BI day 2000 08/12/ 00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara G. Vismara Present situation Proposals Beam parameters Technical solution Beam measurements Conclusions
14

BI day 2000 08/12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara Present situation Proposals Beam parameters Technical solution.

Jan 29, 2016

Download

Documents

Scot Clark
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BI day 2000 08/12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.

BI day 2000 08/12/001

PIPOS Project (TT2 & TT10)(Beam performances)

PIPOS Project (TT2 & TT10)(Beam performances)

G. VismaraG. Vismara

Present situation Proposals Beam parameters Technical solution Beam measurements Conclusions

Page 2: BI day 2000 08/12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.

BI day 2000 08/12/002

Present situationPresent situation

- No Bpm’s in TT2- No Bpm’s in TT2

- 7 BPM’s in TT10- 7 BPM’s in TT10

- TLPOS electronics:- TLPOS electronics: Is not conceived to measure

heavy ions and LHC beams Requires gain switching Obsolete components Difficult maintenance

Page 3: BI day 2000 08/12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.

BI day 2000 08/12/003

ProposalsProposals

Studies & specifications G.Arduini & M.Giovannozzi

Steering optimization requires: 6 BPM’s in TT2 14 BPM’s in TT10

Electronics in BA269 (50%) & BA1 (50%) Reduced cost for cables & G.P. equipment's Active electronics present in the tunnel Inconvenience: BPCL-1006 difficult to access

(on opposite side of the custom door)

Page 4: BI day 2000 08/12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.

BI day 2000 08/12/004

BPM layoutBPM layout

BPCK replaced by BPCLfrom TI12 & 18 and TT70

Electrodes Placed on hor. & vert. axesAperture ± 66.5 mm

Page 5: BI day 2000 08/12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.

BI day 2000 08/12/005

Beam TypesBeam Types

Fix target protons 2000 bunches spaced by 5 ns, 1.7 ns wide

Heavy ions for Fix target 16 bunches spaced by 131 ns, 15 ns wide

LHC single / 84 bunch spaced by 25 ns, 2.1 ns wide

Heavy ions for LHC 4 bunches spaced by 125 ns, 2.4 ns wide

Special beams 1,8,16 bunches spaced by 262 ns, 15 ns wide

Page 6: BI day 2000 08/12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.

BI day 2000 08/12/006

Frequency Spectrum-100

-80

-60

-40

-20

0

20

40

0 100 200 300 400 500 600

MHz

dBV

Fix Target (Max)

LHC (Max)

Special beam (min)

Heavy I ons (min)

97.5 dB

Dynamic & frequency spectrumDynamic & frequency spectrum

f0 = 22.8 MHz

f0 = 200 MHz

Page 7: BI day 2000 08/12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.

BI day 2000 08/12/007

LPFilter

LPFilter

A

B

LogampI to V

Converter

Diff.Ampli

Position = K * VoutLogamp

I to VConverter

Logarithmic normalizationLogarithmic normalization

A spectral line is selected, compressed by a logarithmic amplifier, filtered and applied to a differential amplifier.

The position response is Pos. [log(A/B)] = [log(A)-log(B)] (Vout)

where Vout is the voltage difference between the log-amp outputs

BPFilter

BPFilter

Page 8: BI day 2000 08/12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.

BI day 2000 08/12/008

New generation circuits use several cascaded limiting amplifiers, with fix gain and wide bandwidth. Full wave rms detectors are applied among each stage and by summing theirs output signals, a good approximation to a logarithmic transfer function is obtained.Input dynamic range : >90 dBInput noise: < 1.5 nV/HzNon conformance lin.: < 0.3 dBLimiter Bandwidth: D.C. to >2 GHzVideo Bandwidth: D.C. to 30 MHz

12dB

Full-waveDetector

Ampli-limiter

+LimiterOut

-

Log- amp. Out

+I n-

12 dB

Full-waveDetector

Ampli-limiter

12 dB

Full-waveDetector

Ampli-limiter

12 dB

Full-waveDetector

Ampli-limiter

12 dB

Full-waveDetector

Ampli-limiter-80 -60 -40 -20 0 dBm

.4

.8

1.2

1.6

2.0

0

1.0

-1.0

2.0

-2.0

dB

V

Logarithmic amplifier description

Logarithmic amplifier description

Page 9: BI day 2000 08/12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.

BI day 2000 08/12/009

Beam signals (Heavy Ions)Beam signals (Heavy Ions)

H = 500 ns/div

V = 200 mV/div

Output Level = -51.7 dBV

for 2*1010 charge/16 bunches

H = 500 ns/divV = 20 mV/div 1.8 mm/divResolution= 85 m (V plane)for 1 s integration time

H = 500 ns/divV = 20 mV/div 1.8 mm/divResolution= 85 m (V plane)for 1 s integration time

1 s 1 s

22 MHz BP filter22 MHz BP filter

Page 10: BI day 2000 08/12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.

BI day 2000 08/12/0010

Calibration signal (Sgl LHC bunch)

Calibration signal (Sgl LHC bunch)

H = 200 ns/divV = 200 mV/divOutput level = -37.8 dBVfor 1*1010 p/bunch

H = 100 ns/divV = 10 mV/div .9 mm/divResolution = 45 m over 100 ns integration time

22 MHz BP filter22 MHz BP filter

100 ns

100 ns

Page 11: BI day 2000 08/12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.

BI day 2000 08/12/0011

Calibration signal (Fix Target)

Calibration signal (Fix Target)

H = .5 s/divV = 200 mV/divOutput Level = -37.2 dBVfor .2*1010 p/b and 500 b

H = .5 s/divV = 10 mV/div .9 mm/divResolution = 25 m for 1 s integration time

Single channel (-D)Single channel (-D) Difference (position) (U-D)Difference (position) (U-D)

200 MHz BP filter200 MHz BP filter

1 s1 s1 s1 s

Page 12: BI day 2000 08/12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.

BI day 2000 08/12/0012

Position errors & resolutions (rms)

Position errors & resolutions (rms)

Non-conformity to log function:Position dependence versus intensity:

Zero for a centered beamUp to 250 m for a 11 mm off-center beam

200 MHz channel:Fix Target: 25 m/ 1010 p/b and > 400 bunchesLHC : 40 m/1010 p/b and 84 bunches

22 MHz channel: LHC single: 50 m/1010 p/bHeavy Ions (Fix Target): 50 m/1010 Charges/bSpecial : ??

Page 13: BI day 2000 08/12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.

BI day 2000 08/12/0013

Digitization & AcquisitionDigitization & Acquisition

Log-amp signals (BW < 4 MHz) are send to the auxiliary buildings, via coaxial cables

A modified version of MoposMopos digitizer, with integrator and 14 bit ADC

To improve S/N ratio two integration times are implemented (100 ns and 1 s)

Acquisition is identical to Mopos Mopos system (VME power PC & PMC MACI)

Page 14: BI day 2000 08/12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.

BI day 2000 08/12/0016

ConclusionsConclusions

A special effort has been done to reduce the cost as much as possibleInvestment per channel still extremely low

cables and digital electronics & services represent the largest part of the budget (~78%)

Schedule: TT2 line will be put into operation current 2001 and TT10 after 2001/02 shut-down