Top Banner
BASS RIVER DISTRICT
16

BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.

Jan 20, 2018

Download

Documents

Noah Riley

Master Plan Guiding Principle Economic Development Downtown & Harbor Development
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.

BASS RIVER DISTRICT

Page 2: BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.

• Master Plan• Harbor Management

Plan• Open Space Plan• Downtown Strategic

Plan

Page 3: BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.

Master Plan • Guiding Principle• Economic

Development• Downtown & Harbor

Development

Page 4: BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.

• Encourage Redevelopment - Capitalize on Proximity to Rail Station

• Rezone to Permit Mixed Use (Small Scale Ground-level Retail, Residential Uses on Upper Stories and Marinas)

• Dredge Bass River to Accommodate Existing and New Boating Activity

Page 5: BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.
Page 6: BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.
Page 7: BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.

Bass River Study

Page 8: BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.
Page 9: BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.

Bass River StudyVision Statement

• ACTIVE MIXED-USE NEIGHBORHOOD

• VISUAL & PHYSICAL ACCESS CREATED AND CONNECTED TO SHORELINE TRAIL

• IMPROVED CONNECTIONS ACROSS RAIL TRACKS TO RIVER

• MIXED-USE WITH RESIDENTIAL WILL BE BALANCED WITH INDUSTRIAL USES

Page 10: BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.

Bass River Study

• Provide transportation choice

• Increase transit ridership

• Reduce reliance on automobiles

• Reduce air pollution and energy consumption

• Increase households’ disposable income

• Bolster local economy

• Increase the municipal tax base

• Contribute to more affordable housing

Transit Oriented Development (TOD)

Page 11: BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.

Bass River StudyCommunity Connections

• INTERCONNECTED STREET NETWORK LINKING AMENITIES AND ASSETS

• STREETS DESIGNED TO ACCOMMODATE ALL USERS

• VETERAN’S MEMORIAL PARK & SURROUNDING ROADWAYS

• CONTINUOUS AND CONNECTED WATERFRONT WALKWAY

Page 12: BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.

Bass River StudyCommunity Connections

WATERFRONT WALKWAY: EXISTING

WATERFRONT WALKWAY: PRECEDENT

Page 13: BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.

Bass River StudyLand Use and Zoning

• ALLOW MIX-USE DEVELOPMENT WITH RESIDENTIAL

• REDUCE PARKING REQUIREMENTS

• ALLOW SHARED PARKING ARRANGEMENTS / CONSIDER MAXIMUMS

• INCORPORATE DESIGN GUIDELINES / MAINTAIN VIEW SHEDS AND PUBLIC ACCESS

Page 14: BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.

Bass River StudyZoning Recommendations

• CREATE ACTIVE STREET FRONTS WITH APPROPRIATE LAND USES AND DIMENSIONAL STNDARDS

• MAINTAIN CHARACTER OF PARK STREET AS INDUSTRIAL ARTS NEIGHBORHOOD

• BUILDING HEIGHTS THAT BLEND WITH ADJACENT COMMERCIAL AND RESIDENTIAL DISTRICTS

• DEVELOPMENT STANDARDS WITHIN FLOODPLAIN

Page 15: BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.
Page 16: BASS RIVER DISTRICT. Master Plan Harbor Management Plan Open Space Plan Downtown Strategic Plan.

2016 Zoning Process

• PUBLIC MEETING JANUARY 28

• STAKEHOLDER MEETINGSJAN. – FEB.

• PUBLIC MEETINGDRAFT ORDINANCEMARCH – TBD

• CITY COUNCILAPRIL