Top Banner
Bee Network Engagement Event @GmWalks #BeeNetwork
44

Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

Jun 19, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

Bee Network Engagement Event

@GmWalks #BeeNetwork

Page 2: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure
Page 3: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

The purpose of todays event

• Learn more about the Bee Network and the principles behind the network across Greater Manchester

• Learn more about walking infrastructure

• Contribute to the discussion and create a louder ‘Walking Voice’ for Greater Manchester

• Widen audience engagement in consultation of the Network

Page 4: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

Todays Agenda

9:40am The GM Walking vision and opportunity

Chris Boardman, GM Walking and Cycling Commissioner

9:55am The Bee Network

Andy Howard, Planning & Delivery Officer TfGM

10:10am What is Walking Infrastucture?

Becki Cox, Principal Technical Advisor, Living Streets

10:25am Questions to panel (Chaired by Jenny Wiles)

Chris Boardman, Andy Howard and Becky Cox

Page 5: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

Todays Agenda

10:40am Workshops

1) Walking Infrastructure in Action Becki Cox and Jenny Wiles (Living Streets)

2) Walking: Barriers and Accessibility Nick Brelsford (Sustrans)

3) The Bee Network: Connecting to Greenspace Alan Manning (The Ramblers)

4) Walking In Their Shoes - How Can We Create Active Neighbourhoods &

Engage With Everyone? Pauline Johnston (Levenshulme Bee Network)

12:20 Next Steps and Close- Alan Manning

Page 6: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

Join the GM Walking Voice www.gmwalking.co.uk

Greater Manchester Walking Ambition:

Progress so far and Evaluation Event Thursday, 26 September 2019

9:30 – 13:00

First Floor Hall, King's House Conference Centre, King's Church,

Sidney Street, Manchester

M1 7HB

[email protected]

Page 7: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

Chris Boardman’s slides…

Page 8: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

Greater Manchester Bee Network

11th September 2019

Page 9: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure
Page 10: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

• Plan open for public comment for 4

months

• Over 4,000 online geo-referenced

comments received

• Comments used to inform Plan updates

• Many comments not resulting in Plan

changes still be valuable in informing

scheme development/design

• in excess of 1,000 mapping updates and

changes to the Plan across GM

• v2.1 of the plan published June 2019

Bee Network evolution…

Page 11: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

Bee

Network

Plan

v2.1

Page 12: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

The Updated Bee Network Plan is…

• A combined, joined-up walking and cycling network

• A plan of what is needed, not necessarily what is possible

• The result of many hundreds of hours of officer time;

• Substantially revised with fewer errors;

• Showing a significantly extended network with greater

geographical coverage; and

• The starting point for districts planning MCF-funded

walking and cycling schemes

Page 13: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

The Updated Bee Network Plan is not …

• Perfect or without error;

• The finished article – it will always be a live

document;

• Absolutely rigid;

• A plan of ‘shovel-ready’ schemes; or

• A final commitment to deliver specific schemes.

Page 14: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

How to turn the Plan…

…into schemes on the ground?

Bee Network v2.1

Should be the starting point for

all schemes

Programme entry

(approval sought from GMCA)

Business case

(approval sought from GMCA)

Page 15: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure
Page 16: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure
Page 17: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

Bee Network Standard tests:

• Double Buggy

• Unaccompanied 12 year old

Page 18: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

Design Check for MCF Schemes

Quality Criteria/Level of Service:

• 72-point check

• All MCF schemes must pass

• 12 “criticals”

• Of which, 8 relate directly to

walking

• Of the overall 72 criteria, 57

relate directly or indirectly to

walking

Page 19: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

How can I get involved?

Community-led schemes: Schemes generated

by people for the areas they live in

• What are the issues in your neighbourhood that

make cycling and walking difficult? Street audit.

• What are the potential solutions? What

improvements would you like to see?

• Engage with other local people

• Demonstrate support for measures eg filtered

neighbourhoods

• Engage with your local Council

Consultation

• Take part – be heard!

• Be an advocate for schemes you support

Page 20: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

Thanks for listening.

[email protected]

Page 21: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

WALKING INFRASTRUCTURE:

THINKING BEYOND THE FOOTWAY

Becki Cox

Principal Technical Advisor@becksmoo

Page 22: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

WHAT IS CYCLING INFRASTRUCTURE?

A little test…

Page 23: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

WHAT IS CYCLING INFRASTRUCTURE?

Page 24: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

WHAT IS WALKING INFRASTRUCTURE?

Page 25: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

LEEDS CITY CENTRE

Page 26: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

LEEDS CITY CENTRE

Page 27: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

UNDERSTANDING WALKING AND

CYCLING

2011 report from Lancaster, Leeds and Oxford Brooks Universities

Qualitative research

Main barriers to walking:

• Fears around physical safety (fear of

others and of injury)

• Discomfort – getting wet etc

• Perception of abnormality

• Complex family routines

Page 28: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

COMMUNITY STREET AUDITR O YA L B O R O U G H O F K E N S I N G T O N A N D C H E L S E A

Safety and perception of crime

Lack of wayfinding

Lack of places for young people

Fly-tipping, rubbish, maintenance

Attractiveness and green space

Street / footway at railway station

Page 29: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

THREE LEVELS OF INFRASTRUCTURE

• Macro – network planning, connectivity

• LCWIP guidance

• Treating walking as a transport mode

• Guarding against piecemeal approach

• Micro – finer detail (important to get right)

• Crossings, dropped kerbs, footways, tactiles

• Desire lines

• Emotional – infrastructure that affects perception (secondary)

• Lighting

• Wayfinding

• Conflict management (shared use paths)

• Timings on crossings

Page 30: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

THREE LEVELS OF INFRASTRUCTURE

• Macro – network planning, connectivity

• LCWIP guidance

• Treating walking as a transport mode

• Guarding against piecemeal approach

• Micro – finer detail (important to get right)

• Crossings, dropped kerbs, footways, tactiles

• Desire lines

• Emotional – infrastructure that affects perception (secondary)

• Lighting

• Wayfinding

• Conflict management (shared use paths)

• Timings on crossings

Page 31: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

THREE LEVELS OF INFRASTRUCTURE

• Macro – network planning, connectivity

• LCWIP guidance

• Treating walking as a transport mode

• Guarding against piecemeal approach

• Micro – finer detail (important to get right)

• Crossings, dropped kerbs, footways, tactiles

• Desire lines

• Emotional – infrastructure that affects perception (secondary)

• Lighting

• Wayfinding

• Conflict management (shared use paths)

• Timings on crossings

Page 32: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure
Page 33: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

THREE LEVELS OF INFRASTRUCTURE

• Macro – network planning, connectivity

• LCWIP guidance

• Treating walking as a transport mode

• Guarding against piecemeal approach

• Micro – finer detail (important to get right)

• Crossings, dropped kerbs, footways, tactiles

• Desire lines

• Emotional – infrastructure that affects perception (secondary)

• Lighting

• Wayfinding

• Conflict management (shared use paths)

• Timings on crossings

Page 34: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure
Page 35: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

THREE LEVELS OF INFRASTRUCTURE

• Macro – network planning, connectivity

• LCWIP guidance

• Treating walking as a transport mode

• Guarding against piecemeal approach

• Micro – finer detail (important to get right)

• Crossings, dropped kerbs, footways, tactiles

• Desire lines

• Emotional – infrastructure that affects perception (secondary)

• Lighting

• Wayfinding

• Conflict management (shared use paths)

• Timings on crossings

Page 36: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

LOW TRAFFIC NEIGHBOURHOODS

Modal Filters

Bollards or similar (trees, seats, playgrounds!) that prevent vehicle access but allow people walking and cycling to pass through.

Prevent rat running and create people friendly streets.

Page 37: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

LOW TRAFFIC NEIGHBOURHOODS

Continuous footway

Step change for walking!

Give pedestrians priority over side road crossings; vehicles must wait.

Page 38: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

Raised up to level of footway

Should use the same materials so appear continuous

Pulled back give way markings for drivers

Ramped up to reiterate priority

Page 39: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

Footway level cycle track

New and improved shared use path!

Visual contrast

Should have a slight step between cycle track and footway

Can have mini zebras

Page 40: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

3 TAKE HOME POINTS

• Walking infrastructure is more than footways,

crossings and dropped kerbs

• It is essential to understand perception

(especially of fear) and how infrastructure can

affect it

• Cycling infrastructure won’t automatically cater

for walking but good cycling infrastructure can

and should cater for walking

Page 41: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

Becki Cox

Principal Technical Advisor

[email protected] @becksmoo

Thanks for listening

WALKING INFRASTRUCTURE:

THINKING BEYOND THE FOOTWAY

Page 42: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

Panel Discussion – Q & A

Chaired by Jenny Wiles, Regional Director (North), Living Streets

Panellists

• Chris Boardman, GM Walking and Cycling Commissioner

• Andy Howard, Planning & Delivery Officer, TfGM

• Becki Cox, Principal Technical Advisor, Living Streets

Page 43: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

The Workshops (40 minutes each)

1) Walking Infrastructure in Action (15 max)

Becki Cox and Jenny Wiles (Living Streets)

2) Walking: Barriers and Accessibility

Nick Brelsford (Sustrans)

3) The Bee Network: Connecting to Greenspace

Alan Manning (The Ramblers)

4) Walking In Their Shoes - How Can We Create Active

Neighbourhoods & Engage With Everyone?

Pauline Johnston (Levenshulme Bee Network)

Page 44: Bee Network Engagement Event - GM Moving · •Learn more about the Bee Network and the principles behind the network across Greater Manchester •Learn more about walking infrastructure

Next Steps & Close

@GmWalks #BeeNetwork