Beta-Robust Solutions for the Fuzzy Open Shop Scheduling

Jan 08, 2016

Download

Documents

inesgr35013

Talk given at IPMU 2014 conference
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • -Robust Solutions for the Fuzzy Open ShopScheduling

    Juan Jos Palacios1 Ins Gonzlez-Rodrguez2

    Camino R. Vela1 Jorge Puente1

    1Dept. of Computer Science,University of Oviedo (Spain)

    2Dept. of Mathematics, Statistics and Computing,University of Cantabria (Spain)

    IPMU 2014, July 1519

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 1 / 20

  • Outline

    1 Introduction

    2 The Fuzzy Open Shop Problem

    3 -Robust Schedules

    4 Are -Robust Schedules Actually Robust?

    5 Experimental Results

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 2 / 20

  • Motivation: Scheduling

    Scheduling: Plan de execution of tasks in resources (machines)under certain constraints in an optimal way.Traditional approach: Assume well-known deterministic input dataand optimise some performance measure.Drawback: Input variables are not well-known, may change,causing the optimal solution to be of little or no use at themoment of its execution.

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 3 / 20

  • Motivation: Robustness

    RobustnessA robust solution should still work satisfactorily when design variableschange slightly.

    Different approaches:Practical: Add slack times to task durations so solutionsperformance is not affected by delays.Minimax (regret): Construct solutions with best possibleperformance in worst case.-robustness Maximise the likelihood that a solutionsperformance is not worse than a given target in all cases.

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 4 / 20

  • Open Shop Scheduling Problem (OSP)

    Open shop scheduling problem:applications in testing components of electronic systems, medicaldiagnosis. . . :)increasing presence in the literature :)NP-complete in the general case!traditionally assumes perfect-deterministic information :(

    We would like to. . .incorporate uncertainty into data: fuzzy durationsfind robust solutions

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 5 / 20

  • Open Shop Scheduling Problem (OSP)

    p1 p2 p3

    p4 p5 p6

    p7 p8 p9

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 6 / 20

  • Open Shop Scheduling Problem (OSP)

    Job 1:

    Job 2:

    Job 3:

    p1 p2 p3

    p4 p5 p6

    p7 p8 p9

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 6 / 20

  • Open Shop Scheduling Problem (OSP)

    Machine 1 Machine 2 Machine 3

    p1 p2 p3

    p4 p5 p6

    p7 p8 p9

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 6 / 20

  • Open Shop Scheduling Problem (OSP)

    O||Cmaxn jobs: J1, . . . , Jn,m machines: M1, . . . ,Mm,mn tasks or operations: Ok : 1 k mn:

    I each belonging to one job and requiring one machine;I cannot overlap with other tasks in the same job or machine.

    objective: minimise the makespan Cmax (completion time of lasttask).

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 6 / 20

  • Uncertain Task Durations: Triangular Fuzzy Numbers

    Assume we only know:an interval of possible values for the duration [a1,a3],the most likely duration a2 in this interval.

    This knowledge is represented by a triangular fuzzy number, TFN,A = (a1,a2,a3):

    a1 a3a2

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 7 / 20

  • Uncertain Task Durations: Triangular Fuzzy Numbers

    Assume we only know:an interval of possible values for the duration [a1,a3],the most likely duration a2 in this interval.

    This knowledge is represented by a triangular fuzzy number, TFN,A = (a1,a2,a3):

    a1 a3a2

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 7 / 20

  • Uncertain Durations: Working With TFNs

    Arithmetic:addition:

    A + B = (a1 + b1,a2 + b2,a3 + b3)

    maximum:

    max(A,B) (max{a1,b1},max{a2,b2},max{a3,b3})

    We obtain a fuzzy schedule:starting and completion times of all tasks are TFNs;but there is no uncertainty re. the task processing order.

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 8 / 20

  • Necessity and Possibility

    A TFN can be seen as a possibility distribution on the values aduration may take.We can measure the necessity and possibility that the makespan Cmaxis less than a given number r :

    Cmax

    r

    N(Cmax r)(Cmax r)

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 9 / 20

  • and RobustnessAssume we have a target C? for the makespan: A schedule withmakespan Cmax is

    necessarily -robust w.r.t. C? if and only if = N(Cmax C?);possibly -robust w.r.t. C? iff = (Cmax C?).

    and are the degrees of necessary and possible robustness w.r.t.the threshold C?.

    Cmax

    N(Cmax r)(Cmax r)

    C

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 10 / 20

  • and Robustness: Remarks

    is the degree of confidence that Cmax will be for sure belowthe threshold C?.If a schedule is -robust and -robust w.r.t. C?,

    Pr(Cmax C?) .

    Build a robust schedule w.r.t. C? = build a schedule maximisingthe confidence level .

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 11 / 20

  • Robustness Assessment: Semantics of FuzzySchedules

    A -robust fuzzy schedule:is a predictive schedule;provides an ordering pi of tasks;provides an estimate (possibility distribution) of the value of Cmax .

    When tasks are executed following pi they have exact durations pij , sothe a-posteriori makespan Cmax(pi, pij) is already exact.

    Idea for assessmentIn most cases, for the a-posteriori makespan it should hold that

    Cmax(pi, pij) C.

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 12 / 20

  • Robustness Assessment: Simulation

    Simulate K possible realisations of task durations (coherent withpossibility distributions given by TFNs);calculate a-posteriori makespan for each simulation;measure the proportion of a-posteriori schedules withmakespan below C

    ConjenctureA high a-priori confidence level should correspond to a higha-posteriori performance level .

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 13 / 20

  • Experimental Results: Instances

    Problem instances are fuzzified versions of well-known OSPbenchmark:

    j7 : 9 instances of size 7 7;j8: 9 instances of size 8 8.

    Number of a-posteriori simulations: K=1000.

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 14 / 20

  • Obtaining -Robust Schedules: Adaptive GA

    Initial Idea: Re-use GA from literature on FOSP with objectivefunction ;Drawback: Schedules in initial population will have = 0 for anyreasonable C, so the GA cannot evolve!!!Improved Idea: Use adaptive GA minimising with successivethreshold approximations:

    C0 > C1 > > Cn = C

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 15 / 20

  • Results: Evolution of Adaptive GA

    0

    0.2

    0.4

    0.6

    0.8

    1

    1020

    1040

    1060

    1080

    1100

    1120

    1140

    1160

    0 200 400 600 800 1000 1200 1400 1600 1800 2000

    -robustness C*

    Number of generations

    C* Best individual Population Average

    Evolution of adaptive threshold Ci and necessary robustness level on oneproblem instance (average of 10 runs).

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 16 / 20

  • Results: a-priori versus a-posteriori (7 7)

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 17 / 20

  • Results: a-priori versus a-posteriori (8 8)

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 18 / 20

  • Conclusions and Future Work

    For the FOSP problem:robustness as good averagebehaviour of predictiveschedules;new robustness measure w.r.t.performance threshold basedon possibility/necessity;adaptive GA to obtain robustschedules;empirical assessment basedon simulations.

    Future work:Next step: --robustness;Multiobjective approach:minimise makespan +maximise robustness.

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 19 / 20

  • Thank you!

    Questions?

    Palacios et al. (Uniovi-Unican) -Robustness for FOSP IPMU 2014 20 / 20

    IntroductionThe Fuzzy Open Shop ProblemOpen ShopFuzzy Durations

    *-Robust SchedulesAre *-Robust Schedules Actually Robust?Experimental Results