European strawbale building methods Leonardo da Vinci_PARTNERSHIPS 2009/2011_STRAWBALE BEST BUILDING PRACTICE IN EUROPE 1. General information Method of construction: Post and Beam (wrap ID: PB02 Representative: Boris Hochel Contact: [email protected] www.ozartur.sk Table of Content Personal quotation First SB method with official building permition in Slovakia in 2006. 7. Questionnaire 9. Evaluation sheet 2. Visual description of the method1 1. General information 3. Visual description of the method 2 4. Technical drawings 2D 5. Explanation of the method 6. Calculation sheet 8. Sustainability
8

BBP Slovakia

Apr 09, 2016

Download

Documents

vlado brukker

European strawbale building methods Best building practice, by Boris Hochel, ozartur.sk
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BBP Slovakia

European  strawbale  building  methods

Leonardo da Vinci_PARTNERSHIPS 2009/2011_STRAWBALE BEST BUILDING PRACTICE IN EUROPE

1.  General  information

Method  of  construction: Post  and  Beam  (wrap ID: PB-­‐02Representative: Boris  Hochel

Contact: [email protected]  www.ozartur.sk

Table  of  Content

Personal  quotationFirst  SB  method  with  official  building  permition  in  Slovakia  in  2006.

7.  Questionnaire

9.  Evaluation  sheet

2.  Visual  description  of  the  method-­‐11.  General  information

3.  Visual  description  of  the  method  -­‐24.  Technical  drawings  2D5.  Explanation  of  the  method6.  Calculation  sheet

8.  Sustainability

Page 2: BBP Slovakia

European  strawbale  building  methods

Leonardo da Vinci_PARTNERSHIPS 2009/2011_STRAWBALE BEST BUILDING PRACTICE IN EUROPE

2.  Visual  description  of  the  method-­‐1 Evaluation  of  best  building  practices3D  –  1

Method  of  construction: Post  and  Beam  (wrap ID: PB-­‐02Representative: Boris  Hochel

Contact: [email protected]  www.ozartur.sk

view  from  exterior

wraping  with  strawbales  from  exterior

Page 3: BBP Slovakia

European  strawbale  building  methods

Leonardo da Vinci_PARTNERSHIPS 2009/2011_STRAWBALE BEST BUILDING PRACTICE IN EUROPE

3.  Visual  description  of  the  method  -­‐23D  –  2

Method  of  construction: Post  and  Beam  (wrap ID: PB-­‐02Representative: Boris  Hochel

Contact: [email protected]

view  from  outside

view  from  inside

Page 4: BBP Slovakia

European  strawbale  building  methods

Leonardo da Vinci_PARTNERSHIPS 2009/2011_STRAWBALE BEST BUILDING PRACTICE IN EUROPE

4.  Technical  drawings  2D Evaluation  of  best  building  practices

Method  of  construction: Post  and  Beam  (wrap ID: PB-­‐02Representative: Boris  Hochel

Contact: [email protected]

without  scale

Page 5: BBP Slovakia

European  strawbale  building  methods

Leonardo da Vinci_PARTNERSHIPS 2009/2011_STRAWBALE BEST BUILDING PRACTICE IN EUROPE

5.  Explanation  of  the  method Evaluation  of  best  building  practices

Method  of  construction: Post  and  Beam  (wrap ID: PB-­‐02Representative: Boris  Hochel

Contact: [email protected]

Stone foundations Post and beam construction including roof and floor

Wraping strawbales arround the house with a help of boards

Interior with painted earth plaster

General overview of the house

Plastering strawbales with clay from exterior

Page 6: BBP Slovakia

European  strawbale  building  methods

Leonardo da Vinci_PARTNERSHIPS 2009/2011_STRAWBALE BEST BUILDING PRACTICE IN EUROPE

7.  Questionnaire

Method  of  construction: Post  and  Beam  (wrap ID: PB-­‐02Representative: Boris  Hochel

Contact: [email protected]

1

2

3

4

Fixation  of  balesHow  are  your  bales  secured  in  the  wall?Wooden boards push the bale against the wall fixed with hook and rope. Hazel pins are also used to fix the bales

3.1  How  do  you  deal  with  potential  of  rain  bouncing  from  the  ground  surface  and  ground    humidity?

Bales  without  gaps

Moisture

How  do  you  ensure  tightness  of  the  strawbale  wall  insulation  (stuffing  gaps  between  bales  with  loose  straw  for  example)?

Stuffing the gabs with loose straw

3.2  How  do  you  deal  with  possibility  of  water  intrusion  from  building’s  interior  at  each  floor  level?

First we built the wooden structure infilled with bricks and the roof. The walls are then wrapped ith strawbales from outside

Bottom of the first row of bales is lifted minimum 45 cm above the ground

With 2 layers of clay plaster and finishing layer of lime plaster

Bales

3.5  How  do  you  prevend  water  leakage  at  the  window  sill  detail?  

The window sill is made of tin with splayed drip on the edge

3.3  How  do  you  protect  straw  in  your  walls  against  wind  driven  rain?

3.4  How  do  you  protect  your  wall  during  it’s  construction  from  weather?

Irrelevant

What  are  your  criteria  of  bale  quality  (shape,  density,  moisture  content…)?  Give  the  borderline  values.

Humidity < 15% / density 130 kg/m3 / bales : 500/400/800mm

Page 7: BBP Slovakia

European  strawbale  building  methods

Leonardo da Vinci_PARTNERSHIPS 2009/2011_STRAWBALE BEST BUILDING PRACTICE IN EUROPE

7.  Questionnaire

Method  of  construction: Post  and  Beam  (wrap ID: PB-­‐02Representative: Boris  Hochel

Contact: [email protected]

5

6

7

What  do  you  do  to  secure  airtightness  of  the  walls?  Wall  to  ceiling,  opening  or  ground  floor.  Is  there  a  blowerdoor  test?

Wall  coating

How  do  you  ensure  that  your  plaster/render  (if  included  in  your  wall’s  assembly)  doesn’t  crack  over  connection  of  two  different  supporting  materials  (for  example  timber-­‐straw  connection)?Jute mash overlapping at least 200mm over to each side

How  do  you  ensure  bond  of  the  plaster/render  (if  included  in  your  wall’s  assembly)  with  the  straw?

5.1  Plaster

Fixing all the gaps, in the floor is breathable foil under the balesFire  resistance

Yes

Airtightness

3 layers of render

How  do  you  protect  the  walls  from  fire,  while  building  and  after?  Do  you  refer  to  official  approvals?

Page 8: BBP Slovakia

European  strawbale  building  methods

Leonardo da Vinci_PARTNERSHIPS 2009/2011_STRAWBALE BEST BUILDING PRACTICE IN EUROPE

8.  Sustainability

Method  of  construction: Post  and  Beam  (wrap ID: PB-­‐02Representative: Boris  Hochel

Contact: [email protected]

Primary  energy  demand  non  renewable  (PED)  for  construction  and  total  transmission  heat  loss  after  50  years

THL  [kWh/m2]587

THL  fp=0,6  [kWh/m2]

352

PED  [kWh/m2]88

CO2-­‐  Balance  for  construction

CO2-­‐  Balance  [kg  CO2  eq./m2]-­‐68

U-­‐  Value  and  acidification  potential

U-­‐  Value  [W/m2K]0.149

Acidification  [kg  SO2  eq./m2]0.139