START
Jan 12, 2016
STARTSTART
Index Map for NRBC
Index Map For Sangola Branch Canal (SBC)
Components of SBC Project
Main Canal & Branches Sangola Branch Canal (Br. V)
Main Canal Reach km 1 to 49 with Dy 13
Land Acquisition a) Earthwork
Earthwork b) CD works
Lining c) C.C. Lining
Structures d) Distributaries
Branch Canal
Land Acquisition Reach km 49 to 83 with Dy 14 to27
Earthwork a) Earthwork
Lining b) CD works
i) Branch No. I of NRBC c) C.C. Lining
ii) Branch No. III of NRBC d) Distributaries
iii) Sangola Branch Canal (Br. V) *
iv) Major distributories on NRBC Reach km 83 to 103 with Dy 28 to 38
Total lining a) Earthwork
Structures b) CD works
Distributories & Minors c) C.C. Lining
Land Acquisition d) Distributaries
Earthwork
Lining
Structures
The situation specific problems which compel the need for TAMC Services are as follows: a) Import and Use of Modern canal lining Technology from USA for carrying out the canal lining under water for the continuously flowing NRBC through out the year
b) Restrictions on use of natural sand and its replacement by crushed sand including concrete mix designs
c)Strong opposition from the farmers in existing established perennial irrigation belt under the pretext of adverse effects on their established economy as canal lining will reduce water supply to their established irrigation cropping pattern. This concerns vitally and needs intensified efforts in this regard, to make a dialogue with concerned farmers through frequent and consistent persuasion for eradicating the fear of concerned farmers, and
d)Regular and frequent (at least bimonthly or quarterly) review meetings of all concerned participants and stake holders by competent catalyst Agency for proper coordination and monitoring in light of above (a),(b) & (c)
Special Problems in SBC Project
Flow Chart
Proposed Work Plan Schedules
Annexure 1.1 Annexure 1.2 Annexure 1.3 Annexure 1.4
Performance Domain
In Place Lining Prototype Project
Coachella CanalImperial Country California
Canal Lining
Modified Equipment Version
CONSTRUCTION ACTIVITIES
Earthwork Trimming Discharging Water And Dredge Cuttings Equipment Position In- Place Lining Lining Upstream Vs Downstream Pressure Plates- Computer Monitoring Pvc Guide System Concrete Quality Control Concrete Conveyance System Concrete Joint Construction Concrete Slump Variations Concrete Mix Design Work Berm Elevation Of Canal Surface Water Slope Requirement
Key Associates oSBC is economical backbone for Sangola TehisiloIt is state level project funded from Central assistance.oBeing Republic Democracy , Key Associate consists ofA) Representatives of People 1.Member of Loksabha/ Rajyasabha representing the Sangola Tehisil.2.Member of Legislative Assembly/ Council representing Sanola Tehisil.B) Executive Officers1. Executive Director 2. Chief Engineer3. Superintending Engineer and 4. Executive EngineerC) Work awarded contractors D) Farmers