About P2S Established in 1985 as SERV-TECH a specialty
contractor. Purchased by Phillip Service Corporation in March 1997
and became PSC. Purchased by Fluor in March 2003 and became P2S.
Purchased by Fuel Streamers in 2010. Purchased by Criner Salt Dome
in 2011 and maintained P2S name.
Slide 4
Where we are located Baton Rouge, LA Lake Charles, LA
Paramount, CA Deer Park, TX Stafford, TX Salt Lake City, UT
Slide 5
Safety Performance Safety Statistics: (Q1 2014) 2011 TRIR =
0.39 2012 TRIR = 0.21 2013 TRIR = 0.00 2014 TRIR = 0.00 739 Days
since the Last Recordable 1,882,837 Man-hours since the Last
Recordable
Slide 6
CORE P2S Services
Slide 7
Decommissioning Selective equipment removal Equipment
relocation Asset Recovery Market evaluations Equipment appraisals
Network of brokers Metals recovery Demolition in Active Production
Area Rapid response to emergency plant shutdowns Extensive
knowledge of working refineries & petrochemical plants in
operating units Safety Council Certified Personnel trained to work
safely and efficiently Demolition, Dismantling and Asset Recovery
Services 18 years without recordable injury Demolition of a 120
Storage Tank Acid (Alky) Unit Demolition Project
Slide 8
Demolition, Dismantling and Asset Recovery Services Relocation
Services Demolition of large can heater Removal of floating roof
from inside tank
Slide 9
General Contracting Services Specialist in FCCU, crude, vacuum,
coker, alkylation and olefins unit turnarounds: - Turnaround
Planning and Scheduling Services - Specialty Exchanger Technology
FastDraw and FastClean Tower and Vessel Services including nozzle
repairs - Mechanical and Equipment Modifications and Repair -
Fabrication and Field Installation - Furnace Repair and Maintenance
- Hydro-blasting Services - Civil and Structural Modifications,
Heavy Rigging - Structural Steel and Piping Removal and Replacement
Management of Additional Turnaround Services Compressor and Pump
Repair Insulation and Refractory Repair Scaffolding Catalyst
Replacement Support Post Weld Heat Services Painting
Instrumentation / Electrical Environmental Services Cleaning and
Water Recirculation Services Specialty Turnaround Services 3 years
without recordable injury
Slide 10
Exchanger Services P2S has provided a full range of exchanger
maintenance services since 1985: FastDraw AND Aerial FastDraw Heat
exchangers (as large as 23 tons) can be extracted in under an hour
Reduce down-time of exchangers at the Clients facilities by cutting
extraction time by 80% Reduce safety hazards and damage to bundle
tubes FastClean Replaces conventional hand-held hydro blasting
methods Latest technology with spinning tips Can replace the use of
8 conventional blasters and 24 workers for a single job Reduces
cleaning time as much as 75%
Slide 11
Multiple heater and boiler projects executed annually Ethylene
Crackers Reformers-Methanol & Hydrogen EPC Crackers Boilers
HRSGs & SCRs Process & Waste Heat Recovery Systems
Combustion Air Pre-heating Systems Over 1,500 ASME code approved
procedures Overlays & vessel repairs Towers and vessels All
types of tower internal repairs Level II & III and API 570, 510
inspectors Unfired Pressure Vessels A UPNB S Power Boilers Boiler
Field Assembly Power Piping Registration Repairs & Alterations
R National Board & ASME Boiler, Pressure Vessel and Piping Code
Stamps Welding and Furnace Field Services 9 Years without a
recordable injury 40+ years experience of performing alloy welding
and heater services weld rejection rating is less than 2%
(2010-Present)
Slide 12
External and internal tower repairs, retro-fit and
modifications Expertise in tower blinding, tunneling, re- traying,
bubble-cap repairs and tray modifications Vessel and drum internal
repairs Cleaning for inspection Internal surface crack repairs
Manual weld overlay Nozzle repairs and replacements Pressure vessel
modifications Pump replacement Piping, valves and general
boilermaker services Tower, Vessel and General Mechanical
Services
Slide 13
OTHER P2S SERVICES Planning/Scheduling Construction Services
Project Experience Mechanical Services Fabrication, Piping and
Welding QA/QC Project Management
Slide 14
Best Practices Bid/No Bid Process (can we do the work safely)
Commercial Review (contract) Operations Review (how will project be
executed) Staffing Plan (who will do the work) Site Specific Safety
Plan (reviewed with project team) Injury Prevention (Stop Work
Authority and Hazard Elimination) Case Management (Only use
Occupational Doctors) Light Duty worker program Corporate
Participation (site visits, safety funding, etc)
Slide 15
Best Practices Continued : Mentoring Program Short Service
Program (New Employee Development) Safety Audits Training (includes
P2S web based training) Workforce Development - National Center for
Construction Education & Research (NCCER) - Training (crafts,
leadership and safety) - Local Safety Council Participation
Slide 16
Hire Process All application done in person. Must complete drug
and alcohol test as a condition of employment. Must complete
medical questionnaire. Skill levels are verified on the job. Must
successfully complete P2S orientations, basic plus, and sites
specific training before reporting to the project. Issued General
Information and Safety Rules Handbook
Slide 17
Required Training Basic Plus 28 ModulesP2S Orientation. Sites
Specific Fork Truck Excavator Torch Cutting Rigging Customized
online P2S training 24/7 Safety Leadership for Supervisors
Slide 18
P2S 24/7 Online Training Program
Slide 19
HSE Management System Permits STA Equipment Inspection Tool
Inspections Hazard Elimination Training Disciplinary Action Adopt
A- Crew Mentors