Top Banner
Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities Student Meeting Jose Luis Sirvent PhD. Student 27/05/2013
14

Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities Student Meeting Jose Luis Sirvent PhD. Student 27/05/2013.

Jan 12, 2016

Download

Documents

Erica Hicks
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities Student Meeting Jose Luis Sirvent PhD. Student 27/05/2013.

Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities

Student MeetingJose Luis Sirvent

PhD. Student27/05/2013

Page 2: Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities Student Meeting Jose Luis Sirvent PhD. Student 27/05/2013.

1.Cable Impact on pCVD signal• 3 Studies carried out for the moment (With 2 reports available):

– pCVD Signal estimations from Wire Scanners• http://issues.cern.ch/browse/BIWS-419• Dynamic range first approximations for SPS

– SPS max Charge per bunch (All BWS)_Totem: 120pC– SPS max Charge per bucnh (Prototype Location 51740)_Nominal: 60pC

• Dynamic range first approximations for LHC – LHC max Charge per bunch E=2e-6m B=123m @ 7TeV (Beam_Sigma=181um)_Nominal: 226pC– LHC max Charge per bunch E=2e-6m B=123m @ 450GeV (Beam_Sigma=716um)_Nominal: 32pC

• Proposal of Dynamic range: 2fC (~MIP) to 400pC (~2*Qmax)

– Impact of Long Cables (250m of CK50) in the pCVD Signal (Report)• http://issues.cern.ch/browse/BIWS-422• 250m Cable Bandwidth: ~ 10MHz (To avoid 25ns pulse overlapping needed > 40MHz)• Amplitude loss of 5dB• Observed offset due pulse overlapping 5%• Settling time ~ 66ns (first 3 bunches)

– BWS Scan Simulation Though Long CK50 Cables (Report)• http://issues.cern.ch/browse/BIWS-424• pCVD Signal generation from BWS and Beam characteristics (Script)• Matlab processing and simulation of cable as an approximate filter (Script)• Sigma measurement not affected by cable• Very low temporal resolution at bunch level (too long decays)• Not constant offset. This is good, bad…?

Page 3: Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities Student Meeting Jose Luis Sirvent PhD. Student 27/05/2013.

1.Cable Impact on pCVD signal• BWS Scan Simulation Though Long CK50 Cables (Report)

– A) Why with Matlab? • Problems with Pspice when custom input signals are “too heavy”• Simulations could not be completed with Pspice, only 10% segments …• Matlab has tools enough to approximate the response of the cable.

Page 4: Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities Student Meeting Jose Luis Sirvent PhD. Student 27/05/2013.

1.Cable Impact on pCVD signal• BWS Scan Simulation Though Long CK50 Cables (Report)

– B) Let’s see the response in “Time domain”• Approximations with Butterworth & Chevychev 1st order filters is quite similar• Approximation with FIR2 & FIR1 filters not at all satisfactory• See Matlab (left) VS Pspice (Right)

Page 5: Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities Student Meeting Jose Luis Sirvent PhD. Student 27/05/2013.

1.Cable Impact on pCVD signal• BWS Scan Simulation Though Long CK50 Cables (Report)

– C) Now we can generate the pCVD spected signal and introduce it in cable model.• Modulated train of bunches with a Gaussian envelope• All calculations performed from BWS and Beam characteristics for pCVD at 2m

Page 6: Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities Student Meeting Jose Luis Sirvent PhD. Student 27/05/2013.

1.Cable Impact on pCVD signal• All this leads us to some interesting conclusions:

– 1. Cable is a limiting factor for BbB (Bunch by Bunch) acquisition– 2. Long cables can lead to a poor SNR in Gaussian tails (possible induced noise)

• Could be possible to avoid with a “smart” amplification scheme.• Long CK50 cable noise to be studied in practice.

– 3. It’s required a BW >> for 250m link!! (Undesired signal shaping)• A) Better Cables? • B) Study different techniques?

Page 7: Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities Student Meeting Jose Luis Sirvent PhD. Student 27/05/2013.

2. Looking for inspiration • Experiments using Diamonds or useful technology for us:

– ATLAS Beam Conditions Monitors– CMS Beam Conditions Monitors– CMS BHM (Background at High Radius Detector)– LHC Beam Loss Monitor– CMS Upgrade of the Hadron Calorimeter– Dessy & Fermilab

• Many synergies, shared technology, collaboration & knowledge– Very nice developments already available (ASICS) that could fit well all our specs– This is full of very intelligent people!

Page 8: Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities Student Meeting Jose Luis Sirvent PhD. Student 27/05/2013.

2. Looking for inspiration • ATLAS BCM (pCVD module):

– Double Decked detector: SNR + 50%– 45º Tilted: Signal increasement factor sqrt(2)– BW limit ~ 300MHz: SNR + 20%– 40 dB Amplification in 2 stages (Algient MGA BW500MHz & MiniCircuits Gali52 BW2GHz)– Microstript technology 50ohm.– Package very well shielded and isolated– Diamonds very well characterised and tested.– Connections: HV, LV & Signal– Signal cable Length to ADC: 15m– SNR 11:1 for MIP

HV

Signal

*V.Cindro et al. “The ATLAS Beam Conditions Monitor”. 2008, Journal of Instrumentation Vol3, Feb2008.

Double Decked Detector (Simplified Scheme)

Page 9: Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities Student Meeting Jose Luis Sirvent PhD. Student 27/05/2013.

2. Looking for inspiration • CMS BCM1:

– sCVD Diamond sensors used– Signal transmission by Analog-Optohybrid driver: Linear optical driver (optical analog

signal)– Digitalization on Counting room– The designs planed to be updated on LS1 (BCM1 & BHM)

• “CMS Online Beam Background Monitor Upgrade Plans (Marina Giunta) 13th May 2013”• Planning System as CMS-HF Architecture (Qie10-based)• Quicker electronics, Peack time <10ns, 25ns BbB…

*A.Bell et al. “Fast Beam Conditions Monitor BCM1F for the CMS Experiment”. Nuclear Instruments & Methods in Physics Research. Dec 18,2009

Page 10: Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities Student Meeting Jose Luis Sirvent PhD. Student 27/05/2013.

2. Looking for inspiration • CMS Upgrade of the Hadron Calorimeter:

• 3 Sensors: HB (Barrel),HE(Endcap) & HF (Forward)• Common scheme, Electronics and architecture (Quicker development)• QIE10-Based Acquisition.• 3 Main hardware systems:

– 1. Detector module– 2. Front-End Electronics (Tunnel)– 3. Back-End Electronics (Surface)

• Long Link transmission: Optic SMF 1310• FE-Cards

– QIE10: Charge Integration and Encoder V10– FE-FPGA: RH Data Alignment & Formatting– GBT: RH Serializer & Optic link 4.8Gb/s – VTTX: Versatile Link technology (RH PD/PD…)

• Jake Anderson et al. “Progress on the Upgrade of the CMS Hadron Calorimeter Front-End Electronics”. TIPP2011-Technology and Instrumentation in Particle Physics 2011.

• J. Anderson et al. “CMS Technical Design Report for the Phase 1 Upgrade of the Hadron Calorimeter”. CMS-TDR-010. 26 September 2012.

Page 11: Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities Student Meeting Jose Luis Sirvent PhD. Student 27/05/2013.

2. Looking for inspiration • QIE10 Characteristics and functionality(*):

• Rad-Hard Charge-Integrating ASIC (25ns) • Fast, Wide dynamic range, Dead-Timeless ADC (Latency: only 4x25ns)• Very High dynamic range: 3.2fC 340pC (Fits well our initial estimations!!)

– LSB 3.2fC (Almost MIP for pCVD)– Non linear charge digitalization scheme: 6 bit FACD mantissa + 2 Exp (4 Ranges)– TDC capability: Produces TDC info based on the Rising/falling edge of pulse (2 configurable 8bits thresshold

levels)

• Inputs: – Reset (CLK Alignment)– Charge signal (from pCVD)– CLK– Programable stuff ( Thressholds, Pedestrials…)

• Outputs:– Q : Charge Integral– T1: Arrival time (500ps resolution)– T2: Falling time (500ps resolution)

• QIE10p4 Already available!• QIE10p5 soon (maybe also available)

* “CMS Specifications Document for the QIE10 ASIC. 2010”http://indico.cern.ch/getFile.py/access?contribId=10&resId=0&materialId=0&confId=124743

Page 12: Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities Student Meeting Jose Luis Sirvent PhD. Student 27/05/2013.

2. Looking for inspiration • What is nice form CMS HE/HB FEE ?

– QIE BOARD– 12 Channels per board– Integrated RH ProASIC3 FPGA, GBT & VL (4.8Gb/s GBT link)– Provides already digitalized and formatted information in an Optical link– It’s possible place near the BWS (RadHard components)– Needed a ngCCM Control Board (Clock & Control Module):

» Deliver clock (Good quality)» Orbit signal for data marking and synchro» QIE10 RESET» Calibration signal» I2C com for config of GTBX,QIE10 and FE-FPGA (Remote programming)» Monitoring of Voltages & Temperatures

Page 13: Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities Student Meeting Jose Luis Sirvent PhD. Student 27/05/2013.

3. Just an initial architecture proposalCMS HE/HB FEE-Inspired (Very simplified & Very preliminar)

pCVD Diamond Detector

Bias Circuit

Line amplifiers(Matching Impedance)

Detector Module (ATLAS BCM)

HV

LV

Signal (<15m of CK50)

Front-End Electronics (CMS HE/HB)

QIE10 RH FPGA(ProASIC3)

GBT VTTX

ngCCM

HV LV SMF or MMF4.8Gb/s optical link(RX: CLK + Control)

(TX: D_Signal + Diag.)250m

Back-End Electronics (PFGA Development Board)

GBT VTTXFPGA(Control)

DDR2Memory

Ethernet Link

Diagnostics System

BST(Beam Synchronous Timing)

Counting-Room

Data Bases

Ethernet Link

Expert Application

Dataprocessin

g

Systems integration

Tunnel

Surface

Page 14: Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities Student Meeting Jose Luis Sirvent PhD. Student 27/05/2013.

4. Final statements• 1. Signal cable as limiting factor (Experiments in general use optical links for high

speed signal transmission)• 2. QIE10 is a great candidate for the digitalization of the pCVD signal (Reaches specs in terms

of Timing & Dynamic range)• 3. By Using the Know-how of our section & potential collaboration with CMS our system

could be built (Relatively quickly).• 4. By following LEGO ® mentality we can use a big amount of CERN Developed ASICS.• 5. What now? Present research plan to “Universidad de Barcelona” for PhD. Approval