Top Banner
Behind the Scenes at CISD Clifton Elementary School April 14, 2015
25

Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Dec 31, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Behind the Scenes at CISD

Clifton Elementary School

April 14, 2015

Page 2: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

May 2015 Bond Referendum

In February, the Clifton ISD Board of Trustees called for a $28 million bond proposal for the construction of replacement facilities for the 75 year-old Clifton Elementary School and 65 year-old Bettis Auditorium.

Replacement elementary school-$22.2 million Replacement auditorium-$5.1 million Property acquisition, road construction, parking

improvements-$700,000

Page 3: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

What’s Proposed

A building that meets current building standards of the Texas Education Agency Pre-Kindergarten classrooms -TEA standard 800 sf (current size

651 sf)

Kindergarten classrooms-TEA standard 800 sf (current size 1021 sf)

First Grade classrooms-TEA standard 800 sf (current size 588 sf)

Second Grade classrooms-TEA standard 700 sf (current size 588 sf)

Page 4: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

What’s Proposed

A building that meets current building standards of the Texas Education Agency Library-TEA Standard 3000 sf (current size 2,112 sf)

40% increase in size of Library

Art is not required to be offered at the Elementary level

Art Room would be 1200 sf (current size 819 sf)

47% increase in size of Art Room

Current size of Music room is adequate at 1200 sf

Music room would be 1200 sf with appropriate acoustics

Page 5: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Art Teacher-Brenda SmithCurrent Art Program

Page 6: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Art is housed in the former Home Economics Room that was built in 1950.

Page 7: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Art Room – kiln and exhaust for kiln

Page 8: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Art Room –Over 3500 Art projects stored at the same time. Storage is at capacity.

Page 9: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Art Room – Insufficient wall space for mounting dry erase board.

Page 10: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Art Room-Floor space is often utilized for storage.

Page 11: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Librarian-Lori Kleibrink aka “Mrs. K”Current Library Services

Page 12: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Library – Mrs. K provides lessons to PK- Grade 5

Page 13: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Library – Library shelving is at capacity. Books are being shelved on top of bookcases.

Page 14: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Library – Books are being stored in rolling carts.

Page 15: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Library - Students stand to use computers because library items are stored below computer tables.

Page 16: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Teacher Professional Library has reached capacity.

Page 17: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Library – Books shelved on top of bookcases.

Page 18: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Music Program -Beth FryCurrent Music Program

Page 19: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Music Room-Cinder block construction lacks acoustics.

Page 20: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Music Room – Exposed duct work

Page 21: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Music Room – Fan in the Music office

Page 22: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Music Room – Storage spaces for props, music stands, and equipment is at capacity.

Page 23: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Music1st place Choir Performance

Page 24: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Tax Impact The homestead tax ceiling is the dollar amount limit

on the school taxes paid by a person age 65 or older. The tax ceiling is the amount of tax a person age 65 or older pays in the year that person qualified for the age 65 or older exemption.  The school taxes on the residence homestead of a person age 65 or older may not go above the amount of the tax ceiling. 

However, if improvements such as an addition of a garage or family room are made after a tax ceiling has been established, the tax ceiling will be adjusted to a higher level to reflect the value of the addition to the residence homestead.

Page 25: Behind the Scenes at CISD Clifton Elementary School April 14, 2015.

Tax Impact

The school taxes on the residence homestead of a person age 65 or older may currently be below the homestead tax ceiling amount because Clifton ISD’s tax rate decreased or stayed the same from 2008-2014. The school taxes on the residence homestead of a person age 65 or older may not go above the amount of the homestead tax ceiling.