Public Works andGovernment Services CanadaArchitectural and Engineering Services BATH INSTITUTION Hwy 33, Bath, OntarioBB36 - ACCOMMODATION UNIT #4BB37 - ACCOMMODATION UNIT #5PWGSC Project No. R.043794.001SPECIFICATIONS VOLUME 1 OF 5: GENERAL REQUIREMENTS, EXISTING CONDITIONS, ELECTRICAL/COMMUNICATIONS SITE,AND CIVIL SPECIFICATIONS Issued for Bid2011-05-18
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Architectural and Engineering Services
BB36 - ACCOMMODATION UNIT #4
BB37 - ACCOMMODATION UNIT #5
PWGSC Project No. R.043794.001
AND CIVIL SPECIFICATIONS
Issued for Bid
2011-05-18
PWGSC Ontario LIST OF CONTENTS Section 00 01 11 Region Project Page
1 Number R.043794.001 2011-05-18
Section Title Pages
ELECTRICAL/COMMUNICATIONS - SITE, AND CIVIL
SPECIFICATIONS
Division 01 - General Requirements 01 11 00 SUMMARY OF WORK 3 01 14
00 WORK RESTRICTIONS 2 01 29 83 PAYMENT PROCEDURES: TESTING
LABORATORY SERVICES 2 01 31 19 PROJECT MEETINGS 3 01 32 16.06
CONSTRUCTION PROGRESS SCHEDULE - CRITICAL PATH
METHOD (CPM) 13 01 33 00 SUBMITTAL PROCEDURES 7 01 35 29.06 HEALTH
AND SAFETY REQUIREMENTS 6 01 35 43 ENVIRONMENTAL PROCEDURES 6 01 35
55 SECURITY REQUIREMENTS OUTSIDE THE PERIMETER
CORRECTIONAL SERVICE CANADA 7 01 35 56 SECURITY REQUIREMENTS INSIDE
THE PERIMETER
CORRECTIONAL SERVICE CANADA 13 01 41 00 REGULATORY REQUIREMENTS 3
01 42 13 ABBREVIATIONS AND ACRONYMS 10 01 45 00 QUALITY CONTROL 5
01 51 00 TEMPORARY UTILITIES 4 01 52 00 CONSTRUCTION FACILITIES 4
01 56 00 TEMPORARY BARRIERS AND ENCLOSURES 3 01 61 00 COMMON
PRODUCT REQUIREMENTS 6 01 71 00 EXAMINATION AND PREPARATION 3 01 73
00 EXECUTION 3 01 74 11 CLEANING 3 01 74 20 CONSTRUCTION/DEMOLITION
WASTE MANAGEMENT AND
DISPOSAL 2 01 77 00 CLOSEOUT PROCEDURES 2 01 78 00 CLOSEOUT
SUBMITTALS 8 01 79 00 DEMONSTRATION AND TRAINING 3 01 91 00
COMMISSIONING - GENERAL REQUIREMENTS 4 01 91 31 COMMISSIONING (CX)
PLAN 31 01 91 51 BUILDING MANAGEMENT MANUAL (BMM) 5
Division 02 - Existing Conditions 02 42 92 DECONSTRUCTION OF
SECURITY FENCE 12 02 81 01 HAZARDOUS MATERIALS 5
Division 26 - Electrical (Site) 26 05 00 COMMON WORK RESULTS FOR
ELECTRICAL 12 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
2 26 05 31 SPLITTERS, JUNCTION, PULL BOXES AND CABINETS 2 26 05 32
OUTLET BOXES, CONDUIT BOXES AND FITTINGS 3 26 05 34 CONDUIT,
CONDUIT FASTENINGS AND CONDUIT FITTINGS 5 26 05 43.01 INSTALLATION
OF CABLES IN TRENCHES AND IN DUCTS 4
Division 27 - Communications (Site) 27 05 28 PATHWAYS FOR
COMMUNICATIONS SYSTEMS 2
PWGSC Ontario LIST OF CONTENTS Section 00 01 11 Region Project Page
2 Number R.043794.001 2011-05-18
31 23 10 EXCAVATING, TRENCHING AND BACKFILLING 9
Division 32 - Exterior Improvements 32 11 20 GRANULAR BASE 2 32 11
24 GRANULAR SUB-BASE 2 32 12 17 ASPHALTIC CONCRETE PAVING 4 32 91
19.13 TOPSOIL PLACEMENT AND GRADING 5 32 92 19.16 HYDRAULIC SEEDING
6
Division 33 - Utilities 33 01 30 MAINTENANCE HOLE REPAIRS 3 33 05
14 MAINTENANCE HOLES AND CATCH BASINS 4 33 11 17 SITE WATER UTILITY
DISTRIBUTION PIPING 13 33 34 02 SANITARY SEWERS AND FORCEMAINS 5 33
44 01 STORM SEWERS 4
Appendix 'A' GEOTECHNICAL INVESTIGATION REPORT, Nov 25, 2010,
prepared by DBA Engineering Ltd. 38
Appendix 'B' ADDITIONAL BOREHOLES Report, Apr 19, 2011, prepared by
DBA Engineering Ltd. 35
Appendix 'C' ADDENDUM TO REPORT - ADDITIONAL BOREHOLES, May 10,
2011, prepared by DBA Engineering Ltd. 1
Refer to Volumes 2 to 5 for the remainder of the
specifications:
VOLUME 2 OF 5 - ARCHITECTURAL AND STRUCTURAL SPECIFICATIONS FOR
ACCOMMODATION UNIT #4 (BB36)
VOLUME 3 OF 5 - MECHANICAL AND ELECTRICAL SPECIFICATIONS FOR
ACCOMMODATION UNIT #4 (BB36)
VOLUME 4 OF 5 - ARCHITECTURAL AND STRUCTURAL SPECIFICATIONS FOR
ACCOMMODATION UNIT #5 (BB37)
VOLUME 5 OF 5 - MECHANICAL AND ELECTRICAL SPECIFICATIONS FOR
ACCOMMODATION UNIT #5 (BB37)
END
PWGSC Ontario SUMMARY OF WORK Section 01 11 00 Region Project Page
1 Number R.043794.001 2011-05-18
PART 1 - GENERAL
1.1 PRECEDENCE .1 For Federal Government projects, Division 1
Sections take precedence over technical specification sections in
other Divisions of this Project Manual.
1.2 WORK COVERED .1 Work of this Contract comprises general BY
CONTRACT construction of medium security housing units DOCUMENTS
buildings, located at Bath Institution, Bath,
Ontario, and further identified as "Bath Institution Medium
Security Housing Units, Building BB36 - Accommodation Unit #4,
Building BB37 - Accommodation Unit #5".
1.3 CONTRACT .1 Construct Work under single, stipulated price
METHOD contract.
1.4 COST BREAKDOWN .1 Within 48 hours of notification of acceptance
of bid furnish a cost breakdown by Section aggregating contract
price.
.2 Show separately cost of equipment purchased exempt from Ontario
Retail Sales Tax under your Ontario Sales Tax licence
number.
.3 Within 48 hours of acceptance of bid submit a list of
subcontractors.
1.5 WORK BY OTHERS .1 The Contractor shall for the purpose of the
Ontario Occupational Health and Safety Act and Regulations for
Construction Projects, and for the duration of the Work of the
Contract: .1 Assume the role of Constructor in accordance with the
Authority Having Jurisdictions. .2 Agree, in the event of two or
more Contractors working at the same time and space at the work
site, without limiting the General Conditions GC3.7, to the
Departmental Representative's order to: .3 Assume, as the
Constructor, the responsibility for the Departmental
Representative's other Contractors; or
PWGSC Ontario SUMMARY OF WORK Section 01 11 00 Region Project Page
2 Number R.043794.001 2011-05-18
1.5 WORK BY OTHERS .1 (Cont'd) (Cont'd) .4 Accept the Departmental
Representative's
other Contractor's role as Constructor and conform to that
Contractor's Site Specific Health and Safety Plan.
1.6 WORK SEQUENCE .1 Construct Work in stages to accommodate
continued use and operations of the Institution during
construction.
.2 Coordinate Progress Schedule with Departmental Representative
during construction.
.3 Maintain fire access/control.
1.7 CONTRACTOR .1 Contractor shall limit use of site for Work, USE
OF SITE for storage, and for access, to allow:
.1 Institution occupancy and operations.
.2 Coordinate use of site under direction of Departmental
Representative.
.3 Obtain and pay for use of additional storage or work areas
needed for operations under this Contract.
1.8 INSTITUTION .1 Institution will be occupied during entire
OCCUPANCY construction period for execution of normal
operations.
.2 Cooperate with Departmental Representative and Director in
scheduling operations to minimize conflict and to facilitate
Institution operations.
PWGSC Ontario SUMMARY OF WORK Section 01 11 00 Region Project Page
3 Number R.043794.001 2011-05-18
PART 2 - PRODUCTS
PART 3 - EXECUTION
END
PWGSC Ontario WORK RESTRICTIONS Section 01 14 00 Region Project
Page 1 Number R.043794.001 2011-05-18
PART 1 - GENERAL
1.1 RELATED .1 Section 01 32 16.06 - Construction
Progress SECTIONS Schedule - Critical Path Method
(CPM).
.2 Section 01 56 00 - Temporary Barriers and
Enclosures.
1.2 EXISTING .1 Notify, Departmental Representative and utility
SERVICES companies of intended interruption of services
and obtain required permission.
.2 Where Work involves breaking into or connecting to existing
services, give Departmental Representative 48 hours of notice for
necessary interruption of mechanical or electrical service
throughout course of work. Keep duration of interruptions minimum.
Carry out interruptions after normal working hours of occupants,
preferably on weekends.
.3 Provide for personnel pedestrian and vehicular
traffic.
.4 Construct barriers in accordance with Section
01 56 00.
1.3 SPECIAL .1 Submit schedule in accordance with Section
REQUIREMENTS 01 32 16.06.
PART 2 - PRODUCTS
2.1 NOT USED .1 Not Used.
PWGSC Ontario WORK RESTRICTIONS Section 01 14 00 Region Project
Page 2 Number R.043794.001 2011-05-18
PART 3 - EXECUTION
END
PWGSC Ontario PAYMENT PROCEDURES: Section 01 29 83 Region Project
TESTING LABORATORY SERVICES Page 1 Number R.043794.001
2011-05-18
PART 1 - GENERAL
1.1 RELATED .1 Particular requirements for inspection and
REQUIREMENTS testing to be carried out by testing laboratory
SPECIFIED designated by Departmental Representative are ELSEWHERE
specified under various sections.
1.2 APPOINTMENT .1 Departmental Representative will appoint and AND
PAYMENT pay for services of testing laboratory except as
follows: .1 Inspection and testing required by laws, ordinances,
rules, regulations or orders of public authorities. .2 Inspection
and testing performed exclusively for Contractor's convenience. .3
Testing, adjustment and balancing of conveying systems, mechanical
and electrical equipment and systems. .4 Mill tests and
certificates of compliance. .5 Tests specified to be carried out by
Contractor under the supervision of Departmental Representative. .6
Additional tests specified in the following paragraph.
.2 Where tests or inspections by designated testing laboratory
reveal Work not in accordance with contract requirements, pay costs
for additional tests or inspections as required by Departmental
Representative to verify acceptability of corrected
work.
1.3 CONTRACTOR'S .1 Provide labour, equipment and facilities to:
RESPONSIBILITIES .1 Provide access to Work to be inspected
and
tested. .2 Facilitate inspections and tests. .3 Make good Work
disturbed by inspection and test. .4 Provide storage on site for
laboratory's exclusive use to store equipment and cure test
samples.
.2 Notify Departmental Representative sufficiently in advance of
operations to allow for assignment of laboratory personnel and
scheduling of test.
.3 Where materials are specified to be tested, deliver
representative samples in required quantity to testing
laboratory.
PWGSC Ontario PAYMENT PROCEDURES: Section 01 29 83 Region Project
TESTING LABORATORY SERVICES Page 2 Number R.043794.001
2011-05-18
1.3 CONTRACTOR'S .4 Pay costs for uncovering and making good Work
RESPONSIBILITIES that is covered before required inspection
or
(Cont'd) testing is completed and approved by Departmental
Representative.
PART 2 - PRODUCTS
PART 3 - EXECUTION
END
PWGSC Ontario PROJECT MEETINGS Section 01 31 19 Region Project Page
1 Number R.043794.001 2011-05-18
PART 1 - GENERAL
1.1 ADMINISTRATIVE .1 Schedule and administer project meetings
throughout the progress of the work at the call of Departmental
Representative.
.2 Prepare agenda for meetings.
.3 Distribute written notice of each meeting four days in advance
of meeting date to Departmental Representative.
.4 Provide physical space and make arrangements for
meetings.
.5 Preside at meetings.
.6 Record the meeting minutes. Include significant proceedings and
decisions. Identify actions by parties.
.7 Reproduce and distribute copies of minutes within three days
after meetings and transmit to meeting participants and, affected
parties not in attendance Departmental Representative.
.8 Representative of Contractor, subcontractor and suppliers
attending meetings will be qualified and authorized to act on
behalf of party each represents.
1.2 PRE- .1 Within 15 days after award of Contract, request
CONSTRUCTION a meeting of parties in contract to discuss and
MEETING resolve administrative procedures and
responsibilities.
.2 Departmental Representative, Contractor, major subcontractors,
field inspectors and supervisors will be in attendance.
.3 Establish time and location of meeting and notify parties
concerned minimum 5 days before meeting.
.4 Incorporate mutually agreed variations to Contract Documents
into Agreement, prior to signing.
.5 Agenda to include: .1 Appointment of official representative of
participants in the Work.
PWGSC Ontario PROJECT MEETINGS Section 01 31 19 Region Project Page
2 Number R.043794.001 2011-05-18
1.2 PRE- .5 Agenda to include:(Cont'd) CONSTRUCTION .2 Schedule of
Work: in accordance with MEETING Section 01 32 16.06.
(Cont'd) .3 Schedule of submission of shop drawings,
samples, colour chips. Submit submittals in
accordance with Section 01 33 00. .4 Requirements for
temporary facilities, site sign, offices, storage sheds, utilities,
fences in accordance with Section 01 52 00. .5 Site
security in accordance with Section 01 56 00. .6 Proposed
changes, change orders, procedures, approvals required, mark-up
percentages permitted, time extensions, overtime, administrative
requirements. .7 Record drawings in accordance with Section
01 33 00. .8 Maintenance manuals in accordance with
Section 01 78 00. .9 Take-over procedures, acceptance,
warranties in accordance with Section 01 78 00. .10
Monthly progress claims, administrative procedures, photographs,
hold backs. .11 Appointment of inspection and testing agencies or
firms. .12 Insurances, transcript of policies.
1.3 PROGRESS .1 During course of Work and 2 weeks prior to MEETINGS
project completion, schedule progress meetings
bi-weekly.
.2 Contractor, major subcontractors involved in Work and
Departmental Representative are to be in attendance.
.3 Notify parties minimum 5 days prior to meetings.
.4 Record minutes of meetings and circulate to attending parties
and affected parties not in attendance within 3 days after
meeting.
.5 Agenda to include the following: .1 Review, approval of minutes
of previous meeting. .2 Review of Work progress since previous
meeting. .3 Field observations, problems, conflicts. .4 Problems
which impede construction schedule. .5 Review of off-site
fabrication delivery schedules.
PWGSC Ontario PROJECT MEETINGS Section 01 31 19 Region Project Page
3 Number R.043794.001 2011-05-18
1.3 PROGRESS .5 Agenda to include the following:(Cont'd) MEETINGS
.6 Corrective measures and procedures to
(Cont'd) regain projected schedule. .7 Revision to construction
schedule. .8 Progress schedule, during succeeding work period. .9
Review submittal schedules: expedite as required. .10 Maintenance
of quality standards. .11 Review proposed changes for affect on
construction schedule and on completion date. .12 Other
business.
PART 2 - PRODUCTS
PART 3 - EXECUTION
END
PWGSC Ontario CONSTRUCTION PROGRESS Sect 01 32 16.06 Region Project
SCHEDULE - CRITICAL PATH Page 1 Number R.043794.001 METHOD (CPM)
2011-05-18
PART 1 - GENERAL
1.2 RELATED .1 Section 01 33 00 - Submittal Procedures.
SECTIONS
1.3 DEFINITIONS .1 Activity: element of Work performed during
course of Project. Activity normally has expected duration, and
expected cost and expected resource requirements. Activities can be
subdivided into tasks.
.2 Actual Finish Date (AF): point in time that Work actually ended
on activity
.3 Actual Start Date (AS): point in time that Work actually started
on activity.
.4 Bar Chart (Gantt chart): graphic display of schedule-related
information. In typical bar chart, activities or other Project
elements are listed down left side of chart, dates are shown across
top, and activity durations are shown as date-placed horizontal
bars.
.5 Baseline: original approved plan (for Project, work package, or
activity), plus or minus approved scope changes.
.6 Completion Milestones: they are firstly Certificate of
Substantial Performance and secondly Certificate of
Completion.
.7 Constraint: applicable restriction that will affect performance
of Project. Factors that affect activities can be
scheduled.
.8 Control: process of comparing actual performance with planned
performance, analyzing variances, evaluating possible alternatives,
and taking appropriate corrective action as needed.
.9 Critical Activity: any activity on a critical path. Most
commonly determined by using critical path method.
PWGSC Ontario CONSTRUCTION PROGRESS Sect 01 32 16.06 Region Project
SCHEDULE - CRITICAL PATH Page 2 Number R.043794.001 METHOD (CPM)
2011-05-18
1.3 DEFINITIONS .10 Critical Path: series of activities that
(Cont'd) determines duration of Project. In deterministic
model, critical path is usually defined as those activities with
float less than or equal to specified value, often zero. It is
longest path through Project.
.11 Critical Path Method (CPM): network analysis technique used to
predict Project duration by analyzing which sequence of activities
(which path) has least amount of scheduling flexibility (least
amount of float).
.12 Data Date (DD): date at which, or up to which, Project's
reporting system has provided actual status and
accomplishments.
.13 Duration (DU): number of work periods (not including holidays
or other non-working periods) required to complete activity or
other Project element. Usually expressed as workdays or work
weeks.
.14 Early Finish Date (EF): in critical path method, earliest
possible point in time on which uncompleted portions of activity
(or Project) can finish, based on network logic and schedule
constraints. Early finish dates can change as Project progresses
and changes are made to Project plan.
.15 Early Start Date (ES): in critical path method, earliest
possible point in time on which uncompleted portions of activity
(or Project) can start, based on network logic and schedule
constraints. Early start dates can change as Project progresses and
changes are made to Project Plan.
.16 Finish Date: point in time associated with activity's
completion. Usually qualified by one of following: actual, planned,
estimated, scheduled, early, late, baseline, target, or
current.
.17 Float: amount of time that activity may be delayed from its
early start without delaying Project finish date. Float is
mathematical calculation, and can change as Project progresses and
changes are made to Project plan. This resource is available to
both PWGSC and Contractor.
.18 Lag: modification of logical relationship that directs delay in
successor task.
PWGSC Ontario CONSTRUCTION PROGRESS Sect 01 32 16.06 Region Project
SCHEDULE - CRITICAL PATH Page 3 Number R.043794.001 METHOD (CPM)
2011-05-18
1.3 DEFINITIONS .19 Late Finish Date (LF): in critical path method,
(Cont'd) latest possible point in time that activity may
be completed without delaying specified milestone (usually Project
finish date).
.20 Late Start Date (LS): in critical path method, latest possible
point in time that activity may begin without delaying specified
milestone (usually Project finish date).
.21 Lead: modification of logical relationship that allows
acceleration of successor task.
.22 Logic Diagram: see Project network diagram.
.23 Master Plan: summary-level schedule that identifies major
activities and key milestones.
.24 Milestone: significant event in Project, usually completion of
major deliverable.
.25 Monitoring: capture, analysis, and reporting of Project
performance, usually as compared to plan.
.26 Near-Critical Activity: activity that has low total
float.
.27 Non-Critical Activities: activities which when delayed, do not
affect specified Contract duration.
.28 Project Control System: fully computerized system utilizing
commercially available software packages.
.29 Project Network Diagram: schematic display of logical
relationships of Project activities. Always drawn from left to
right to reflect Project chronology.
.30 Project Plan: formal, approved document used to guide both
Project execution and Project control. Primary uses of Project plan
are to document planning assumptions and decisions, facilitate
communication among stakeholders, and document approved scope,
cost, and schedule baselines. Project plan may be summary or
detailed.
.31 Project Planning: development and maintenance of Project
Plan.
.32 Project Planning, Monitoring and Control System: overall system
operated by Departmental
PWGSC Ontario CONSTRUCTION PROGRESS Sect 01 32 16.06 Region Project
SCHEDULE - CRITICAL PATH Page 4 Number R.043794.001 METHOD (CPM)
2011-05-18
1.3 DEFINITIONS .32 (Cont'd) (Cont'd) Representative to enable
monitoring of Project
Work in relation to established milestones.
.33 Project Schedule: planned dates for performing activities and
planned dates for meeting milestones. Dynamic, detailed record of
tasks or activities that must be accomplished to satisfy project
objectives. Monitoring and control process involves using project
schedule in executing and controlling activities and is used as
basis for decision making throughout project life
cycle.
.34 Quantified days duration: working days based on 5 day work
week, discounting statutory holidays.
.35 Risk: uncertain event or condition that, if it occurs, has
positive or negative effect on Project's objectives.
.36 Scheduled Finish Date (SF): point in time that Work was
scheduled to finish on activity. Scheduled finish date is normally
within range of dates delimited by early finish date and late
finish date.
.37 Scheduled Start Date (SS): point in time that Work was
scheduled to start on activity. Scheduled start date is normally
within range of dates delimited by early start date and late start
date.
.38 Start Date: point in time associated with activity's start,
usually qualified by one of following: actual, planned, estimated,
scheduled, early, late, target, baseline, or current.
.39 Work Breakdown Structure (WBS): deliverable-oriented grouping
of project elements that organizes and defines total Work scope of
Project. Each descending level represents increasingly detailed
definition of Project Work.
1.4 SYSTEM .1 Construction Progress Schedule (Project Time
DESCRIPTION Management): describes processes required to
ensure timely completion of Project. These processes ensure that
various elements of Project are properly co-ordinated. It consists
of planning, time estimating, scheduling, progress monitoring and
control.
PWGSC Ontario CONSTRUCTION PROGRESS Sect 01 32 16.06 Region Project
SCHEDULE - CRITICAL PATH Page 5 Number R.043794.001 METHOD (CPM)
2011-05-18
1.4 SYSTEM .2 Planning: this is most basic function of DESCRIPTION
management, that of determining presentation of
(Cont'd) action and is essential. .1 It involves focusing on
objective consideration of future, and integrating forward thinking
with analysis; therefore, in planning, implicit assumptions are
made about future so that action can be taken today. .2 Planning
and scheduling facilitates accomplishment of objectives and should
be considered continuous interactive process involving planning,
review, scheduling, analysis, monitoring and reporting.
.3 Ensure that planning process is iterative and results in
generally top-down processing with more detail being developed as
planning progresses, and decisions concerning options and
alternatives are made. This implies progressively more reliability
of scheduling data. Detail Project schedule is used for analysis
and progress monitoring.
.4 Ensure project schedule efficiencies through monitoring. .1 When
activities begin on time and are performed according to estimated
durations without interruptions, original Critical Path will remain
accurate. Changes and delays will however, create an essential need
for continual monitoring of Project activities. .2 Monitor progress
of Project in detail to ensure integrity of Critical Path, by
comparing actual completions of individual activities with their
scheduled completions, and review progress of activities that has
started but are not yet completed. .3 Monitoring should be done
sufficiently often so that causes of delays are immediately
identified and removed if possible.
.5 Project monitoring and reporting: as Project progresses, keep
team aware of changes to schedule, and possible consequences. In
addition to Bar Charts and CPM networks, use narrative reports to
provide advice on seriousness of difficulties and measures to
overcome them. .1 Narrative reporting begins with statement on
general status of Project followed by summarization of delays,
potential problems, corrective measures and Project status
criticality.
PWGSC Ontario CONSTRUCTION PROGRESS Sect 01 32 16.06 Region Project
SCHEDULE - CRITICAL PATH Page 6 Number R.043794.001 METHOD (CPM)
2011-05-18
1.5 CPM .1 Ensure Master Plan and Detail Schedule are REQUIREMENTS
practical and remain within specified Contract
duration.
.2 Master Plan and Detail Schedule deemed impractical by
Departmental Representative are revised and resubmitted for
approval.
.3 Acceptance of Master Plan and Detail Schedule showing scheduled
Contract duration shorter than specified Contract duration does not
constitute change to Contract. Duration of Contract may only be
changed through bilateral Agreement.
.4 Consider Master Plan and Detail Schedule deemed practical by
Departmental Representative, showing Work completed in less than
specified Contract duration, to have float.
.5 First Milestone on Master Plan and Detail Schedule will identify
start Milestone with an "ES" constraint date equal to Award of
Contract date.
.6 Calculate dates for completion milestones from Plan and Schedule
using specified time periods for Contract.
.7 Certificate of Substantial Performance with "LF" constraint
equal to calculated date.
.8 Calculations on updates to be such that if early finish of
Certificate of Substantial Performance falls later than specified
Contract duration then float calculation to reflect negative
float.
.9 Delays to non-critical activities, those with float may not be
basis for time extension.
.10 Do not use float suppression techniques such as software
constraints, preferential sequencing, special lead/lag logic
restraints, extended activity times or imposed dates other than
required by Contract.
.11 Allow for and show Master Plan and Detail Schedule adverse
weather conditions normally anticipated. Specified Contract
duration has been predicated assuming normal amount of adverse
weather conditions.
.12 Provide necessary crews and manpower to meet schedule
requirements for performing Work within specified Contract
duration. Simultaneous use of
PWGSC Ontario CONSTRUCTION PROGRESS Sect 01 32 16.06 Region Project
SCHEDULE - CRITICAL PATH Page 7 Number R.043794.001 METHOD (CPM)
2011-05-18
1.5 CPM .12 (Cont'd) REQUIREMENTS multiple crews on multiple fronts
on multiple
(Cont'd) critical paths may be required.
.13 Arrange participation on and off site of subcontractors and
suppliers, as required by Departmental Representative, for purpose
of network planning, scheduling, updating and progress monitoring.
Approvals by Departmental Representative of original networks and
revisions do not relieve Contractor from duties and
responsibilities required by Contract.
.14 Ensure that it is understood that Award of Contract or time of
beginning, rate of progress, Certificate of Substantial Performance
and Certificate of Completion as defined times of completion are of
essence of this contract.
1.6 SUBMITTALS .1 Provide submittals in accordance with Section
01 33 00.
.2 Submit to Departmental Representative Project Control System for
planning, scheduling, monitoring and reporting of project
progress.
.3 Submit Project Control System to Departmental Representative for
approval; failure to comply with each required submission, may
result in progress payment being withheld in accordance with
Federal Government's GC5 Terms of Payment.
.4 Include costs for execution, preparation and reproduction of
schedule submittals in bid documents.
.5 Submit letter ensuring that schedule has been prepared in
co-ordination with major sub-contractors.
.6 Refer to article "Progress monitoring and reporting" of this
specification Section for frequency of Project control system
submittals.
.7 Submit Project planning, monitoring and control system data as
part of initial schedule submission and monthly status reporting
and as required by Departmental Representative in following form.
.1 USB drive or CD files in original scheduling software containing
schedule and cash flow information, labelled with data
date,
PWGSC Ontario CONSTRUCTION PROGRESS Sect 01 32 16.06 Region Project
SCHEDULE - CRITICAL PATH Page 8 Number R.043794.001 METHOD (CPM)
2011-05-18
1.6 SUBMITTALS .7 (Cont'd) (Cont'd) .1 (Cont'd)
specific update, and person responsible for update. .2 Master Plan
Bar Chart. .3 Construction Detail schedule Bar Chart. .4 Listing of
project activities including milestones and logical connectors,
networks (sub-networks) from Project start to end. Sort activities
by activity identification number and accompany with descriptions.
List early and late start and finish dates together with durations,
codes and float. .5 Criticality report listing activities and
milestones with negative, zero and up to 5 days total float used as
first sort for ready identification of critical or near critical
paths through entire project. List early and late starts and
finishes dates, together with durations, codes and float for
critical activities. .6 Progress report in early start sequence,
listing for each trade, activities due to start, underway, or
finished within two months from monthly update date. List activity
identification number, description and duration. Provide columns
for entry of actual start and finish dates, duration remaining and
remarks concerning action required.
1.7 QUALITY .1 Use experienced personnel, fully qualified in
ASSURANCE planning and scheduling to provide services from
start of construction to Certificate of Completion, including
Commissioning.
1.8 PROJECT .1 Meet with Departmental Representative within 5
MEETING working days of Award of Contract date, to
establish Work requirements and approach to project construction
operations.
1.9 WORK .1 Prepare construction Work Breakdown Structure BREAKDOWN
(WBS) within 5 working days of Award of Contract STRUCTURE (WBS)
date. Develop WBS through at least five levels:
Project, stage, element, sub-element and work package.
PWGSC Ontario CONSTRUCTION PROGRESS Sect 01 32 16.06 Region Project
SCHEDULE - CRITICAL PATH Page 9 Number R.043794.001 METHOD (CPM)
2011-05-18
1.10 PROJECT .1 Mandatory and recommended project milestones
MILESTONES form targets for both Master Plan and Detail
Schedule of CPM construction network system. .1 Excavation
completed. .2 Substructure completed. .3 Superstructure completed.
.4 Building closed-in and weatherproofed. .5 Interior finishing and
fitting, mechanical and electrical work completed. .6 Certificate
of Substantial Performance. .7 Outside work completed. .8
Certificate of Completion.
1.11 MASTER PLAN .1 Structure and base CPM construction networks
system on WBS coding in order to ensure consistency throughout
Project.
.2 Prepare comprehensive construction Master Plan (CPM logic
diagram) and dependent Cash Flow Projection within working days of
finalizing Agreement to confirm validity or alternates of
identified milestones. .1 Master Plan will be used as
baseline.
.1 Revise baseline as conditions dictate and as required by
Departmental Representative. .2 Departmental Representative will
review and return revised baseline within 5 work days.
.3 Reconcile revisions to Master Plan and Cash Flow Projections
with previous baseline to provide continuous audit
trail.
.4 Initial and subsequent Master Plans will include: .1 USB drive
or CD containing schedule and cash flow information, clearly
labelled with data date, specific update, and person responsible
for update. .2 Bar chart identifying coding, activity durations,
early/late and start/finish dates, total float, completion as
percentile, current status and budget amounts. .3 Network diagram
showing coding, activity sequencing (logic), total float,
early/late dates, current status and durations. .4 Actual/projected
monthly cash flow: expressed annually and monthly and shown in both
graphical and numerical form.
PWGSC Ontario CONSTRUCTION PROGRESS Sect 01 32 16.06 Region Project
SCHEDULE - CRITICAL PATH Page 10 Number R.043794.001 METHOD (CPM)
2011-05-18
1.12 DETAIL .1 Provide detailed project schedule (CPM logic
SCHEDULE diagram) within 5 working days of Award of
Contract date showing activity sequencing, interdependencies and
duration estimates. Include listed activities as follows: .1 Shop
drawings. .2 Samples. .3 Approvals. .4 Procurement. .5
Construction. .6 Installation. .7 Site works. .8 Testing. .9
Commissioning and acceptance.
.2 Detail CPM schedule to cover in detail period of construction
beginning from Award of Contract date. .1 Show remaining activities
for CPM construction network system up to Certificate of Completion
and develop complete detail as project progresses. .2 Detail
activities completely and comprehensively throughout duration of
project.
.3 Relate Detail Schedule activities to basic activities and
milestones developed and approved in Master Plan.
.4 Clearly show sequence and interdependence of construction
activities and indicate: .1 Start and completion of all items of
Work, their major components, and interim milestone completion
dates. .2 Activities for procurement, delivery, installation and
completion of each major piece of equipment, materials and other
supplies, including:
.1 Time for submittals, resubmittals and review. .2 Time for
fabrication and delivery of manufactured products for Work. .3
Interdependence of procurement and construction activities.
.3 Include sufficient detail to assure adequate planning and
execution of Work. Activities should generally range in duration
from 3 to 15 workdays each.
.5 Provide level of detail for project activities such that
sequence and interdependency of Contract tasks are demonstrated and
allow co-ordination and control of project activities. Show
continuous flow from left to right.
PWGSC Ontario CONSTRUCTION PROGRESS Sect 01 32 16.06 Region Project
SCHEDULE - CRITICAL PATH Page 11 Number R.043794.001 METHOD (CPM)
2011-05-18
1.12 DETAIL .6 Ensure activities with no float are calculated
SCHEDULE and clearly indicated on logical CPM
(Cont'd) construction network system as being, whenever possible,
continuous series of activities throughout length of Project to
form "Critical Path". Increased number of critical activities is
seen as indication of increased risk.
.7 Insert Change Orders in appropriate and logical location of
Detail Schedule. After analysis, clearly state and report to
Departmental Representative for review effects created by insertion
of new Change Order.
1.13 REVIEW OF THE .1 Allow 5 work days for review by Departmental
CONSTRUCTION Representative of proposed construction Detail DETAIL
SCHEDULE Schedule.
.2 Upon receipt of reviewed Detail Schedule make necessary
revisions and resubmit to Departmental Representative for review
within 5 work days.
.3 Promptly provide additional information to validate
practicability of Detail Schedule as required by Departmental
Representative.
.4 Submittal of Detail Schedule indicates that it meets Contract
requirements and will be executed generally in
sequence.
1.14 COMPLIANCE .1 Comply with reviewed Detail Schedule. WITH
DETAIL SCHEDULE .2 Proceed with significant changes and
deviations
from scheduled sequence of activities that cause delay, only after
written receipt of approval by Departmental
Representative.
.3 Identify activities that are behind schedule and causing delay.
Provide measures to regain slippage. .1 Corrective measures may
include:
.1 Increase of personnel on site for effected activities or work
package. .2 Increase in materials and equipment. .3 Overtime work
or additional work shifts.
.4 Submit to Departmental Representative, justification, project
schedule data and supporting evidence for approval of extension to
Contract completion date or interim milestone
PWGSC Ontario CONSTRUCTION PROGRESS Sect 01 32 16.06 Region Project
SCHEDULE - CRITICAL PATH Page 12 Number R.043794.001 METHOD (CPM)
2011-05-18
1.14 COMPLIANCE .4 (Cont'd) WITH DETAIL date when required. Include
as part of SCHEDULE supporting evidence:
(Cont'd) .1 Written submission of proof of delay based on revised
activity logic, duration and costs, showing time impact analysis
illustrating influence of each change or delay relative to approved
contract schedule. .2 Prepared schedule indicating how change will
be incorporated into the overall logic diagram. Demonstrate
perceived impact based on date of occurrence of change and include
status of construction at that time. .3 Other supporting evidence
requested by Departmental Representative. .4 Do not assume approval
of Contract extension prior to receipt of written approval from
Departmental Representative.
.5 In event of Contract extension, display in Detail Schedule that
scheduled float time available for work involved has been used in
full without jeopardizing earned float. .1 Departmental
Representative will determine and advise Contractor number of
allowable days for extension of Contract based on project schedule
updates for period in question, and other factual information. .2
Construction delays affecting project schedule will not constitute
justification for extension of contract completion
date.
1.15 PROGRESS .1 On ongoing basis, Detail Schedule on job site
MONITORING AND must show "Progress to Date". Arrange REPORTING
participation on and off site of subcontractors
and suppliers, as, and when necessary, for purpose of network
planning, scheduling, updating and progress monitoring. Inspect
Work with Departmental Representative at least once monthly to
establish progress on each current activity shown on applicable
networks.
.2 Update and reissue project Work Breakdown Structure and relevant
coding structures as project develops and changes.
.3 Perform Detail Schedule update monthly with status dated (Data
Date) on last working day of month. Update to reflect activities
completed to date, activities in progress, logic and duration
changes.
PWGSC Ontario CONSTRUCTION PROGRESS Sect 01 32 16.06 Region Project
SCHEDULE - CRITICAL PATH Page 13 Number R.043794.001 METHOD (CPM)
2011-05-18
1.15 PROGRESS .4 Do not automatically update actual start and
MONITORING AND finish dates by using default mechanisms found
REPORTING in project management software.
(Cont'd) .5 Submit to Departmental Representative copies of
updated Detail Schedule.
.6 Requirements for monthly progress monitoring and reporting are
basis for progress payment request.
.7 Submit monthly written report based on Detail Schedule, showing
Work to date performed, comparing Work progress to planned, and
presenting current forecasts. Report must summarize progress,
defining problem areas and anticipated delays with respect to Work
schedule, and critical paths. Explain alternatives for possible
schedule recovery to mitigate any potential delay. Include in
report: .1 Description of progress made. .2 Pending items and
status of: permits, shop drawings, Change Orders, and possible time
extensions. .3 Status of Contract completion date and milestones.
.4 Current and anticipated problem areas, potential delays and
corrective measures. .5 Review of progress and status of Critical
Path activities.
PART 2 - PRODUCTS
PART 3 - EXECUTION
END
PWGSC Ontario SUBMITTAL PROCEDURES Section 01 33 00 Region Project
Page 1 Number R.043794.001 2011-05-18
PART 1 - GENERAL
1.1 ADMINISTRATIVE .1 Submit to Departmental Representative
submittals listed for review. Submit promptly and in orderly
sequence to not cause delay in Work. Failure to submit in ample
time is not considered sufficient reason for extension of Contract
Time and no claim for extension by reason of such default will be
allowed.
.2 Do not proceed with Work affected by submittal until review is
complete.
.3 Present shop drawings, product data, samples and mock-ups in SI
Metric units.
.4 Where items or information is not produced in SI Metric units
converted values are acceptable.
.5 Review submittals prior to submission to Departmental
Representative. This review represents that necessary requirements
have been determined and verified, or will be, and that each
submittal has been checked and co-ordinated with requirements of
Work and Contract Documents. Submittals not stamped, signed, dated
and identified as to specific project will be returned without
being examined and considered rejected.
.6 Notify Departmental Representative, in writing at time of
submission, identifying deviations from requirements of Contract
Documents stating reasons for deviations.
.7 Verify field measurements and affected adjacent Work are
co-ordinated.
.8 Contractor's responsibility for errors and omissions in
submission is not relieved by Departmental Representative's review
of submittals.
.9 Contractor's responsibility for deviations in submission from
requirements of Contract Documents is not relieved by Departmental
Representative review.
.10 Keep one reviewed copy of each submission on site.
.11 Submit number of hard copies specified for each type and format
of submittal and in also submit
PWGSC Ontario SUBMITTAL PROCEDURES Section 01 33 00 Region Project
Page 2 Number R.043794.001 2011-05-18
1.1 ADMINISTRATIVE .11 (Cont'd) (Cont'd) in electronic format as
pdf files. Forward pdf
files on CD or through email.
1.2 SHOP DRAWINGS .1 The term "shop drawings" means drawings, AND
PRODUCT DATA diagrams, illustrations, schedules, performance
charts, brochures and other data which are to be provided by
Contractor to illustrate details of a portion of Work.
.2 Submit drawings stamped and signed by professional engineer
registered or licensed in Province of Ontario of
Canada.
.3 Indicate materials, methods of construction and attachment or
anchorage, erection diagrams, connections, explanatory notes and
other information necessary for completion of Work. Where articles
or equipment attach or connect to other articles or equipment,
indicate that such items have been co-ordinated, regardless of
Section under which adjacent items will be supplied and installed.
Indicate cross references to design drawings and
specifications.
.4 Allow 3 working days for Departmental Representative's review of
each submission.
.5 Adjustments made on shop drawings by Departmental Representative
are not intended to change Contract Price. If adjustments affect
value of Work, state such in writing to Departmental Representative
prior to proceeding with Work.
.6 Make changes in shop drawings as Departmental Representative may
require, consistent with Contract Documents. When resubmitting,
notify Departmental Representative in writing of revisions other
than those requested.
.7 Accompany submissions with transmittal letter, in duplicate,
containing: .1 Date. .2 Project title and number. .3 Contractor's
name and address. .4 Identification and quantity of each shop
drawing, product data and sample. .5 Other pertinent
data.
PWGSC Ontario SUBMITTAL PROCEDURES Section 01 33 00 Region Project
Page 3 Number R.043794.001 2011-05-18
1.2 SHOP DRAWINGS .8 Submissions shall include: AND PRODUCT DATA .1
Date and revision dates.
(Cont'd) .2 Project title and number. .3 Name and address of:
.1 Subcontractor.
.2 Supplier.
.1 Fabrication.
.2 Layout, showing dimensions, including identified field
dimensions, and clearances. .3 Setting or erection details. .4
Capacities. .5 Performance characteristics. .6 Standards. .7
Operating weight. .8 Wiring diagrams. .9 Single line and schematic
diagrams. .10 Relationship to adjacent work.
.9 After Departmental Representative's review, distribute
copies.
.10 Submit three hard copies and one electronic copy of shop
drawings for each requirement requested in specification Sections
and as Departmental Representative may reasonably
request.
.11 Submit three hard copies and one electronic copy of product
data sheets or brochures for requirements requested in
specification Sections and as requested by Departmental
Representative where shop drawings will not be prepared due to
standardized manufacture of product.
.12 Submit three hard copies and one electronic copy of test
reports for requirements requested in specification Sections and as
requested by Departmental Representative. .1 Report signed by
authorized official of testing laboratory that material, product or
system identical to material, product or system to be provided has
been tested in accord with specified requirements. .2 Testing must
have been within 3 years of date of contract award for
project.
PWGSC Ontario SUBMITTAL PROCEDURES Section 01 33 00 Region Project
Page 4 Number R.043794.001 2011-05-18
1.2 SHOP DRAWINGS .13 Submit three hard copies and one electronic
AND PRODUCT DATA copy of certificates for requirements
requested
(Cont'd) in specification Sections and as requested by Departmental
Representative. .1 Statements printed on manufacturer's letterhead
and signed by responsible officials of manufacturer of product,
system or material attesting that product, system or material meets
specification requirements. .2 Certificates must be dated after
award of project contract complete with project name.
.14 Submit three hard copies and one electronic copy of
manufacturers instructions for requirements requested in
specification Sections and as requested by Departmental
Representative. .1 Pre-printed material describing installation of
product, system or material, including special notices and Material
Safety Data Sheets concerning impedances, hazards and safety
precautions.
.15 Submit three hard copies and one electronic copy of
Manufacturer's Field Reports for requirements requested in
specification Sections and as requested by Departmental
Representative.
.16 Documentation of the testing and verification actions taken by
manufacturer's representative to confirm compliance with
manufacturer's standards or instructions.
.17 Submit three hard copies and one electronic copy of Operation
and Maintenance Data for requirements requested in specification
Sections and as requested by Departmental
Representative.
.18 Delete information not applicable to project.
.19 Supplement standard information to provide details applicable
to project.
.20 If upon review by Departmental Representative, no errors or
omissions are discovered or if only minor corrections are made,
copies will be returned and fabrication and installation of Work
may proceed. If shop drawings are rejected, noted copy will be
returned and resubmission of corrected shop drawings, through same
procedure indicated above, must be performed before fabrication and
installation of Work may proceed.
.21 The review of shop drawings by Public Works and Government
Services Canada (PWGSC) is for sole
PWGSC Ontario SUBMITTAL PROCEDURES Section 01 33 00 Region Project
Page 5 Number R.043794.001 2011-05-18
1.2 SHOP DRAWINGS .21 (Cont'd) AND PRODUCT DATA purpose of
ascertaining conformance with general
(Cont'd) concept. .1 This review shall not mean that PWGSC approves
detail design inherent in shop drawings, responsibility for which
shall remain with Contractor submitting same, and such review shall
not relieve Contractor of responsibility for errors or omissions in
shop drawings or of responsibility for meeting requirements of
construction and Contract Documents. .2 Without restricting
generality of foregoing, Contractor is responsible for dimensions
to be confirmed and correlated at job site, for information that
pertains solely to fabrication processes or to techniques of
construction and installation and for co-ordination of Work of
sub-trades.
1.3 SAMPLES .1 Submit for review samples in duplicate as requested
in respective specification Sections. Label samples with origin and
intended use.
.2 Deliver samples prepaid to Departmental Representative's
business address.
.3 Notify Departmental Representative in writing, at time of
submission of deviations in samples from requirements of Contract
Documents.
.4 Where colour, pattern or texture is criterion, submit full range
of samples.
.5 Adjustments made on samples by Departmental Representative are
not intended to change Contract Price. If adjustments affect value
of Work, state such in writing to Departmental Representative prior
to proceeding with Work.
.6 Make changes in samples which Departmental Representative may
require, consistent with Contract Documents.
.7 Reviewed and accepted samples will become standard of
workmanship and material against which installed Work will be
verified.
1.4 MOCK-UPS .1 Erect mock-ups in accordance with
01 45 00.
PWGSC Ontario SUBMITTAL PROCEDURES Section 01 33 00 Region Project
Page 6 Number R.043794.001 2011-05-18
1.5 PHOTOGRAPHIC .1 Submit electronic and hard copy of colour
DOCUMENTATION digital photography in jpg format, standard
resolution monthly with progress statement and as directed by
Departmental Representative.
.2 Project identification: name and number of project and date of
exposure indicated.
.3 Number of viewpoints: viewpoints and their location as
determined by Departmental Representative.
.4 Frequency of photographic documentation: as directed by
Departmental Representative.
1.6 CERTIFICATES .1 Immediately after award of Contract, submit AND
TRANSCRIPTS Workers' Safety and Insurance Board Experience
Report.
1.7 FEES, PERMITS .1 Provide authorities having jurisdiction with
AND CERTIFICATES information requested.
.2 Pay fees and obtain certificates and permits
required.
.3 Furnish certificates and permits.
.4 Submit acceptable certificate stating that suspended ceiling
systems provide adequate support for electrical fixtures, as
required by current bulletin of Electrical Inspection Department of
Ontario Hydro.
PART 2 - PRODUCTS
2.1 NOT USED .1 Not Used.
PWGSC Ontario SUBMITTAL PROCEDURES Section 01 33 00 Region Project
Page 7 Number R.043794.001 2011-05-18
PART 3 - EXECUTION
END
PWGSC Ontario HEALTH AND SAFETY Section 01 35 29.06 Region Project
REQUIREMENTS Page 1 Number R.043794.001 2011-05-18
PART 1 - GENERAL
1.1 REFERENCES .1 Canadian Standards Association (CSA): Canada .1
CSA S350-M1980(R2003), Code of Practice for Safety in
Demolition of Structures.
.2 National Building Code 2010 (NBC): .1 NBC 2010, Division B,
Part 8, Safety Measures at Construction and Demolition
Sites.
.3 National Fire Code 2010 (NFC): .1 NFC 2010, Division B,
Part 2 Emergency Planning, subsection 2.8.2 Fire Safety
Plan.
.4 Province of Ontario: .1 Occupational Health and Safety Act
Revised Statutes of Ontario 1990, Chapter O.1 as amended, and
Regulations for Construction Projects, O. Reg. 213/91 as amended.
.2 Workplace Safety and Insurance Act, 1997. .3 Municipal statutes
and authorities.
.5 Treasury Board of Canada Secretariat (TBS): .1 Treasury Board,
Fire Protection Standard April 1, 2010
www.tbs-sct.gc.ca/pol/doc-eng.aspx
?id=17316§ion=text.
.6 Fire Commissioner of Canada (FCC): .1 FC-301 Standard for
Construction Operations, June 1982. .2 FC-302 Standard for Welding
and Cutting, June 1982.
Labour Program Fire Protection Engineering Services 4900 Yonge
Street 8th Floor North York, Ontario M2N 6A8
and copies may be obtained from:
Human Resources and Social Development Canada Labour Program Fire
Protection Engineering Services Ottawa, Ontario K1A 0J2
1.2 SUBMITTALS .1 Make submittals in accordance with Section
01 33 00.
.2 Submit site-specific Health and Safety Plan: Within 7 days after
date of Notice to Proceed
PWGSC Ontario HEALTH AND SAFETY Section 01 35 29.06 Region Project
REQUIREMENTS Page 2 Number R.043794.001 2011-05-18
1.2 SUBMITTALS .2 (Cont'd) (Cont'd) and prior to commencement of
Work. Health and
Safety Plan must include: .1 Results of site specific safety hazard
assessment. .2 Results of safety and health risk or hazard analysis
for site tasks and operations found in work plan. .3 Measures and
controls to be implemented to address identified safety hazards and
risks. .4 Provide a Fire Safety Plan, specific to the work
location, in accordance with NBC, Division B, Article 8.1.1.1
prior to commencement of work. The plan shall be coordinated with,
and integrated into, the Facility Emergency Procedures and
Evacuation Plan in place at the site. Departmental Representative
will provide Facility Emergency Procedures and Evacuation Plan.
Deliver two copies of the Fire Safety Plan to the Departmental
Representative not later than 14 days before commencing work. .5
Contractor's and sub-contractors' Safety Communication Plan. .6
Contingency and Emergency Response Plan addressing standard
operating procedures specific to the project site to be implemented
during emergency situations. Coordinate plan with existing Facility
Emergency Response requirements and procedures provided by
Departmental Representative.
.3 Departmental Representative will review Contractor's
site-specific Health and Safety Plan and provide comments to
Contractor within 5 days after receipt of plan. Revise plan as
appropriate and resubmit plan to Departmental Representative within
3 days after receipt of comments from Departmental
Representative.
.4 Departmental Representative's review of Contractor's final
Health and Safety plan should not be construed as approval and does
not reduce the Contractor's overall responsibility for construction
Health and Safety.
.5 Submit names of personnel and alternates responsible for site
safety and health.
.6 Submit records of Contractor's Health and Safety meetings when
requested.
.7 Submit 3 copies of Contractor's authorized representative's work
site health and safety
PWGSC Ontario HEALTH AND SAFETY Section 01 35 29.06 Region Project
REQUIREMENTS Page 3 Number R.043794.001 2011-05-18
1.2 SUBMITTALS .7 (Cont'd) (Cont'd) inspection reports to
Departmental
Representative, weekly.
.8 Submit copies of orders, directions or reports issued by health
and safety inspectors of the authorities having
jurisdiction.
.9 Submit copies of incident and accident reports.
.10 Submit Material Safety Data Sheets (MSDS).
.11 Submit Workplace Safety and Insurance Board (WSIB)- Experience
Rating Report.
.12 Medical Surveillance: where prescribed by legislation,
regulation or safety program, submit certification of medical
surveillance for site personnel prior to commencement of Work, and
submit additional certifications for any new site personnel to
Departmental Representative.
1.3 FILING OF .1 File Notice of Project with Provincial NOTICE
authorities prior to commencement of Work.
1.4 WORK PERMIT .1 Obtain building permits related to project prior
to commencement of Work.
.2 Obtain Hot Work Permit from Departmental
Representative.
1.5 SAFETY .1 Perform site specific safety hazard assessment
ASSESSMENT related to project.
1.6 MEETINGS .1 Schedule and administer Health and Safety meeting
with Departmental Representative prior to commencement of
Work.
1.7 REGULATORY .1 Comply with the Acts and regulations of the
REQUIREMENTS Province of Ontario.
.2 Comply with specified standards and regulations to ensure safe
operations at site.
PWGSC Ontario HEALTH AND SAFETY Section 01 35 29.06 Region Project
REQUIREMENTS Page 4 Number R.043794.001 2011-05-18
1.8 GENERAL .1 Develop written site-specific Health and Safety
REQUIREMENTS Plan based on hazard assessment prior to
beginning site Work and continue to implement, maintain, and
enforce plan until final demobilization from site. Health and
Safety Plan must address project specifications.
.2 Departmental Representative may respond in writing, where
deficiencies or concerns are noted and may request re-submission
with correction of deficiencies or concerns either accepting or
requesting improvements.
.3 Relief from or substitution for any portion or provision of
minimum Health and Safety standards specified herein or reviewed
site-specific Health and Safety Plan shall be submitted to
Departmental Representative in writing.
1.9 COMPLIANCE .1 Comply with Ontario Occupational Health and
REQUIREMENTS Safety Act, R.S.O. 1990 Chapter O.1, as
amended.
1.10 RESPONSIBILITY .1 Be responsible for health and safety of
persons on site, safety of property on site and for protection of
persons adjacent to site and environment to extent that they may be
affected by conduct of Work.
.2 Comply with and enforce compliance by employees with safety
requirements of Contract Documents, applicable federal, provincial,
territorial and local statutes, regulations, and ordinances, and
with site-specific Health and Safety Plan.
.3 Where applicable the Contractor shall be designated
"Constructor", as defined by Occupational Health and Safety Act for
the Province of Ontario.
1.11 UNFORSEEN .1 Should any unforeseen or peculiar HAZARDS
safety-related factor, hazard, or condition
become evident during performance of Work, immediately stop work
and advise Departmental Representative verbally and in
writing.
.2 Follow procedures in place for Employees Right to Refuse Work as
specified in the Occupational Health and Safety Act for the
Province of Ontario.
PWGSC Ontario HEALTH AND SAFETY Section 01 35 29.06 Region Project
REQUIREMENTS Page 5 Number R.043794.001 2011-05-18
1.12 POSTING OF .1 Ensure applicable items, articles, notices and
DOCUMENTS orders are posted in conspicuous location on
site in accordance with Acts and Regulations of Province of
Ontario, and in consultation with Departmental Representative. .1
Contractor's Safety Policy. .2 Constructor's Name. .3 Notice of
Project. .4 Ministry of Labour Orders and reports. .5 Occupational
Health and Safety Act and Regulations for Construction Projects for
Province of Ontario. .6 Address and phone number of nearest
Ministry of Labour office. .7 Material Safety Data Sheets. .8
Written emeregency Response Plan. .9 Site Specific Safety Plan. .10
Valid certificate of first aider on duty. .11 WSIB "In Case of
Injury At Work" poster. .12 Location of toilet and cleanup
facilities.
1.13 CORRECTION OF .1 Immediately address health and safety
NON-COMPLIANCE non-compliance issues identified by authority
having jurisdiction or by Departmental Representative.
.2 Provide Departmental Representative with written report of
action taken to correct non-compliance of health and safety issues
identified.
.3 Departmental Representative may stop Work if non-compliance of
health and safety regulations is not corrected.
1.14 BLASTING .1 Blasting or other use of explosives is not
permitted.
1.15 POWDER .1 Powder actuated devices are not permitted. ACTUATED
DEVICES
1.16 WORK STOPPAGE .1 Give precedence to safety and health of
public and site personnel and protection of environment over cost
and schedule considerations for Work.
.2 Assign responsibility and obligation to and competent supervisor
to stop or start Work when,
PWGSC Ontario HEALTH AND SAFETY Section 01 35 29.06 Region Project
REQUIREMENTS Page 6 Number R.043794.001 2011-05-18
1.16 WORK STOPPAGE .2 (Cont'd) (Cont'd) at competent supervisor's
discretion, it is
necessary or advisable for reasons of health or safety.
Departmental Representative may also stop Work for health and
safety considerations.
PART 2 - PRODUCTS
PART 3 - EXECUTION
END
PWGSC Ontario ENVIRONMENTAL PROCEDURES Section 01 35 43 Region
Project Page 1 Number R.043794.001 2011-05-18
PART 1 - GENERAL
1.1 DEFINITIONS .1 Environmental Pollution and Damage: presence of
chemical, physical, biological elements or agents which adversely
affect human health and welfare; unfavourably alter ecological
balances of importance to human life; affect other species of
importance to humankind; or degrade environment aesthetically,
culturally and/or historically.
.2 Environmental Protection: prevention/control of pollution and
habitat or environment disruption during construction. Control of
environmental pollution and damage requires consideration of land,
water, and air; biological and cultural resources; and includes
management of visual aesthetics; noise; solid, chemical, gaseous,
and liquid waste; radiant energy and radioactive material as well
as other pollutants.
1.2 SUBMITTALS .1 Submittals: in accordance with Section
01 33 00.
.2 Prior to commencing construction activities or delivery of
materials to site, submit Environmental Protection Plan for review
and approval by Departmental Representative. Environmental
Protection Plan is to present comprehensive overview of known or
potential environmental issues which must be addressed during
construction.
.3 Address topics at level of detail commensurate with
environmental issue and required construction tasks.
.4 Environmental protection plan: include: .1 Names of persons
responsible for ensuring adherence to Environmental Protection
Plan. .2 Names and qualifications of persons responsible for
manifesting hazardous waste to be removed from site. .3 Names and
qualifications of persons responsible for training site personnel.
.4 Descriptions of environmental protection personnel training
program. .5 Erosion and sediment control plan which identifies type
and location of erosion and sediment controls to be provided
including monitoring and reporting requirements to assure
PWGSC Ontario ENVIRONMENTAL PROCEDURES Section 01 35 43 Region
Project Page 2 Number R.043794.001 2011-05-18
1.2 SUBMITTALS .4 Environmental protection plan:(Cont'd) (Cont'd)
.5 (Cont'd)
that control measures are in compliance with erosion and sediment
control plan, Federal, Provincial, and Municipal laws and
regulations. .6 Drawings showing locations of proposed temporary
excavations or embankments for haul roads, stream crossings,
material storage areas, structures, sanitary facilities, and
stockpiles of excess or spoil materials including methods to
control runoff and to contain materials on site. .7 Traffic control
plans including measures to reduce erosion of temporary roadbeds by
construction traffic, especially during wet weather. Plans include
measures to minimize amount of mud transported onto paved public
roads by vehicles or runoff. .8 Work area plan showing proposed
activity in each portion of area and identifying areas of limited
use or non-use. Plan to include measures for marking limits of use
areas including methods for protection of features to be preserved
within authorized work areas. .9 Spill Control Plan: including
procedures, instructions, and reports to be used in event of
unforeseen spill of regulated substance. .10 Non-Hazardous solid
waste disposal plan identifying methods and locations for solid
waste disposal including clearing debris. .11 Air pollution control
plan detailing provisions to assure that dust, debris, materials,
and trash, do not become air borne and travel off project site. .12
Contaminant prevention plan that: identifies potentially hazardous
substances to be used on job site; identifies intended actions to
prevent introduction of such materials into air, water, or ground;
and details provisions for compliance with Federal, Provincial, and
Municipal laws and regulations for storage and handling of these
materials. .13 Waste water management plan that identifies methods
and procedures for management and/or discharge of waste waters
which are directly derived from construction activities, such as
concrete curing water, clean-up water, dewatering of ground water,
disinfection water, hydrostatic test water, and water used in
flushing of lines. .14 Historical, archaeological, cultural
resources biological resources and wetlands plan that defines
procedures for identifying and protecting historical,
archaeological, cultural resources, biological resources and
wetlands.
PWGSC Ontario ENVIRONMENTAL PROCEDURES Section 01 35 43 Region
Project Page 3 Number R.043794.001 2011-05-18
1.2 SUBMITTALS .4 Environmental protection plan:(Cont'd) (Cont'd)
.15 Pesticide treatment plan: to be included
and updated, as required. .16 Halocarbon Control Plan: submit
documentation specified in PWGSC Ontario Region Halocarbon
Information Sheet dated March 2010 including a signed, completed
copy of the information sheet.
1.3 FIRES .1 Fires and burning of rubbish on site are not
permitted.
1.4 DISPOSAL OF .1 Do not bury rubbish and waste materials on site
WASTES unless approved by Departmental Representative.
.2 Do not dispose of waste or volatile materials, such as mineral
spirits, oil or paint thinner into waterways, storm or sanitary
sewers.
1.5 DRAINAGE .1 Provide erosion and sediment control plan that
identifies type and location of erosion and sediment controls to be
provided. Plan: include monitoring and reporting requirements to
assure that control measures are in compliance with erosion and
sediment control plan, Federal, Provincial, and Municipal laws and
regulations.
.2 Storm Water Pollution Prevention Plan (SWPPP) to be substituted
for erosion and sedimentations control plan.
.3 Provide temporary drainage and pumping as necessary to keep
excavations and site free from water.
.4 Do not pump water containing suspended materials into waterways,
sewer or drainage systems.
.5 Control disposal or runoff of water containing suspended
materials or other harmful substances in accordance with local
authority requirements.
PWGSC Ontario ENVIRONMENTAL PROCEDURES Section 01 35 43 Region
Project Page 4 Number R.043794.001 2011-05-18
1.6 SITE CLEARING .1 Protect trees and plants on site and adjacent
AND PLANT properties where indicated. PROTECTION
.2 Wrap in burlap, trees and shrubs adjacent to construction work,
storage areas and trucking lanes, and encase with protective wood
framework from grade level to height of 2 m.
.3 Protect roots of designated trees to dripline during excavation
and site grading to prevent disturbance or damage. Avoid
unnecessary traffic, dumping and storage of materials over root
zones.
.4 Minimize stripping of topsoil and vegetation.
.5 Restrict tree removal to areas indicated or designated by
Departmental Representative.
1.7 WORK ADJACENT .1 Do not operate construction equipment in TO
WATERWAYS waterways.
.2 Do not use waterway beds for borrow material without
Departmental Representative's approval.
.3 Do not dump excavated fill, waste material or debris in
waterways.
.4 Design and construct temporary crossings to minimize erosion to
waterways.
.5 Do not skid logs or construction materials across
waterways.
.6 Avoid indicated spawning beds when constructing temporary
crossings of waterways.
.7 Do not blast under water or within 100 m of indicated
spawning beds.
1.8 POLLUTION .1 Maintain temporary erosion and pollution CONTROL
control features installed under this contract.
.2 Control emissions from equipment and plant to local authorities'
emission requirements.
.3 Prevent sandblasting and other extraneous materials from
contaminating air and waterways beyond application area, by
providing temporary enclosures.
PWGSC Ontario ENVIRONMENTAL PROCEDURES Section 01 35 43 Region
Project Page 5 Number R.043794.001 2011-05-18
1.8 POLLUTION .4 Cover or wet down dry materials and rubbish to
CONTROL prevent blowing dust and debris. Provide dust
(Cont'd) control for temporary roads.
.5 Spills of deleterious substances: .1 Immediately contain, limit
spread and clean up in accordance with provincial regulatory
requirements. .2 Report immediately to Ontario Spills Action
Centre: 1-800-268-6060. .3 Further information on dangerous goods
emergency cleanup and precautions including a list of companies
performing this work can be obtained from the Transport Canada
24-hour number (613) 996-6666 collect.
1.9 HALOCARBONS .1 Comply with Federal Halocarbon Regulations 2003
under the Canadian Environmental Protection Act 1999, EPAM and
PWGSC Ontario Region Halocarbon Information Sheet dated March
2010.
1.10 HISTORICAL/ .1 Provide historical, archaeological, cultural
ARCHAEOLOGICAL resources biological resources and wetlands plan
CONTROL that defines procedures for identifying and
protecting historical, archaeological, cultural resources,
biological resources and wetlands known to be on project site:
and/or identifies procedures to be followed if historical
archaeological, cultural resources, biological resources and
wetlands not previously known to be onsite or in area are
discovered during construction.
.2 Plan: include methods to assure protection of known or
discovered resources and identify lines of communication between
Contractor personnel and Departmental Representative.
1.11 NOTIFICATION .1 Departmental Representative will notify
Contractor in writing of observed noncompliance with Federal,
Provincial or Municipal environmental laws or regulations, permits,
and other elements of Contractor's Environmental Protection
plan.
.2 Contractor: after receipt of such notice, inform Departmental
Representative of proposed corrective action and take such action
for approval by Departmental Representative.
PWGSC Ontario ENVIRONMENTAL PROCEDURES Section 01 35 43 Region
Project Page 6 Number R.043794.001 2011-05-18
1.11 NOTIFICATION .3 Departmental Representative will issue stop
(Cont'd) order of work until satisfactory corrective
action has been taken.
.4 No time extensions granted or equitable adjustments allowed to
Contractor for such suspensions.
1.12 SPECIES AT .1 If peregrine falcons are encountered the RISK
Contractor shall cease all work and contact
Departmental Representative for advice regarding mitigation
measures.
.2 Contractor shall protect and not disturb the falcons and their
offspring in accordance with Section 01 35 43. Falcons
will become aggressive if disturbed.
PART 2 - PRODUCTS
PART 3 - EXECUTION
END
PWGSC Ontario SECURITY REQUIREMENTS Section 01 35 55 Region Project
OUTSIDE THE PERIMETER Page 1 Number R.043794.001 CORRECTIONAL
SERVICE CANADA 2011-05-18
1 PURPOSE .1 To ensure that both the construction project and the
institutional operations may proceed without undue disruption or
hindrance and that the security of the Institution is maintained at
all times.
2 DEFINITIONS .1 "Contraband" means: .1 An intoxicant, including
alcoholic beverages, drugs and narcotics. .2 Tobacco or associated
tobacco products. .3 An igniting device, lighter or matches. .4 A
weapon or a component thereof, ammunition for a weapon, and
anything that is designed to kill, injure or disable a person or
that is altered so as to be capable of killing, injuring or
disabling a person, when possessed without prior authorization. .5
An explosive or a bomb or a component thereof. .6 Currency over any
applicable prescribed limit, when possessed by an inmate without
prior authorization. .7 Any item not described in paragraphs 2.1.1
to 2.1.6 that could jeopardize the security of a Penitentiary or
the safety of persons, when that item is possessed without prior
authorization.
.2 "Unauthorized Smoking and related Items" means all smoking items
including, but not limited to, cigarettes, cigars, tobacco, chewing
tobacco, cigarette making machines, matches and
lighters.
.3 "Commercial Vehicle" means any motor vehicle used for the
shipment of material, equipment and tools required for the
construction project.
.4 "CSC" means Correctional Service Canada.
.5 "Director" means Director, Warden or Superintendent of the
Institution as applicable.
.6 "Construction Employees" means persons working for the General
Contractor, the sub-contractors, equipment operators, material
suppliers, testing and inspection companies and regulatory
agencies.
.7 "Departmental Representative" means the project manager from
Public Works and Government Services Canada.
PWGSC Ontario SECURITY REQUIREMENTS Section 01 35 55 Region Project
OUTSIDE THE PERIMETER Page 2 Number R.043794.001 CORRECTIONAL
SERVICE CANADA 2011-05-18
2 DEFINITIONS .8 "Perimeter" means the fenced or walled area of
(Cont'd) the Institution that restrains the movement of
the inmates.
.9 "Construction Limits" means the area as shown on the contract
drawings that the Contractor will be allowed to work". This area
may or may not be isolated from the security area of the
Institution.
.10 "CPIC" means RCMP Canadian Police Information
Centre.
3 GENERAL .1 Co-operate with institutional personnel in
INSTRUCTIONS ensuring that security requirements are observed
by all construction employees.
4 CONSTRUCTION .1 Submit to the Director a signed security
EMPLOYEES clearance request form for each construction REQUIREMENTS
employee seeking admission to the Institution. FOR ADMITTANCE
.2 Allow two (2) weeks for processing of security clearances
(CPIC's). Employees will not be admitted to the Institution without
a valid security clearance (CIPC) in place and a recent picture
identification such as a provincial driver's license. Security
clearances obtained from other CSC Institutions are not valid at
this Institution.
.3 The Director requires that facial photographs (ID Cards) be
displayed prominently on the Construction Employees' clothing at
all times while Construction Employees are in the
Institution.
.4 Entry to Institutional Property will be refused to any person
there may be reason to believe may be a security risk.
.5 Any person employed on the construction site will be subject to
immediate removal from Institutional Property if they: .1 Appear to
be under the influence of alcohol, drugs or narcotics. .2 Behave in
an unusual or disorderly manner. .3 Are in possession of
contraband.
.6 Smoking is prohibited anywhere on CSC property.
PWGSC Ontario SECURITY REQUIREMENTS Section 01 35 55 Region Project
OUTSIDE THE PERIMETER Page 3 Number R.043794.001 CORRECTIONAL
SERVICE CANADA 2011-05-18
5 VEHICLES .1 All unattended vehicles on CSC property shall have
windows closed; doors and trunks shall be locked and keys removed.
The keys shall be securely in the possession of the owner or an
employee of the company that owns the vehicle. Failure to comply
with the above will result in an immediate shutdown of the job site
and a stoppage of work for an indefinite period of time at the
Contractor's expense.
.2 The Director may limit at any time the number and type of
vehicles allowed within the Institution.
.3 If the Director permits trailers to be left inside the secure
perimeter of the Institution, or within the fenced construction
site compound, these trailers' doors will be locked at all times.
All windows will be securely locked when left unoccupied. All
trailer windows shall be covered with expanded metal mesh. All
storage trailers inside and outside the perimeter shall be locked
when not in use.
6 PARKING .1 Parking area(s) to be used by Construction Employees
will be designated by the Director. Parking in other locations will
be prohibited and vehicles may be subject to removal.
7 SHIPMENTS .1 All shipments of project material, equipment and
tools shall be addressed in the Contractor's name to avoid
confusion with the Institution's own shipments. The Contractor must
have his/her own employees on site to receive any deliveries or
shipments. CSC staff will NOT accept receipt of deliveries or
shipments of any material, equipment or tools.
8 WORK HOURS .1 Work hours within the construction site are:
07:00 hrs to 17:00 hrs, seven days per week.
9 OVERTIME WORK .1 No overtime work will be allowed without
permission of the Director. Give a minimum forty-eight (48) hours
advance notice when overtime work on the construction project is
necessary and approved. If overtime work is required because of an
emergency such as the
PWGSC Ontario SECURITY REQUIREMENTS Section 01 35 55 Region Project
OUTSIDE THE PERIMETER Page 4 Number R.043794.001 CORRECTIONAL
SERVICE CANADA 2011-05-18
9 OVERTIME WORK .1 (Cont'd) (Cont'd) completion of a concrete pour
or work to make
the construction safe and secure, the Contractor shall advise the
Director as soon as this condition is known and follow the
directions given by the Director.
10 TOOLS AND .1 Keep all tools and equipment under constant
EQUIPMENT supervision, particularly power-driven and
cartridge-driven tools, cartridges, files, saw blades, rod saws,
wire, rope, ladders and any sort of jacking device. Ensure that
these tools and equipment are not accessible to inmates on the
outside of the fenced perimeter enclosure.
.2 Ensure that at the end of each work day, and when not in use,
all tools and equipment are locked in a secure room or in secure
lockable tool boxes.
.3 All missing or lost tools or equipment shall be reported
immediately to the Director.
11 HARDWARE .1 Security Hardware/ Keys - Existing: .1 Turn over all
removed security hardware to the Director of the Institution for
disposal or for safekeeping until required for
re-installation.
.2 Security Hardware/ Keys - New: .1 Arrange with the security
hardware supplier to have the cylinders and keys for the security
hardware to be delivered from the manufacturer directly to the
Institution, specifically the Security Maintenance Officer (SMO).
.2 The SMO will provide a receipt to the Contractor for security
hardware and keys. .3 Provide a copy of the security hardware and
keys receipt to the Departmental Representative.
.3 Construction Hardware/ Keys: .1 The Contractor will use standard
construction cylinders for locks for his/her use during the
construction period. .2 The Contractor will issue instructions to
his/her employees and sub-trades, as necessary, to ensure safe
custody of the construction set of keys.
PWGSC Ontario SECURITY REQUIREMENTS Section 01 35 55 Region Project
OUTSIDE THE PERIMETER Page 5 Number R.043794.001 CORRECTIONAL
SERVICE CANADA 2011-05-18
11 HARDWARE .3 Construction Hardware/ Keys:(Cont'd) (Cont'd) .3
Upon completion of each phase of the
construction, the CSC representative will, in conjunction with the
lock manufacturer:
.1 Accept the operational keys and cylinders directly from the lock
manufacturer. .2 CSC will arrange for removal and return of the
construction cores and install the operational cores in all
locks.
.4 Upon putting operational security keys into use, the CSC
construction escort shall obtain these keys as they are required
from the Security Maintenance Officer (SMO) and open doors as
required by the Contractor. The Contractor shall issue instructions
to his/her employees advising them that all security keys shall
always remain with the CSC construction escort.
12 PRESCRIPTION .1 Employees of the Contractor who are required to
DRUGS take prescription drugs during the workday shall
obtain approval of the Director to bring a one day supply only into
the Institution.
13 CONTRABAND .1 Weapons, ammunition, explosives, alcoholic
beverages, drugs and narcotics are prohibited on Institutional
Property.
.2 Discovery of Contraband on the construction site and the
identification of the person(s) responsible for the Contraband
shall be reported immediately to the Director.
.3 Contractors shall be vigilant with both their staff and the
staff of their sub-contractors and suppliers that the discovery of
Contraband may result in cancellation of the security clearance of
the affected employee. Serious infractions may result in the
removal of the company from the Institution for the duration of the
construction.
.4 Presence of arms and ammunition in vehicles of Contractors,
sub-contractors and suppliers or employees of these will result in
the immediate cancellation of security clearances for the driver of
the vehicle.
PWGSC Ontario SECURITY REQUIREMENTS Section 01 35 55 Region Project
OUTSIDE THE PERIMETER Page 6 Number R.043794.001 CORRECTIONAL
SERVICE CANADA 2011-05-18
14 SEARCHES .1 All vehicles and persons entering Institutional
property may be subject to search.
.2 When the Director suspects, on reasonable grounds, that an
employee of the Contractor is in possession of Contraband or
unauthorized items, he/she may order that person to be
searched.
15 ACCESS TO AND .1 Construction personnel and commercial vehicles
REMOVAL FROM will not be admitted to the Institution or the
INSTITIUION fenced primary construction site after normal PROPERTY
working hours, unless approved by the Director.
.2 Access to the primary construction site will be controlled by
Contractor, and during normal course of business Institutional
staff will not be permitted on to the site due to Health and Safety
Regulations.
16 MOVEMENT OF .1 Vehicles shall be refused access to VEHICLES
Institutional Property if, in the opinion of the
Director, they contain any article which may jeopardize the
security of the Institution.
.2 Private vehicles of Construction Employees will not be allowed
within the security wall or fence of medium or maximum security
Institutions without the permission of the Director.
.3 When equipment is permitted to remain on the construction site
overnight or over the weekend this equipment must be securely
locked and disabled.
17 SURVEILLANCE .1 Construction activities and all related AND
INSPECTION movement of personnel and vehicles will be
subject to surveillance and inspection by CSC security staff
members to ensure that established security requirements are
met.
.2 CSC staff members will ensure that an understanding of the need
to carry out surveillance and inspections, as specified above, is
established among Construction Employees and maintained throughout
the construction project.
PWGSC Ontario SECURITY REQUIREMENTS Section 01 35 55 Region Project
OUTSIDE THE PERIMETER Page 7 Number R.043794.001 CORRECTIONAL
SERVICE CANADA 2011-05-18
18 STOPPAGE OF .1 The Director may request at any time that the
WORK Contractor, his/her employees, sub-contractors
and their employees not enter or leave the work site immediately
due to a security situation occurring within the Institution. The
Contractor's site supervisor shall note the name of the staff
member making the request and the time of the request and obey the
order as quickly as possible.
.2 The Contractor shall advise the Departmental Representative
within 24 hours of this delay to the progress of the
work.
19 CONTACT WITH .1 Unless specifically authorized, it is forbidden
INMATES to come into contact with inmates, to talk with
them, to receive objects from them or to give them objects. Any
employee doing any of the above will be removed from the site and
his/her security clearance revoked.
.2 It is forbidden to take pictures of inmates, of CSC staff
members or of any part of the Institution other than those required
as part of this Contract.
20 COMPLETION OF .1 Upon completion of the construction project or,
CONSTRUCTION when applicable, the takeover of a facility, the
PROJECT Contractor shall remove all remaining
construction material, tools and equipment that are not specified
to remain in the Institution as part of the construction
contract.
END
PWGSC Ontario SECURITY REQUIREMENTS Section 01 35 56 Region Project
INSIDE THE PERIMETER Page 1 Number R.043794.001 CORRECTIONAL
SERVICE CANADA 2011-05-18
1 PURPOSE .1 To ensure that both the construction project and the
institutional operations may proceed without undue disruption or
hindrance and that the security of the Institution is maintained at
all times.
2 DEFINITIONS .1 "Contraband" means: .1 An intoxicant, including
alcoholic beverages, drugs and narcotics. .2 Tobacco or associated
tobacco products. .3 An igniting device, lighter or matches. .4 A
weapon or a component thereof, ammunition for a weapon, and
anything that is designed to kill, injure or disable a person or
that is altered so as to be capable of killing, injuring or
disabling a person, when possessed without prior authorization. .5
An explosive or a bomb or a component thereof. .6 Currency over any
applicable prescribed limit, when possessed by an inmate without
prior authorization. .7 Any item not described in paragraphs 2.1.1
to 2.1.6 that could jeopardize the security of a Penitentiary or
the safety of persons, when that item is possessed without prior
authorization.
.2 "Unauthorized Smoking and related Items" means all smoking items
including, but not limited to, cigarettes, cigars, tobacco, chewing
tobacco, cigarette making machines, matches and
lighters.
.3 "Commercial Vehicle" means any motor vehicle used for the
shipment of material, equipment and tools required for the
construction project.
.4 "CSC" means Correctional Service Canada.
.5 "Director" means Director, Warden or Superintendent of the
Institution as applicable.
.6 "Construction Employees" means persons working for the General
Contractor, the sub-contractors, equipment operators, material
suppliers, testing and inspection companies and regulatory
agencies.
.7 "Departmental Representative" means the project manager from
Public Works and Government Services Canada.
PWGSC Ontario SECURITY REQUIREMENTS Section 01 35 56 Region Project
INSIDE THE PERIMETER Page 2 Number R.043794.001 CORRECTIONAL
SERVICE CANADA 2011-05-18
2 DEFINITIONS .8 "Perimeter" means the fenced or walled area of
(Cont'd) the Institution that restrains the movement of
the inmates.
.9 "Construction Limits" means the area as shown on the contract
drawings that the Contractor will be allowed to work". This area
may or may not be isolated from the security area of the
Institution.
.10 "CPIC" means RCMP Canadian Police Information
Centre.
.11 "Commissioner" means designated representative of Director, to
monitor construction related activities including surveillance of
inmate labour.
3 GENERAL .1 Prior to the commencement of work, the INSTRUCTIONS C