ADDITIONAL WORKS REQUIRED BY TESTING & COMMISSIONING PUNCH LIST 1. Outdoor Children’s Play Area Equipment. Safety padding to 2.1 meter high required to the shade columns Safety padding to 2.1 high required to the swing columns. 2. Road Signage. Speed hump sign in the bottom should have speed HUMP text written in Arabic & English. Page 1 of 12
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
ADDITIONAL WORKS REQUIRED BY TESTING &
COMMISSIONING PUNCH LIST
1. Outdoor Children’s Play Area
Equipment.
Safety padding to 2.1 meter high required
to the shade columns
Safety padding to 2.1 high required to the
swing columns.
2. Road Signage.
Speed hump sign in the bottom should have speed HUMP text written in
Arabic & English.
Upon entering all the
gates, Speed Limit Signs
to be fixed
Page 1 of 10
Upon entering all the gates Reverse Parking signs to be fixed.
3. Tennis Court (With Seating).
Page 2 of 10
Tennis court is in elevated position, slope protection to provide around the
area to avoid future erosion
Guard rail is required at the end
and at the back of seating.
Drain line to introduce a gully or clean out in between for easy cleaning or
unblocking drain block.
4. Decorative
fence of
outdoor children’s play
area.
Page 3 of 10
Provide additional gate
to be used as an
emergency exit and
must be labeled.
ADDITIONAL WORKS REQUIRED – MULTI-PURPOSE SPORTS HALL
5. Multi-Purpose Sports Hall.
Acoustic boards installed
on the walls to be tested if
it will absorbed sounds.
6. External.
Page 4 of 10
Emergency Gates to be leveled in Arabic & English Text.
7. Children’s Play equipment area.
Children’s Play equipment area should be leveled both English & Arabic Text.
8. Aluminum Gates.
Door to be labeled on both side as identification.
Page 5 of 10
Door to be leveled flammable or hazard in Arabic & English text.