  • A Technical report on the study of

    Manufacture & Assembly of Turbo Generator

    Training Incharge: Submitted By:

    Mr.Rajendra Kumar Manish Snehi

    Proj. Guide: Mr. S K Singh Enroll. No.-11115051

    Post-SDGM (BL-1) Btech(EE 4th Yr.)

    BHEL, Haridwar IIT ROORKEE

  • ACKNOWLEDGEMENT

    I acknowledge the cordial assistance and guidance provided to

    me from several rather unexpected spheres during the course

    of this six weeks of study.It would be my pleasure to express

    my gratitude to each and every one of them.

    I am extremely thankful to Mr. RAJENDRA KUMAR for

    providing me with an opportunity to undergo training under

    his guidance and imparting me a very deep knowledge of

    practice aspect of industrial work culture.

    I express my thanks and gratitude to Mr. Satish k Singh and

    other authorities of BHEL for instructing me to during whole

    training process in this organization and letting me to gain

    some work experience.

  • Table of Contents

    1. Introduction

    2. Coil & insulation manufacturing shop(block-4)

    3. Electrical machine block(Block 1)

    4. Manufacturing Process of turbo generator

    5. Introduction to 500 MW Turbo Generator

    6. Constructional Features of core

    7. Constructional feature of stator body

    8. Constructional feature of rotor

    9. Constructional features of winding

    10. Working Principle

    11. Cooling System

    12. Excitation system

    13. Electrical Generator Protection

    14. Conclusion

  • INTRODUCTION

    One of the Indias largest manufacturing and engineering enterprise in energy

    specific infrastructure today, a 40 odd years ago,leading the way in indigenously

    developes Heavy electrical equipment Plant , that has been well recognized as a

    great arena of performance .BHEL manufactures a range of up to 30 general

    product,over 180 products and feeds to the major sector of the

    indian markets, Transportation, Power transmission and generation

    industry, Telecom,energy sector. Its wide network has four Power

    Sector regional centre,14 manufacturing divisions, 18 regional

    offices, eight service centre, over 100 projects sites making the

    company enable to sincerely cater its customers providing them

    appropriate products, enhanced services and system at reasonable

    prices. This higher reliability and quality outcomes are because of

    greater emphasis on engineering, design, producing at international

    levels with best technologies of world and the technologies of its

    own R&D centre.

    Feature of BHEL

    More than 90000 MW of power generation for all the varied sphere

    houses of power consumers.

    2,25,000 MVA of transformer capacity and all equipment in

    transmission and distribution network of upto 400 KV of AC& DC.

    25000 motors been supplied with drive control system to Refineries,

    power projects, aluminum, Petrochemical, fertilizers, cement plants

    Steel, Fertilizer.

    Over 12000 km of railway network been fed in form of Traction electric

    and AC&DC locos

    Over one million valves to power plants and other industries has been

    supplied.

  • HEEP

    HEEP, (Heavy Electrical Equipment Plant) manufactures electrical

    devices for the Turbo Generators production.In HEEP there is

    production of turbo generator, exciter, turbine, AC/DC motor, etc. HEEP,

    started the production from January 1967. Over 40%, electrical energy

    generated from the power equipment by BHEL, Haridwar.

    COIL & INSULATION MANUFACTURING SHOP (BLOCK-4):-

    BAY-1: Bar winding shop, manufactures stator winding of generator.

    BAY-2: Manufactures heavy duty generator stator bars with CNC

    machine No. 3-464 i.e. Robol bar centre.

  • BAY-3: Insulation detail shop, Manufactures hard insulation & then

    machines insulation of hard part (Glass textolite) such as packing

    washers ,wedges, insulation boxes etc.

    Bar Shop: Manufacture turbo generators stator winding coil.

    Why it is called a bar:-

    It is difficult to manufacture, wind in and handle the stator slot for

    higher generation capacity generators because of heavy weight and

    bigger size.So coil is made in two parts. One part is bottom part of coil

    called bottom or lower bar and other part of coil is upper bar or top bar.

    TYPES OF GENERATOR:

    The generator classified,as based upon the used cooling system in it

    such as: TARI, THRI, THDD, THDF, THDI, THW, THFF.

    T= First word denotes type of generator i.e. turbo generator or hydro

    generator.

    A/H= Second word stands for medium used for the cooling of rotor as

    air or hydrogen gas.

    R/D/I/F= Third word signifies cooling of rotor as radial, forced,indirect,

    direct.

  • D/I/F= Last word signifies type of cooling if stator as indirect cooling,

    forced cooling, direct cooling.

    W= Medium being used for cooling of stator coil as water

    Resin System

    Thermo reactive or Rich resin insulation system :

    Bond content of resin is 35-37% in this insulation system. The raw

    material required preservation and working on temperature 20-25C and

    are ready to use. Its shelf life is one year when kept at temperature 20C

    which is increased from when at a temperature of 5C.

    Micalastic or Poor Resin system :

    Bond content in this system of resin is 5-7% and accelerator treatment

    is used for preparing insulating material. No requirement of temperature

    control. The insulating material, applied on job and then is impregnated

    in resin.

    MANUFACTURING OF BARS:

    Some points in manufacturing process are in brief below-

    Conductor Cutting:

    This is done by an automatic CNC machine. In this process number of

    pieces of pre insulated copper conductor is cut in required length (length

    given in drawing as per design).And then insulation is removed out from

    both side of copper conductor.

  • Transposition of conductor:

    Transposition refers to changing/shifting position of conductors in

    active core (slot) part .The required number of conductors after being

    cut,is arranged in the comb in staggered manner and then with help of

    bending die, bend are given to the conductors at needed distance.The

    conductors are then taken out of the comb & die and are placed with

    their end with the line for transposition to be carried out.For making

    another half of the bar same is repeated. Then the two halves are

    overlapped with a spacer placed in between.

    Crossover insulation:

    Due to mechanical bending in die the pre insulation may be damaged,

    hence at crossover position the spacers are provided. A filler material

    (insulating putty of moulding mecanite ),to maintain the rectangular

    shape and to cover the difference of levels of conductor , is provided

    along height of bars is provided.

    Stack Consolidation:

    The core of bar is pressed in a press(closed box) under high pressure

    (varies from product to product) and a temperature of 160C for a given

    period. Dimensions are checked after consolidated stack is withdrawn

    from press.

    Inter Strand Short Test:

    The consolidated bar stack is tested for short between conductors, if

    found then it is rectified.

    Forming:

    The straight bar stack is formed as per overhang profile (as per design).

    After forming overhang portion is consolidated.

    The straight bar stack is bend at the two end portion as per requirement

    design.

    Brazing of coil Lugs:

    The electrical connection contact in water box for inlet or outlet are

    brazed in case of water cooled generator bars. The water box is also

    known as contact slew. The contact slew is brazed with the help of

  • copper aluminium alloy rod. This rod is brought to touch to hot contact

    slew and after melting it fill the spaced, in this manner the bar is brazed.

    Nitrogen leak test:

    For a given duration nitrogen flow test, pressure test and nitrogen leak

    test is tested.

    Thermal Shock Test:

    To ensure thermal expansion and contraction in joints, thermal shock

    test is done by 23 cycle of cold and hot water flow. The temperature of

    hot water is about 80`C and the cold water is 30`C. By doing this test if

    there is any fracture or voids at the joints are present , then it exposed

    and easily detected.

    Helium leakage test:

    This test is performed after the thermal shock test. With the help of this

    test we can found very minute leakage if present. In this test the helium

    gas pipe is connected at one end and the other end is closed. After this

    we insert a helium spectrometer to measure the pressure of the helium

    gas.

    Baking and Impregnation :

    Micalastic system:

    For poor resin system,insulated bars for filling of air gaps are dipped in

    heated resin.After draining extra resin it is baked under required

    pressure and tempreature

    Thermo reactive system:

    For reach resin system bar is pressed in closed box and baked under

    required temperature and pressure.

    VPI Micalastic System :

    Bar impregnated in resin and fixture with box is baked under required

    temperature.

  • VIP Micalastic system :

    Separate bar heated in vacuum and then dipped in resin. After taking

    out is pressed in a closed box and baked at given temperature and

    pressure.

    Insulation:

    Number of layer is provided in insulation to increase the thickness of

    insulation.

    Finishing:

    Baked bars are then smoothened and calibrated for dimensions.

    Conducting varnish coating:

    End corona Protection:

    To minimize end corona and prevent discharge, gray semiconducting

    varnish applied on core ends.

    OCP (Outer Corona Protection) Coating

    Black semiconducting varnish is applied.

    Testing:

    Tan0 Test: This test ensure quality of dielectric material.

    H.V. Test: Bars are tested momentarily for high voltages.

    Dispatched for winding:

    Bars sent to block-1 for winding with preserved in polythene sleves.

  • ELECTRICAL MACHINE (BLCOK-1):

    INTRODUCTION:-

    1- Block first is design to manufacture Turbo Generators.

    2- The block consist of 4 bays-Bay 1(36*482meters), Bay-2(36*360

    meters), and Bay-3 & Bay-4(of size 24*360 meters each).

    3- Testing facilities of turbo generator are available in Bay-2

    4- There is a special test bed area for testing of T.G. of capacity of

    500MW unit sizes.

    MANUFACTURING PROCESS OF TURBO GENERATOR:-

    Fabricated components are received in respective machine sections from-

    Fabrications blocks (block-2,5, 6, 8), while castings and

    forgings are received from sister unit CFFP and other indigenous and

    foreign sources for turbo generators. Stampings are received from

    stampings manufacture block, block-4and coils bars, insulating details

    and sheet.

    Metal components are received from coils and insulation manufacture

    and apparatus and control gear box (Blok-4).

    TURBO GENERATOR:-

    The turbo-generator is common-shaft excitation AC synchronous

    generator with 3phases, 2 poles or with 3 phases, 4 poles.

    BHEL,HARIDWAR makes turbo generators that have the brushless

    excitation mechanism which has been explained in the NTPC report.

    BHEL till today has manufactured Turbo-Generators of up to 560 MW

    and is working of going up to 660 MW. It also have capability to take up

    the manufacture of TG up to 1000 MW suitable for gas based and

    combined cycle power generation and thermal power generation, gas

  • based also for diverse industrial applications like cement, Paper,

    Fertilizers, Sugars Petrochemical, Fertilizers, Rayon Industries, etc.

    500MW turbo generator at a glance-

    2-pole machine with the following features:-

    1- Direct cooling of stator winding with water.

    2- Direct hydrogen cooling for rotor.

    3- Micalastic insulation system.

    4- Spring mounted core housing for effective transmission of

    vibration.

    5- Brushless excitation system.

    6- Vertical hydrogen coolers.

    Salient technical data-

    1- Rated output :588MVA, 500MW

    2- Terminal voltage :21KV

    3- Rated stator current: 16KA

    4- Rated frequency :50Hz

    5- Rated power factor: 0.85 lag

    6- Efficiency : 98.55%

    Manufacturing process:-

    1- Stator-

    The stator is assembled as six parts. It is made up of steel with 4.5% of

    silica. Silica decreases hysteresis loss. The sheets are cut at 30 degree

    angles. The sheets then are punched with man drill holes, support rod

    slots and slots for the conductors. This process is called notching and

    the cutting part as shearing. The sheets are then varnished after

    blanking or smoothening of the surface to increase insulation. A bunch

  • of these sheets are stacked together and compressed onto each other so

    that air gaps are eliminated. These stacks are then assembled with a

    small air gap differentiating each stack,ventilating machine. After the

    assembly of the stator shell, the inside of the slots are varnished. The

    sheets of the core are varnished with xylor, at a temperature of 30-400

    degrees Celsius. It is heated, coated then cooled. After the core is

    assembled , the winding is placed in the stator. The winding type

    depends upon the power required and the current required to be

    produced. The core and the winding are separated by an insulation

    called HGL. This prevents the shorting of the core and winding .The

    winding in the front and back are also separated by this material and

    they are joined as per the winding required (lap or wave) using glass-o-

    flex, a pink ribbon like material. The windings are insulated. These

    windings are then painted to obtain a the stator, where the power is

    generated. The windings are always inserted from the exciter end, one is

    clockwise and the other anti-clockwise.

    2-The Rotor-

    The rotor comprises of following component:

    1- Rotor shaft

    2- Rotor winding

  • 3- Rotor wedges and other locating parts for winding

    4- Retaining ring

    5- Fans

    6- Field lead connections

    The rotor is carved out with the slots into a cylindrical shape from a large

    block of metal using Lathe heavy machines. The rotor consists of 2 ends

    The turbine coupling end

    The exciter end

    The turbine end has a coupling shaft which is circular in shape and has

    slots.

    The exciter end has an input lead and an output lead which are used to

    give the rotor DC input for the excitation of the rotating field.

  • The ends of each rotor consist of bearings. These bearings are

    placed so as to support the shaft. The bearing consists of oil which

    is used to support a thin film over the surface. This lubricates and

    decreases friction and losses. The bearing has top end and bottom

    end and is stationary. The top end is used to supply the oil. After

    the construction, the winding is fitted into the slots. The slots and

    windings are separated by HGL or hard glass lamination which

    insulates the core from the cable. The rotor is constructed so as to

    obtain brushless excitation. The complete rotor along with the

    excitation mechanism is mounted on the shaft and is balanced for

    synchronous speed. For better balancing weight removal is done as

    that is a better option to adding weight to the system. The rotor

    ends are provided with induction motor fans which are used for

    cooling of the rotor winding. The winding is made up of 99.99 %

    copper.

  • WORKING PRINCIPLE:-

    One end of the alternator is coupled to the turbine and other end is

    coupled through the exciter. The whole assembly is on the shaft.

    Turbine act as a prime mover, the permanent magnet of the exciter

    creates a permanent magnetic field, which is cut by the rotor

    conductors. Making the formation of 3-phase power, this 3-phase

    power is fed to the thyristor controlled switches for rectification. The

    3-phase power is fed to main exciter, after that this 3-phase power

    is given to the diode wheel so it is produce the dc power. The dc

    power is given to the main alternator field without brushes and slip

    ring. Then alternating field is produce by the cut of rotor

    conductors making the production of emf by the FARADAYS LAW.

  • Cooling of the Alternator:-

    The machine needs to be cooled to avoid damage and for greater life.

    Heating causes insulation failure. Hence, cooling is a very important

    factor that needs to be taken care of. For cooling, the stator and rotor are

    provided with a ventilation to cool it down. Air gaps are provided

    throughout the machine. But for very high power machines

    natural cooling is insufficient so a cooling system is provided. For

    collection of hot air, a large chamber is provided. This air is cooled and

    recycled into the generator. The rotor of the alternator consists of fans

    powered by induction motors. They suck in the air and push it through

    to the cooling chamber. Another method is also used which is called

    hydrogen cooling. Hydrogen acts as ac coolant and the chamber is shut

    completely is filled with hydrogen. Hydrogen cools itself. The chamber is

    emptied each time the machine is stopped.

    TG TEST BED:-

    New LSTG [Large Scale Turbo Generator] TEST BED has been put up

    with indigenous know how in record time testing Turbo Generator of

    rating 500MW and above up to 1000MW. It caters to the most advanced

    requirement of testing by employing on line computer for data analysis.

  • Circuit Breakers:-

    By separating two contacts in medium such as SF6, having good

    arch quenching and dielectric properties current can be

    interrupted. After the contact seperates current flows through an

    arc and is interrupted when the arc is cooled by gas blast.Gas blast

    should be able to cool it swiftly so the temperature is reduced from

    20000K to 2000K in order to withstand transient recovery voltage

    after interruption.SF6 normally is used in HV circuit breaker(more

    than 52 kV).In this process arc energy is used to generate blast by

    thermal expansion and to accelerate circuit breaker on other

    hand.Over pressure by arc energy is linked with a pistonwhich

    accelerates moving part and increasing energy for tripping.

    This interrupting principle with increasing the energy delivery for

    tripping maintains the opening speed independent of current.This

    mechanism is more favorable in high current circuit breaker.

  • COOLING SYSTEM:-

    Cooling system is a very important part of the alternator. Mainly two

    types of cooling process is occur such as-

    1- Radial cooling

    2- Axial cooling

    Since the cooling system is divided three part such as-

    1- Hydrogen cooling

    2- Water cooling

    3- Air cooling

    Cooling system is used because dissipating the heat generated by

    various losses and to prolong the life of insulating material. In small

    generator natural cooling is adequate. In these machines cooling by

    natural sources is sufficient, but in large generators natural cooling

    is in sufficient, so in these generator air, water &hydrogen is done.

    Force air cooling is used for large machine. In this scheme air is

    first passed through cleaning filter and then forced through the

  • machine for cooling purpose. Air cooling system is better and

    necessary in 500MW & 600MW generator.

    EXCITATION SYSTEM:-

    Turbo generator is a doubly excited machine. Because its field

    winding is excited by dc source and its armature winding is

    connected to ac source. For dc excitation we need use the use of

    exciter. Hence there are three types of dc excitation-

    1- DC exciter

    2- Static excitation

    3- Brushless exciter

  • In BHEL organization brushless exciter is widely use because slip

    ring and brushes is absent and it is provide less losses so that its

    efficiency is high so we use the brushless exciter. The brushless

    exciter is used for generating the dc field which is used to fall on

    alternator of rotor. When the dc field is fall on the rotor and the

    rotor is directly connected to the turbine so that the turbine is

    rotate the rotor, the alternating field is generated by the rotor then

    due to the induction the alternating emf is generated in the stator

    core. These emf is received by the stator terminal those are called ac

    voltage.

    The brushless exciter has mainly two parts such has-

    1- Pilot exciter

    2- Main exciter

    In pilot exciter permanent magnet is used, which produce the

    permanent magnetic field. Three phase power from pilot exciter is

    fed to thyristor controlled bridge to main exciter. After rectification

    the controlled dc output is supplied to stationary field winding of

    main exciter.

  • ELECTRICAL GENERATOR PROTECTION:-

    Generator may be endangered by short circuit, ground

    fault, over voltage, under excitation and excessive thermal

    stresses. The following protective equipment is

    recommended such as

    1- Differential protection

    2- Stator ground fault protection

    3- Rotor ground fault protection

    4- Under excitation protection

    5- Over current protection

    6- Load unbalance protection

    7- Rise in voltage protection

    8- Under frequency protection

    9- Reverse power protection

    10-Over voltage protection

  • CONCLUSION:-

    Bharat Heavy electrical limited being the largest manufacturing and

    engineering public sector in india. The sector is an important part

    in turbo generators. The stator is assembled by the laminated

    sheets. We use the UNIVERSAL FORM FICTURE type bar which

    assemble all the straight part and the over hang at a time. The

    universal from facture type bar is more flexible and its life time

    more. We use the bar transposition for stator winding which is more

    advantages. BHEL has acquired the latest technology in the

    insulation system, the VACCUM IMPREGINATION system of

    insulation, which has various advantages like cost reduction with

    improve quality. Thus designed an manufactured start of turbo

    generator is used mostly in paper, sugar, cement, petrochemical,

    fertilizer, Rayon, industries. The architecture of BHEL, the interlink

    of various units and the way working of whole plant is controlled

    made me realize that engineering is not just structural description

    but greater part is planning and management.

    It has allowed us and an opportunity to get exposure to

    implementation of theoretical fundamentals.