Bechtel ES MILCON Project Renovation and Expansion & Bechtel ES Swing Space Decision Community Town Hall Meeting Camp Courtney Theater 23-OCT-2018
18

Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

Jun 28, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

Bechtel ES MILCON Project

Renovation and Expansion

&

Bechtel ES Swing Space DecisionCommunity Town Hall Meeting

Camp Courtney Theater23-OCT-2018

Page 2: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

2

Purpose

The purpose of this presentation is to:

➢ Outline the MILCON program project to renovate and create a 21st Century Learning Environment for the students served by Bechtel ES.

➢ Present the decision as to where and how to temporarily house Bechtel Elementary school students for the duration of the military construction project has significant community ramifications.

➢ Decisions were made jointly with US Army Corps of Engineers, Marine Corps Installations – Pacific and the DoDEA Pacific South district

We are pleased to share with you our way forward!

Page 3: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

3

Introduction

▪ Problem:

▪ Major military construction project to transform Bechtel

Elementary School (BES) into a 21st Century School.

Timing is dictated by the Fiscal Year for which the funding

is allocated. The project start cannot be postponed.

▪ Demolition / construction work is so extensive that

students & staff will have to relocate to a temporary

location for the duration of the project. Safety is a critical

concern

▪ How do we provide a learning environment that will

support teaching and learning for the Bechtel ES

community and retain its identity as a school.

Page 4: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

4

Current Bechtel Elementary School

Page 5: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

5

Bechtel ES Changes

Demolition of existing building 4,066 sq.m. or 43,766 sq.ft.

New Construction – 7,525 sq.m. or 70,493 sq.ft. Net increase = 37,234 sq.ft.

Renovation for 70,493 sq. ft. Total Area of New/Renovated School = 107, 727 sq.ft.

Page 6: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

• The 21st century teaching and learning model of studios and learning neighborhoods is created along with group learning areas, on-to-one teaching spaces and staff collaboration areas.

• The Commons / Multipurpose Room increases the cafeteria capabilities of the school to support a population of 850 students.

• A new Information Center.

• Adds room for specialists, Special Education service providers and conference rooms.

• All covered passage within the facility is provided.

• There is covered main entry and a bridged entry from bus drop off and loading areas.

6

What is Gained with this Project?

Page 7: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

7

What Will the New/Renovated Bechtel ES Look Like?

Front Entrance

Page 8: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

8

Commons Area

Page 9: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

9

Outdoor & Garden Area

Page 10: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

10

Learning Neighborhood

Page 11: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

11

Information Center / Library

Page 12: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

12

Page 13: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

13

Bechtel ES - Second Floor

Page 14: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

14

Third Floor Plan

Page 15: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

15

Construction Schedule

Page 16: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

16

How Will the Necessary Swing

Space be Created?

▪ Location: By Using the Existing Ryukyu MS Facility to have

the Bechtel ES students & staff

▪ Ryukyu MS has a functional capacity of 1150 students. This

will hold the 800+ Bechtel ES students and approximately 250

to 280 middle school students, to include the students who

currently come from Camps McTureous and Courtney

▪ Ryukyu MS has adequate facilities to support the population

to include classrooms, information center, cafeteria, art, music

and physical education facilities.

▪ Bechtel ES and Ryukyu MS administrators have developed a

plan for the use of the building to provide an effective

educational environment for all of the students.

Page 17: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

17

Logistical / Facility Requirements

Requirements to Utilize RMS:

▪ Some restroom modifications for Kindergarten,

Preschool Services for Children with Disabilities (PSCD),

and Sure Start Students

▪ Additional buses to transport students

▪ Playground items

▪ Relocation of existing, right sized, furniture and

equipment for the Bechtel ES students

Page 18: Bechtel ES MILCON Project Renovation and Expansion Bechtel … › BechtelES › upload › Bechtel-ES... · 2018-10-15 · Bechtel ES. Present the decision as to where and how to

18

Questions?