Top Banner
Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes www.ecy.wa.gov/beyondwaste Cheryl Smith Washington State Dept of Ecology NAHMMA Conference September 23, 2005
26

Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes Cheryl Smith Washington.

Dec 31, 2015

Download

Documents

Opal Barker
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing

Hazardous Materials and Wastes

www.ecy.wa.gov/beyondwaste

Cheryl SmithWashington State Dept of Ecology

NAHMMA ConferenceSeptember 23, 2005

Page 2: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

What is the Beyond Waste Project?

30-year statewide plan for

Decreasing solid and hazardous wastes Increasing recycling and reuse Reducing the use of toxic substances Properly managing those wastes that remain

Page 3: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

Five Myths√ If a product is on the shelf, it is safe

√ Existing laws and regulations provide adequate protection from toxics

√ Landfills solve the waste problem

√ Recycling solves the waste problem

√ Eliminating waste and toxics will be bad for the economy

Page 4: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

State Law PrioritiesSolid Waste Priorities

Waste reductionRecycling (source separated)Then, Disposal

Hazardous Waste PrioritiesWaste reductionRecyclingTreatment (physical, chemical, biological)IncinerationSolidification/stabilization treatmentLandfill

Page 5: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

PERCENT OF EXTRACTED

MATERIALS WASTED

94%99%

Extraction

Page 6: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

The Beyond Waste Vision

We can transition to a society where wastes are viewed as inefficient and where most wastes and

toxic substances have been eliminated.

This will contribute to environmental, economic and social vitality.

Page 7: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

5 Key Initiatives

1. Reduce industry'sindustry's toxic materials &

hazardous wastes

2. Reduce threats from small-volume

hazardous wastes & materials ((MRWMRW)

3. Make green buildinggreen building mainstream

4. Increase organicsorganics closed-loop recycling

5.5. MeasureMeasure progress regularly

Page 8: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

How we chose these 5 areas

Stakeholder Priorities Portions of waste stream Don’t try to do it all at once! Impacts (health & environment) Momentum and opportunity Interconnectedness Enhance economic competitiveness

Page 9: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

Portions of waste streamINDUSTRIES:1.1 million tons solid waste0.2 million tons haz waste16,000 tons of toxic chemicals

HAZ WASTES FROM HOUSEHOLDS AND SMALL GENERATOR BUSINESSES (MRW)

HHW estimated 1% of MSW by volumeSQG estimate=???

Page 10: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

Recommendations are Interconnected

For example, Compost in landscaping: Contributes to organics recycling

Helps meet green building standards

Reduces use of pesticides

Expands business opportunities for industries

Page 11: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

Strategies Align signals & resources

Find levers

Look “upstream”

Measure progress regularly

Page 12: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

Beyond Collection…Existing system is not sustainable

We have not yet created the system that will sustain us into the future

Beyond Waste lays out long-term goals for MRW that mean moving beyond collection

Page 13: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

Safer Products and Services: Most threats to human health and the environment have been eliminated by minimizing chemical hazards associated with the life cycles of products and services.

Page 14: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

Efficient Materials Management: Reuse and recycling are optimized for any remaining hazardous materials still in use as a collaborative system has been developed for safely and responsibly managing hazardous materials.

Page 15: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

Greater Economic Vitality: Economic sectors in Washington thrive in the domestic and global marketplace as hazardous materials are systematically eliminated from products and services. Consumer confidence has increased, risks and liabilities have decreased, and costs for managing wastes are reduced.

Page 16: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

MRW---In 5 Years

Product stewardship programs for paint and electronics

Environmentally preferable purchasing for several classes of products

Sales of mercury-containing products will decrease

Page 17: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

MRW 5-Yr Actions Focus on Priority substances &

Products First

State (& local) govt environmentally preferable purchasing

Product Stewardship efforts

Evaluate regulatory framework for long-term---base standards on risk, not amount

Full implementation of MRW Plans

Page 18: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

Priority Products & Substances

For first 5 years: Mercury Electronics PBDE Paints Selected Pesticides

AND, determine future priorities

Don’t try to do it all at once!

Page 19: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

MRW 5-Yr Actions Focus on Priority substances & Products First

State (& local) govt environmentally preferable purchasing

Product Stewardship efforts Evaluate regulatory framework for long-term---base

standards on risk, not amount

Full implementation of MRW Plans

Page 20: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

Govt Environmentally Preferable Purchasing

State govt EPP in the following areas: Automotive products and vehicles Grounds maintenance Electronic products Building materials Cleaning products Products with flame retardants

Page 21: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

MRW 5-Yr Actions Focus on Priority substances & Products First

State (& local) govt environmentally preferable purchasing

Product Stewardship efforts

Evaluate regulatory framework for long-term---base standards on risk, not amount

Full implementation of MRW Plans

Page 22: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

Product Stewardship Efforts Electronics product stewardship infrastructure

Paint product stewardship infrastructure

Take-back system for banned pesticides (non-ag)

Support legislation requiring mfrs of mercury-containing products to fund a collection & recycling infrastructure

Page 23: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

MRW 5-Yr Actions Focus on Priority substances & Products First

State (& local) govt environmentally preferable purchasing

Product Stewardship efforts

Evaluate regulatory framework for long-term---base standards on risk, not amount

Full implementation of MRW Plans

Page 24: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

Evaluate Regulatory FrameworkDevelop long-term proposal to revise state

laws and regs in 3 areas:

1. Graduated regulatory system based less on quantity and more on risk factors

2. Comprehensive regulatory system that removes barriers and provides incentives to reduce risk factors

3. Shift from waste-based focus to hazardous substance use and handling

Page 25: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

MRW 5-Yr Actions Focus on Priority substances & Products First

State (& local) govt environmentally preferable purchasing

Product Stewardship efforts

Evaluate regulatory framework for long-term---base standards on risk, not amount

Full implementation of MRW Plans

Page 26: Beyond Collection: Washington State’s Beyond Waste Strategy for Reducing Hazardous Materials and Wastes  Cheryl Smith Washington.

Implementation of Local MRW Plans Develop strategy to update any out-of-date

plans

Project future infrastructure needs in line with closed-loop recycling system

Provide assistance with plan update and implementation