BE-RF CONSOLIDATION C. Rossi on behalf of the RF Group nsolidation Day – 12 September 2013
Jan 03, 2016
BE-RF CONSOLIDATIONC. Rossi on behalf of the RF Group
Consolidation Day – 12 September 2013
PRESENTATION OUTLINE
Consolidation Needs by Area
• The Meyrin Accelerator Complex
o AD
o LEIR
o Linac2 / Linac3
o PSB
o PS
• SPS
• LHC
Summary tables
Risk Analysis
PRESENTATION OUTLINE
Consolidation Needs by Area
• The Meyrin Accelerator Complex
o AD
o LEIR
o Linac2 / Linac3
o PSB
o PS
• SPS
• LHC
Summary tables
Risk Analysis
PRESENTATION OUTLINE
Consolidation Requests by Area
• The Meyrin Accelerator Complex
o AD
o LEIR
o Linac2 / Linac3
o PSB
o PS
• SPS
• LHC
Summary tables
Risk Analysis
3 MCHF consolidation budget started or approved, rest of consolidation transferred to LIU
3.6 MCHF consolidation budget already approved.
1.7 MCHF consolidation budget already approved.
ADAD Consolidation - HLRF
AD RF system was built to start physics in 2000 by recuperating old RF equipment coming from dismissed accelerators and with the initial perspective of operating until 2012, then extended to 2016 and later.RF amplifiers for the bunch rotation system AD C10 were built around the TH116 RF tube, now out of production, the existing stock may provide still 5 years of operation, depending on the status of spares. With one system the AD can run at 70% of the beam current.
AD C10 AD C02
The renovation of power supplies will improve reliability and maintainability. Consolidation is needed for LLRF and interlocks.
The urgency of the renovation will depend also on the measurements that will be performed on the “stock” of TH116.
ADAD Consolidation - LLRF
The AD LLRF system is of the old analogue type, an upgrade to the new digital standards, already tested on other machines, like PSB, is necessary. The upgrade of the Schottky pick-up electronics can be done at the same time.The upgrade of the transverse dampers can progress in parallel with the renovation of the PSB equipment.
ADAD Stochastic Cooling
The AD stochastic cooling plays a fundamental role in the machine operation.48 RF amplifiers need to be replaced after 30 years of operation; components are obsolete and the amplifiers and RF filters will not withstand additional 20 years of operation.
LINAC2/LIN
AC3Linac2/Linac3 Consolidation - HLRF
The 200 MHz amplifier for the Linac2 RFQ is heavily corroded, no adjustment is possible in this condition. A spare amplifier would be profitable also to the Linac3 IH RF system.
Linac3 Consolidation
The renovation concerns:the LLRF, that will be upgraded to the Linac4 standard;The driver amplifiers for bunchers, debuncher and ramping cavity;The Frank James amplifiers.
SPSSPS Consolidation - New 18 kVAC transformers
Manufactured in 1989, they have an expected lifetime of 20-30 years; an accident happened in 2011. Experts’ review (EDMS 1222075) recommends replacement in medium term.
New HV capacitors
Following an accident in 1997 all capacitors were replaced in 1998. The expected lifetime is 20 years.
HV new cabling (TWC + Dampers)
Upgraded in 90’s, several HV cable faults observed within the last years.Reliability and safety issues require new cables complying with safety standards.
SPSSPS Consolidation – Cooling Pipes
40 years old cooling pipes for SPS RF amplifiers are source of risk for the reliability of RF systems and safety of personnel. Upgrade needed to stainless steel pipes.
YL tube replacement
Richardson decided to stop producing tubes (YL1530, YL1520, YL1440)Half SPS-RF 200 MHz is affectedSector management agreed to move to Thales to provide a ‘pin to pin’ compatible tube
Damper Power Amplifiers Consolidation
• New tube design by suppliers (new grid material);
• Present air cooling is too weak leading in premature tube failures;
• Machine down time and cost impact as tube lifetime is reduced;
• New amplifiers cooling system.
Cooling
• Several faults have been identified due to amplifier to kicker connection
• Improved connection to be studied and implemented
Amplifier to kicker connection
LHC
LHC Consolidation – Additional Spare Cavities
We will now build 6 cavities with He-tank instead of 3, and we will have to work on the spare unit LHC19 (contaminated) and the module HCACSCA000-AC000003 that will be removed from the machine. .
A new LHC module has been agreedFour new spare couplers are needed for this module, including four Double walled Tubes (DT)
LHC 4 FPC for new module LHC Damper Power Amplifiers
Same as for the SPS
SUM
MARY TABLES
BUDGET Summary Table
BC Accel Description 2013 2014 2015 2016 2017 2018 2019 2020
69711SPS OLD
SPS Driver amplifiers128 98
SPS NEW 68 158
69237SPS OLD
TWC800 antennas, couplers, wg237 98 49
SPS NEW 200 135 New SPS YL tubes replacement 1700 1000 New SPS SPS New 18 kVAC transformers 300 1500 New SPS SPS New HV capacitors 500 New SPS SPS new cooling for all amplifiers (EN/CV) 500 New SPS SPS HV new cabling (TWC + DT) 200 New SPS SPS Dampers PA consolidation 100 New LHC LHC Dampers PA consolidation 200 New LHC LHC 4 FPC for new module 150 150 150 150
69815LHC OLD
Spare SC Cavities for LHC13 350 160
LHC NEW 13 800 350 350 New Linac3 Linac3 LLRF migration to Linac4 technology 50 100 150 New Linac3 Linac3/Linac2 200MHz spare amplifier 60
New Linac3 Linac3: replacement of driver amplifiers for buncher, debuncher, and ramping
20 40
New Linac3 Linac3 101 MHz amplifiers 100 100 50New Linac3 Linac3 Frank James amplifiers 25 New AD AD C10 RF System 1000 1500 1500
New AD AD C02 RF System LLRF and Interlocks + Schottky intensity measurement + Transverse dampers
38 12 30 60 60
New AD AD Stochastic cooling amplifiers and filters 25 1000
SUM
MARY TABLES
RISK ANALYSIS Summary Table
Accel Description P Io Ir If Is ∑i Rs Rs’
SPS YL tubes replacement 4 5 3 3 1 0.7 20 14
SPS SPS New 18 kVAC transformers 3 5 3 3 5 0.7 15 10.5
SPS SPS New HV capacitors 3 5 3 3 5 0.7 15 10.5
SPS SPS new cooling for all amplifiers 2 3 2 2 1 0.7 6 4.2
SPS SPS HV new cabling (TWC + DT) 3 2 2 2 2 0.7 6 4.2
SPS SPS Dampers PA consolidation 2 1 1 1 1 0.7 2 1.4
LHC LHC Dampers PA consolidation 2 1 1 1 1 0.4 2 0.8
LHC LHC 4 FPC for new module 2 3 2 2 1 0.4 6 2.4
Linac3 Linac3 LLRF migration to Linac4 technology 2 2 1 2 1 0.55 4 2.2
Linac3 Linac3/Linac2 200MHz spare amplifier 3 3 1 1 1 1 9 9
Linac3 Linac3: replacement of driver amplifiers for buncher, debuncher, and ramping 3 3 1 1 1 0.55 9 4.95
Linac3 Linac3 101 MHz amplifiers 2 2 2 2 1 0.55 4 2.2
Linac3 Linac3 Frank James amplifiers 2 3 2 1 1 0.55 6 3.3
AD AD C10 RF System 2 5 3 3 1 0.1 10 1
AD AD C02 RF System LLRF and Interlocks 4 2 2 1 1 0.1 8 0.8
AD AD Stochastic cooling amplifiers and filters 4 3 2 2 1 0.1 12 1.2
In the risk analysis Rs’ still includes CNGS, in order to keep coherence with previous analysis.AD Rs’ is obviously low, being AD a “single user” machine, counting for a factor 0.1; however the proposed consolidation is crucial for extending the operation to the next decades.
SUM
MARY CH
ARTSummary Chart
RF Consolidation requested budget profile
2013 2014 2015 2016 2017 2018 2019 20200
500
1000
1500
2000
2500
3000
3500
4000
4500
LHCSPSLinacsAD
SUM
MARY CH
ARTSummary Chart
RF Consolidation budget profile, including approved
2013 2014 2015 2016 2017 2018 2019 20200
1000
2000
3000
4000
5000
6000
PS approvedLHC+approvedSPS+approvedLinacsAD