3.3.3 Slab on Grade /fill 9 sq.m.
3.3.4 Stiffeners columns, lintel and bond beam (Exterior Wall) 22 sq.m.
3.3.5 Equipment pad 50 sq.m.
3.3.6 Column and Wall Footing 62 sq.m.
3.4 Concrete Accessories
3.4.1 Expansion joint with sealant; pre-formed type; 12 x 200mm
Chilled Water Pumphouse Page 49 of 77
Page 50
UNIT UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTY
3.4.1.1 At Slab-on-grade 121 l.m.
3.4.1.2 At Masonry Wall 121 l.m.
Total "DIV-03" - CONCRETE WORKS
DIV-04 MASONRY WORKS
4.1 Accessories
4.1.1 Concrete Grout, 2000 psi 13 cu.m.
4.1.2 CHB steel reinforcements, PNS 275 (Grade 40) 1,119 kg
4.2 CHB
4.2.1 150mm thk (1000 psi) - Exterior Wall 154 sq.m.
Total "DIV-04" - MASONRY WORKS
DIV-05 METAL WORKS
5.1
Fabrication, delivery and erection of structural steel roof framing including
columns, main girders, beams, trusses, rafters, struts, purlins, sag rods,
cross bracings with turn buckles, bolts, plates and all other incidentals to
complete
2,277 kg
5.2 Miscellaneous Metals
5.2.1100mm Chainlink with 50mmø G.I Pipe Frame, Epoxy Painted Finish (refer
to drawings for detailed design)98 sq.m.
Total "DIV-05" - METAL WORKS
DIV-07 THERMAL AND MOISTURE PROTECTION
7.1 Dampproofing and Waterproofing
7.1.1 Damproofing vapor barriers, 1 layer 6 mils thick @ Slab on Grade 131 sq.m.
7.2 Insulation
7.2.1
Roof Insulation - 50mm thk Mineral Wool Insulation with two sided
aluminum including chicken wire support and other consumable
accessories to complete
92 sq.m.
7.3 Roofing and Accessories
7.3.1Ga.24 preformed prepainted long span single rib metal roofing inclusive of
all bended materials and incidentals to complete.92 sq.m.
7.3.2 6mm thick fiber cement fascia board
7.3.2.1 300mm high 40 l.m.
Total "DIV-07"-THERMAL AND MOISTURE PROTECTION
DIV-08 DOORS AND WINDOWS
8.1 WINDOWS
8.1.1Fixed metal louver window with stainless steel insect screen and welded
wire mesh support painted finish8.1.1.1 L-1, 1.50 x 2.0m 11 set
Sub-total "8.1" - WINDOWS
8.2 DOORS AND PANELS
8.2.1 Metal Doors
8.2.1.1 Double leaf swing metal louver door including door jamb with stainless
steel insect screen painted finish
8.2.1.1.1 D-1, 1.60 x 2.10m 1 set
Sub-total "8.2" - DOORS AND PANELS
8.3 HARDWARES
8.3.1 LOCKSET
8.3.1.1 Lockset series 4000 F91, Grade 1 1 set
8.3.3 Hinges
8.3.3.1 Butt hinges 114mm x 114mm (4 1/2 x 4 1/2) 4 pair
Chilled Water Pumphouse Page 50 of 77
Page 51
UNIT UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTY
8.3.4 Door Accessories
8.3.4.1 Flushbolt (top and bottom of inactive door leaf) 1 set
Sub-total "8.3" - HARDWARES
Total "DIV-08" - DOORS AND WINDOWS
DIV-09 FINISHES
9.1 FLOOR FINISHES
9.1.1 Plain cement concrete steel trowel finish with floor hardener 59 sq.m
9.1.2 Plain cement concrete finish with HD floor hardener 132 sq.m
Sub-total "9.1" - FLOOR FINISHES
9.2 WALL FINISHES
9.2.1 Plain cement plaster wall Painted Finish 315 sq.m
Sub-total "9.2" - WALL FINISHES
9.3 CEILING FINISHES
9.3.1 6mm thk. Fiber cement ceiling board on metal frame 20 sm
Sub-total "9.3" - CEILING FINISHES
9.4 BASE BOARD FINISHES
9.4.1 100mm high painted base 33 l.m.
Sub-total "9.4" - BASE BOARD FINISHES
9.5 PAINTING WORKS
9.5.1 At Floor
9.5.1.1 Epoxy paint 70 sq.m.
9.5.2 At Wall
9.5.2.1 Painting on wooden surfaces
9.5.2.1.1 Acrylic paint finish 211 sq.m.
9.5.2.1.2 Latex paint flat finish 122 sq.m.
9.5.3 At Ceiling
9.5.3.1 Painting on Fiber cement board surfaces 32 sq.m.
9.5.4Painting on metal surfaces (metal doors, railings, gratings, grilles) - Epoxy
Paint213 sq.m.
9.5.5 Painting on steel trusses
9.5.5.1 Exposed Steel/Metal 157 sq.m.
Sub-total "9.5" - PAINTING WORKS
Total "DIV-09" - FINISHES
Chilled Water Pumphouse Page 51 of 77
Page 52
S U M M A R Y
3.10 FUEL STORAGE TANK
DIV-02 SITE CONSTRUCTION l.s.
DIV-03 CONCRETE WORKS l.s.
DIV-05 METAL WORKS l.s.
DIV-07 THERMAL AND MOISTURE PROTECTION l.s.
DIV-09 FINISHES l.s.
DIV-15 MECHANICAL WORKS
15.2 VENTILATING AND AIRCONDITIONING WORKS l.s.
TOTAL COST - FUEL STORAGE TANK
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
Fuel Storage Tank Page 52 of 77
Page 53
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
3.10 FUEL STORAGE TANK
DIV-02 SITE CONSTRUCTION
2 SITE WORKS
2.1.1 Building Layout 74 sq.m.
2.1.2 Structure Excavation 404 cu.m.
2.1.3 Backfilling and filling
2.1.3.1 Gravel base; 150 mm thk 22 cu.m.
2.1.4 Soil Disposal
2.1.4.1 Remove surplus excavated material from site 404 cu.m.
2.1.5 Subgrade Preparation 74 sq.m.
2.1.6Anti-termite treatment to surfaces of ground and sides and bottoms of
excavations265 sq.m.
Sub-total "2.1" - SITE WORKS
DIV-03 CONCRETE WORKS
3.1 Cast-In-Place Structural Concrete
3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa
3.1.1.1 Water Tank/Fuel Tank 112 cu.m.
3.1.2 Lean concrete; 2000 psi or 13.79 Mpa
3.1.2.1 Concrete Tank Base 4 cu.m.
3.2 Reinforcement in concrete
3.2.1Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 60
3.2.1.1 Water Tank/Fuel Tank 13,948 kg
3.2.2Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 40
3.2.2.1 Water Tank/Fuel Tank 66 kg
3.3 Formwork
3.3.1 Water Tank/Fuel Tank 554 sq.m.
3.4 Concrete Accessories
3.4.1 PVC Waterstop 142 l.m.
Total "DIV-03" - CONCRETE WORKS
DIV-05 METAL WORKS
5.1Fabrication, delivery and installation of Misc. Plates for Tank Base Plate
oncluding bolts and all incidentals to complete66 kg
5.7 Miscellaneous Metals
5.7.1Stainless Steel ladder for Fuel Storage Tank including all incidental
tocomplete10 l.m.
5.7.2 Manhole Cover
5.7.2.1 600 mmø Steel Manhole Cover 2 set
Total "DIV-05" - METAL WORKS
DIV-07 THERMAL AND MOISTURE PROTECTION
7.1 Dampproofing and Waterproofing
7.1.1 Waterproofing
7.1.1.1 Elastomeric Membrane Waterproofing
7.1.1.1.1 @ Fuel Storage Tank 331 sq.m.
Fuel Storage Tank Page 53 of 77
Page 54
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
Total "DIV-07"-THERMAL AND MOISTURE PROTECTION
DIV-09 FINISHES
9.1 FLOOR FINISHES
9.1.1 Plain cement concrete steel trowel finish 72 sq.m
Sub-total "9.1" - FLOOR FINISHES
9.5 PAINTING WORKS
9.5.1 At Floor
9.5.1.1 Epoxy paint 161 sq.m.
9.5.2 Painting on steel trusses
9.5.2.1 Exposed Steel/Metal 2 sq.m.
Sub-total "9.5" - PAINTING WORKS
Total "DIV-09" - FINISHES
Fuel Storage Tank Page 54 of 77
Page 55
S U M M A R Y
3.11 CHLORINATION HOUSE 1
DIV-02 SITE CONSTRUCTION l.s.
DIV-03 CONCRETE WORKS l.s.
DIV-04 MASONRY WORKS l.s.
DIV-05 METAL WORKS l.s.
DIV-07 THERMAL AND MOISTURE PROTECTION l.s.
DIV-08 DOORS AND WINDOWS l.s.
DIV-09 FINISHES l.s.
DIV-13 SPECIAL CONSTRUCTION l.s.
DIV-15 MECHANICAL WORKS
15.1 PLUMBING WORKS l.s.
15.2 VENTILATING AND AIRCONDITIONING WORKS l.s.
DIV 16 ELECTRICAL WORKS l.s.
TOTAL COST - CHLORINATION HOUSE 1
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
Chlorination House 1 Page 55 of 77
Page 56
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
3.11 CHLORINATION HOUSE 1
DIV-02 SITE CONSTRUCTION
2.1 SITE WORKS
2.1.1 Building Layout 11 sq.m.
2.1.2 Structure Excavation 10 cu.m.
2.1.3 Backfilling and filling
2.1.3.1 Backfill excavations with suitable excavated materials 7 cu.m.
2.1.3.2 Gravel base; 150 mm thk 4 cu.m.
2.1.4 Soil Disposal
2.1.4.1 Remove surplus excavated material from site 3 cu.m.
2.1.5 Subgrade Preparation 11 sq.m.
2.1.6Anti-termite treatment to surfaces of ground and sides and bottoms of
excavations58 sq.m.
Sub-total "2.1" - SITE WORKS
DIV-03 CONCRETE WORKS
3.1 Cast-In-Place Structural Concrete
3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa
3.1.1.1 Columns and Pedestal 2 cu.m.
3.1.1.2 Suspended Beams 1 cu.m.
3.1.1.3 Stiffeners columns, lintel and bond beam (Exterior Wall) 1 cu.m.
3.1.1.4 Column/Pedestal Footing 2 cu.m.
3.1.1.5 Wall Footing 1 cu.m.
3.1.2 Reinforced concrete; 3000 psi or 21 Mpa
3.1.2.1 Slab-on-grade /fill 2 cu.m.
3.2 Reinforcement in concrete
3.2.1Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 40
3.2.1.1 Columns and Pedestal 438 kg
3.2.1.2 Suspended Beams 192 kg
3.2.1.3 Slab on Grade 70 kg
3.2.1.4 Stiffeners columns, lintel and bond beam (Exterior Wall) 46 kg
3.2.1.5 Column and Wall Footing 127 kg
3.3 Formwork
3.3.1 Columns and Pedestal 22 sq.m.
3.3.2 Suspended Beams 12 sq.m.
3.3.3 Slab on Grade /fill 1 sq.m.
3.3.4 Column and Wall Footing 10 sq.m.
3.4 Concrete Accessories
3.4.1 Expansion joint with sealant; pre-formed type; 12 x 200mm
3.4.1.1 At Slab-on-grade 14 l.m.
3.4.1.2 At Masonry Wall 45 l.m.
Total "DIV-03" - CONCRETE WORKS
DIV-04 MASONRY WORKS
4.1 Accessories
4.1.1 Concrete Grout, 2000 psi 3 cu.m.
Chlorination House 1 Page 56 of 77
Page 57
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
4.1.3 CHB steel reinforcements, PNS 275 (Grade 40) 244 kg
4.2 CHB
4.2.1 150mm thk (1000 psi) - Exterior Wall 35 sq.m.
Total "DIV-04" - MASONRY WORKS
DIV-05 METAL WORKS
5.1
Fabrication, delivery and erection of structural steel roof framing including
columns, main girders, beams, trusses, rafters, struts, purlins, sag rods,
cross bracings with turn buckles, bolts, plates and all other incidentals to
complete
864 kg
Total "DIV-05" - METAL WORKS
DIV-07 THERMAL AND MOISTURE PROTECTION
7.1 Dampproofing and Waterproofing
7.1.1 Damproofing vapor barriers, 1 layer 6 mils thick @ Slab on Grade 11 sq.m.
7.3 Insulation
7.3.1
Roof Insulation - 50mm thk Mineral Wool Insulation with two sided
aluminum including chicken wire support and other consumable
accessories to complete
20 sq.m.
7.4 Roofing and Accessories
7.4.1Ga.24 preformed prepainted long span single rib metal roofing inclusive of
all bended materials and incidentals to complete.20 sq.m.
Total "DIV-07"-THERMAL AND MOISTURE PROTECTION
DIV-08 DOORS AND WINDOWS
8.1 WINDOWS
8.1.1 Fixed metal louver window with stainless steel insect screen painted finish
8.1.1.1 L-1, 2.0 x 1.80m 1 set
8.1.1.2 L-2, 1.0 x 1.80m 1 set
Sub-total "8.1" - WINDOWS
8.2 DOORS AND PANELS
8.2.3 Metal Doors
8.2.3.1 Double leaf swing metal louver door including door jamb with stainless
steel insect screen painted finish
8.2.3.1.1 D-1, 1.40 x 2.15m 1 set
Sub-total "8.2" - DOORS AND PANELS
8.3 HARDWARES
8.3.1 LOCKSET
8.3.1.1 Lockset series 4000 F91, Grade 1 1 set
8.3.2 Hinges
8.3.2.1 Butt hinges 114mm x 114mm (4 1/2 x 4 1/2) 4 pair
8.3.3 Door Accessories
8.3.3.1 Flushbolt (top and bottom of inactive door leaf) 1 set
Sub-total "8.3" - HARDWARES
Total "DIV-08" - DOORS AND WINDOWS
DIV-09 FINISHES
9.1 FLOOR FINISHES
Chlorination House 1 Page 57 of 77
Page 58
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
9.1.1 Plain cement concrete steel trowel finish 2 sq.m
Sub-total "9.1" - FLOOR FINISHES
9.2 WALL FINISHES
9.2.1 Plain cement plaster wall Painted Finish 87 sq.m
9.2.2 20mm groove line 29 l.m
Sub-total "9.2" - WALL FINISHES
9.3 CEILING FINISHES
9.3.1 6mm thk. Fiber cement ceiling board on metal frame 6 sm
Sub-total "9.3" - CEILING FINISHES
9.4 BASE BOARD FINISHES
9.4.1 100mm high painted base 12 l.m.
Sub-total "9.4" - BASE BOARD FINISHES
9.5 PAINTING WORKS
9.5.1 At Floor
9.5.1.1 Epoxy paint 9 sq.m.
9.5.2 At Wall
9.5.2.1 Semi-gloss paint finish 51 sq.m.
9.5.2.2 Painting on wooden surfaces
9.5.2.2.1 Latex paint flat finish 36 sq.m.
9.5.3 At Ceiling
9.5.3.1 Painting on Fiber cement board surfaces 6 sq.m.
9.5.4Painting on metal surfaces (metal doors, railings, gratings, grilles) - Epoxy
Paint20 sq.m.
9.5.5 Painting on steel trusses
9.5.5.1 Exposed Steel/Metal 21 sq.m.
9.5.5.2 Covered Steel/Metal 25 sq.m.
Sub-total "9.5" - PAINTING WORKS
Total "DIV-09" - FINISHES
Chlorination House 1 Page 58 of 77
Page 59
S U M M A R Y
3.12 CHLORINATION HOUSE 2
DIV-02 SITE CONSTRUCTION l.s.
DIV-03 CONCRETE WORKS l.s.
DIV-04 MASONRY WORKS l.s.
DIV-05 METAL WORKS l.s.
DIV-07 THERMAL AND MOISTURE PROTECTION l.s.
DIV-08 DOORS AND WINDOWS l.s.
DIV-09 FINISHES l.s.
DIV-13 SPECIAL CONSTRUCTION l.s.
DIV-15 MECHANICAL WORKS
15.1 PLUMBING WORKS l.s.
15.2 VENTILATING AND AIRCONDITIONING WORKS l.s.
DIV 16 ELECTRICAL WORKS l.s.
TOTAL COST - CHLORINATION HOUSE 2
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
Chlorination House 2 Page 59 of 77
Page 60
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
3.12 CHLORINATION HOUSE 2
DIV-02 SITE CONSTRUCTION
2.1 SITE WORKS
2.1.1 Building Layout 11 sq.m.
2.1.2 Structure Excavation 10 cu.m.
2.1.3 Backfilling and filling
2.1.3.1 Backfill excavations with suitable excavated materials 7 cu.m.
2.1.3.2 Gravel base; 150 mm thk 4 cu.m.
2.1.4 Soil Disposal
2.1.4.1 Remove surplus excavated material from site 3 cu.m.
2.1.5 Subgrade Preparation 11 sq.m.
2.1.6Anti-termite treatment to surfaces of ground and sides and bottoms of
excavations58 sq.m.
Sub-total "2.1" - SITE WORKS
DIV-03 CONCRETE WORKS
3.1 Cast-In-Place Structural Concrete
3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa
3.1.1.1 Columns and Pedestal 2 cu.m.
3.1.1.2 Suspended Beams 1 cu.m.
3.1.1.3 Stiffeners columns, lintel and bond beam (Exterior Wall) 1 cu.m.
3.1.1.4 Column/Pedestal Footing 2 cu.m.
3.1.1.5 Wall Footing 1 cu.m.
3.1.2 Reinforced concrete; 3000 psi or 21 Mpa
3.1.2.1 Slab-on-grade /fill 2 cu.m.
3.2 Reinforcement in concrete
3.2.1Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 40
3.2.1.1 Columns and Pedestal 438 kg
3.2.1.2 Suspended Beams 192 kg
3.2.1.3 Slab on Grade 70 kg
3.2.1.4 Stiffeners columns, lintel and bond beam (Exterior Wall) 46 kg
3.2.1.5 Column and Wall Footing 127 kg
3.3 Formwork
3.3.1 Columns and Pedestal 22 sq.m.
3.3.2 Suspended Beams 12 sq.m.
3.3.3 Slab on Grade /fill 1 sq.m.
3.3.4 Column and Wall Footing 10 sq.m.
3.4 Concrete Accessories
3.4.1 Expansion joint with sealant; pre-formed type; 12 x 200mm
3.4.1.1 At Slab-on-grade 14 l.m.
3.4.1.2 At Masonry Wall 45 l.m.
Total "DIV-03" - CONCRETE WORKS
DIV-04 MASONRY WORKS
4.1 Accessories
4.1.1 Concrete Grout, 2000 psi 3 cu.m.
Chlorination House 2 Page 60 of 77
Page 61
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
4.1.3 CHB steel reinforcements, PNS 275 (Grade 40) 244 kg
4.2 CHB
4.2.1 150mm thk (1000 psi) - Exterior Wall 35 sq.m.
Total "DIV-04" - MASONRY WORKS
DIV-05 METAL WORKS
5.1
Fabrication, delivery and erection of structural steel roof framing including
columns, main girders, beams, trusses, rafters, struts, purlins, sag rods,
cross bracings with turn buckles, bolts, plates and all other incidentals to
complete
864 kg
Total "DIV-05" - METAL WORKS
DIV-07 THERMAL AND MOISTURE PROTECTION
7.1 Dampproofing and Waterproofing
7.1.1 Damproofing vapor barriers, 1 layer 6 mils thick @ Slab on Grade 11 sq.m.
7.3 Insulation
7.3.1
Roof Insulation - 50mm thk Mineral Wool Insulation with two sided
aluminum including chicken wire support and other consumable
accessories to complete
20 sq.m.
7.4 Roofing and Accessories
7.4.1Ga.24 preformed prepainted long span single rib metal roofing inclusive of
all bended materials and incidentals to complete.20 sq.m.
Total "DIV-07"-THERMAL AND MOISTURE PROTECTION
DIV-08 DOORS AND WINDOWS
8.1 WINDOWS
8.1.1 Fixed metal louver window with stainless steel insect screen painted finish
8.1.1.1 L-1, 2.0 x 1.80m 1 set
8.1.1.2 L-2, 1.0 x 1.80m 1 set
Sub-total "8.1" - WINDOWS
8.2 DOORS AND PANELS
8.2.3 Metal Doors
8.2.3.1 Double leaf swing metal louver door including door jamb with stainless
steel insect screen painted finish
8.2.3.1.1 D-1, 1.40 x 2.15m 1 set
Sub-total "8.2" - DOORS AND PANELS
8.3 HARDWARES
8.3.1 LOCKSET
8.3.1.1 Lockset series 4000 F91, Grade 1 1 set
8.3.2 Hinges
8.3.2.1 Butt hinges 114mm x 114mm (4 1/2 x 4 1/2) 4 pair
8.3.3 Door Accessories
8.3.3.1 Flushbolt (top and bottom of inactive door leaf) 1 set
Sub-total "8.3" - HARDWARES
Total "DIV-08" - DOORS AND WINDOWS
DIV-09 FINISHES
9.1 FLOOR FINISHES
Chlorination House 2 Page 61 of 77
Page 62
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
9.1.1 Plain cement concrete steel trowel finish 2 sq.m
Sub-total "9.1" - FLOOR FINISHES
9.2 WALL FINISHES
9.2.1 Plain cement plaster wall Painted Finish 87 sq.m
9.2.2 20mm groove line 29 l.m
Sub-total "9.2" - WALL FINISHES
9.3 CEILING FINISHES
9.3.1 6mm thk. Fiber cement ceiling board on metal frame 6 sm
Sub-total "9.3" - CEILING FINISHES
9.4 BASE BOARD FINISHES
9.4.1 100mm high painted base 12 l.m.
Sub-total "9.4" - BASE BOARD FINISHES
9.5 PAINTING WORKS
9.5.1 At Floor
9.5.1.1 Epoxy paint 9 sq.m.
9.5.2 At Wall
9.5.2.1 Semi-gloss paint finish 51 sq.m.
9.5.2.2 Painting on wooden surfaces
9.5.2.2.1 Latex paint flat finish 36 sq.m.
9.5.3 At Ceiling
9.5.3.1 Painting on Fiber cement board surfaces 6 sq.m.
9.5.4Painting on metal surfaces (metal doors, railings, gratings, grilles) - Epoxy
Paint20 sq.m.
9.5.5 Painting on steel trusses
9.5.5.1 Exposed Steel/Metal 21 sq.m.
9.5.5.2 Covered Steel/Metal 25 sq.m.
Sub-total "9.5" - PAINTING WORKS
Total "DIV-09" - FINISHES
Chlorination House 2 Page 62 of 77
Page 63
S U M M A R Y
3.13A GUARD HOUSES
DIV-02 SITE CONSTRUCTION l.s.
DIV-03 CONCRETE WORKS l.s.
DIV-04 MASONRY WORKS l.s.
DIV-05 METAL WORKS l.s.
DIV-06 WOOD AND PLASTIC l.s.
DIV-07 THERMAL AND MOISTURE PROTECTION l.s.
DIV-08 DOORS AND WINDOWS l.s.
DIV-09 FINISHES l.s.
DIV-10 SPECIALTIES l.s.
DIV-13 SPECIAL CONSTRUCTION l.s.
DIV-15 MECHANICAL WORKS
15.1 PLUMBING WORKS l.s.
15.2 VENTILATING AND AIRCONDITIONING WORKS l.s.
DIV 16 ELECTRICAL WORKS l.s.
TOTAL COST PER UNIT - GUARD HOUSES
TOTAL COST - GUARD HOUSES (4 Units)
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
Guard Houses Page 63 of 77
Page 64
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
3.13A GUARD HOUSES
DIV-02 SITE CONSTRUCTION
2 SITE WORKS
2.1.1 Building Layout 19 sq.m.
2.1.2 Structure Excavation 12 cu.m.
2.1.3 Backfilling and filling
2.1.3.1 Backfill excavations with suitable excavated materials 9 cu.m.
2.1.3.2 Gravel base; 150 mm thk 6 cu.m.
2.1.4 Soil Disposal
2.1.4.1 Remove surplus excavated material from site 3 cu.m.
2.1.5 Subgrade Preparation 19 sq.m.
2.1.6Anti-termite treatment to surfaces of ground and sides and bottoms of
excavations79 sq.m.
Sub-total "2.1" - SITE WORKS
DIV-03 CONCRETE WORKS
3.1 Cast-In-Place Structural Concrete
3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa
3.1.1.1 Columns and Pedestal 3 cu.m.
3.1.1.2 Suspended Beams 2 cu.m.
3.1.1.3 Suspended Slab and ramps 1 cu.m.
3.1.1.4 Stiffeners columns, lintel and bond beam (Exterior Wall) 1 cu.m.
3.1.1.5 Column/Pedestal Footing 3 cu.m.
3.1.1.6 Wall Footing 2 cu.m.
3.1.2 Reinforced concrete; 3000 psi or 21 Mpa
3.1.2.1 Slab-on-grade /fill 3 cu.m.
3.2 Reinforcement in concrete
3.2.1Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 60
3.2.1.1 Columns and Pedestal 155 kg
3.2.2Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 40
3.2.2.1 Columns and Pedestal 420 kg
3.2.2.2 Suspended Beams 293 kg
3.2.2.3 Suspended Slab, ramps and canopy 78 kg
3.2.2.4 Slab on Grade 189 kg
3.2.2.7 Stiffeners columns, lintel and bond beam (Exterior Wall) 53 kg
3.2.2.9 Column and Wall Footing 181 kg
3.3 Formwork
3.3.1 Columns and Pedestal 27 sq.m.
3.3.2 Suspended Beams 22 sq.m.
3.3.3 Suspended Slab, ramps and canopy 12 sq.m.
3.3.4 Slab on Grade /fill 5 sq.m.
3.3.8 Stiffeners columns, lintel and bond beam (Exterior Wall) 4 sq.m.
3.3.15 Column and Wall Footing 15 sq.m.
3.4 Concrete Accessories
3.4.1 Expansion joint with sealant; pre-formed type; 12 x 200mm
3.4.1.1 At Slab-on-grade 39 l.m.
3.4.1.2 At Masonry Wall 46 l.m.
Guard Houses Page 64 of 77
Page 65
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
Total "DIV-03" - CONCRETE WORKS
DIV-04 MASONRY WORKS
4.1 Accessories
4.1.1 Concrete Grout, 2000 psi 3 cu.m.
4.1.2Concrete lintel and bond beams inclusive of formworks and Steel
reinforcements, Grade 40 (For Interior Walls)1 cu.m.
4.1.3 CHB steel reinforcements, PNS 275 (Grade 40) 310 kg
4.2 CHB
4.2.1 150mm thk (1000 psi) - Exterior Wall 28 sq.m.
4.2.3 100mm thk (350 psi / 2.5 N/mm2) 9 sq.m.
Total "DIV-04" - MASONRY WORKS
DIV-05 METAL WORKS
5.1
Fabrication, delivery and erection of structural steel roof framing including
columns, main girders, beams, trusses, rafters, struts, purlins, sag rods,
cross bracings with turn buckles, bolts, plates and all other incidentals to
complete
314 kg
Total "DIV-05" - METAL WORKS
DIV-06 WOOD AND PLASTIC
6.1 Finish Carpentry
6.1.3
2640 x 400 x 750 ht., 25mm Plyboard desk with 2 layers of 20mm plyboard
shelf including wood edging, wood frame, painting and accessories to
complete (at Guad House)
1 lot
Total "DIV-06" - WOOD AND PLASTIC
DIV-07 THERMAL AND MOISTURE PROTECTION
7.1 Dampproofing and Waterproofing
7.1.1 Damproofing vapor barriers, 1 layer 6 mils thick @ Slab on Grade 19 sq.m.
7.1.2 Waterproofing
7.1.2.1 Elastomeric Membrane Waterproofing
7.1.2.1.1 Exposed type for concrete slab and parapet wall 8 sq.m.
7.3 Insulation
7.3.1
Roof Insulation - 50mm thk Mineral Wool Insulation with two sided
aluminum including chicken wire support and other consumable
accessories to complete
16 sq.m.
7.4 Roofing and Accessories
7.4.1Ga.24 preformed prepainted long span single rib metal roofing inclusive of
all bended materials and incidentals to complete.16 sq.m.
Total "DIV-07"-THERMAL AND MOISTURE PROTECTION
DIV-08 DOORS AND WINDOWS
8.1 WINDOWS
8.1.1Awning window in Aluminum Powder coated frame with 6mm thk clear
glass and complete accessories
8.1.1.1 W-3, 0.70 x 1.20m 1 set
8.1.2Sliding window in Aluminum Powder coated frame with 6mm thk clear glass
and complete accessories
8.1.2.1 W-2, 1.20 x 1.20m 3 set
Guard Houses Page 65 of 77
Page 66
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
8.1.3 Acrylic sheet on aluminum powder coated frame
8.1.3.1 W-1, 3.0 x 1.20m 1 set
Sub-total "8.1" - WINDOWS
8.2 DOORS AND PANELS
8.2.1 Aluminum Doors
8.2.1.1 Single leaf powder coated aluminum door with 6mm thk. Clear glass
including push and pull bar (as per manufacturer's standard)
8.2.1.1.1 D-1, 0.65 x 2.05m 1 set
8.2.2 Wood Doors
8.2.2.1 Single leaf flush hollow core plywood door painted finish
8.2.2.1.1 D-3, 0.40 x 2.15m 1 set
8.2.3 PVC/Plastic Doors
8.2.3.1 PVC Flush door with bottom louver including hinges and privacy lockset
8.2.3.1.1 D-2, 0.60 x 2.15m 1 set
Sub-total "8.2" - DOORS AND PANELS
8.3 HARDWARES
8.3.1 LOCKSET
8.3.1.1 Lockset series 4000 F82, Grade 1 1 set
8.3.1.2 DEADLOCK
8.3.1.2.1 Cylinder deadlock F-16, Grade 1 1 set
8.3.2 Closer
8.3.2.1 Overhead Concealed Closer 1 set
8.3.3 Hinges
8.3.3.1 Butt hinges 100mm x 100mm (4 x 4 ) 2 pair
8.3.3.2 Center pivot ( top & bottom) 1 pair
8.3.4 Door Accessories
8.3.4.1 Door Handle
8.3.4.1.1 Push & pull bars (door manufacturer's standard) 2 set
8.3.4.2 Threshold
8.3.4.2.1 Aluminum threshold 1 set
Sub-total "8.3" - HARDWARES
Total "DIV-08" - DOORS AND WINDOWS
DIV-09 FINISHES
9.1 FLOOR FINISHES
9.1.1 Plain cement concrete steel trowel finish 8 sq.m
9.1.2 Homogeneous Vinyl Floor Tiles, 300 x 300 x 3 mm thk 8 sq.m
9.1.3 300 x 300 Unglazed Ceramic Tiles (including mortar bed) 2 sq.m
Sub-total "9.1" - FLOOR FINISHES
9.2 WALL FINISHES
9.2.1 Plain cement plaster wall Painted Finish 83 sq.m
9.2.2 20mm groove line 17 l.m
9.2.3 300 x 300mm Glazed ceramic wall tiles (including mortar bed) 8 sq.m
Sub-total "9.2" - WALL FINISHES
9.3 CEILING FINISHES
9.3.1 12mm thk. Ordinary Gypsum Board on metal frame 8 sm
9.3.2 12mm thk. Moisture Resistant Gypsum Board on metal frame 2 sm
Guard Houses Page 66 of 77
Page 67
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
9.3.3 6mm thk. Fiber cement ceiling board on metal frame 5 sm
Sub-total "9.3" - CEILING FINISHES
9.4 BASE BOARD FINISHES
9.4.1 100mm high Vinyl base board 17 l.m.
9.4.2 300 x 300mm high Glazed Ceramic Tile 3 sq.m.
Sub-total "9.4" - BASE BOARD FINISHES
9.5 PAINTING WORKS
9.5.1 At Wall
9.5.1.1 Semi-gloss paint finish 36 sq.m.
9.5.1.2 Painting on wooden surfaces
9.5.1.2.1 Acrylic paint finish 48 sq.m.
9.5.3 At Ceiling
9.5.3.1 Painting on Fiber cement board surfaces 5 sq.m.
9.5.3.2 Painting on Gypsum board surfaces 9 sq.m.
9.5.4 Painting on wood doors 4 sq.m.
9.5.5 Painting on steel trusses
9.5.5.1 Covered Steel/Metal 21 sq.m.
Sub-total "9.5" - PAINTING WORKS
Total "DIV-09" - FINISHES
DIV-10 SPECIALTIES
10.16mm thick Facial mirror on 6mm thick marine plywood backing inclusive all
incidentals to complete
10.1.1 500 x 800mm 1 set
Total "DIV-10" - SPECIALTIES
Guard Houses Page 67 of 77
Page 68
S U M M A R Y
3.13B GUARD HOUSE with SEPTIC TANK
DIV-02 SITE CONSTRUCTION l.s.
DIV-03 CONCRETE WORKS l.s.
DIV-04 MASONRY WORKS l.s.
DIV-05 METAL WORKS l.s.
DIV-06 WOOD AND PLASTIC l.s.
DIV-07 THERMAL AND MOISTURE PROTECTION l.s.
DIV-08 DOORS AND WINDOWS l.s.
DIV-09 FINISHES l.s.
DIV-10 SPECIALTIES l.s.
DIV-13 SPECIAL CONSTRUCTION l.s.
DIV-15 MECHANICAL WORKS
15.1 PLUMBING WORKS l.s.
15.2 VENTILATING AND AIRCONDITIONING WORKS l.s.
DIV 16 ELECTRICAL WORKS l.s.
TOTAL COST - GUARD HOUSE with SEPTIC TANK
UNIT UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTY
Guard House with Septic Tank Page 68 of 77
Page 69
UNIT UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTY
3.13B GUARD HOUSE with SEPTIC TANK
DIV-02 SITE CONSTRUCTION
2 SITE WORKS
2.1.1 Building Layout 19 sq.m.
2.1.2 Structure Excavation 12 cu.m.
2.1.3 Backfilling and filling
2.1.3.1 Backfill excavations with suitable excavated materials 9 cu.m.
2.1.3.2 Gravel base; 150 mm thk 6 cu.m.
2.1.4 Soil Disposal
2.1.4.1 Remove surplus excavated material from site 3 cu.m.
2.1.5 Subgrade Preparation 19 sq.m.
2.1.6Anti-termite treatment to surfaces of ground and sides and bottoms of
excavations79 sq.m.
Sub-total "2.1" - SITE WORKS
DIV-03 CONCRETE WORKS
3.1 Cast-In-Place Structural Concrete
3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa
3.1.1.1 Columns and Pedestal 3 cu.m.
3.1.1.2 Suspended Beams 2 cu.m.
3.1.1.3 Suspended Slab and ramps 1 cu.m.
3.1.1.4 Stiffeners columns, lintel and bond beam (Exterior Wall) 1 cu.m.
3.1.1.5 Column/Pedestal Footing 3 cu.m.
3.1.1.6 Wall Footing 2 cu.m.
3.1.2 Reinforced concrete; 3000 psi or 21 Mpa
3.1.2.1 Slab-on-grade /fill 3 cu.m.
3.2 Reinforcement in concrete
3.2.1Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 60
3.2.1.1 Columns and Pedestal 155 kg
3.2.2Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 40
3.2.2.1 Columns and Pedestal 420 kg
3.2.2.2 Suspended Beams 293 kg
3.2.2.3 Suspended Slab, ramps and canopy 78 kg
3.2.2.4 Slab on Grade 189 kg
3.2.2.7 Stiffeners columns, lintel and bond beam (Exterior Wall) 53 kg
3.2.2.9 Column and Wall Footing 181 kg
3.3 Formwork
3.3.1 Columns and Pedestal 27 sq.m.
3.3.2 Suspended Beams 22 sq.m.
3.3.3 Suspended Slab, ramps and canopy 12 sq.m.
3.3.4 Slab on Grade /fill 5 sq.m.
3.3.8 Stiffeners columns, lintel and bond beam (Exterior Wall) 4 sq.m.
3.3.15 Column and Wall Footing 15 sq.m.
3.4 Concrete Accessories
3.4.1 Expansion joint with sealant; pre-formed type; 12 x 200mm
3.4.1.1 At Slab-on-grade 39 l.m.
3.4.1.2 At Masonry Wall 46 l.m.
Guard House with Septic Tank Page 69 of 77
Page 70
UNIT UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTY
Total "DIV-03" - CONCRETE WORKS
DIV-04 MASONRY WORKS
4.1 Accessories
4.1.1 Concrete Grout, 2000 psi 3 cu.m.
4.1.2Concrete lintel and bond beams inclusive of formworks and Steel
reinforcements, Grade 40 (For Interior Walls)1 cu.m.
4.1.3 CHB steel reinforcements, PNS 275 (Grade 40) 310 kg
4.2 CHB
4.2.1 150mm thk (1000 psi) - Exterior Wall 28 sq.m.
4.2.3 100mm thk (350 psi / 2.5 N/mm2) 9 sq.m.
Total "DIV-04" - MASONRY WORKS
DIV-05 METAL WORKS
5.1
Fabrication, delivery and erection of structural steel roof framing including
columns, main girders, beams, trusses, rafters, struts, purlins, sag rods,
cross bracings with turn buckles, bolts, plates and all other incidentals to
complete
314 kg
Total "DIV-05" - METAL WORKS
DIV-06 WOOD AND PLASTIC
6.1 Finish Carpentry
6.1.3
2640 x 400 x 750 ht., 25mm Plyboard desk with 2 layers of 20mm plyboard
shelf including wood edging, wood frame, painting and accessories to
complete (at Guad House)
1 lot
Total "DIV-06" - WOOD AND PLASTIC
DIV-07 THERMAL AND MOISTURE PROTECTION
7.1 Dampproofing and Waterproofing
7.1.1 Damproofing vapor barriers, 1 layer 6 mils thick @ Slab on Grade 19 sq.m.
7.1.2 Waterproofing
7.1.2.1 Elastomeric Membrane Waterproofing
7.1.2.1.1 Exposed type for concrete slab and parapet wall 8 sq.m.
7.3 Insulation
7.3.1
Roof Insulation - 50mm thk Mineral Wool Insulation with two sided
aluminum including chicken wire support and other consumable
accessories to complete
16 sq.m.
7.4 Roofing and Accessories
7.4.1Ga.24 preformed prepainted long span single rib metal roofing inclusive of
all bended materials and incidentals to complete.16 sq.m.
Total "DIV-07"-THERMAL AND MOISTURE PROTECTION
DIV-08 DOORS AND WINDOWS
8.1 WINDOWS
8.1.1Awning window in Aluminum Powder coated frame with 6mm thk clear
glass and complete accessories
8.1.1.1 W-3, 0.70 x 1.20m 1 set
8.1.2Sliding window in Aluminum Powder coated frame with 6mm thk clear glass
and complete accessories
8.1.2.1 W-2, 1.20 x 1.20m 3 set
Guard House with Septic Tank Page 70 of 77
Page 71
UNIT UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTY
8.1.3 Acrylic sheet on aluminum powder coated frame
8.1.3.1 W-1, 3.0 x 1.20m 1 set
Sub-total "8.1" - WINDOWS
8.2 DOORS AND PANELS
8.2.1 Aluminum Doors
8.2.1.1 Single leaf powder coated aluminum door with 6mm thk. Clear glass
including push and pull bar (as per manufacturer's standard)
8.2.1.1.1 D-1, 0.65 x 2.05m 1 set
8.2.2 Wood Doors
8.2.2.1 Single leaf flush hollow core plywood door painted finish
8.2.2.1.1 D-3, 0.40 x 2.15m 1 set
8.2.3 PVC/Plastic Doors
8.2.3.1 PVC Flush door with bottom louver including hinges and privacy lockset
8.2.3.1.1 D-2, 0.60 x 2.15m 1 set
Sub-total "8.2" - DOORS AND PANELS
8.3 HARDWARES
8.3.1 LOCKSET
8.3.1.1 Lockset series 4000 F82, Grade 1 1 set
8.3.1.2 DEADLOCK
8.3.1.2.1 Cylinder deadlock F-16, Grade 1 1 set
8.3.2 Closer
8.3.2.1 Overhead Concealed Closer 1 set
8.3.3 Hinges
8.3.3.1 Butt hinges 100mm x 100mm (4 x 4 ) 2 pair
8.3.3.2 Center pivot ( top & bottom) 1 pair
8.3.4 Door Accessories
8.3.4.1 Door Handle
8.3.4.1.1 Push & pull bars (door manufacturer's standard) 2 set
8.3.4.2 Threshold
8.3.4.2.1 Aluminum threshold 1 set
Sub-total "8.3" - HARDWARES
Total "DIV-08" - DOORS AND WINDOWS
DIV-09 FINISHES
9.1 FLOOR FINISHES
9.1.1 Plain cement concrete steel trowel finish 8 sq.m
9.1.2 Homogeneous Vinyl Floor Tiles, 300 x 300 x 3 mm thk 8 sq.m
9.1.3 300 x 300 Unglazed Ceramic Tiles (including mortar bed) 2 sq.m
Sub-total "9.1" - FLOOR FINISHES
9.2 WALL FINISHES
9.2.1 Plain cement plaster wall Painted Finish 83 sq.m
9.2.2 20mm groove line 17 l.m
9.2.3 300 x 300mm Glazed ceramic wall tiles (including mortar bed) 8 sq.m
Sub-total "9.2" - WALL FINISHES
9.3 CEILING FINISHES
9.3.1 12mm thk. Ordinary Gypsum Board on metal frame 8 sm
9.3.2 12mm thk. Moisture Resistant Gypsum Board on metal frame 2 sm
Guard House with Septic Tank Page 71 of 77
Page 72
UNIT UNIT COST TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTY
9.3.3 6mm thk. Fiber cement ceiling board on metal frame 5 sm
Sub-total "9.3" - CEILING FINISHES
9.4 BASE BOARD FINISHES
9.4.1 100mm high Vinyl base board 17 l.m.
9.4.2 300 x 300mm high Glazed Ceramic Tile 3 sq.m.
Sub-total "9.4" - BASE BOARD FINISHES
9.5 PAINTING WORKS
9.5.1 At Wall
9.5.1.1 Semi-gloss paint finish 36 sq.m.
9.5.1.2 Painting on wooden surfaces
9.5.1.2.1 Acrylic paint finish 48 sq.m.
9.5.3 At Ceiling
9.5.3.1 Painting on Fiber cement board surfaces 5 sq.m.
9.5.3.2 Painting on Gypsum board surfaces 9 sq.m.
9.5.4 Painting on wood doors 4 sq.m.
9.5.5 Painting on steel trusses
9.5.5.1 Covered Steel/Metal 21 sq.m.
Sub-total "9.5" - PAINTING WORKS
Total "DIV-09" - FINISHES
DIV-10 SPECIALTIES
10.16mm thick Facial mirror on 6mm thick marine plywood backing inclusive all
incidentals to complete
10.1.1 500 x 800mm 1 set
Total "DIV-10" - SPECIALTIES
Guard House with Septic Tank Page 72 of 77
Page 73
S U M M A R Y
3.14 DOTC-CAAP QUARTER
DIV-02 SITE CONSTRUCTION l.s.
DIV-03 CONCRETE WORKS l.s.
DIV-04 MASONRY WORKS l.s.
DIV-05 METAL WORKS l.s.
DIV-06 WOOD AND PLASTIC l.s.
DIV-07 THERMAL AND MOISTURE PROTECTION l.s.
DIV-08 DOORS AND WINDOWS l.s.
DIV-09 FINISHES l.s.
DIV-10 SPECIALTIES l.s.
DIV-12 FURNISHINGS l.s.
DIV-15 MECHANICAL WORKS
15.1 PLUMBING WORKS l.s.
15.2 VENTILATING AND AIRCONDITIONING WORKS l.s.
DIV 16 ELECTRICAL WORKS l.s.
TOTAL COST - DOTC-CAAP QUARTER
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
DOTC-CAAP Quater Page 73 of 77
Page 74
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
3.14 DOTC-CAAP QUARTER
DIV-02 SITE CONSTRUCTION
2.1 SITE WORKS
2.1.1 Building Layout 508 sq.m.
2.1.2 Structure Excavation 305 cu.m.
2.1.3 Backfilling and filling
2.1.3.1 Backfill excavations with suitable excavated materials 182 cu.m.
2.1.3.2 Gravel base; 150 mm thk 77 cu.m.
2.1.4 Soil Disposal
2.1.4.1 Remove surplus excavated material from site 88 cu.m.
2.1.5 Subgrade Preparation 508 sq.m.
2.1.6Anti-termite treatment to surfaces of ground and sides and bottoms of
excavations508 sq.m.
Sub-total "2.1" - SITE WORKS
DIV-03 CONCRETE WORKS
3.1 Cast-In-Place Structural Concrete
3.1.1 Reinforced concrete; 280 kg/cm2 or 4000 psi or 27.60 Mpa
3.1.1.1 Columns 23 cu.m.
3.1.1.2 Suspended Beams 74 cu.m.
3.1.1.3 Footing Tie Beam 50 cu.m.
3.1.1.4 Suspended Slab 77 cu.m.
3.1.1.5 Concrete Gutter (slab & parapet wall) 43 cu.m.
3.1.1.6 Column/Wall Footing 38 cu.m.
3.1.2 Reinforced concrete; 3000 psi or 21 Mpa
3.1.2.1 Slab-on-grade /fill 77 cu.m.
3.2 Reinforcement in concrete
3.2.1Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 60
3.2.1.1 Columns 7,192 kg
3.2.1.2 Suspended Beams 10,881 kg
3.2.1.3 Column and Wall Footing 3,258 kg
3.2.1.4 Footing Tie Beam 6,962 kg
3.2.1.5 Suspended Slab 5,313 kg
3.2.1.6 Concrete Gutter (slab & parapet wall) 8,085 kg
3.2.2Steel bar reinforcement including cutting and bending, links, stirrups,
binders, and tie wires, etc; grade 40
3.2.2.1 Slab on Grade 4,902 kg
3.3 Formwork
3.3.1 Columns 203 sq.m.
3.3.2 Suspended Beams 499 sq.m.
3.3.3 Suspended Slab 509 sq.m.
3.3.4 Concrete Gutter (slab & parapet wall) 563 sq.m.
3.3.5 Footing Tie Beam 284 sq.m.
3.4 Concrete Accessories
3.4.1 Expansion joint with sealant; pre-formed type; 12 x 200mm
3.4.1.1 At Slab-on-grade 168 l.m.
Total "DIV-03" - CONCRETE WORKS
DIV-04 MASONRY WORKS
DOTC-CAAP Quater Page 74 of 77
Page 75
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
4.1 Accessories
4.1.1 Concrete Grout, 2000 psi 53 cu.m.
4.1.2Concrete lintel and bond beams inclusive of formworks and Steel
reinforcements, Grade 40 (For Interior Walls)18 cu.m.
4.1.3 CHB steel reinforcements, PNS 275 (Grade 40) 3,307 kg
4.2 CHB
4.2.1 150mm thk (1000 psi) - Exterior Wall 332 sq.m.
4.2.2 100mm thk (350 psi / 2.5 N/mm2) 549 sq.m.
Total "DIV-04" - MASONRY WORKS
DIV-05 METAL WORKS
5.7 Steel Railings
5.7.138mm dia. Stainless Steel Stair rail with vertical and horizontal members
including all incidentals to complete (supply and install)45 l.m.
Total "DIV-05" - METAL WORKS
DIV-06 WOOD AND PLASTIC
6.1 Finish Carpentry
6.1.1
Sink Cabinet, 20mm thk. Plywood in wood frame including hardware,
expansion bolts, galvanized steel frame, shelves, edging, duco paint and
all incidentals to complete at 6F Pantry (L = 3.60m; W = 0.60m; H = 0.90m)
2 set
Total "DIV-06" - WOOD AND PLASTIC
DIV-07 THERMAL AND MOISTURE PROTECTION
7.1 Dampproofing and Waterproofing
7.1.1 Damproofing vapor barriers, 1 layer 6 mils thick @ Slab on Grade 510 sq.m.
7.1.2 Waterproofing
7.1.2.1 Elastomeric Membrane Waterproofing
7.1.2.1.1 60 mils for Roof Deck & Gutter 785 sq.m.
7.3 Insulation
7.3.1
Roof Insulation - 50mm thk Mineral Wool Insulation with two sided
aluminum including chicken wire support and other consumable
accessories to complete
785 sq.m.
Total "DIV-07"-THERMAL AND MOISTURE PROTECTION
DIV-08 DOORS AND WINDOWS
8.1 WINDOWS
8.1.1Sliding window in Aluminum Powder coated frame with 6mm thk clear glass
and complete accessories
8.1.1.1 2.40 x 1.20m 20 set
8.1.1.2 0.76 x 0.59m 14 set
Sub-total "8.1" - WINDOWS
8.2 DOORS AND PANELS
8.2.1 Metal Doors
8.2.1.1 Single leaf hollow metal door, 1 hour fire rated painted finish
8.2.1.1.1 D-1, 0.90 x 2.10m 20 set
DOTC-CAAP Quater Page 75 of 77
Page 76
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
8.2.2 PVC/Plastic Doors
8.2.2.1 PVC Flush door with bottom louver including hinges and privacy lockset
8.2.2.1.1 D-12, 0.70 x 2.10m 14 set
Sub-total "8.2" - DOORS AND PANELS
8.3 HARDWARES
8.3.1 LOCKSET
8.3.1.1 Lockset series 4000 F82, Grade 1 34 set
8.3.1.3 Lockset series 4000 F91, Grade 1 34 set
8.3.2 Closer
8.3.2.1 Overhead door closer CO 2012 20 set
8.3.3 Hinges
8.3.3.1 Butt hinges 100mm x 100mm (4 x 4 ) 68 pair
Sub-total "8.3" - HARDWARES
Total "DIV-08" - DOORS AND WINDOWS
DIV-09 FINISHES
9.1 FLOOR FINISHES
9.1.1 Plain cement concrete steel trowel finish (to receive vinyl flooring) 151 sq.m
9.1.2 Homogeneous Vinyl Floor Tiles, 300 x 300 x 3 mm thk 151 sq.m
9.1.3 600 x 600 Granite Tiles (including mortar bed) 3 sq.m
9.1.4 600 x 600 Homogeneous Polished Tiles (including mortar bed) 111 sq.m
9.1.5 400 x 400 Non-skid Homogeneous Tiles (including mortar bed) 193 sq.m
9.1.6 300 x 300 Unglazed Ceramic Tiles (including mortar bed) 52 sq.m
Sub-total "9.1" - FLOOR FINISHES
9.2 WALL FINISHES
9.2.1 Plain cement plaster wall Painted Finish 1,642 sq.m
9.2.2 300 x 300mm Glazed ceramic wall tiles (including mortar bed) 242 sq.m
9.2.39mm thk. Fiber cement board double face wall partition panel on light
weight metal frame112 sq.m
9.2.4 Exposed Construction Painted Finish 339 sm
Sub-total "9.2" - WALL FINISHES
9.3 CEILING FINISHES
9.3.1 12mm thk. Ordinary Gypsum Board on metal frame 192 sm
9.3.2 Exposed Construction Painted Finish 262 sm
9.3.3 4.5mm thk. Fiber cement ceiling board on metal frame 52 sm
Sub-total "9.3" - CEILING FINISHES
9.4 BASE BOARD FINISHES
9.4.1 100 x 400mm Non-skid Homogeneous Tiles 388 sq.m.
Sub-total "9.4" - BASE BOARD FINISHES
9.5 PAINTING WORKS
9.5.1 At Wall
9.5.1.1 Semi-gloss paint finish 1,320 sq.m.
9.5.1.2 Painting on wooden surfaces
9.5.1.2.1 Acrylic paint finish 339 sq.m.
9.5.1.2.2 Latex paint flat finish 224 sq.m.
9.5.3 At Ceiling
DOTC-CAAP Quater Page 76 of 77
Page 77
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
PAY ITEM
NO.D E S C R I P T I O N
ESTIMATED
QTYUNIT UNIT COST TOTAL COST
9.5.3.1 Semi-gloss paint finish 419 sq.m.
9.5.3.2 Painting on Fiber cement board surfaces 52 sq.m.
9.5.3.3 Painting on Gypsum board surfaces 192 sq.m.
9.5.4Painting on metal surfaces (metal doors, railings, gratings, grilles) - Epoxy
Paint76 sq.m.
Sub-total "9.5" - PAINTING WORKS
Total "DIV-09" - FINISHES
DIV-10 SPECIALTIES
10.16mm thick Facial mirror on 6mm thick marine plywood backing inclusive all
incidentals to complete
10.1.1 2200x1000mm 2 set
10.1.2 600 x 800mm 14 set
10.2 Countertops
10.2.1 Monolithic Solid Surface Countertop 12 sq.m
Total "DIV-10" - SPECIALTIES
DIV-12 FURNISHINGS
12.1 FURNISHINGS 1 lot
Total "DIV-12" - FURNISHINGS
DOTC-CAAP Quater Page 77 of 77
Page 78
PART A FACILITIES FOR THE ENGINEER
A.1(a) Rental and Maintenance of Office for the Engineer’s Representative 24 mo
A.1(b) Maintenance of Field Office and Staff House for the Engineer 24 mo
A.1(c)Provide and Maintain Field Office for the Engineer
1 ls
A.1(d)Furnish Equipment, Furnitures, Fixtures, Office Equipment and Appliances for the Field Office and
Staff House for the Engineer and Engineer’s Representative (Schedule B)1 ls
A.2(a)Provide, Operate and Maintain Communication Equipment for the Engineer and Engineer’s
Representative (Schedule C)24 mo
A.3(a)Provide Supplies and Consumable for Field Office, Laboratory and Staff House for the Engineer
and Engineer’s Representative (Schedules D)24 mo
A.4(a) Provide 4W D Pick-up Type, Double Crew Cab, Service Vehicle Brandnew for the Engineer and
Engineer’s Representative (Rental Basis)4 veh-mo
A.4(b)Operate and Maintain 4W D Pick-up Type, Double Crew Cab, Service Vehicle for the Engineer and
Engineer’s Representative96 veh-mo
A.5(a)Progress Photographs 24 mo
Sub - Total -PART A FACILITIES FOR THE ENGINEER
PART B OTHER GENERAL REQUIREMENTS
B.1 Project Signboard 2 set
B.2 Construction Health and Safety 24mo.
B.3 Environmental and Social Safeguard 24mo.
Sub - Total -PART B OTHER GENERAL REQUIREMENTS
Total
TOTAL COST
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
ITEM NO. DESCRIPTIONESTIMATED
QTYUNIT UNIT COST
Facilities for the Engineer Page 1 of 1
Page 79
SUMMARY
2.0CIVIL WORKS - LANDSIDE (Earthworks, Water Supply, Security Fence and
Gates)
Part C Earthworks
Part H Miscellaneous Structures (Security Fence and Gates)
2.1 Water Supply Wells
TOTAL - LANDSIDE
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
ITEM NO. DESCRIPTIONESTIMATE
D QTYUNIT UNIT COST TOTAL COST
Civil Works Page 1 of 3
Page 80
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
ITEM NO. DESCRIPTIONESTIMATE
D QTYUNIT UNIT COST TOTAL COST
2.0 CIVIL WORKS - LANDSIDE (Earthworks, Security Fence and Gates)
Part C Earthworks
102(1) Unsuitable Excavation 36,778.00 cu.m.
100(4) Individual Removal Trees, Large 3.00 ea.
104(1)a Embankment from Site Excavation 3,804.00 cu.m.
104(1)cEmbankment from Borrow Source (Quarry Source is 10 km. from the
site)277,756.00 cu.m.
610 Sodding 1,565.00 sq.m
Sub-total - Part C Earthworks
Part H Miscellaneous Structures (Security Fence and Gates)
604(5)
Security fence Chainlink fence with zocalo with 5-barbed wire including
excavation, backfill, gravel base, concreting, masonry, finishing works
and all incidentals to complete
1,091.00 I.m.
604(4)a
Airport Entrance Road 2 Gate with fence with 20mm x 20mm Rust
Proof square Bars on 50mmx 100mm Rust Proof Tubular Bar Frame,
includes Concrete Post, H=2.4m
604(4)a Vehicular Gate, 12.80m W x 2.40m H 1.00 set
604(4)a Pedestrian Gate, 1.0m W x 2.10m H 1.00 set
604(4)a
Terminal Road A Main Steel Gate with 20mm x 20mm Rust Proof
square Bars on 50mmx 100mm Rust Proof Tubular Bar Frame,
includes Concrete Post, H=2.4m
604(4)a Vehicular Gate, 7.50m W x 2.40m H 1.00 set
604(4)a Pedestrian Gate, 1.0m W x 2.10m H 2.00 set
604(4)a
Terminal Road D Main Steel Gate with 20mm x 20mm Rust Proof
square Bars on 50mmx 100mm Rust Proof Tubular Bar Frame,
includes Concrete Post, H=2.4m
604(4)a Vehicular Gate, 7.50m W x 2.40m H 1.00 set
604(4)bSecondary Steel Gate with 20mm x 20mm Rust Proof square bars on
50mm x 100mm Rust Proof Tubular Bar Frame, H=2.4m
604(4)a Vehicular Gate, 4.90m +5.20m W x 2.40m H 1.00 set
604(4)a Pedestrian Gate, 1.0m W x 2.10m H 2.00 set
Sub-total - Part H Miscellaneous Structures (Security Fence and
Gates)
3.0 Water Supply Wells
Civil Works Page 2 of 3
Page 81
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
ITEM NO. DESCRIPTIONESTIMATE
D QTYUNIT UNIT COST TOTAL COST
3.1
Deepwell Development, D=80 m, Borehole Dia = 350mm Dia, Well
Casing = 200mm Dia. with Hyphochlorinator system (includes drilling,
steel casing, sump pipe, submersible pump, stainless steel wirewound
screens, gravel fill pack, gravel fill pipe, water level sounding pipe, steel
plate cover and other items to complete the work.)
2.00 Set
Sub-total - Water Supply Wells
TOTAL 2.0 CIVIL WORKS - LANDSIDE (Earthworks, Security
Fence and Gates)
Civil Works Page 3 of 3
Page 82
SPECIAL CONSTRUCTION
1.1 Airconditioning System
1.2 Ventilation System
13.2 Fire Protection System
13.1 Building Management System
1.5 Fuel Oil & Exhaust System
1.6 Testing and Commissioning
TOTAL
BILL OF QUANTITIES - MECHANICAL WORKS: CARGO TERMINAL BUILDING
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
TOTAL
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
TOTAL
BILL OF QUANTITIES - MECHANICAL WORKS : MAINTENANCE BUILDING
BILL OF QUANTITIES - MECHANICAL WORKS : CRASH FIRE RESCUE BUILDING
TOTAL COSTESTIMATED
QTYUNIT UNIT COST ITEM NO. DESCRIPTION
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
BILL OF QUANTITIES
TOTAL COST
TOTAL COST
ITEM NO. DESCRIPTIONESTIMATED
QTYUNIT UNIT COST
UNIT COST ITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
BILL OF QUANTITIES - MECHANICAL WORKS: PASSENGER TERMINAL BUILDING
Page 1 / 53
Page 83
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
BILL OF QUANTITIES
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
TOTAL
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
TOTAL
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
13.1 Building Management System
TOTAL
BILL OF QUANTITIES - MECHANICAL WORKS : PUMP HOUSE & WATER TANK
ITEM NO. DESCRIPTIONESTIMATED
QTYUNIT UNIT COST TOTAL COST
BILL OF QUANTITIES - MECHANICAL WORKS : AIR TRAFFIC CONTROL BUILDING
TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT UNIT COST
TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT UNIT COST
BILL OF QUANTITIES - MECHANICAL WORKS : POWER HOUSE BUILDING
ITEM NO. DESCRIPTIONESTIMATED
QTYUNIT UNIT COST TOTAL COST
Page 2 / 53
Page 84
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
BILL OF QUANTITIES
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
TOTAL
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
TOTAL
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
TOTAL
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
TOTAL
BILL OF QUANTITIES - MECHANICAL WORKS : CHILLED WATER PUMP HOUSE BUILDING
ITEM NO. DESCRIPTIONESTIMATED
QTYUNIT UNIT COST
BILL OF QUANTITIES - MECHANICAL WORKS : GUARD HOUSE 2
TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT UNIT COST
BILL OF QUANTITIES - MECHANICAL WORKS : GUARD HOUSE 1
TOTAL COST
TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT UNIT COST
Page 3 / 53
Page 85
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
BILL OF QUANTITIES
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
TOTAL
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
TOTAL
TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT UNIT COST
BILL OF QUANTITIES - MECHANICAL WORKS : CHLORINATION 2
TOTAL COST UNIT COST ITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
BILL OF QUANTITIES - MECHANICAL WORKS : CHLORINATION 1
Page 4 / 53
Page 86
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
BILL OF QUANTITIES
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
TOTAL
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
TOTAL
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
TOTAL
BILL OF QUANTITIES - MECHANICAL WORKS : FUEL STORAGE TANK
ITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
DIRECT UNIT
COST
TOTAL
CONSTRUCTION
COST
TOTAL
CONSTRUCTION
COST
BILL OF QUANTITIES - MECHANICAL WORKS : LOCALIZER ANTENNA SHELTER
ITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
DIRECT UNIT
COST
BILL OF QUANTITIES - MECHANICAL WORKS : ILS GLIDE PATH BUILDING
TOTAL
CONSTRUCTION
COST
ITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
DIRECT UNIT
COST
BILL OF QUANTITIES - MECHANICAL WORKS : DVOR DME BUILDING
Page 5 / 53
Page 87
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
BILL OF QUANTITIES
(1) (2)
13 SPECIAL CONSTRUCTION
1.1 Airconditioning System
1.5 Fuel Oil & Exhaust System
1.6 Testing and Commissioning
TOTAL
ITEM NO. DESCRIPTION
Page 6 / 53
Page 88
13 SPECIAL CONSTRUCTION
1.1 Airconditioning System
1.2 Ventilation System
1.3 Fire Protection System
1.4 Building Management System
1.5 Fuel Oil & Exhaust System
1.6 Testing and Commissioning
Total
1.1 Air Conditioning System
Equipment, see schedule for specifications (to include all other
necceessary works to make the unit complete and operational.)
15856(1)a Air handling Unit
AHU-1 : Horizontal Draw Thru, Vertical Upblast, 47 TR 1 set/s
AHU-2A : Horizontal Draw Thru, Vertical Upblast, 12 TR 1 set/s
AHU-2B : Horizontal Draw Thru, Vertical Upblast, 15 TR 1 set/s
AHU-3 : Horizontal Draw Thru, Vertical Upblast, 40 TR 1 set/s
AHU-4 : Horizontal Draw Thru, Vertical Upblast, 60 TR 1 set/s
AHU-5 : Horizontal Draw Thru Vertical Upblast, 50 TR 1 set/s
AHU-6 : Horizontal Draw Thru Vertical Upblast, 30 TR 1 set/s
AHU-7 : Horizontal Draw Thru Vertical Upblast, 30 TR 1 set/s
AHU-8 : Vertical Draw Thru Vertical Upblast, 20 TR 1 set/s
PAHU-04 : 70 TR 1 set/s
PAHU-01 : 88 TR 1 set/s
PAHU-02 : 43 TR 1 set/s
PAHU-03 : 70 TR 1 set/s
15653(1)a
DX split type Air-conditioning Unit complete with support, hangers,
base and all necessary accessories as specified in the Mechanical
Drawings and Technical Specifications.
FCU / ACCU - 1: 3.33TR, Ceiling Cassette 3 set/s
FCU / ACCU - 5A - B: 2.0 TR, Ceiling Cassette 2 set/s
FCU / ACCU - 6: 2.5TR, Ceiling Cassette 1 set/s
FCU-9/ACCU-9: Wall Mounted DX, Indoor Free Blow 2 TR set/s
FCU-14 A-C : Ceiling Cassette Type, 1.33 TR 3 set/s
FCU-14 D-1 : Ceiling Cassette Type, 3.33 TR 6 set/s
FCU-15 A-E : Ceiling Concealed Ducted Type, 7.48 TR 5 set/s
15653(1)a Split Type AC Units
FCU / ACCU - 5A - B: 2.0 TR, Ceiling Cassette 2 set/s
FCU / ACCU - 6: 2.5TR, Ceiling Cassette 1 set/s
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Page 7 / 53
Page 89
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
15653(1)a
Multi-Split type Air-coolled Condensing Units; complete with all
necessary accessories, support/hangers/connections, base as
specified in the Mechanical Drawings and Technical Specifications.
Variable Refrigerant Volume Type; capacity 5.0TR 3 set/s
15653(1)a Window Type AC- 3:A - B, 1.07 TR
WAC-1:Window Type AirConditioner w/ three speed Fan Switch
and other standard accessories 1.07 TR, 220V,1ø,60Hzset/s
WAC-1C: Window Type Air Conditioner with three speed Fan
Switch and other standard accessories 1.07 TR, 220v,1ø, 60HZset/s
WAC - 2A-B: Window Type Air Conditioner with three speed Fan
Switch and other standard accessories 1.9 TR, 220v, 1Ǿ, 60Hzset/s
15856(2)c Fan Coil Unit (Chilled Water Type)
FCU-1, Ceiling cassette type,1.5TR,220V,1PH,60Hz, & std
accessoriesset/s
FCU-2, Ceiling cassette type,2.0TR,220V,1PH,60Hz, & std
accessoriesset/s
FCU-3, Ceiling cassette type,2.0TR,220V,1PH,60Hz, & std
accessoriesset/s
FCU-4, Ceiling cassette type,4.0TR,220V,1PH,60Hz, & std
accessoriesset/s
FCU-7, Ceiling cassette type,3.0TR,220V,1PH,60Hz, & std
accessoriesset/s
FCU-8, Ceiling suspended type, 2.0TR, 220V,1PH,60Hz, & std
accessoriesset/s
FCU-11, Ceiling suspended type, 2.0TR, 220V,1PH,60Hz, & std
accessoriesset/s
FCU-12, Ceiling suspended type, 2.0TR, 220V,1PH,60Hz, & std
accessoriesset/s
FCU-13, Ceiling suspended type, 3.0TR, 220V,1PH,60Hz, & std
accessoriesset/s
FCU-14D-I, Ceiling cassette type,4.0TR,220V,1PH,60Hz, & std
accessoriesset/s
Page 8 / 53
Page 90
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
FCU-16, Ceiling concealed ducted type, 3.28TR,220V,1PH,60Hz,
& std accessoriesset/s
SPU- 1: Single Package Unit, Vertical Upblast, 20 TR set/s
CH-1 -3: Air-Cooled Screw Chiller 432TR set/s
PCHWP 1A - C Primary<: End Suction Centrifugal Pump. Single
stage, 536 gpm X 11.2 M TDHset/s
SCHWP 2A - C: Secondary End Suction Centrifugal Pump, Single
Stage, 536 gpm x 40 TDHset/s
AS-1: Centrifugal Air Separator, 1072 gpm, 610 mm dia.x 1367
mm htset/s
ET-1: Expansion Tank, Pressurized Vertical Tank, 77.3 gal cap.610
mm Ø x 1292 mm htset/s
Above ground horizontal storage tank, ms plate 6 mm (1/4") thick
complete with inlet/Outlet, fill line, drain, overflow connections,
level gauge, access manhole, vent, tank shall be treated with anti-
corrossion. Dimension : 3,000 mm øx 6,000 mm SL
set/s
15200(3)a Flexible Duct Connector l.m.
200mm dia. Flexible duct connector l.m.
250mm dia. Flexible duct connector l.m.
300mm dia. Flexible duct connector l.m.
15895(1)a Galvanized Steel Duct including support
Ga 26 34.23 sq.m.
Ga 24 1299.39 sq.m.
Ga 22 1416.78 sq.m.
Ga 20 828.81 sq.m.
15250(1)a Duct Insulation, 50 mm thick, rigid minearl fiber 48kg/ m3 density 3579.21 sq.m.
Duct Insulation, 50 mm thick, rigid minearl fiber 48kg/ m3 density
with aluminum foilsq.m.
15250(1)a Acoustical duct liner, 25 mm thk flexible unicellular rubber 122 sq.m.
15895(3)a Variable Air Volume Unit
VAV 1A-D, 500 cfm 4 set/s
VAV 2, 1400 cfm 1 set/s
VAV 3 400 cfm 1 sets
VAV -4 2346 cfm sets
VAV -5 2330 cfm sets
Page 9 / 53
Page 91
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
VAV -6 796 cfm sets
VAV -7 584 cfm sets
VAV -8 2370 cfm sets
VAV -9 3777 cfm sets
VAV -10 3684 cfm sets
VAV -11 1556 cfm sets
VAV -12 2924 cfm sets
VAV -13 1868 cfm sets
VAV -14 846 cfm sets
15895(2)a Supply Air Glille
1050 x 150 18 set/s
750 x 450 2 set/s
550 x 150 2 set/s
15895(2)a Return Air Grille /Register
1500x 1200 set/s
800x 200 set/s
1200 x 1050 1 set/s
1050 x 450 31 set/s
750 x 400 set/s
600 x 400 set/s
600 x 250 1 set/s
550 x 550 7 set/s
550 x 250 set/s
450 x 350 set/s
450 x 250 3 set/s
450 x 150 set/s
300 x 150 set/s
15895(2)a Supply Ceiling Diffuser
450 x 450 4 set/s
400 x 400 45 set/s
375 x 375 96 set/s
300 x 300 35 set/s
Exhaust Air Duct
200mm dia l.m.
150 mm dia l.m.
Hot Air Duct (250mm dia) l.m.
Page 10 / 53
Page 92
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
15895(2)a Volume Damper
750 x 300 7 ea.
500 x 300 7 ea.
450 x 400 ea.
450 x 350 ea.
450 x 250 10 ea.
400 x 200 6 ea.
350 x 350 ea.
350 x 200 4 ea.
300 x 300 ea.
300 x 250 ea.
300 x 200 ea.
300 x 150 ea.
150 x 100 ea.
15895(2)a Fire and Smoke Damper
1950 x 650 3 ea.
1750 x 650 1 ea.
1500 x 500 ea.
1300 x 500 ea.
1250 x 500 ea.
850 x 500 ea.
15895(2)a Motorized Smoke Damper
1850 x 650 1 ea.
1850 x 550 1 ea.
1600 x 600 1 ea.
1050 x 500 1 ea.
1000 x 500 1 ea.
850 x 500 1 ea.
600 x 250 1 ea.
550 x 550 7 ea.
550 x 500 ea.
450 x 250 1 ea.
300 x 200 3 ea.
15652(1)a Chilled Water Piping
Steel Pipe, ERW Sched 40 incldg fittings and support
250 mm ø l.m.
200 mm ø 24 l.m.
150 mm ø 24 l.m.
100 mm ø l.m.
80 mm 60 l.m.
65 mmø l.m.
50 mm ø l.m.
Page 11 / 53
Page 93
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
40 mm ø l.m.
32 mm ø l.m.
25 mm ø l.m.
20 mm ø l.m.
15 mm ø l.m.
15250(2)aChilled Water Pipe Insulation, 50mm thk. Flexible closed cell
elastomeric rubber
250 mm ø l.m.
200 mm ø 24 l.m.
150 mm ø 24 l.m.
100 mm ø 340 l.m.
80 mm ø 60 l.m.
65 mm ø l.m.
50 mm ø l.m.
40 mm ø l.m.
32 mm ø l.m.
25 mm ø l.m.
20 mm ø l.m.
15 mm ø l.m.
Pipe Insulation flexible closed cell rubber, 50 mm thk with vapor
barrier
100 mm ø l.m.
65 mm ø l.m.
50 mm ø l.m.
40 mm ø l.m.
32 mm ø l.m.
25 mm ø l.m.
20 mm ø l.m.
Fresh Air Louver w/ pre-filter and insect screen
450 x 250mm set/s
300 x 250mm set/s
200 x 200mm set/s
300 x 300 set/s
200 x 150 set/s
150 x 150 set/s
Flexible Air Duct
150mm dia l.m.
Exhaust Air Duct
200mm dia l.m.
150mm dia
Page 12 / 53
Page 94
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Backdraft Damper
750 x 150 set/s
15652(2)a Valves & Piping Accessories
Butterfly Valve
150 mmø ea.
100 mmø ea.
80 mm ø 8 ea.
65 mmø ea.
Ball valve
50 mm ø 8 ea.
25 mm ø ea.
20 mm ø ea.
15 mm ø ea.
Auto Flow Control Valve
150 mmø ea.
80 mmø 4 ea.
65 mmø ea.
25 mm ø ea.
20 mm ø ea.
3-way Modulating Valve, 80 mm ø 4 ea.
3-way control valve
80 mmø ea.
65 mmø ea.
25 mm ø ea.
20 mm ø ea.
Wye Strainer with blow-off valve
150 mm ø ea.
80 mm ø 4 ea.
65 mmø ea.
32 mm ø ea.
25 mm ø ea.
20 mm ø ea.
Auto Air Vent, tap to 65mm dia 8 ea.
Pressure Gauge 8 ea.
Tap to 65 mm diameter ea.
Tap to 32 mm diameter ea.
Page 13 / 53
Page 95
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Tap to 25 mm diameter ea.
Tap to 20 mm diameter ea.
Flow Meter
Tap to 65 mm diameter ea.
Pressure Gauge w/ pet cock & pressure gauge well set/s
Thermometer
Tap to 365mm diameter set/s
Tap to 32 mm diameter set/s
Tap to 25 mm diameter set/s
Tap to 20 mm diameter set/s
Balancing Valve
32 mm ø set/s
25 mm ø set/s
20 mm ø set/s
Temperature Gauge set/s
Temperature Sensor set/s
Check Valve
150 mm ø set/s
Motorized Valve
150 mm ø set/s
65 mm ø set/s
32 mm ø set/s
25 mm ø set/s
20 mm ø set/s
Gate Valve
150 mm ø set/s
65 mm ø set/s
50 mm ø set/s
40 mm ø set/s
32 mm ø set/s
25 mm ø set/s
20 mm ø set/s
15652(1)a Ga. 26 Aluminum Pipe Cladding
150 mm ø, Ga.26Al. Pipe Cladding l.m.
100 mm ø, Ga.26Al. Pipe Cladding l.m.
80 mm ø, Ga.26Al. Pipe Cladding l.m.
Page 14 / 53
Page 96
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
65 mm ø, Ga.26Al. Pipe Cladding l.m.
Drain Valve
50 mm ø set/s
25 mm ø set/s
20 mm ø set/s
15200(2)a Flexible Pipe Connector
150mmø set/s
80 mm ø 8 sets
65 mmø sets
32 mm ø set/s
25 mm ø sets
20 mm ø sets
18.88mmø set/s
9.53mmø set/s
15653(2)a Refrigerant Piping , copper Type L
9.52 mm ø copper, RL 10 l.m.
15.88 mm ø, RS 10 l.m.
15653(2)a Refrigerant Pipe insulation, flexible elastomeric rubber, 25 mm thk
9.52 mm ø copper RL 10 l.m.
15.88 mm ø copper , RS 10 l.m.
15652(1)a Condensate Drain Piping, PVC pipe, sch 40, class 150
50 mm ø l.m.
32 mm ø l.m.
25 mm ø 10 l.m.
20 mm ø 10 l.m.
15250(2)a Condensate Drain pipe insulation, 19 mm thk flexible elastomeric
50 mm ø l.m.
32 mm ø l.m.
25 mm ø 10 l.m.
20 mm ø 10 l.m.
15652(1)a Aluminum Pipe Cladding
250 mm ø l.m.
200 mm ø l.m.
150 mm ø l.m.
115 mm ø l.m.
100 mm ø l.m.
Page 15 / 53
Page 97
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
82 mm ø l.m.
59.5 mm ø 10 l.m.
65.88mm ø 10 l.m.
50 mm ø l.m.
20 mm ø l.m.
15.88 mm Ø l.m.
9.53 mmØ l.m.
15653(2)a Fiter Dryer, 9.53 mm ø 1 set/s
15653(2)a Sight Glass, 9.53 mm ø 1 set/s
Chemical Pot Feeder set/s
Flow Switch set/s
Others, Pls Specify
Sub - Total
1.2 Ventilation System
15871(1)aEquipment see schedule for specifications (to include all other
necessary works to make the unit complete and operational)
EF / 1 Centrifugal In- LineFan , 680 cmh, Belt Drive 1/3 hp 230
V 1 Ph, 60Hzset/s
EF / 2A-E Centrifugal Ceiling Casatte Fan , 262 cmh, direct
drive, 0.17 hp, 230 V 1 Ph, 60 HZset/s
EF / 3 Centrifugal In- Line Fan , 1292 cmh, Belt Drive 1/3 hp,
230 V 1 Ph, 60HZset/s
EF / 4A Centrifugal Ceiling Cassette Fan, 195 cmh, direct drive,
19w, 230 V 1 Ph, 60HZset/s
EF / 5A-B Propeller Wall Mounted fan, 300 cmh, direct drive,
0.03 hp, 230 V 1Ph, 60HZ set/s
EF - 6: 73 CMH, 125" ESP, direct drive, .02hp 230V, 1Ph, 60Hz,
wall mounted propeller type with backdraft damper, weather
hood, vibration isolators, isolation switch and other std
accessories.
set/s
Page 16 / 53
Page 98
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
EF-7:2120 cmh, 0.125"ESP, direct drive, 0.11hp, 230V, 1Ph,
60Hz, wall mounted propeller type with backdraft damper,
weather hood, vibration isolators, isolation switch and other std
accessories.
set/s
EF- 8A -K : 262cmh, . 0.25" ESP, direct drive , 0.17 hp 230V,
1Ph, 60Hz, wall mounted propeller type with backdraft damper,
weather hood, vibration isolator, isolation switch and other std
accessories
11 set/s
EF / 9A - B Propeller Wall Mounted Fan, 1280 cmh, direct drive,
0.17 hp, 230 V 1ph, 60 HZ2 set/s
EF / 10A-B Centrifugal Ceiling Cassette Fan, 1256 cmh direct
drive , 1/2 hp, 230 V 1ph, 60 HZ2 set/s
EF -11A-J : 680cmh,. 25 " ESP, belt drive, 1/3hp, 230V, 1ph
60Hz, centrifugal in - line exhaust fan with backdraft damper,
isolation switch and other std accessories
10 set/s
EF / 12A-E Propeller Wall Mounted Fan, 1659 cmh, direct drive,
104w, 230 V 1 Ph, 60HZset/s
EF / 13 Propeller Wall Mounted Fan, 210cmh, direct drive, 13w
230V 1Ph, 60 Hzset/s
EF / 14 Propeller Wall Mounted Fan, 300cmh, direct drive, 19w
230V 1Ph, 60 Hzset/s
EF /15A-B: Centrifugal Roof Exhaust Fan 5913 cmh, direct
drive, 559 watts, 230V, 1Ph, 60 Hzset/s
EF /16A-B: Propeller Wall Mounted Fan, 157 cmh, 63 watts,
230V 1Ph, 60 Hzset/s
EF - 16B: 88cmh, .125* ESP, belt drive, .50 w, 230V, 1 Ph,
60Hz, wall mounted propeller type with backdraft damper,
weather hood, vibration isolators, isolation switch and other std
accessories.
set/s
EF - 17A-C: 5536cmh, 0.125* ESP, belt drive, .550 w, 230V, 1
Ph, 60Hz, wall mounted propeller type with backdraft damper,
weather hood, vibration isolators, isolation switch and other std
accessories.
set/s
EF - 18: 23885cmh, 1* ESP, belt drive, .420 w, 230V, 1 Ph,
60Hz, wall mounted propeller type with backdraft damper,
weather hood, vibration isolators, isolation switch and other std
accessories.
set/s
EF - 19: 11934cmh, 1* ESP, belt drive, .1500 w, 230V, 1 Ph,
60Hz, wall mounted propeller type with backdraft damper,
weather hood, vibration isolators, isolation switch and other std
accessories.
set/s
Page 17 / 53
Page 99
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Exhaust Fan (EF-20),Ceiling cassette type, 530cmh, 63w, 230V,
1Ph, 60Hz, c/w TEFC motor, backdraft damper, & std
accessories
set/s
Exhaust Fan(EF-21), wall mtd type, 834cmh, 36w,230V,1Ph,
60Hz, c/w TEFC motor, backdraft damper, & std accessories set/s
Exhaust Fan (EF-22), wall mtd type, 210cmh, 13w,230V, 1Ph,
60Hz, c/w TEFC motor, backdraft damper, & std accessories set/s
Exhaust Fan(EF-23), Ceiling cassette type, 131cmh, 19w, 230V,
1Ph, 60Hz, c/w TEFC motor, backdraft damper, & std
accessories
set/s
Exhaust Fan (EF-24), wall mtd type 75cmh, 13w, 230v, 1 ph, hz,
c/w TEFC motor, backdraft damper, & std accessoriesset/s
Exhaust Fan (EF-25), wall mtd type 630cmh, 98w, 230v, 1 ph,
hz, c/w TEFC motor, backdraft damper, & std accessoriesset/s
Exhaust Fan (EF-26), wall mtd type 195c3h, 27w, 230v, 1 ph,
hz, c/w TEFC motor, backdraft damper, & std accessoriesset/s
Exhaust Fan (EF-27), wall mtd type 1280cmh, 27w, 230v, 1 ph,
hz, c/w TEFC motor, backdraft damper, & std accessoriesset/s
EF - 28: 480 cmh, 0.125"ESP, Direct drive, 0.03hp, 230V, 1Ph,
60Hz, wall mounted propeller type with backdraft damper,
weather hood, vibration isolators, isolation switch and other std
accessories.
set/s
Exhaust Fan (EF-29), wall mtd type 480cmh, 22w, 230v, 1 ph,
hz, c/w TEFC motor, backdraft damper, & std accessoriesset/s
EF / 29A-C Propeller Wall Mounted Fan, 300 cmh, direct drive,
19w, 230 V 1 Ph, 60HZset/s
Exhaust Fan (RH-1), kitchen hood type, 480cmh, 79w, 230V,
1Ph, 60Hz, backdraft amper, & std accessories set/s
Page 18 / 53
Page 100
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Pressurization Fan (PF-1), centrifugal utility type, 7024cmh,
2238w, 230V, 3ph, 60Hz explosion proof motor, backdraft
damper & std accessories.
set/s
SEF / 1,3 & 4 Centrifugal Belt Driven Type Smoke Exhaust Fan
C/W Backdraft Damper , 19720 cmh, 7.5 hp 220 V 3Ph, 60HZ3 set/s
SEF / 2 Centrifugal Belt Driven Type Smoke Exhaust Fan C/W
Backdraft Damper, 14110 cmh, 5hp, 220 V 3 Ph, 60 Hz1 set/s
SEF / 5 Centrifugal Belt Driven Type Smoke Exhaust Fan C/W
Backdraft Damper, 6358 cmh, 1.5hp, 220 V 1Ph, 60 Hzset/s
SEF / 6 Centrifugal Belt Driven Type Smoke Exhaust Fn C/W
Backdraft Damper, 6103 cmh, 1.93hp, 220 V 1Ph, 60 Hzset/s
SEF / 7 Centrifugal Belt Driven Type Smoke Exhaust Fan C/W
Backdraft Damper, 2040cmh, belt driven, 559.5w, 230V, 1Ph,
60Hz
set/s
15871(2)a PVC duct
200 mmø 161 l.m.
150 mmø l.m.
100 mmø 14 l.m.
15895(2)a Vent Cap
250mm set/s
200mm set/s
150mm set/s
100 mmø 7 sets
15895(1)a Galvanized Steel Duct including support
Ga 26 34.23 sq.m.
Ga 24 1299.39 sq.m.
Ga 22 1416.78 sq.m.
15200(3)a Flexible Duct Connector l.m.
150mm dia. Flexible duct connector l.m.
Toilet Exhaust Air Duct
150mm l.m.
Air Duct Devices
Exhaust Air Register
650 x 150 set/s
Page 19 / 53
Page 101
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
550 x 150 set/s
Exhaust Air Register with Volume Damper
750 x 600 set/s
600 x 300 set/s
Butterfly Damper
800 x 750 set/s
800 x 600 set/s
Weather Hood set/s
Range Hood Exhaust duct, stainless steel, ga sq.m.
Fresh Air Louver w/ pre-filter and insect screen
300 x 300 set/s
Fresh Air register, 200 x 200 mm set/s
Pressurization Air Register, 600 x 500 set/s
Range Hood Exhaust Louver, 400 x 150 mm set/s
Smoke Exhaust Register
500 x 500 set/s
350 x 350 set/s
Motorized Smoke Damper
500 x 250 set/s
450 x 250 set/s
Volume Damper
300 x 250 set/s
600 x 500 set/s
450 x 250 mm set/s
800 x 750 set/s
600 x 450 set/s
200x 150 set/s
150 x 150 set/s
Weather hood vent cap w/ insect screen set/s
Sub - Total
1.3 Fire Protection System
FP-1 : Fire Pump, 1600 gpm, c/w controller and std accessories,
Electric Motor Drivenset/s
Page 20 / 53
Page 102
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
JP - 1: Jockey Pump, 20 gpm, c/w controller and std accessories. set/s
Piping System
15330(1)a Black Steel Pipe, ERW schedule 40 with fitting and support
250 mm ø l.m.
200 mm ø l.m.
150 mm ø 92 l.m.
100 mm ø 494 l.m.
80 mm ø l.m.
65 mm ø 3 l.m.
50 mm ø 32 l.m.
40 mm ø 1365 l.m.
32 mm ø 33 l.m.
25 mm ø 179 l.m.
15330(2)a Sprinkler Heads, k = 5.6 , 155˚ F temp rating
Pendent 352 set/s
Upright 36 set/s
Sidewall 5 set/s
Sprinkler reserve cabinet with spare sprinkler heads: (12
pendent and wrench)2 set/s
Pendent, Standard spray, k= 5.6, 57° C temp rating set/s
15330(5)a Fire Hose Cabinet
Fire Hose Cabinet made from Ga.18 BI steel construction with
glass door, continuous steel hinge. Cabinet shall contain
ø40cast brass angle valve with 30 m of ø40 polyurethane
singled line synthetic jacket hose, brass nipple and coupling.
Hose rack swivel type with pin and water stop. NST thread for
fire hose. Cabinet to contain one (1) 4.5 kg abc dry chemical
extinguisher.
8 set/s
Recessed Mounted Type / Class III (FCH-2) : Fire Hose cabinet
made from gauge 18 BI steel construction with glass door,
continuous steel hinge. Cabinet shall contain ø40 cast brass
angle valve with 30m of ø40 polyurethane singled lined synthetic
jacket hose, brass nipple and coupling. Hose rack swivel type
with pin and water stop. NST thread for fire hose. Cabinet to
contain one (1) 4.5 kg abc dry chemical extinguisher
set/s
Page 21 / 53
Page 103
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Surface Mounted Type / Class III (BI. FHCassembly) : Fire hose
cabinet made from gauge 18 BI steel construction with glass
door, continuous steel hinge. Cabinet shall contain ø40
polyurethane singled lined synthetic jacket hose, brass nipple
and coupling. Hose rack swivel type with pin and water stop.
NST thread for fire hose. Cabinet to contain one (1) 4.5 kg abc
dry chemical extinguisher.
set/s
Recessed Mounted Type / Class II (BI. FHCassembly): Fire
hose cabinet made from gage 18 bi steel construction with glass
door, continuous steel hinge. Cabinet shall contain ø40 cast
brass angle valve with 30 m of ø40 polyurethane singled lined
synthetic jacket hose, brass nipple and coupling. Hose rack
swivel type with pin and water stop. NST thread for fire hose.
Cabinet to contain one (1) 4.5 kg abc dry chemical extinguisher.
set/s
15330(6)a Fire Extinguisher
FE-1 : 4.5 kg. Siliconized mono ammonium phosphate dry
chemical wall mounted multi- purpose portable fire extinguisher
complete with hose and horn, wall bracket, UL listed and FM
approved.
48 set/s
FE-2 : 4.5 kg. Carbon Dioxide portable fire extinguisher
complete with hose and horn, wall bracket, UL listed and FM
approved.
set/s
FE-3 : 22.7 kg. Wheeled Carbon Dioxide portable fire
extinguisher complete with hose and horn, wall bracket, UL
listed and FM approved.
set/s
15330(3)a Valves and Accessories
ø150 mm Alarm Check Valve Assembly c/w pressure gages,
switch, alarm gong, retard chamber, trimmings and other
standard accessories
1 set/s
ø100 mm Alarm Check Valve Assembly c/w pressure gages,
switch, alarm, gong, retard chamber, trimmings and other
standard accessories
set/s
ø80 mm Alarm Check Valve Assembly c/w pressure gapes,
switch, alarm gong, retard chamber, trimmings and other
standard accessories
set/s
Ø65 mm Alarm Check Valve Assembly c/w pressure gages,
switch, alarm gong, retard chamber, trimmings and other
standard accessories.
set/s
150mmø OS&Y Gate Valve w/ supervisory switch 2 set/s
Page 22 / 53
Page 104
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
OS&Y Gate Valve w/ monitor switch
150mmø 1 set/s
100 mmø 2 set/s
80 mmø set/s
65 mmø set/s
Fire Dept. Connection, 100 x 65 x 65 ø set/s
Zone control Valve Assembly w/ supervisory switch
ø100mm set/s
ø80mm set/s
ø50mm set/s
Flow Switch
ø50mm set/s
Check valve
200mmø set/s
100mmø 1 set/s
50mmø set/s
25mmø set/s
Water flow detector 2 set/s
Flushing Connection
80 mm ø set/s
25 mm ø set/s
Inspector Test Connection, ø25 mm set/s
Mechanical Groove Coupling,
ø150 mm set/s
ø100 mm set/s
ø80 mm set/s
ø65 mm set/s
Flexible Coupling
250 mm dia. set/s
50 mm dia. set/s
Fire hose Valve,
40mmø set/s
Gate Valve
250 mm dia. set/s
200 mm dia. set/s
150 mm dia. set/s
50 mm dia. set/s
32mmø set/s
Globe Valve, 150 mm dia. set/s
Page 23 / 53
Page 105
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Y - Strainer
250 mm dia. set/s
50 mm dia. set/s
Manifold, 150 mmØ x 1.0 m lg complete with 3 - 65 mmØ Fire hose
valveset/s
Pressure Gauge set/s
Air Release valve, 25 mm dia. set/s
Ball Drip Valve, 25 mm dia. set/s
Test Valve with cap and chain, 65 mm dia. set/s
Sight Glass , 25 mmø set/s
Splash Block lot
Painting sq.m.
15330 FM 200 Fire Suppression System
Supply and Installation of Fire Suppression System (FM-200),
Including Cylinder Assemblies 215lbs. capacity, Valves, Pipe
& Fittings, Wires & Conduit, Fire Alarm Control Panels &
accessories and other miscellaneous, consumable items to
complete as specified in Mechanical Drawings and Technical
Specifications.
lot
Sub - Total
1.4 Building Management System
15971(1)cTo control and monitor status AHU'S, VAV'S, Exhaust Fans and
accessoriespt
To Control and monitor status of Chillers and Chilled Water
Pumps.pt
Sub - Total
Fuel Oil & Exhaust System
Fuel Oil System
Positive displacement rotary gear pump complete with explosion
proof motor, common steel base, vibration isolator, pressure relief
vent, gauges, 1 gpm, 50 psi, 1 hp, 230V, 3ph, 60 hz
DT 1 - 3: Above ground light oil horizontal day tank, 660 gal, 1500
mmØ x 2600 mm lengthset/s
Page 24 / 53
Page 106
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Fuel Oil Piping
Fuel Oil Pipe, Black steel, sched 40, seamless with fittings and
support,
65 mm ø l.m.
50 mm ø l.m.
20 mm ø l.m.
Valves and accessories
Gate Valve
65 mm ø set/s
50 mm ø set/s
Check Valve, 50 mmØ set/s
Duplex Basket Strainer, 50 mmØ set/s
Pressure Relief Valve, 50 mmØ set/s
Pressure Gauge set/s
Flexible pipe connector
50 mmØ set/s
20 mmØ set/s
15200(3)a Flexible Duct Connector l.m.
150mm dia. Flexible duct connector l.m.
Exhaust Pipe
250 mØ l.m.
100 mØ l.m.
Exhaust Pipe Insulation
250mmØ sq.m.
100mmØ sq.m.
Flexible Pipe Connector
250mmØ set/s
100mmØ set/s
Wall Thimble
250 mmØ set/s
100 mmØ set/s
65 mm ø Cap with chain set/s
Others, please specify
Sub - Total
1.6 Testing and Commissioning
Testing and Commissioning (ACV and FP) lot
Sub - Total
Page 25 / 53
Page 107
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
TOTAL
Page 26 / 53
Page 108
13 SPECIAL CONSTRUCTION
1.1 Airconditioning System
1.2 Ventilation System
13.2 Fire Protection System
13.1 Building Management System
1.5 Fuel Oil & Exhaust System
1.6 Testing and Commissioning
TOTAL
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Page 27 / 53
Page 109
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
1.1 Air Conditioning System
Equipment, see schedule for specifications (to include all other
necceessary works to make the unit complete and operational.)
15856(1)a Air handling Unit
AHU-1 : Horizontal Draw Thru, Vertical Upblast, 47 TR 1 set/s
AHU-2A : Horizontal Draw Thru, Vertical Upblast, 12 TR 1 set/s
AHU-2B : Horizontal Draw Thru, Vertical Upblast, 15 TR 1 set/s
AHU-3 : Horizontal Draw Thru, Vertical Upblast, 40 TR 1 set/s
AHU-4 : Horizontal Draw Thru, Vertical Upblast, 60 TR 1 set/s
AHU-5 : Horizontal Draw Thru Vertical Upblast, 50 TR 1 set/s
PAHU-04 : 70 TR 1 set/s
PAHU-01 : 88 TR 1 set/s
PAHU-02 : 43 TR 1 set/s
PAHU-03 : 70 TR 1 set/s
15653(1)a
DX split type Air-conditioning Unit complete with support, hangers,
base and all necessary accessories as specified in the Mechanical
Drawings and Technical Specifications.
FCU / ACCU - 1: 3.33TR, Ceiling Cassette 3 set/s
FCU / ACCU - 5A - B: 2.0 TR, Ceiling Cassette 2 set/s
FCU / ACCU - 6: 2.5TR, Ceiling Cassette 1 set/s
15653(1)a
Multi-Split type Air-coolled Condensing Units; complete with all
necessary accessories, support/hangers/connections, base as
specified in the Mechanical Drawings and Technical Specifications.
Variable Refrigerant Volume Type; capacity 5.0TR 3 set/s
15895(1)a Galvanized Steel Duct including support
Ga 26 34.23 sq.m.
Ga 24 1299.39 sq.m.
Ga 22 1416.78 sq.m.
Ga 20 828.81 sq.m.
15250(1)a Duct Insulation, 50 mm thick, rigid minearl fiber 48kg/ m3 density 3579.21 sq.m.
15250(1)a Acoustical duct liner, 25 mm thk flexible unicellular rubber 122 sq.m.
15895(3)a Variable Air Volume Unit
VAV 1A-D, 500 cfm 4 set/s
VAV 2, 1400 cfm 1 set/s
VAV 3 400 cfm 1 sets
Page 28 / 53
Page 110
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
15895(2)a Supply Air Glille
1050 x 150 18 set/s
550 x 150 2 set/s
15895(2)a Return Air Grille /Register
1200 x 1050 1 set/s
1050 x 450 31 set/s
550 x 550 7 set/s
450 x 250 3 set/s
15895(2)a Supply Ceiling Diffuser
450 x 450 4 set/s
400 x 400 45 set/s
375 x 375 96 set/s
300 x 300 35 set/s
15895(2)a Volume Damper
750 x 300 7 ea.
500 x 300 7 ea.
450 x 250 10 ea.
400 x 200 6 ea.
350 x 200 4 ea.
15895(2)a Fire and Smoke Damper
1950 x 650 3 ea.
1750 x 650 1 ea.
15895(2)a Motorized Smoke Damper
1850 x 650 1 ea.
1850 x 550 1 ea.
1600 x 600 1 ea.
1050 x 500 1 ea.
1000 x 500 1 ea.
850 x 500 1 ea.
600 x 250 1 ea.
550 x 550 7 ea.
450 x 250 1 ea.
300 x 200 3 ea.
15652(1)a Chilled Water Piping
Steel Pipe, ERW Sched 40 incldg fittings and support
150 mm ø 24 l.m.
100 mm ø 340 l.m.
80 mm 60 l.m.
Page 29 / 53
Page 111
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
15250(2)aChilled Water Pipe Insulation, 50mm thk. Flexible closed cell
elastomeric rubber
150 mm ø 24 l.m.
100 mm ø 340 l.m.
80 mm ø 60 l.m.
15652(2)a Valves & Piping Accessories
Butterfly Valve
80 mm ø 8 ea.
Ball valve
50 mm ø 8 ea.
Auto Flow Control Valve
80 mmø 4 ea.
3-way Modulating Valve, 80 mm ø 4 ea.
Wye Strainer with blow-off valve
80 mm ø 4 ea.
Auto Air Vent, tap to 65mm dia 8 ea.
Pressure Gauge 8 ea.
15200(2)a Flexible Pipe Connector
80 mm ø 8 set/s
15653(2)a Refrigerant Piping , copper Type L
9.52 mm ø copper, RL 10 l.m.
15.88 mm ø, RS 10 l.m.
15653(2)a Refrigerant Pipe insulation, flexible elastomeric rubber, 25 mm thk
9.52 mm ø copper RL 10 l.m.
15.88 mm ø copper , RS 10 l.m.
15652(1)a Condensate Drain Piping, PVC pipe, sch 40, class 150
25 mm ø 10 l.m.
20 mm ø 10 l.m.
15250(2)a Condensate Drain pipe insulation, 19 mm thk flexible elastomeric
Page 30 / 53
Page 112
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
25 mm ø 10 l.m.
20 mm ø 10 l.m.
15652(1)a Aluminum Pipe Cladding
59.5 mm ø 10 l.m.
65.88mm ø 10 l.m.
15653(2)a Fiter Dryer, 9.53 mm ø 1 set/s
15653(2)a Sight Glass, 9.53 mm ø 1 set/s
Others, Pls Specify
Sub - Total
1.2 Ventilation System
15871(1)aEquipment see schedule for specifications (to include all other
necessary works to make the unit complete and operational)
EF- 8A -K : 262cmh, . 0.25" ESP, direct drive , 0.17 hp 230V,
1Ph, 60Hz, wall mounted propeller type with backdraft damper,
weather hood, vibration isolator, isolation switch and other std
accessories
11 set/s
EF / 9A - B Propeller Wall Mounted Fan, 1280 cmh, direct drive,
0.17 hp, 230 V 1ph, 60 HZ2 set/s
EF / 10A-B Centrifugal Ceiling Cassette Fan, 1256 cmh direct
drive , 1/2 hp, 230 V 1ph, 60 HZ2 set/s
EF -11A-J : 680cmh,. 25 " ESP, belt drive, 1/3hp, 230V, 1ph
60Hz, centrifugal in - line exhaust fan with backdraft damper,
isolation switch and other std accessories
10 set/s
SEF / 1,3 & 4 Centrifugal Belt Driven Type Smoke Exhaust Fan
C/W Backdraft Damper , 19720 cmh, 7.5 hp 220 V 3Ph, 60HZ3 set/s
SEF / 2 Centrifugal Belt Driven Type Smoke Exhaust Fan C/W
Backdraft Damper, 14110 cmh, 5hp, 220 V 3 Ph, 60 Hz1 set/s
15871(2)a PVC duct
200 mmø 161 l.m.
100 mmø 14 l.m.
15895(2)a Vent Cap
200mm 12 set/s
100 mmø 7 sets
Page 31 / 53
Page 113
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Sub - Total
13.2 Fire Protection System
Piping System
15330(1)a Black Steel Pipe, ERW schedule 40 with fitting and support
150 mm ø 92 l.m.
100 mm ø 494 l.m.
65 mm ø 3 l.m.
50 mm ø 32 l.m.
40 mm ø 1365 l.m.
32 mm ø 33 l.m.
25 mm ø 179 l.m.
15330(2)a Sprinkler Heads, k = 5.6 , 155˚ F temp rating
Pendent 352 set/s
Upright 36 set/s
Sidewall 5 set/s
Sprinkler reserve cabinet with spare sprinkler heads: (12
pendent and wrench)2 set/s
15330(5)a Fire Hose Cabinet
Fire Hose Cabinet made from Ga.18 BI steel construction with
glass door, continuous steel hinge. Cabinet shall contain
ø40cast brass angle valve with 30 m of ø40 polyurethane
singled line synthetic jacket hose, brass nipple and coupling.
Hose rack swivel type with pin and water stop. NST thread for
fire hose. Cabinet to contain one (1) 4.5 kg abc dry chemical
extinguisher.
8 set/s
15330(6)a Fire Extinguisher
FE-1 : 4.5 kg. Siliconized mono ammonium phosphate dry
chemical wall mounted multi- purpose portable fire extinguisher
complete with hose and horn, wall bracket, UL listed and FM
approved.
48 set/s
15330(3)a Valves and Accessories
ø150 mm Alarm Check Valve Assembly c/w pressure gages,
switch, alarm gong, retard chamber, trimmings and other
standard accessories
1 set/s
150mmø OS&Y Gate Valve w/ supervisory switch 2 set/s
OS&Y Gate Valve w/ monitor switch
150mmø 1 set/s
100 mmø 2 set/s
Check valve
Page 32 / 53
Page 114
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
100mmø 1 set/s
Water flow detector 2 set/s
Sub - Total
13.1 Building Management System
Sub - Total
Fuel Oil & Exhaust System
Others, please specify
Sub - Total
1.6 Testing and Commissioning
Testing and Commissioning (ACV and FP) 1 lot
Sub - Total
TOTAL
Page 33 / 53
Page 115
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
13.2.1 Piping System
Black Steel Pipe, ERW schedule 40 with fitting and support
1 100 mm ø 6 l.m.
2 80 mm ø 36 l.m.
3 40 mm ø 6 l.m.
4 32 mm ø 90 l.m.
5 25 mm ø 12 l.m.
13.2.2 Sprinkler Heads, k = 5.6 , 155˚ F temp rating
1 Pendent 2 set/s
2 Upright 18 set/s
3 Sidewall 10 set/s
4Sprinkler reserve cabinet with spare sprinkler heads: (12
pendent and wrench)1 set/s
13.2.3 Fire Hose Cabinet
1
Fire Hose Cabinet made from Ga.18 BI steel construction with
glass door, continuous steel hinge. Cabinet shall contain
ø40cast brass angle valve with 30 m of ø40 polyurethane
singled line synthetic jacket hose, brass nipple and coupling.
Hose rack swivel type with pin and water stop. NST thread for
fire hose. Cabinet to contain one (1) 4.5 kg abc dry chemical
extinguisher.
1 set/s
13.2.4 Fire Extinguisher
1
FE-1 : 4.5 kg. Siliconized mono ammonium phosphate dry
chemical wall mounted multi- purpose portable fire extinguisher
complete with hose and horn, wall bracket, UL listed and FM
approved.
2 set/s
13.2.5 Valves and Accessories
1
ø100 mm Alarm Check Valve Assembly c/w pressure gages,
switch, alarm, gong, retard chamber, trimmings and other
standard accessories
1 set/s
OS&Y Gate Valve w/ monitor switch
2 100 mmø 1 set/s
3 Fire Dept. Connection, 100 x 65 x 65 ø 1 set/s
Check valve
4 100mmø 1 set/s
Flushing Connection
5 80 mm ø 4 set/s
6 Inspector Test Connection, ø25 mm 1 set/s
Mechanical Groove Coupling,
7 ø100 mm 2 set/s
8 Fire hose Valve, 40mmø 1 set/s
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Cargo Terminal Building / Special Construction Page 34 / 53
Page 116
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
13.2.6 Miscellaneous
1 Splash Block 1 lot
2 Painting 27 sq.m.
Sub - Total
TOTAL
Cargo Terminal Building / Special Construction Page 35 / 53
Page 117
13 SPECIAL CONSTRUCTION
13.1 Building Management System
1To control and monitor status AHU'S, VAV'S, Exhaust Fans and
accessories113 pt
Sub - Total
TOTAL
ITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COST
Administration Building / Special Construction Page 36 of 53
Page 118
13 SPECIAL CONSTRUCTION
13.1 Building Management System
1To control and monitor status AHU'S, VAV'S, Exhaust Fans and
accessories62 pt
Sub - Total
13.2 Fire Protection System
13.2.1 Piping System
Black Steel Pipe, ERW schedule 40 with fitting and support
1 100 mm ø 24 l.m.
2 80 mm ø 18 l.m.
3 65 mm ø 18 l.m.
4 50 mm ø 24 l.m.
5 40 mm ø 30 l.m.
6 32 mm ø 6 l.m.
7 25 mm ø 102 l.m.
13.2.2 Sprinkler Heads, k = 5.6 , 155˚ F temp rating
1 Pendent 42 set/s
2 Sidewall 2 set/s
3Sprinkler reserve cabinet with spare sprinkler heads: (12
pendent and wrench)1 set/s
13.2.3 Fire Hose Cabinet
1
Surface Mounted Type / Class III (BI. FHCassembly) : Fire hose
cabinet made from gauge 18 BI steel construction with glass
door, continuous steel hinge. Cabinet shall contain ø40
polyurethane singled lined synthetic jacket hose, brass nipple
and coupling. Hose rack swivel type with pin and water stop.
NST thread for fire hose. Cabinet to contain one (1) 4.5 kg abc
dry chemical extinguisher.
2 set/s
13.2.4 Fire Extinguisher
1
FE-1 : 4.5 kg. Siliconized mono ammonium phosphate dry
chemical wall mounted multi- purpose portable fire extinguisher
complete with hose and horn, wall bracket, UL listed and FM
approved.
6 set/s
13.2.5 Valves and Accessories
1
ø80 mm Alarm Check Valve Assembly c/w pressure gapes,
switch, alarm gong, retard chamber, trimmings and other
standard accessories
1 set/s
OS&Y Gate Valve w/ monitor switch
2 80 mmø 1 set/s
3 Fire Dept. Connection, 100 x 65 x 65 ø 1 set/s
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
ITEM NO. DESCRIPTIONESTIMATED
QTYUNIT UNIT COST TOTAL COST
Crash Fire Rescue Building / Special Construction Page 37 of 53
Page 119
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
ITEM NO. DESCRIPTIONESTIMATED
QTYUNIT UNIT COST TOTAL COST
Zone control Valve Assembly w/ supervisory switch
4 ø80mm 1 set/s
5 ø50mm 2 set/s
Check valve
6 100mmø 1 set/s
7 25mmø 3 set/s
8 Inspector Test Connection, ø25 mm 2 set/s
Mechanical Groove Coupling
9 ø80 mm 3 set/s
Gate Valve
10 32mmø 3 set/s
13.2.6 Miscellaneous
1 Sight Glass , 25 mmø 3 set/s
2 Splash Block 2 lot
3 Painting 40 sq.m.
Sub - Total
TOTAL
Crash Fire Rescue Building / Special Construction Page 38 of 53
Page 120
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
13.2.1 Piping System
Black Steel Pipe, ERW schedule 40 with fitting and support
1 150 mm ø 12 l.m.
2 80 mm ø 130 l.m.
3 32 mm ø 148 l.m.
4 25 mm ø 18 l.m.
13.2.2 Sprinkler Heads, k = 5.6 , 155˚ F temp rating
1 Pendent 5 set/s
2 Upright 33 set/s
3Sprinkler reserve cabinet with spare sprinkler heads: (12
pendent and wrench)1 set/s
13.2.3 Fire Hose Cabinet
1
Recessed Mounted Type / Class II (BI. FHCassembly): Fire
hose cabinet made from gage 18 bi steel construction with glass
door, continuous steel hinge. Cabinet shall contain ø40 cast
brass angle valve with 30 m of ø40 polyurethane singled lined
synthetic jacket hose, brass nipple and coupling. Hose rack
swivel type with pin and water stop. NST thread for fire hose.
Cabinet to contain one (1) 4.5 kg abc dry chemical extinguisher.
1 set/s
13.2.4 Fire Extinguisher
1
FE-1 : 4.5 kg. Siliconized mono ammonium phosphate dry
chemical wall mounted multi- purpose portable fire extinguisher
complete with hose and horn, wall bracket, UL listed and FM
approved.
5 set/s
13.2.5 Valves and Accessories
1
ø150 mm Alarm Check Valve Assembly c/w pressure gages,
switch, alarm gong, retard chamber, trimmings and other
standard accessories
1 set/s
OS&Y Gate Valve w/ monitor switch
2 150mmø 1 set/s
3 Fire Dept. Connection, 100 x 65 x 65 ø 1 set/s
Check valve
4 100mmø 1 set/s
Flushing Connection
5 25 mm ø 4 set/s
6 Inspector Test Connection, ø25 mm 1 set/s
Mechanical Groove Coupling,
7 ø150 mm 1 set/s
8 ø80 mm 3 set/s
Fire hose Valve,
9 40mmø 5 set/s
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Maintenance Buillding / Special Construction Page 39 of 53
Page 121
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
13.2.6 Miscellaneous
1 Splash Block 1 lot
2 Painting 70 sq.m.
Sub - Total
TOTAL
Maintenance Buillding / Special Construction Page 40 of 53
Page 122
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
13.2.1 Piping System
Black Steel Pipe, ERW schedule 40 with fitting and support
1 65 mm ø 12 l.m.
2 40 mm ø 30 l.m.
3 32 mm ø 6 l.m.
4 25 mm ø 12 l.m.
13.2.2 Sprinkler Heads, k = 5.6 , 155˚ F temp rating
1 Pendent, Standard spray, k= 5.6, 57° C temp rating 4 set/s
13.2.3 Fire Hose Cabinet
1
Recessed Mounted Type / Class II (BI. FHCassembly): Fire
hose cabinet made from gage 18 bi steel construction with glass
door, continuous steel hinge. Cabinet shall contain ø40 cast
brass angle valve with 30 m of ø40 polyurethane singled lined
synthetic jacket hose, brass nipple and coupling. Hose rack
swivel type with pin and water stop. NST thread for fire hose.
Cabinet to contain one (1) 4.5 kg abc dry chemical extinguisher.
1 set/s
13.2.4 Fire Extinguisher
1
FE-1 : 4.5 kg. Siliconized mono ammonium phosphate dry
chemical wall mounted multi- purpose portable fire extinguisher
complete with hose and horn, wall bracket, UL listed and FM
approved.
1 set/s
2
FE-2 : 4.5 kg. Carbon Dioxide portable fire extinguisher
complete with hose and horn, wall bracket, UL listed and FM
approved.
2 set/s
3
FE-3 : 22.7 kg. Wheeled Carbon Dioxide portable fire
extinguisher complete with hose and horn, wall bracket, UL
listed and FM approved.
4 set/s
13.2.5 Valves and Accessories
1
Ø65 mm Alarm Check Valve Assembly c/w pressure gages,
switch, alarm gong, retard chamber, trimmings and other
standard accessories.
1 set/s
OS&Y Gate Valve w/ monitor switch
2 65 mmø 1 set/s
Mechanical Groove Coupling,
3 ø65 mm 2 set/s
4 Fire hose Valve, 40mmø 1 set/s
13.2.6 Miscellaneous
1 Painting 25 sq.m.
Sub - Total
TOTAL
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Power House Building / Special Construction Page 41 of 53
Page 123
13 SPECIAL CONSTRUCTION
13.1 Building Management System
1To control and monitor status AHU'S, VAV'S, Exhaust Fans and
accessories182 pt
Sub - Total
13.2 Fire Protection System
13.2.1 Piping System
Black Steel Pipe, ERW schedule 40 with fitting and support
1 150 mm ø 18 l.m.
2 100 mm ø 54 l.m.
3 80 mm ø 12 l.m.
4 65 mm ø 6 l.m.
5 50 mm ø 36 l.m.
6 40 mm ø 42 l.m.
7 32 mm ø 48 l.m.
8 25 mm ø 216 l.m.
13.2.2 Sprinkler Heads, k = 5.6 , 155˚ F temp rating
1 Pendent 75 set/s
2 Sidewall 6 set/s
3Sprinkler reserve cabinet with spare sprinkler heads: (12
pendent and wrench)1 set/s
13.2.3 Fire Hose Cabinet
1
Recessed Mounted Type / Class III (FCH-2) : Fire Hose cabinet
made from gauge 18 BI steel construction with glass door,
continuous steel hinge. Cabinet shall contain ø40 cast brass
angle valve with 30m of ø40 polyurethane singled lined synthetic
jacket hose, brass nipple and coupling. Hose rack swivel type
with pin and water stop. NST thread for fire hose. Cabinet to
contain one (1) 4.5 kg abc dry chemical extinguisher
5 set/s
13.2.4 Fire Extinguisher
1
FE-1 : 4.5 kg. Siliconized mono ammonium phosphate dry
chemical wall mounted multi- purpose portable fire extinguisher
complete with hose and horn, wall bracket, UL listed and FM
approved.
13 set/s
2
FE-2 : 4.5 kg. Carbon Dioxide portable fire extinguisher
complete with hose and horn, wall bracket, UL listed and FM
approved.
4 set/s
13.2.5 Valves and Accessories
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Air Traffic Control Tower Building / Special Construction Page 42 of 53
Page 124
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
1
ø100 mm Alarm Check Valve Assembly c/w pressure gages,
switch, alarm, gong, retard chamber, trimmings and other
standard accessories
1 set/s
OS&Y Gate Valve w/ monitor switch
2 100 mmø 1 set/s
3 Fire Dept. Connection, 100 x 65 x 65 ø 1 set/s
Zone control Valve Assembly w/ supervisory switch
4 ø100mm 1 set/s
Flow Switch
5 ø50mm 5 set/s
6 Inspector Test Connection, ø25 mm 2 set/s
7 Mechanical Groove Coupling,
ø100 mm 3 set/s
13.2.6 Miscellaneous
1 Splash Block 2 lot
2 Painting 125 sq.m.
13.2.7 FM 200 Fire Suppression System
1
Supply and Installation of Fire Suppression System (FM-200),
Including Cylinder Assemblies 215lbs. capacity, Valves, Pipe &
Fittings, Wires & Conduit, Fire Alarm Control Panels & accessories
and other miscellaneous, consumable items to complete as
specified in Mechanical Drawings and Technical Specifications.
1 lot
Sub - Total
TOTAL
Air Traffic Control Tower Building / Special Construction Page 43 of 53
Page 125
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
13.2.1 Pumps
1FP-1 : Fire Pump, 1600 gpm, c/w controller and std accessories,
Electric Motor Driven1 set/s
2 JP - 1: Jockey Pump, 20 gpm, c/w controller and std accessories. 1 set/s
13.2.2 Piping System
13.2.2.1 Black Steel Pipe, ERW schedule 40 with fitting and support
1 250 mm ø 12 l.m.
2 200 mm ø 12 l.m.
3 150 mm ø 12 l.m.
4 50 mm ø 12 l.m.
13.2.3 Fire Extinguisher
1
FE-3 : 22.7 kg. Wheeled Carbon Dioxide portable fire
extinguisher complete with hose and horn, wall bracket, UL
listed and FM approved.
1 set/s
13.2.4 Valves and Accessories
Check valve
1 200mmø 2 set/s
2 50mmø 1 set/s
Flexible Coupling
3 250 mm dia. 2 set/s
4 50 mm dia. 2 set/s
Gate Valve
5 250 mm dia. 1 set/s
6 200 mm dia. 1 set/s
7 150 mm dia. 4 set/s
8 50 mm dia. 2 set/s
9 32mmø 1 set/s
10 Globe Valve, 150 mm dia. 1 set/s
Y - Strainer
11 250 mm dia. 1 set/s
12 50 mm dia. 1 set/s
13Manifold, 150 mmØ x 1.0 m lg complete with 3 - 65 mmØ Fire hose
valve1 set/s
14 Pressure Gauge 4 set/s
15 Air Release valve, 25 mm dia. 3 set/s
16 Ball Drip Valve, 25 mm dia. 1 set/s
17 Test Valve with cap and chain, 65 mm dia. 3 set/s
13.2.5 Miscellaneous
1 Painting 30 sq.m.
Sub - Total
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Pump Room and Water Reservoir / Special Construction Page 44 of 53
Page 126
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
TOTAL
Pump Room and Water Reservoir / Special Construction Page 45 of 53
Page 127
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
13.2.1 Fire Extinguisher
1
FE-1 : 4.5 kg. Siliconized mono ammonium phosphate dry
chemical wall mounted multi- purpose portable fire extinguisher
complete with hose and horn, wall bracket, UL listed and FM
approved.
1 set/s
Sub - Total
TOTAL
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Guard House (TS) / Special Construction Page 46 / 53
Page 128
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
13.2.1 Fire Extinguisher
1
FE-1 : 4.5 kg. Siliconized mono ammonium phosphate dry
chemical wall mounted multi- purpose portable fire extinguisher
complete with hose and horn, wall bracket, UL listed and FM
approved.
1 set/s
Sub - Total
TOTAL
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Guard House / Special Construction Page 47 / 53
Page 129
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
TOTAL
13.1 Building Management System
To Control and monitor status of Chillers and Chilled Water
Pumps.56 pt
Sub - Total
13.2 Fire Protection System
13.2.1 Fire Extinguisher
1
FE-3 : 22.7 kg. Wheeled Carbon Dioxide portable fire
extinguisher complete with hose and horn, wall bracket, UL
listed and FM approved.
1 set/s
Sub - Total
TOTAL
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Chilled Water Pumhouse / Special Construction Page 48 of 53
Page 130
13 SPECIAL CONSTRUCTION
13.2 Fire Protection System
13.2.1 Fire Extinguisher
FE-1 : 4.5 kg. Siliconized mono ammonium phosphate dry
chemical wall mounted multi- purpose portable fire extinguisher
complete with hose and horn, wall bracket, UL listed and FM
approved.
1 set/s
Sub - Total
TOTAL
BILL OF QUANTITIES
BICOL INTERNATIONAL AIRPORT DEVELOPMENT PROJECT
Daraga, Albay
UNIT COST TOTAL COSTITEM NO. DESCRIPTIONESTIMATED
QTYUNIT
Chlorination House 1 / Special Construction Page 49 / 53