Top Banner
BETTER SOLUTIONS KMS : PRESS KMS : PRESS Transport/Installation Transport/Installation 2006.08.30 2006.08.30
10

BETTER SOLUTIONS KMS : PRESS Transport/Installation 2006.08.30.

Mar 26, 2015

Download

Documents

Wyatt Leach
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BETTER SOLUTIONS KMS : PRESS Transport/Installation 2006.08.30.

BETTER SOLUTIONS

KMS : PRESS KMS : PRESS Transport/InstallationTransport/Installation

2006.08.302006.08.30

Page 2: BETTER SOLUTIONS KMS : PRESS Transport/Installation 2006.08.30.

1.1. Project Overview Project Overview

2.2. Project Execution ScheduleProject Execution Schedule

3.3. Ocean Transportation Ocean Transportation

4.4. River TransportationRiver Transportation

5.5. Inland TransportationInland Transportation

6. Site installation and commisioning6. Site installation and commisioning

Contents

BETTER SOLUTIONS

Page 3: BETTER SOLUTIONS KMS : PRESS Transport/Installation 2006.08.30.

BETTER SOLUTIONS

1.Project Overview

Manufacturer & Supplier : Rotem Company / WIA Corporation (Korea)

Site : KIA Motors Slovakia (Zilina, Teplicka site)

KMS Equipment List

Shipment Description WT(Ton) CBM FOB Date

1st shipment 5,400T Press & Auxiliaries 4,086 9,113 2005.09.30

2nd shipment 5,400T Press 2,814 6,104 2005.12.30

Total 6,890 15,217

Transport Schedule : Masan Rotterdam/Constanza Rinz Zilina (sea : 25~35d duration) (river : 15d) (land : 10d)

Installation/Commissioning : Press #1st + Aux.–‘05.12~’06.01 / ‘06.01~04 프레스 #2nd – ‘06.03~05 / ‘06.05~07

Page 4: BETTER SOLUTIONS KMS : PRESS Transport/Installation 2006.08.30.

BETTER SOLUTIONS

2. Project Execution Schedule2. Project Execution Schedule

Schedule’05 year ’06 year

junjuly

aug

sep

oct nov dec jan feb mar apr may jun july aug

presentation(6/29)

Proposal letter

Final quotation

contracting

Contract (exec.co)

final Packing list

Transportation(1st)

Installation/trial(1st)

Transportation(2nd)

Installation/trial(2nd)

Page 5: BETTER SOLUTIONS KMS : PRESS Transport/Installation 2006.08.30.

BETTER SOLUTIONS

3. Detail schedule for ocean transportation

shipment

(changwon)

trucking

masan

(to load)

loading

(bulker)

Ocean transpor

t

(bulker)

discharging

(rotterdam)

barging

Barge transport

(danube)

discharging,on truck,custom

clearance

(rinz)

Inland transport

(rinz-zilina)

KMS

Deliver to

factory

custom clearance

(zilina)

Installation &

commisioning

25

3

Normal : 61d

short : 55d

35

13

4Transport duration

(departure~custom clearance)

33

Rotem BMI(SSU)

Page 6: BETTER SOLUTIONS KMS : PRESS Transport/Installation 2006.08.30.

BETTER SOLUTIONS

3-1. Shipment scope

Requirement at the time of loading

party working scope

ROTEM

documents : Invoice, Packing list, export license, insurance

inland trucking & storaging

warehousing & inport shuttle

in time sailing (rotem & wia)

final cargo readiness : end of aug.

BMI(SSU)

charter vessel

berth arrangement

loading

issue B/L

transport shcedule management

Page 7: BETTER SOLUTIONS KMS : PRESS Transport/Installation 2006.08.30.

BETTER SOLUTIONS

3-2. Loading operation

loading operation

Page 8: BETTER SOLUTIONS KMS : PRESS Transport/Installation 2006.08.30.

BETTER SOLUTIONS

3-3. Route and duration of ocean transportation

Suez

Constanza

Rotterdam

Masan Typical Liner (35days)

Charter vessel (25days)

Page 9: BETTER SOLUTIONS KMS : PRESS Transport/Installation 2006.08.30.

BETTER SOLUTIONS

3-4.1 Vessel spec. & transit time (Typical Liner)

Vessel Type : Typical Liner

(Multi-purpose heavy lift)

Gross tonnage : 24,000Ton

Net tonnage : 11,000Ton

Length(Over All) : 200M

Breath(Mid) : 28M

Depth(Mid) : 15M

Mouldet Draft/Dwt : 11M/30Ton

Built : Year 2004

Classification : G. Lloyd + 100 A5 E

Cargo Hold : No.1~5 Hold with Tween Deck

Speed : 18~20 Knots

Page 10: BETTER SOLUTIONS KMS : PRESS Transport/Installation 2006.08.30.

BETTER SOLUTIONS

3-4.2 Vessel spec. & transit time (Charter Vessel)

Vessel Type : Multi-purpose heavy lift

Gross tonnage : 9,000Ton

Net tonnage : 5,000Ton

Length(Over All) : 120M

Breath(Mid) : 20M

Depth(Mid) : 12M

Mouldet Draft/Dwt : 9M/20Ton

Built : Year 2000

Classification : G. Lloyd + 100 A5 E3

Cargo Hold : No.1~2 Hold with Tween

Deck

Speed : 15 Knots