    CITYOFDALLAS

    BECKLEY/ COLORADOSIDEWALKIMPROVEMENTS

  • 8/13/2019 Beckley Colorado Public Meeting Presentation Rev_1

    2/10

    BECKLEY/

    COLORADOSIDE

    WALKENHANCEM

    ENTS

    Streetscape

    Improving the current condition to

    8-foot sidewalks

    Lighting along sidewalks Keeping existing trees where

    possible

    Additional trees along W. Colorado

    Blvd & N. Beckley Ave.

    Bioswales with native plantings

    where possible.

  • 8/13/2019 Beckley Colorado Public Meeting Presentation Rev_1

    3/10

    BECKLEY/

    COLORADOSIDE

    WALKENHANCEM

    ENTS

  • 8/13/2019 Beckley Colorado Public Meeting Presentation Rev_1

    4/10

    BECKLEY/

    COLORADOSIDE

    WALKENHANCEM

    ENTS

  • 8/13/2019 Beckley Colorado Public Meeting Presentation Rev_1

    5/10

    BECKLEY/

    COLORADOSIDE

    WALKENHANCEM

    ENTS

  • 8/13/2019 Beckley Colorado Public Meeting Presentation Rev_1

    6/10

    BECKLEY/

    COLORADOSIDE

    WALKENHANCEM

    ENTS

    Looking North on N Beckley Ave

    (at Madison Ave)

  • 8/13/2019 Beckley Colorado Public Meeting Presentation Rev_1

    7/10

    BECKLEY/

    COLORADOSIDE

    WALKENHANCEM

    ENTS

    Looking East on W Colorado Blvd

    (at N Beckley Ave)

  • 8/13/2019 Beckley Colorado Public Meeting Presentation Rev_1

    8/10

    BECKLEY/

    COLORADOSIDE

    WALKENHANCEM

    ENTS

  • 8/13/2019 Beckley Colorado Public Meeting Presentation Rev_1

    9/10

    BECKLEY/

    COLORADOSIDE

    WALKENHANCEM

    ENTS

    Project Budget

    2006 Bond Fund - $ 1,690,693 Available Funding

    Design Cost - $ 218,000

    Construction Cost (estimate) - $ 1,471,875

    Project Length4,852 LF

    Improvement Elements

    8foot concrete sidewalk

    66,500 SF x $15.50/SF = $ 1,030,750

    Street / Pedestrian lights (acorn style)

    60 lights x $5,000/light = $ 300,000

    Trees (200 gallon type)

    125 trees x $1,129/tree = $ 141,125

    Current Project Cost = $1,689,875

  • 8/13/2019 Beckley Colorado Public Meeting Presentation Rev_1

    10/10

    BECKLEY/

    COLORADOSIDE

    WALKENHANCEM

    ENTS

    Project Schedule

    Begin Design: August 2013

    Complete Design (estimate): September 2014

    Begin Construction (estimate): January 2015

    Complete Construction (estimate): December 2015