Project Summary: Lady's Island Vacuum Truck - Friendship Lane, Site Photographs Sams Point Road, Ethel Grant Lane, Honeysuckle Lane, Pine Run Trail Before Project #: 2010-043 Completed: Aug-09 Narrative Description of Project: Cleaned out (17) catch basins. Jetted (1) crossline pipe, 1,204 L.F. of roadside pipe and 137 L.F. of outfall pipe. Material Cost, Rental Equipment Summary, and Labor Material Unit Cost/Unit Qty Cost Water gallon $0.01 9,300 $93.00 Diesel gallon $2.37 155.2 $367.82 Labor hours 127.5 $4,068.68 Total Cost of Materials, Rental Equip., and Labor $4,529.50 During Note: Labor cost includes the employee's salary plus fringe benefits. Equipment Cost Item Asset Cost/Hour Hrs. Cost Vacuum Truck 22812 $20.30 62.0 $1,258.60 Total Equipment Cost $1,258.60 Cost/hour excludes fuel cost. Total Cost: $5,788.10 After Beaufort County Public Works Stormwater Infrastructure Project Summary
6

Beaufort County Public Works Stormwater …...2010-041 Township: Lady's Island Completed: August 2009 0 35 70 140 210 280 Feet 1 inch equals 97.55 feet Prepared By: BC Stormwater Management

Jul 16, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Beaufort County Public Works Stormwater …...2010-041 Township: Lady's Island Completed: August 2009 0 35 70 140 210 280 Feet 1 inch equals 97.55 feet Prepared By: BC Stormwater Management

Project Summary: Lady's Island Vacuum Truck - Friendship Lane, Site PhotographsSams Point Road, Ethel Grant Lane, Honeysuckle Lane, Pine RunTrail

BeforeProject #: 2010-043 Completed: Aug-09

Narrative Description of Project: Cleaned out (17) catch basins. Jetted (1) crossline pipe, 1,204 L.F. of roadside pipe and 137 L.F. of outfall pipe.

Material Cost, Rental Equipment Summary, and Labor

Material Unit Cost/Unit Qty CostWater gallon $0.01 9,300 $93.00Diesel gallon $2.37 155.2 $367.82Labor hours 127.5 $4,068.68Total Cost of Materials, Rental Equip., and Labor $4,529.50 During

Note: Labor cost includes the employee's salary plus fringe benefits. Equipment Cost

Item Asset Cost/Hour Hrs. Cost

Vacuum Truck 22812 $20.30 62.0 $1,258.60Total Equipment Cost $1,258.60 Cost/hour excludes fuel cost. Total Cost: $5,788.10

After

Beaufort County Public WorksStormwater Infrastructure

Project Summary

Page 2: Beaufort County Public Works Stormwater …...2010-041 Township: Lady's Island Completed: August 2009 0 35 70 140 210 280 Feet 1 inch equals 97.55 feet Prepared By: BC Stormwater Management

")

")

")

")

")

Cleaned out (3) catch basins.Jetted 500 L.F. of roadsidepipe.

")

")Cleaned out (2) catch basins.Jetted 23 L.F. of outfall pipe.

Jetted 34 L.F. of outfal pipe.

Cleaned out (2) catch basins.Jetted out 462 L.F. of roadside pipe.

Jetted 80 L.F. of outfall pipe.

SHERMAN DR

D/W

GA

NN

ET P

OIN

T R

D

DOLLY LN

DOG CREEK RD

TRA

ILS

EN

D

LegendDrainage Type

River

Stream

Outfall

Lateral

Roadside

Crossline

D/W

Access

Piped

Bleeder

Parcels

®Project: FriendshipLane

Activity:Vacuum Truck

Project #:2010-043

Township:Lady's Island

Completed:August 2009

0 230 460 690 920115Feet

1 inch equals 381.78 feetPrepared By: BC Stormwater Management UtilityDate Print:09/10/09File:C:\project summaries map/Friendship Lane_2010_043

Page 3: Beaufort County Public Works Stormwater …...2010-041 Township: Lady's Island Completed: August 2009 0 35 70 140 210 280 Feet 1 inch equals 97.55 feet Prepared By: BC Stormwater Management

")")

Cleaned out (2) catch basins.

SAM

S PO

INT

RD

CEDAR POINT DR

LegendDrainage Type

River

Stream

Outfall

Lateral

Roadside

Roadside Pipe

Crossline

D/W

Access

Piped

Bleeder

Parcels

®Project: Sams Point Road

Activity:Vacuum Truck

Project #:2010-042

Township:Lady's Island

Completed:August 2009

0 90 180 270 36045Feet 1 inch equals 153.84 feet

Prepared By: BC Stormwater Management UtilityDate Print:09/10/09File:C:\project summaries map/ Sams Point Road_2010_042

Page 4: Beaufort County Public Works Stormwater …...2010-041 Township: Lady's Island Completed: August 2009 0 35 70 140 210 280 Feet 1 inch equals 97.55 feet Prepared By: BC Stormwater Management

") ")

Cleaned out (2) catch basins. Jetted(1) crossline pipe and 94 L.F.of roadside pipe.

COOSAW RIVER DR

ETH

EL G

RAN

T LN

MAR

SHAL

L LN

FRIE

ND

SHIP

LN

LegendDrainage Type

River

Stream

Outfall

Lateral

Roadside

Crossline

D/W

Access

Piped

Bleeder

Parcels

®Project: EthelGrant Lane

Activity:Vacuum Truck

Project #:2010-041

Township:Lady's Island

Completed:August 2009

0 70 140 210 28035Feet

1 inch equals 97.55 feetPrepared By: BC Stormwater Management UtilityDate Print:09/10/09File:C:\project summaries map/Ethel Grant lane_2010_041

Page 5: Beaufort County Public Works Stormwater …...2010-041 Township: Lady's Island Completed: August 2009 0 35 70 140 210 280 Feet 1 inch equals 97.55 feet Prepared By: BC Stormwater Management

") ")

Cleaned out (2) catch basins.

ALSTON RD

HO

NE

YSU

CK

LE L

N

BUB

BA

LN

LegendDrainage Type

River

Stream

Outfall

Lateral

Roadside

Crossline

D/W

Access

Piped

Bleeder

Parcels

®Project:Honeysuckle Lane

Activity:Vacuum Truck

Project #:2010-044

Township:Lady's Island

Completed:August 2009

0 70 140 210 28035Feet

1 inch equals 107.12 feet Prepared By: BC Stormwater Management UtilityDate Print:09/10/09File:C:\project summaries map/Honeysuckle Lane_2010_044

Page 6: Beaufort County Public Works Stormwater …...2010-041 Township: Lady's Island Completed: August 2009 0 35 70 140 210 280 Feet 1 inch equals 97.55 feet Prepared By: BC Stormwater Management

")

")

")

")Cleaned out (1) catch basin.Jetted 148 L.F. of roadside pipe.

Cleaned out (3) catch basins.PI

NE

RU

N T

RL

SAM

S PO

INT

RD

HICKORY RD

RED TIP RD

CO

VE

RD

WHITE DOGWOOD RD

ROYAL PINES BLVD

ATT A

WA

Y LN

LegendDrainage Type

River

Stream

Outfall

Lateral

Roadside

Roadside Pipe

Crossline

D/W

Access

Piped

Bleeder

Parcels

®Project: Pine Run Trail

Activity:Vacuum Truck

Project #:2009-165

Township:Lady's Island

Completed:August 2009

0 130 260 390 52065Feet

1 inch equals 215.45 feetPrepared By: BC Stormwater Management UtilityDate Print:10/18/09File:C:\project summaries map/ Pine Run Trail_2009-165