Top Banner
Big Data Europe Pilot case in System Monitoring Energy BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16 4-oct.-16 F. Mouzakis (CRES)
19

Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

Apr 09, 2017

Download

Technology

BigData_Europe
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

Big Data EuropePilot case in System Monitoring Energy

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/164-oct.-16

F. Mouzakis (CRES)

Page 2: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.2

4-oct.-16www.big-data-europe.eu

Use Case (Scenario, Pilot)

Title: System monitoring in energy production units

Objective:Provide a tool for handling the analysis of large data sets, tailored for distributed and highly sampled sensors

Field/Stakeholders: The pilot addresses RES developers, researchers in CMS systems, manufacturers, CMS and IT service providers in wind energy field

Other Use: Sensor data cases (transport, manufacturing and other related industrial fields)

Page 3: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.3

4-oct.-16www.big-data-europe.eu

The management of large number of distributed energy production systems present challenges in operation monitoring, maintenance and production forecasting. In renewable energy production, the stochastic nature of the resource input, poses an additional challenge.

In order to meet the above challenges, an extensive network of sensors operates and produces data continually supporting decision making. In research field experimental systems are generating data that feed procedures under development. Constraints in data volume lead to degradation of their value.

For the reduction of energy cost, the increase of production reliability and the increase of renewables penetration (all major aspects of the societal challenge) the new developments in Information Technology have to be combined with the Operation Technology exploiting in a holistic approach the data collection, management and analytics.

Problem Definition

Page 4: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.4

4-oct.-16www.big-data-europe.eu

The following user workflows are supported:

Monitoring of the operational status of the units, considering the cluster operation in total

Incorporation of third party systems (condition monitoring systems, experimental research modules) into the monitoring process and performing correlated assessment

(optional) Support preventive maintenance strategy based on fleet operational data

(optional) Power production prognostics

The pilot receives data (raw sensor and locally analyzed data) and maintains the campaign data base (with functionalities of content preview, visualization, querying etc).

Except from the built-in analytics the user will be able to select data for custom analysis.

Scenario

Page 5: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.5

4-oct.-16www.big-data-europe.eu

Primary Content/Data InvolvedType: SCADA and CMS data on a Wind Turbine specifically instrumented for BDE

Status: Open

Sensors: Operational parameters, Vibration, Mechanical Loading, Power Quality etc

Format: Third party (TDMS technical data management streaming) – preprocessing foreseen

Acquisition technology: Field Programmable Gate Arrays (FPGA)

Sampling rate: from 200Hz for operational parameters up to 50kHz for vibration & power quality

Streaming volume: 3 distributed units yield ~14Gb/hour continuously

Scope: Long term monitoring for drive train health monitoring research

Analytics: engineering signal analysis, research on parameterics, fault identification and loop with updated methodologies on raw data

Operation of pilot: 1 year

Page 6: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.6

CRES Wind Farm

4-oct.-16www.big-data-europe.eu

Monitored WTNeg-Micon 750kW

Page 7: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.7

CRES CM system on NegMicon 750kW WT

4-oct.-16www.big-data-europe.eu

The SCADA software provides indicatively the following data for the condition monitoring system:

- system operational statuses/parameters- wind turbine output electrical power - nacelle yaw position, yaw motor electrical power- wind speed from nacelle anemometerand additionally:- mechanical loads on tower top and base cross

section - rotor thrust & tower torsion- HSS torque (on shaft coupling the gearbox with the

generator)- vibration at gearbox various stages- acoustic emision signals (blade/gearbox)

Page 8: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.8

www.big-data-europe.eu

SC3 Pilot measuring system

Gearbox and Drive train DAQ systems

Operation DAQ systemSupervising PCLocal storage unit

Page 9: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.9

www.big-data-europe.eu

SC3 Pilot sample sensors

Power Quality voltage and current probes

Bearing vibration sensors at gearbox HSS (accelerometers)

Page 10: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.10

BDE pilot CM module topology

www.big-data-europe.eu

7.2Gb/hour (i2)

0.1Gb/hour (r4)

7.2Gb/hour (i2)

?

Source: NI.com

Page 11: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.11

Sample BDE pilot timeseries

www.big-data-europe.eu 4-oct.-16

Page 12: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.12

4-oct.-16www.big-data-europe.eu

Page 13: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.13

4-oct.-16www.big-data-europe.eu

Page 14: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.14

Basic analytics

www.big-data-europe.eu

Raw time series

Statistics and correlations

Dynamic analysis

Fatigue analysis

4-oct.-16

Page 15: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.15

4-oct.-16www.big-data-europe.eu

Pilot concept

Page 16: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.16

4-oct.-16www.big-data-europe.eu

Pilot concept

Page 17: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.17

4-oct.-16www.big-data-europe.eu

User interface

Page 18: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.18

4-oct.-16www.big-data-europe.eu

Hardware setup

Page 19: Bde sc3 2nd_workshop_2016_10_04_p06_bde_pilot

BigDataEurope 2nd SC3 Workshop, Brussels 4/10/16BDE Pilot case in system monitoring p.19

4-oct.-16www.big-data-europe.eu

Pilot status

◎ Data acquisition in operation

◎ Spark ‘executor’ and analytics modules are operative

◎ Web application to be launched in 2016

Future interaction with stakeholders:

◎ Application of the pilot for data sets and analytics modules provided by stakeholder (not open data)

◎ Extending the functionalities of the web app (feedback from the community)