Project-overview
IOCL VGM Spurline project , a venture in its pride to escalatetechnology in the Oil business to the next shift making CAIRNEnergy India Ltd.L&T`s construction contract for this project valued over Rs.10 Cr,
where, both Pipeline & Piping activities included, Launcher in VGMTerminal and Receiver at IOCL Terminal.Project Pipeline spans for over 2.5km, bridging Cairn and IOCLterminal; Piping scopes over 2200inch-dia with 5 packages.This Projects construction with elevated measures in Safety, Quality
& Stringent accomplishments with sophistication in each level of thisexecution.A Paramount in its possession, scope consists of Procurement,Fabrication, Construction, Installation, Pre-commissioning, Testing,Commissioning and Performance test run.
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
3/54
ROLLER COASTER RIDE ACCIDENTOne of the theories was due to the failure of a weld (car onto rollingmember). This speeds up more than 80kmph. It is reported that anaverage of 900 fatalities are reported each year in spite of constantinspection and most of theories were fatigue weld failures.
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
4/54
LEARNER INDUCTION PROGRAM
Welders are to be taught about the WPS, explained to depths in themanner he understands;
To ensure that he practices surface preparation; Fit-up checks like high-low, vertical/horizontal alignment and to re-
ensure that he abides welding by the approved WPS; Qualified Filler wire/Electrode to be made to use and their storageconditions to be checked; Use of Owen for Low Hydrogen Electrodes(E-7018) and their effect on
the weldments. Effect of Pre-heating & Stress Relieving on the weldments are to be
defined in detail. Forbid multiple Fit-ups; Restrict Support tack-welds (over parent material) to a minimum; All welders must bear their ID`s on site.
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
5/54
Welding Procedure SpecificationThis directs the welder/welding operatorto weld by the rules/parameters as per
the code requirements
ESSENTIAL VARIABLES
These variables are a must duringexecution and subject to changes/re-
qualification of WPS/PQR, when thesevariables are changed. All that derive
changes in the mechanical property areessential variables listed in the PQR
SUPPLEMENTARY VARIABLES
These are variables that are termed with
specificity of their requirement, anychange in the variables will summon for
re-qualification/re-certification of theWPS/PQR
NON-ESSENTIAL VARIABLES
Variables can be changed without re-qualifying the WPS
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
6/54
P number
Assigned based on the BASE metalcharacteristics towards Weldability,Composition & Mechanical properties;
G numberApplied for steel & steel alloys that
belong to a group of P-numbers for thepurpose of procedure qualification,
where, notch toughness requirementsare specified and metallurgical
compatibilities should be considered;
F numberApplied for grouping of electrodes
based on their usability characteristics;Grouping done to reduce voluminous
WPS/PQR and metallurgical
compatibilities should beconsidered;
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
7/54
WELDING POSITIONS
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
8/54
CLASSIFICATION CURRENT ARC/PENETRATION ELECTRODE COATING
E XXX0 DCEP DIGGING/DEEP CELLULOSE - Na
E XXX1 AC/DCEP DIGGING/DEEP CELLULOSE - K
E XXX2 AC/DCEN MEDIUM/SHALLOW RUTILE Ti & Na
E XXX3 AC/DCEN/DCEP SOFT/SHALLOW RUTILE Ti & K
E XXX4 AC/DCEN/DCEP SOFT/SHALLOW RUTILE Ti & Fe powder
E XXX5 DCEP MEDIUM/SHALLOW BASIC LOW H 2 - Na
E XXX6 AC/DCEP MEDIUM/SHALLOW BASIC LOW H 2 - K
E XXX7 AC/DCEN/DCEP MEDIUM/SHALLOW IRON OXIDE - Fe powderE XXX8 AC/DCEP MEDIUM/SHALLOW BASIC LOW H 2 - Fe powder
E XXX9 AC/DCEN/DCEP MEDIUM/SHALLOW RUTILE IRON OXIDE- Fe powder
ELECTRODE CLASSIFICATION
E (electrode) 70 (x1000 psi Tensile Strength) 1 (Welding Position) 8 (Coating, Penetration & Current)1 Flat, Horizontal, Vertical (up), Overhead
2 Flat, Horizontal4 Flat, Horizontal, Overhead, Vertical (down)WELDING POSITION
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
9/54
WELDING ELECTRODES A STUDY
CELLULOSE RUTILE BASIC
MECHANICAL PROPERTY GOOD GOOD EXCELLENT
WELD-ABILITY &PENETRATION EASY & DEEP MEDIUM & SHALLOW DIFFICULT & MODERATE
ARC-STABILITY STRONGER & HARDER, MORESPATTERS, SPRAY-FORMLIGHTER & EASIER, LESSSPATTER, SPRAY-FORM
LIGHTER & EASIER,REDUCED SPATTER, DROP-
FORM
COATING THICKNESS THIN / MEDIUM MEDIUM THICK & HYGROSCOPIC(BAKING NECESSARY)
DE-SLAGGING MEDIUM DUE TO STRONGERARC INTENSITY EASY DIFFICULT-MORE VISCOUS
WELDING POSITION &ANGLE
DEEP-PENETRATION AT ALLPOSITIONS & 45to 60
VERY GOOD AT VERTICAL-DOWN & 45to 60
FLAT, HORIZONTAL &VERTICAL-UP & 75to 90
WELD METAL DEPOSITION 85% 65% 115%
PARAMETERS DC(-) & DC(+) for SHALLOW &DEEP PENETRATION AC / DCDC preferred for continuous
ARC-STABILITY
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
10/54
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
11/54
ARC WELDING - SAFETY CONCERNS
Rays from Arc-Welding ranges from 2500C to 6500C, hence,direct eye-view would cause corneal aberration, IR heating- causingdistortion of cartilaginous lens;
Sparks and molten spatters impinge on the skin with high velocity-causing burns & fire hazard;
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
12/54
Electrical Hazards In-sufficient safety-wears-gloves, goggles, shoes,un-insulated / damaged holders, bare live cables and proper earthingwith soil conductivity is also a factor;
Fumes Confined areas, electrode certification through OSHAS/othersafety standards are a must, as toxicity is a major issue;
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
13/54
Equipment operation familiarity is a concern & Safety is a prioritymeasure; Use of Flash-back arrestors & tarpaulin overs which arenot fire-proof;
Site Management-evaluating working / conditions of clothing and
different areas of work-nature, Usage of safety-wears in the rightmanner; committing to provide thoughts to the fellow workers.
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
14/54
1. Make sure machine is properly grounded (earth-ing);
2. Never permit live electric parts to touch bare skin;
3. Do not cool electrode holders by immersing in water;4. Turn off power supply when welder is not in use;
5. Do not stand on wet areas while welding;
6. Wear leather gloves;7. Make sure that cables are not open-striped off making the inner bare
wire naked;
8. Make certain that electrode holders are properly insulated;
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
15/54
1. Protect eyes and face from flying particles of slag by use of safetyglasses or face shield.
2. Wear adequate protective clothing.
3. Always wear leather gloves.
4. Wear high top shoes.
5. Keep collar, shirt pockets, etc buttoned.
6. Do not touch the electrode or metal where welding has taken place.
7. Handle hot metal with pliers or tongs.
8. Keep electrode stubs properly disposed of.
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
16/54
1. Use a welding helmet with the correct shade lens for each weldingprocess, in good condition.
2. Wear suitable clothing do not leave bare skin exposed to the rays of the arc.
3. Do not strike the arc without covering the face and eyes. Givewarning to others before striking the arc.
4. Avoid looking directly at the arc where others are welding withoutproper eye protection.
5. If administered seeing the arc with the naked eyes, immediately washeyes with water.
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
17/54
1. Work only in well-ventilated, clean areas.
2. Use great care when working on metals covered with lead or zinc.
3. If working in a confined area use respirator or other approvedbreathing devices.
4. In confined spaces, presence of toxic gases and ventilation for gasesduring welding should be checked initially.
5. Necessary precautions to be taken when welding near combustiblematerials of any kind.
6. Never weld on covered containers which may have held combustiblematerials without first taking adequate safety precautions. For
example, fill them with water, steam clean or fill with an inert gas.
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
18/54
1. Be familiar with location and types of fire extinguishers.
2. Familiarity with the use of extinguishers;
3. Report any unsafe conditions that might start a fire.4. Do not weld near inflammable materials.
5. Do not weld on containers that has/had inflammable materials.
6. Do not weld near electrical fittings or lines.
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
19/54
HEAT TREATMENT
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
20/54
HEAT TREATMENT an Introduction
Pre-heating:Localized heating of the parent
material on either sides of the joint above theambient temperature before welding.
Post-heating:Localized heating of the welded joint
and the HAZ.
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
21/54
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
22/54
Pre-Heating Decreases rate of thermal conductivity; Decreases the cooling rate after welding,
thereby, susceptibility towards cracking &martensitic transformation is meagre;
Reduces stress across the weld-parent metalinterface, thus, reduces distortion;
Reduces shrinkage and increases parent metalsurface wettability; Moisture evacuation; Usually, ranging between 10 C to 400 C.
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
23/54
Pre-heat Temperature-Information Chiefly based on Carbon Equivalent values (Ceq) for carbon steels
dependent on the weight percentage of carbon presence.Ceq = C + Mn /6 + (Cr + Mo + V) /5 + (Cu + Ni) /15
Material thickness is a main factor to be considered in the evaluationof heat-treatments. Material with Large thickness dissipates heat orcools off sooner and Thinner materials tend to distort with largelinear/lateral variation and cools slowly as the volume for thermaldistribution is less.
Upon pre-heating, hydrogen emissivity is increased, thereby,reducing prone to Weld-metal, HAZ hydrogen cracking.
A welded joint on a high thickness job cools off immediately, as thevolume more is large to conduct/dissipate heat through the material.Therefore, pre-heating, will help the weld-puddle (molten weldbefore solidification) to cool at a slower rate. Therefore, shrinkage isminimized.
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
24/54
MILD STEEL MEDIUM CARBON &ALLOYED STEELHIGH CARBON &ALLOYED STEEL
CARBONEQUIVALENT
CeqC
eq< 0.4 0.4< C
eq0.5
WELDABILITY EASY MEDIUM DIFFICULT
PRE-HEAT
10 C for thickness 1in as
per ASME B31.3 andOptional by BS 5135
150 C to 180 C as perASME B31.3 and 93 C
to 204 C by BS 5135
150 C to 400 C as perASME B31.3 and204 C to 370 C
by BS 5135
USE OF LOWHYDROGEN
ELECTRODESOptional for Thicker sections
Optional for Thinsections & Conditional
for thicker sections
Conditional for all size-dimensions
POST-WELD
HEATINGOptional for Thicker sections Conditional for thicker
sections at 1 hr/in
Conditional for all size-
dimensions at 2 hr/in
COOLING RATE AIR-COOLING SLOW VERY SLOW
HEATAFFECTED
ZONE (HAZ)Cracking
Not susceptible , if lowhydrogen electrodes are
used
Less susceptible , iflow hydrogen
electrodes are used
Higher susceptibility .Mandatory use of LowHydrogen Electrodes
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
25/54
Post-weld Heat Treatment Post weld heat treatment (PWHT), defined as
any heat treatment after welding, is often used toimprove the properties of a weldment.
This process is commonly referred to stressrelief , so called because it is carried out attemperatures below the critical range of thebase metal, followed by uniform cooling.
PWHT-Stress Relieving: decreases hardness,increases ductility by decreasing yield strengthof the material.
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
26/54
Post Weld Heat Treatment Relaxes residual stresses; Recovers cold work-deformations; Improves toughness;
Tempering to the required levels (softening), asin the case for Leaf springs used as suspensorin heavy vehicles ;
Re-crystallization & Spherodization for specialpurpose applications .
PWHT to be done within 14 days from the day ofwelding completion-as per ASME B31.3.
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
27/54
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
28/54
HEATTREATMENT PROCESS
COOLINGRATE
MECHANICALPROPERTIES
ANNEALINGHeated above UCT & soaked for1Hr for every 1in.Then, cooled in Furnace
SLOW
DUCTILITY TOUGHNESS
STRENGTH COARSE GRAINED
SUB-CRITICAL orSTRESS-RELIEF
ANNEALING
Heating around LCT (~635 C),depending on the steel and locality SLOW
ONLY RESIDUAL STRESSRELIEVED; NO CHANGE INGRAIN STRUCTURE
NORMALIZINGHeated above UCT & soaked for1Hr for every 1in.Then, cooled in Air
MEDIUM
DUCTILITY TOUGHNESS STRENGTH FINE GRAINED
TEMPERING(DRAWING)
Re-Heated(220 C to 723 C) toconvert the remaining Hardness intoToughness
MEDIUM
DUCTILITY
TOUGHNESS STRENGTH FINE GRAINED
HARDENINGHeated above UCT & soaked for1Hr for every 1in.
Then, cooled in QuenchingRAPID
DUCTILITY HARDNESS TOUGHNESS STRENGTH FINE GRAINED
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
29/54
HEAT INPUT - INFORMATION Heat Input (H) is a relative measure of the amount of
Energy transferred during welding. Any change in values from the WPS will call for re-
qualification. Welding with High Q will weaken the HAZ due to its
high temperature & Slower cooling rate-coarser grainstructure.
H = Power / Velocity of motionduring welding, Watt-sec/mm ;
One Joule = One Watt-sec; Cooling Rate is conversely
proportional to the Pre-heattemperature and the Heat Input;
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
30/54
If the HEAT-INPUT is large,
MECHANICALPROPERTIES
Reduced Tensile & Yield StrengthIncreased Ductility, Reduced Hardness
Notch Toughness for 1550 kJ/in for SMAW
Notch Toughness for 50110 kJ/in for SMAW
if S , Blow Hole, In-complete penetration, Porosity, Improper Beadsize, Ir-regular weave profile
if V A, Complex & profuse melting of electrode, localized weldlumps, reinforcement, under-cuts, pressurized-gouging arc,weak HAZ, forced slag entrapment
HAZLarge & Weak-HAZ/oxidation of the parent material,precipitation in some steels
COOLINGRATE
Lower cooling rate, Large metallurgical changes, Pre-heatrequired for some metals with low heat-input (faster cooling)
DISTORTION Depends on thickness & large variation-angular/linear
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
31/54
Post Heating Method
Flexible Ceramic Pads (FCP) heatingelements- desired temperature up to 1150C
Burners- Infrared gas burners - smaller
sized objects.
- Oil burners or High Velocity gasburners- larger objects
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
32/54
Heat Treatment Furnaces
Temporary furnaces Permanent furnaces High temperature
furnaces
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
33/54
BASIC FIT-UP REGULATIONS Inside cleaning, Surface Buff, Paint/stain & foreign material removal; Groove-design, Face-width, Bevel taper & Angle-made as per the
approved procedure; Check for the appropriate material & thickness in use;
Material for tack-supports shall be the same as the parent materialmade in use & be restricted to 4 at each 90 of 10mm max; Wedge/Bridge inserts tacked between the grooves are better
preferred & After welding, De-tacks shall not be hammered out; Suspended pipings/Sand-bag supports tend to deviate, hence, mitre
possibilities are to be checked & counter alignment has to be made;; RF pads shall be drilled for a hole before welding onto pipes; Use of machining wheels-GRINDING/CUTTING for appropriate
applications; Punching/Tracing shall be made out before welding;
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
34/54
Improper BEVEL-ANGLE ,Insufficient GAP and
DIS-QUALIFIED Branch Fit-up
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
35/54
UN-REGULATED GAP(7mm) /MIS-MATCH FOUND, THIS
INVOLVES SUPPORT PIPE RE-LENGTHING & WELDING
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
36/54
JOINT INVOLVING MORE THAN 4FIT-UP SPOTS; PARENT METALELECTRODE-STROKED; POOR
BEVEL & GROOVE DESIGN
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
37/54
RESTRICT TACK WELDS TO AMINIMUM & EACH SHOULD
CONTAIN STITCH WELDS/ DROPSNOT TO EXCEED 10 mm
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
38/54
De-LINEAR ALIGNMENT
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
39/54
IMPROPER BRANCH CUTS FORWELDING OF OLETS INNER
DIAMETER DOEST NOT MATCH THE`OLET in FIG A; SQUARE CUTTING
BY GRINDING WHEELas in FIG B & C;
FLOW OBSTRUCTION & SHOCKTURBULENCE MAY BE OBSERVED IN
DUE SERVICE
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
40/54
`OLETS WELDED WITHFLANGES BEFORE WELDING
ONTO PIPES; HIGH RATEDFLANGES ARE HEAVY, WOULDPOSE A MIS-FIT IN ALIGNMENT
SIMULTANEOUS FIT-UPS-NOTADVICED; CAUSES RESTRAINT
AMONG THE MEMBERS
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
41/54
FIG A & B : SUPPORTCHANNELS DIRECTLYWELDED TO THE PARENTMATERIAL WITHOUT ANYSANDWICH(SIMILAR TOPARENT METAL);FIG C : CS SUPPORTS AREGIVEN TO SS PIPINGS-REGRETTED;
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
42/54
PRE/POST WELD REGULATIONS Welder ID/Qualification to be checked; Electrode-baking, Amperage controls, Pre-heat are to be checked; Earthing to be tight, blunt, insulated & clamped and should not be placed
over the parent metal; Welding cleats for fit-ups to be made by approved welder for the right
material; Conductivity check of the electrode be made over a scrap piece; For Socket welds, minimum 2 runs required & the start point shall not
coincide with the end point;
Post weld De-slagging, Re-capping be made if convex peeks, Under-cuts& removal of welded cleats are observed;
Arc-strikes must be restricted and if made should be filed-off; Weaving width shall not exceed 2.5D;
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
43/54
OBSERVATION : RF PAD WELDED ONTO PIPE JOINT;CONSEQUENCE : HAZ WEAKENING or PRECIPITATION
SEGREGATION, JOINT INSPECTION IN-ABILITY, SERVICE LOADIMBALANCE;
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
44/54
CLEATREMOVALUN-DONE
CRATERS ASSISTED WITH ELECTRODE DRAG &PENETRATED ARC-STRIKE
IN-COMPLETECAPPING,
UN-REGULATEDWEAVING
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
45/54
DAMAGED-PIPE TACK WELD SPOTS
DAMAGES MADE BYFIT-UP TACKS &
GRINDING
POOR AMPERAGE CONTROLS & PARAMETERS
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
46/54
POOR AMPERAGE CONTROLS & PARAMETERS
IN-COMPLETE PENETRATION
EXCESSPENETRATION
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
47/54
ARC-STRIKES & INAPPROPRIATE EARTHING SPOTS
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
48/54
NO SURFACE PREPARATION-WELDED OVERCOATING, RESULTING IN HEAVY OXIDATION DUE TO
HIGH HEAT INPUT & PIPE DAMAGE
SUPPORTPENETRATING
THRO` THE PIPE
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
49/54
INSUFFICIENT OVERLAPPING OF BEADS
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
50/54
LEAKS OBSERVED DUE TO ELECTRODEPENETRATION THROUGH THE THICKNESS OFTHE PIPE, INDISCIPLINED WELD LEAKSWITNESSED
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
51/54
OBSERVATION: Leak during hydro-test, a 7 mmprotrusion (thro` thickness) found;REASON: Pipe welded with R-pad support, but, waspoorly welded with the electrode penetrating thro` thethickness;
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
52/54
Stainless steel - AWARENESSAwareness:Heat Input (H) parameters to be checked as per the approved WPS, as
they vary from CS to SS (H,usually lower than CS);Pipes/Tubes 2 & below are to be welded by GTAW for shallowpenetration;
Inter-pass time delay for Distortion control in SS;Purging for SS avoids OXIDATION;Use of low/no chloride markers for markings on SS, as punching &materials/tools used in CS are regretted for use in SS;Use of the appropriate electrodes for SS;
Use of the appropriate SS materials for supports, fit-up cleats,grinding/buffing tools;
THERMAL BEHAVIOUR CS SSThermal Conductivity
Thermal Expansion & Distortion
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
53/54
CRATER STROKES
UNDERCUT
OXIDIZATION of impurities present in thefiller / foreign material interference
8/8/2019 Basic Quality Induction Programme for Welders`,Fitters & Engineers
54/54