STATE OF VERMONT PUBLIC SERVICE BOARD Petition of Beaver Wood Energy Pownal, LL C ) for a Certificate of Public Good, pursuant to 30 ) V.S.A. § 248, to install and operate a Biomass ) Energy Facility and an integrated wood pellet Docket No manufacturing facility north of the ol d ) Green Mountain Racetrack in Pownal, Vermont, ) to be known as the “Pownal Biomass Project” ) PRE-FILED TESTIMONY OF WILLIAM BOUSQUET ON BEHALF OF BEAVER WOOD ENERGY P O A L , LLC October 25 , 2010 Th e purpose of th e pre-filed testimony of Mr. Bousquet is to demonstrate that the Pownal Biomass Project will comply with certain provisions of 30 V.S.A. § 24 8 (b)(2)(3)(5)(6)(7)(9) and (10) an d to support th e Motion fo r Preliminary Approval.
50
Embed
Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
Petition of Beaver Wood Energy Pownal, LL C)for a Certificate of Public Good, pursuant to 30 )
V.S.A. § 248 , t o install and operate a Biomass )Energy Facility and an integrated wood pellet
Docket Nomanufacturing facility located north of the old )Green Mountain Racetrack in Pownal, Vermont, )to be known as the “Pownal Biomass Project” )
PRE-FILED TESTIMONY OF
WILLIAM BOUSQUET
ON BEHALF OF
BEAVER WOOD ENERGY POAL , LLC
October 25, 2010
The purpose of the pre-filed testimony of Mr. Bousquet is to demonstrate tha t the PownalBiomass Project will comply with certain provisions of 30 V.S.A. § 248(b)(2)(3)(5)(6)(7)(9) and (10) and to support the Motion for Preliminary Approval.
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
Petition of Beaver Wood Energy Pownal, LLC )for a Certificate of Public Good, pursuant to 30 )V.S.A. § 248, to install and operate a Biomass )Energy Facility and an integrated wood pellet )
Docket Nomanufacturing facility located north of the old )Green Mountain Racetrack in Pownal, Vermont, )to be known as the ‘Pownal Biomass Project” )
PREFILED TESTIMONY OF
WILLIAM BOUSQUET
Exhibit BWEP - WB -1
Resumé
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
Peti tion of Beaver Wood Energy Pownal, LLC )for a Certificate of Public Good, pursuant to 30 )V.S.A. § 248 , to install and operate a Biomass )Energy Facility and an integrated wood pellet )
Docket Nomanufacturing facility located north of the old )Green Mountain Racetrack in Pownal. Vermont, )
to be known as the “Pownal Biomass Project” )
PREFILED TESTIMONY OF
WILLIAM BOUSQUET
Exhibit BWEP - WB -3
Proposed Transmission Route
:,SIm
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
Petition of Beaver Wood Energy Pownal, LLC )for a Certificate of Public Good, pursuant to 30 )V.S.A. § 248, to install and operate a Biomass )Energy Facility and an integrated wood pellet
D k Nmanufacturing facility located north of the old )
oc e 0.
Green Mountain Racetrack in Pownal, Vermont, )to be known as the “Pownal Biomass Project” )
PREFILED TESTIMONY OF
WILLIAM BOUSQUET
Exhibit BWEP - WB -4
Ability to Serve - Fire
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
James P. W. GossHans 8. HuessyA. Jay KenlanRodne y E. MePheeJohn C. NewmanEdward V. Schwiebert
Paula J. Mccann, Of CounselRon R. Morgan, Of Counsel
KENLANSCHWIEBERT
FACEY&IGOSs,pc
flTTQHNEYS lIT 1.11W
Christop her W. Blanchard
David R. CooperHeather 2. CooperMatthew D. GettyMa tthew G. Hart
Marilyn A, MahuskyMichael A. Stabler
Karen M. Villemair e
Candy Anderson , Paralegal
Kim J. Miller. ParalegalHolly Webb, Paralegal
David R Cooper, Esq.dcooper(ken Ianl aw.com
Direct Dia l 602-665-2702
VJA U S MAIL
Ka ren J. Burri ng ton, ClerkTo wn of Powna l
P0 Box 411
Pow nal, VT 05261
O ct ob er 22, 20 10
RE: Beaver Wood Energy Pownal, LLC Proposed Biotnass Energy Facility andIntegrated Wood Pellet Manufacturing Facility
D ear Ms. Bur rin gton :
Enclosed please find an Ability to Serv e letter for the Pownal Fire Departm ent and/or thePownal Valley Fir e Department, inten ded to confirm that the proposed biomass project will notim pose a burden upon the fire department or departments tha t cover the area in which the project
site is located. Can you please forward the enclosed to the Ch ief(s) of the app ropr iatedepartm ent or departments?
If you have any questions or require any additional information , please do no t he sitateto contact me.
D RC/m nibEnd.
P. 0 Box 578-71 Allen St. • Ste. 401 ’ Rutbnd, Vermont 05702 -0578 -Phone (802) 773-3300 (877) 4-ICENLAN- Fax (802)775-1581. www.kenlanlaw corn
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
James P. W. GossHans G. HuessyA. Jay KenlanRodn ey E. McPheeJohn C. Newma nEdward V. Schwiebert
Paula 3. McCann, Of CounselRon R. Morgan, Of Counsel
KENLANSCHWIEBERT
FACEY&GOSS, P.C.
ATTORNEYS AT 1.6W
Ch ristophe r W. Blan cha rcjDaM R. Cooper
Heath er 1 CooperMatthew 0. CattyMa tthew C. Hart
Marilyn A, MahuskyMichael A. Stahier
Karen M. Villecnajre
Candy Anderson, Paralegal
Kim 3. Miller, ParalegalHolly Webb, Paralegal
David A Cooper, Esq.dcooperkenlanfaw,comDirect Dial 802-665-2702
VIA US MAIL
Pownal Fire Department
Oc tobe r 22, 2010
RE: Beaver Wood Energy Pownal, LLC Proposed Biomass Energy Facility andIntegrated Wood Pellet Manufacturing Facility
Dear Sir/Madam:
We represent Beaver Wood Energy Pownal, LLC in connection with its petit ion for aCertificate of Public Good , pu rsuant to 30 V.S.A. § 248, to install and operate a Biom ass EnergyFacility and an integrated wood pellet manufacturing fac ili ty located north of the old Green
Mountain Racetrack in Pownal, Vermont, known as the “Pownal Biomass Project”. I am writingto confirm the Fire Department’s abi lit y to serve the Project . To ass ist you in making thisdetermination, attached please find a description of the Project’s on-site fire preventionmechanisms. If you have any ques tions abou t any of these items please let me know and I willhave the Project engineer contac t you.
if the capacity to serve exist s, please confirm this in writing and return the same to me inthe enclosed postage prepaid envelope.
Please feel free to contact me if you have questions regarding the forego ing. Thank youin advance f
RE: BeaverWood Energy Pownal, LLC Proposed Biomass Energy Facilityand Integrated Wood Pellet Manufacturing Facility
ON-SITE FIRE PREVENTION MECHANISMS
An independent fire water system will be provided for the facility,with no interconnection to the city water system. A dedicatedvolume of the raw water/fire water storage tank will be providedfor fire protection with makeup from offsite supplies. The tank willinclude a 2-hour dedicated fire water capacity in accordance withNFPA codes. A motor-driven main fire pump and a diesel-drivenfire pump will be provided. Automatic start for the fire pumps willbe initiated by pressure switch in accordance with NFPA practic e.Once started, the pum
p(s) will continue to run until manuallystopped at the associated local pump controller. The fir e pump willbe sized to provide the maximum water demand to the firesuppression system with the most direct yard loop path out ofservice.
The fire water supply system will provide fire-fighting water toyard hydrants, hose stations, water spray, and sprinkler system s.The system will supply the design maximum water demand forany automatic suppression system plus flow for fir e hydrants and
hose stations per NFPA requirements.
The main header will serve strategically located yard hydrants andhose stations and will have sectionalizing valves so that a singlefailure in the yard ioop piping will not impact service to bothsuppression systems and yard hydrants serving the same area. Firehydrants will be spaced at approximately 250-foot intervals aroundthe fire loop. The hydrants will be located in accordance withNFPA 24 and local fire codes.
Class III standpipe systems will be designed and installed inaccordance with the requirements of NFPA 14. The standpipesystems will be designed for a minimum hose outlet pressure of 65psig at the respective design flow required by NFPA 14 aspermitted in NFPA 14-2000, Sec tion 5-7 (1), Exception 1. The ClassIII standpipe systems will incorporate 2-1/2-inch hose outlets withremovable 1-1/2-inch hose adapter inserts for fire department use.
Sprinkler and fixed spray systems will be designed and installed inaccordance with NFPA 13 and NFPA 15, respectively.
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
Jwnes P. W. GossHans C. HuessyA. Jay KenlanRodney E. McPheeJohn C. New ma nEdward V. Schwiebert
PaulaJ. Mccann. Of CounselRon P. Morgan, Of Counsel
KENLANSCHWIEBERT
FAGEY& GOSS, PG.
ATTUITNEYS ITT LAW
Christopher W. BlanchardDavid B. Cooper
Heather Z. CooperMatthew 0. GettyMatthew C. Hart
Marilyn A, MahuskyMichae l A. Stahier
Karen M. Villemair e
Candy Ander son, Paralegal
Kim J. Miller, ParalegalHolly Webb, Paralegal
David R Cooper, Esq.dcooperkenIanIaw.comDirect Dial 802-665-2702
VIA US MAIL
Pownal Valley Fire Department
October 22, 2010
RE: Beaver Wood Energy Pownal, LLC Proposed Biomass Energy Facility andIntegrated Wood Pellet Manufacturing Facility
Dear Sir/Madam:
We represent Beaver Wood Energy Pownal, LLC in connect ion with its petition for aCertificate of Public Good, pursuant to 30 V.S.A. § 248, to instal l and operate a Biomass EnergyFacil ity and an integrated wood pellet manufacturing facility located north of the old Green
Mountain Racetrack in Pownal , Vermont , known as the “Pownal Biomass Project”. I am writi ngto confirm the Fire Department’s ability to serve the Project. To assis t you in making th isdetermination, attached please find a description of the Projec t’s on-site fire prev entionmechanisms. If you have any questions abou t any of these items please let me know and I willhave the Project engineer contact you.
If the capacity to serve exists, please confirm this in writing and return the same to me inthe enclosed postage prepaid envelope.
Please fee l free to contact me if you have questions regarding the foregoing. Thank you
in advance for your time and attention to this matter.
DRC/mmbEnd.
P. 0. Bo x 578 - Ti Mien St. • Ste. 4W - Rutland, Vermont 05702-0578 ‘Phone (802) 77 3-3300’ (877) 4-KENLAN’ Fax (802)775-1581. wwwkepJanIawm
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
RE: Beaver Wood Energy Pownal, LLC Proposed Biomass Energy Facilityand Integrated Wood Pellet Manufacturing Facility
ON-SITE FIRE PREVENTION MECHANISMS
An independent fire water system will be provided for the facility ,with no interconnection to the city water system. A dedicatedvolume of the raw water/fire water storage tank will be providedfor fire protection with makeup from offsite supplies. The tank willinclude a 2-hour dedicated fire water capacity in accordance withNFPA codes. A motor-driven main fire pump and a diesel-drivenfire pump will be provided. Automatic start for the fire pumps willbe initiated by pressure switch in accordance with NFPA prac tice.Once started, the pump(s) will
continue to run until manuallystopped at the associated local pump controller. The fire pump willbe sized to provide the maximum water demand to the firesuppression system with the most direct yard loop path out ofservice.
The fire water supply system will provide fire-fighting water toyard hydrants, hose stations, water spray, and sprinkler systems.The system will supply the design maximum water demand forany automatic suppression system plus flow for fire hydrants and
hose stations per NFPA requirements.
The main header will serve strategically located yard hydrants andhose stations and will have sectionalizing valves so that a sing lefailure in the yard loop piping will not impact service to bothsuppression systems and yard hydrants serving the same area. Firehydrants will be spaced at approximately 250-foo t intervals aroundthe fire ioop. The hydrants will be located in accordance withNFPA 24 and local fire codes.
Class HI standpipe systems will be designed and installed inaccordance with the requirements of NFPA 14. Th e standpipesystems will be designed for a minimum hose outlet pressure of 65psig at the respective design flow required by NFPA 14 aspermitted in NFPA 14-2000, Section 5-7 (1), Exception 1. Th e ClassIII standpipe systems will incorporate 2-1/2-inch hose outlets withremovable 1-1/2-inch hose adapter inserts for fire department use.
Sprinkler and fixed spray systems will be designed and installed in
accordance with NFPA 13 and NFPA 15, respectively.
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
Cathe rine McClure, SuperintendentSouthwes t Supervisory Union
246 South Stream RoadBenning ton, VT 05201
October 22, 2010
RE: Beaver Wood Energy Pownal, LLC Proposed Biomass Energy Facility andIntegrated Wood Pellet Manufacturing Facility
Dear Ms. McC lure:
We repres ent Beaver Wood Energy Pownal, LEC in connection with its pe tition for aCertificate of Public Good, pursuan t to 30 V.S.A. § 248, to install and operate a Biomass Energy
Facility and an integrated wood pellet manufacturing facility located north of the old GreenMoun tain Racetr ack in Pownal, Vermont, to be known as the “Powna l Biomass Project”. ThePowna l Biornass Project is expected to result in 12 school aged children . This estimate is basedupon the expectation that the Project will gene ra te 18 new residents in Pown al living in 8 newhousehold s with 1.5 schoo l aged children per hou sehold.
If it is the case, please confirm in writing that the are a schools have the capacity toaccomm oda te the additional students without unreasonable burden.
Please feel free to contact me if you have questions rega rding the
in advance for your time and attention to this matter.
foregoing. Th ank you
P. 0. Box 578 71 Allen St. • Ste. 401 Rutland, Vermont 05702-0578 . Phone (802) 773-3300 - (877) 44ENLAN . Fax (802)775-1581. www.kenlanIaw.com
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
Petition of Beaver Wood Energy Pownal, LLC )for a Certificate of Public Good, pursuant to 30 )V.S.A. § 248, to install and operate a Biomass )Energy Facility and an integrated wood pellet )
D k Nomanufacturing facility located north of t he o ld )
c e
Green Mountain Racetrack in Pownal, Vermont, )to be known as the “Pownal Biomass Project” )
PREFILED TESTIMONY OF
WILLIAM BOUSQUET
Exhibit BWEP - WB -6
Ability to Serve - Town
Shannon A. Bertrand
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
Jame5 P. W. GossHans G. HuessyA. Jay KenlanRo dne y F. McPheeJohn C. Newm anEdward V. Schwiebert
Paula J. Mccann, Of Counsel
Ron P. Morgan, Of Counsel
KENLANSCHWIEBERT
FACEY& GOSS, PC.
OTTORNEYG OT LOW
Christoph er W. BlanchardDav id P. Cooper
Heather Z. CooperMatthew 0. CattyMatthew 0. Hart
Marilyn A, MahuskyMichael A. Stahier
Karen M. Villern aire
Candy Ande rson, ParalegalKim J. Miller, ParalegalHolly Webb . Paralegal
David B Cooper, Esq.d cooper@4cerilanlaw. corn
Direct Dial 802-665-2702
VIA US MAIL
Karen J. Burrington, Clerk
Town of Pownal
P0 Box 411Pownaj, VT 05261
October 22, 2010
RE: Beaver Wood Energy Pownal, LLC Proposed Biomass Energy Facility andIntegrated Wood Pellet Manufacturing Facility
Dear Ms. Burrington:
We represent Beaver Wood Energy Powual, EtC in connection with its petition for aCertificate of Public Good, pursuant to 30 V.S .A . 248, to install and ope ra te a Biomass Energy
Facility and an integrated wood pellet manufacturing facility located north of the old GreenMountain Racetrack in Pownal, Vermont, to be known as the “Pownal Biomass Project”. ThePownal Biomass Project will not be using municipal sewer or water. The Project will becontracting fo r the removal of ash generated at the site with a private hauling company. Theaccess road to the Project will be maintained by the petitioner. The Project has sent a separa teletter to the Fire Department with respect to fire protection. As a result, the only services that theProject may require from the Town are the disposal of non-ash solid waste and rescue service.
If it is the case, please confirm in writing tha t the Town has the capacity to provide theabove described services to the Pownal Biomass Project without unreasonable bu rden , and return
the same to me in the enclosed postage prepaid envelope.
Please feel free to contact me if you have questions regarding the foregoing. Thank youin advance for your time and attention to this matter.
Petition o f Beaver Wood Energy Pownal, LLCfor a Certificate of Public Good, pursuant to 30 )V.S.A. § 248, to install and operate a Biomass )Energy Facility and an integrated wood pellet
Docket Nomanufacturing facility located north of the old )Green Mountain Racetrack in Pownal, Vermont, )to be known as the ‘Pownal Biomass Project” )
PREFILED TESTIMONY OF
WILLIAM BOUSQUET
Exhibit BWEP - WB -7
45 Day Notice Letter
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
Clerk, Town of Pow iial Planning CommissionP.O. Box 411
Pownal, Vermont 05261
Clerk, Town of Pownal Se lect BoardP.O. Box 411
Powna l, Vermont 05261
Bennington County Regional Commission111 Sou th Street, Suite 203Bennington, VT 05201
RE: Beaver Wood Energy Pownal, LLC Bioinass and Wood Pellet FacilityCertificate of Public Good — Section 248 Permit Process45-Day Advance Notice of Proposed Project
I. Introduction
Beaver Wood Energy Pownal, LLC (“Beaver Wood”) is a Delaware lim ited liability company,registered to do business in Verm
ont, that is preparing to file a petition for a Certificate of Publ icGood pursuant to 30 V.S.A. § 248 with the Vermont Publ ic Service Board (the “PSB” or“Bo ard”), requesting approval to construct and opera te a 29.5 megawatt wood biomass-firedelectric generation plant and integrated wood pellet manufacturing faci lity to be located on Route7, just north of the old Green Mountain Racetrack , in the Town of Pownal, Vermont (the“P roject”).
Beaver Wood anticipates filing a Petition for a Certificate of Public Good with the Board on orafter October 25, 2010, and is providing the information in this 45-day advance notice packageto the municipal and regional planning commissions and municipal leg islative bodies inacco rdance with PSB Rules 5.402
and 5.4 03.
P. 0. Box 578 7, Mien St. Ste. 40 1 Rutland, Vermont o57o2o578- Phone (Soz) 773-33oo (S r)4KENLAN Fax (8o2)fl5-,581. www.kenlanlaw.com
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
Town of PownaL Select Boa rdBennington County Regional CommissionSeptem ber 10, 2010
Page 3
Ba sed upon the enclosed, simulated photograph of the Project , Beaver Wood’s overallconclusion is that the proposed Project will not, if constructed, result in an undue adv erse impactto the aes the tics and scenic beauty of the area. Beaver Wood is confident tha t the aestheticassessment will serve to re inforce and confirm that conclusion .
IV. Right of the Local and Regional Planning Commissions to Comment on the ProjectPlans
Pursuan t to Section 248(1) of Title 30 of Vermont Statutes Annota ted (30 V.S.A § 248(f)),municipal and regional planning commissi
ons can make recommendations, if any, to the PSBand to the petitioner at least 7 days prior to filing of the Pe tition with the Public Service Board.So that the PSB may take you r views into account, Beaver Wood req uests tha t your comments besubm itted no later than October 18, 2010, which is 7 days prior to the anti cipated filing date ofOctober 25, 2010 . Your commission also has the right to make revised recommendations within45 days afte r the date the Petition is fiLed with the PSB, if the Petition contains new or morede tailed information that was not previously inc luded in these plans.
For additional information regarding this process, including you r planning commission’s righ t toparticipa te in the PSB’s proceeding, please refer to the “Gu ide to the Verm ont Public Serv iceBoa rd ’s S ec tion 248 Process” which can be found at hftp://www.psb.vermont.gov.
As the Project is still in the design phase, we will continue to have discuss ions and expect toreceive feedback on this Project from your representat ives, as well as various key stakeholders.
I hop e that you are aware of the public presentation scheduled for September2 and the factthat Be ave r Wood plans to organize several bus trips to working biomass facilities. If you areinterested in a separate presentation on the Project, want to atten d one of the bu s trips , or havecomments or request further information, please contact me.
If possible, Beaver Wood would like to ga in some flexibility with respect to the filing date.
Accordingly, I would ask tha t you consider waiving 15 days worth of the notice pe riod so BeaverWood can file its Petition sooner if it completes its work in time to do so. I will be call ing youshortly to foll ow up on this issue. Thank you for your attention to this matte r.
Sincerely,
r
Hans
Attorney for Wood Energy Pownal, LLC
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
Rodney E. McPheeJohn C. Newma nEdward V. Sehwiebert
Paula J. Mccann, Of CounselRon R. Morgan, Of Counsel
KENLANSCHWIEBERT
FAGEY& GOSS, PG.
ATTORNEYS AT LAW
Chris topher W. BlanchardOavid R. Cooper
Heather 1 CooperMatthew 0. GettyMatt
hewG. HartMarilyn A, MahuskyMichae l A. Stahlerl<aren M. Villemaire
Candy Anderson, ParalegalKim J. Miller, ParalegalHolly Webb, Paralegal
Hans G. l-iuessy, Esq.hhuessy@)kenlanlaw.comDirect Dial 802-665-2690
September 13, 2010
Clerk, Town of Pownal Planning Commission
P.O. Box 411Pow nal, Vermont 05261
Clerk, Town of Pownal Se lect Boa rdP.O. Box 411Powna l, Vermont 05261
Benning ton County Regional Commission111 South Street , Suite 203Bennington, VT 05201
RE: Beaver Wood Energy Pownal, LLC Biomass and Wood Pellet FacilityCertificate of Public Good — Section 248 Permit Process45-Day Advance Notice of Proposed Project
Dear Folks :
Enc losed please find two (2) revised aeria l depictions of the proposed Beaver WoodEnergy Pow nal Plant relative to the Prefiling Not ice fo rwarded to you on September 10, 2010.
Please do not hesitate to call if you have any questions.
Petition of Beaver Wood Energy Pownal, LLC )for a Certificate of Public Good, pursuant to 30 )V.S.A. § 248, to install and operate a Biomass )Energy Facility and an integrated wood pellet )
Docket Nomanufacturing facility located north of the old )Green Mountain Racetrack in Pownal, Vermont, )to be known as the “Pownal Biomass Project” )
PREFILED TESTIMONY OF
WILLIAM BOUSQUET
Exhibit BWEP - WB -8
Sample Notice Letter and List of Abutters
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
Act 250 Abutters To Beaver Wood Energy Pownal, LLC (Developer) and ProgressPartners, Ltd., 158 Westmoreland Aye, White Plains, NY 10606 (Record Owner) Per
Certified Grand List 6/14/2010 & Property Transfers to 9/22/2010)
REE&C Capital Management Services, P.O. Box 795, Manchester Center, VT 05255
James & Vernelle Winchester. P.O. Box 22, Pownal, VT 05261-0022
Pan Am Southern LLC, 1700 hon Horse Park, North Billerica, Ma 01862
Petition of Beaver Wood Energy Pownal, LLC )for a Certificate of Public Good, pursuant to 30 )V.S.A . § 248, to install and operate a Biomass )Energy Facility and an integrated wood pellet
D k Nmanufacturing facility located north of the old )
oc e 0.
Green Mountain Racetrack in Pownal, Vermont, )to be known as the “Pownal Biomass Project” )
PREFILED TESTIMONY OF
WILLIAM BOUSQUET
Exhibit BWEP - WB -9
2010-11 Construction Activities Schedule
1
62
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
Petition of Beaver Wood Energy Pownal, LLC )for a Certificate of Public Good, pursuant to 30 )V.S.A . § 248, to install and operate a BiomassEnergy Facility and an integrated wood pellet )
Docket Nomanufacturing facility located north of the old )Green Mountain Racetrack in Pownal, Vermont, )to be known as the “Pownal Biomass Project” ) -.
PREFJLEI) TESTIMONY OF
WILLIAM BOUSQUET
Exhibit BWEP - WB -10
2010-11 Construction Activities and Costs
Pownal 2010/ Early 2011 Co nstr uction Activi ties :
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
Item Descr iption Items to be Installe d Cost to Cost to
Install Remove4 Truck scales Foundations and underground $45,000 $5 ,000
utili tie s
22 Fire/raw water tank Foundation only $28,000 $3,00023 Fire water pump house Foundation and underground $12,000 $1,000
util ities
24 Coo ling Tower Foundation on ly $70 ,000 $10,00025 Fuel oil storage tank Foundation on ly $35,0 00 $6,00038 Uncovered storage pile Base and pavement $160 ,000 N/A49 Emergency / black start Foundation, underground $75 ,000 $15,000
generator utilities and pre-fab bui ldingA Process water line fro m Pipe (880 ft) and va lves from $30,0 00 N/A
existi ng well to plant well to a point near fly ash siloB Makeup water line from Pipe (1900 ft) and conduit $65 ,000 N/A
pump house to water
tank
C Force ma in plant to UlC* Pipe (13 00 ft) $47 ,000 N/A
D Required storm water Ponds as required $30 ,000 $2,000ponds
E Plant roads Road base as required for access $100 ,000 N/A
to ac tivities
All construction activities are weather dependent.
UIC — Underground injection control
STATE OF VERMONT
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
Petition of Beaver Wood Energy Pownal, LLC )for a Certificate of Public Good, pursuant to 30 )V.S.A. § 248, to install and operate a Biom ass )Energy Facility and an integrated wood pellet )
D k Nmanufacturing facility located north of the old )
oc e 0.
Green Mountain Racetrack in Pownal, Vermont, )to be known as the “Pownal Biomass Project”
PREFILED TESTIMONY OF
WILLIAM BOUSQUET
Exhibit BWEP - WB -11
Topographic Site Map
.;r
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD
Petition of Beaver Wood Energy Pownal, LLC )for a Certificate of Public Good , pursuant to 30V.S.A. § 248, to install and operate a Biomass )Energy Facility and an integrated wood pellet )
Dk Nmanufacturing facility located north of the old )e 1 O•
Green Mountain Racetrack in Pownal, Vermont, )to be known as the “Pownal Biomass Project” )
PREFILED TESTIMONY OF
WILLIAM BOUSQUET
Exhibit BWEP - WB -12
Aeria l Site Photograph
8/8/2019 Beaver Wood Pownal 248 Filing: No. 8B - Pre-Filed Testimony of William Bousquet SD