Top Banner
BE-AWARE Project B onn Agre ement: A rea-w ide A ssessment of R isk E valuations John Mouat, Deputy Secretary
12

BE-AWARE Project Bonn Agreement: Area-wide Assessment of Risk Evaluations John Mouat, Deputy Secretary BONN AGREEMENT.

Apr 01, 2015

Download

Documents

Elyse Mae
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BE-AWARE Project Bonn Agreement: Area-wide Assessment of Risk Evaluations John Mouat, Deputy Secretary BONN AGREEMENT.

BE-AWARE Project

Bonn Agreement: Area-wide Assessment of Risk

EvaluationsJohn Mouat, Deputy Secretary

Page 2: BE-AWARE Project Bonn Agreement: Area-wide Assessment of Risk Evaluations John Mouat, Deputy Secretary BONN AGREEMENT.

Bonn AgreementAgreement for cooperation in dealing with pollution of the

North Sea by oil and other harmful substances

• Surveillance for threats of marine pollution• Development of common operational

methods • Support in response operations• Sharing research and development• Carrying out joint exercises• Risk assessment

Page 3: BE-AWARE Project Bonn Agreement: Area-wide Assessment of Risk Evaluations John Mouat, Deputy Secretary BONN AGREEMENT.

Why do we need a risk Assessment in the Greater North Sea?

• Increasing traffic and vessel size

• Increased transports of oil and HNS

• New maritime uses and activity– Energy generation– Ocean aquaculture– Marine protected areas

• Increased storminess

Page 4: BE-AWARE Project Bonn Agreement: Area-wide Assessment of Risk Evaluations John Mouat, Deputy Secretary BONN AGREEMENT.

Project Background• Bonn Agreement

Ministerial Meeting 2010– Dublin Declaration– Bonn Agreement

Action Plan (BAAP)• Risk Analysis

Workshop, May 2011• No existing overview• Need to further

develop on National risk assessments

Page 5: BE-AWARE Project Bonn Agreement: Area-wide Assessment of Risk Evaluations John Mouat, Deputy Secretary BONN AGREEMENT.
Page 6: BE-AWARE Project Bonn Agreement: Area-wide Assessment of Risk Evaluations John Mouat, Deputy Secretary BONN AGREEMENT.

Project Structure

Page 7: BE-AWARE Project Bonn Agreement: Area-wide Assessment of Risk Evaluations John Mouat, Deputy Secretary BONN AGREEMENT.

Project Structure

Page 8: BE-AWARE Project Bonn Agreement: Area-wide Assessment of Risk Evaluations John Mouat, Deputy Secretary BONN AGREEMENT.
Page 9: BE-AWARE Project Bonn Agreement: Area-wide Assessment of Risk Evaluations John Mouat, Deputy Secretary BONN AGREEMENT.

Project partnersCoordinating Beneficiary:

Bonn Agreement

Associate Beneficiaries:

RBINSMUMM

RWSNoordzee

Admiral Danish Fleet HQ

Co-Financiers:

Norwegian Coastal Administration

Belgian Federal Public Service: Marine Environment Unit

Page 10: BE-AWARE Project Bonn Agreement: Area-wide Assessment of Risk Evaluations John Mouat, Deputy Secretary BONN AGREEMENT.

Timeline

Page 11: BE-AWARE Project Bonn Agreement: Area-wide Assessment of Risk Evaluations John Mouat, Deputy Secretary BONN AGREEMENT.

Continuation

• Joint sensitivity mapping and detailed analysis Joint sensitivity mapping and detailed analysis of impactof impact

• Modelling of a range of scenarios comprising Modelling of a range of scenarios comprising additional risk reducing measures and additional risk reducing measures and response capabilitiesresponse capabilities

• Comprehensive HNS analysisComprehensive HNS analysis• Enhanced preparedness in high risk areasEnhanced preparedness in high risk areas

Page 12: BE-AWARE Project Bonn Agreement: Area-wide Assessment of Risk Evaluations John Mouat, Deputy Secretary BONN AGREEMENT.

Thank you

www.bonnagreement.org

0044 (0)20 7439 5200