Study Areas in Ward Status of EA Studies EA Study Progress in Ward
11 Completed (2012)
41 Underway (Began in 2015)
35 Completed (2018)39 Completed (2018)48 EA to Begin in 201951 EA to Begin in 201936 Underway (Began in 2015)
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 1.36 M $ 1.10 M
Subsidized by City Cost to Property Owners
1144 9110
Properties with FPD Properties without FPD
24%
25%
50%
$ 6.1 M, 11%
$ 44.0 M, 75%
$ 8.4 M, 14%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
TOTAL$ 58.5 M
Study isUnderway
Area Studied
Area to be Studied
• 1.1 km of storm sewer upgrades installed
Page 2
###
Underway (Began in 2015)
Basement Flooding Protection Program Summary
Ward 2 - Etobicoke Centre
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
8 Completed (2012)9 Completed (2012)10 Completed (2012)7 Completed (2012)35 Completed (2018)
50 EA to Begin in 2019EA to Begin in 201948
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
EA to Begin in 2019
38
54
Underway (Began in 2015)
EA to Begin in 201951
Underway (Began in 2015)36
41
$ 5.61 M $ 4.63 M
Subsidized by City Cost to Property Owners
4714 15380
Properties with FPD Properties without FPD
22%
50%
28%
$ 12.4 M, 5%
$ 20.9 M, 8%
$ 226.7 M, 87%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
Study isUnderway
Area Studied
Area to be Studied
TOTAL$ 260.0 M
• 3.0 km of storm sewer upgrades installed
• 3.2 km of sanitarysewer upgrades installed
Page 3
###
Basement Flooding Protection Program Summary
Ward 3 - Etobicoke-Lakeshore
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
49 EA to Begin in 201951 EA to Begin in 201953 EA to Begin in 201954 EA to Begin in 201938 Underway (Began in 2015)
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 3.94 M $ 3.24 M
Subsidized by City Cost to Property Owners
3281 17325
Properties with FPD Properties without FPD
8%
92%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
Study isUnderway
Area Studied
Area to be Studied
Implementation will proceed followingcompletion of the next Environmental
Assessment Study in this ward
Page 4
###
Basement Flooding Protection Program Summary
Ward 4 - Parkdale-High Park
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
4 Completed (2014)
62 EA to Begin in 2019
5 Completed (2014)51 EA to Begin in 201944 EA to Begin in 201949 EA to Begin in 201942 EA to Begin in 2019
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 2.99 M $ 2.55 M
Subsidized by City Cost to Property Owners
2518 8362
Properties with FPD Properties without FPD
7%
93%
$ 1.7 M, 100%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
TOTAL$1.7M
Study isUnderway
Area Studied
Area to be Studied
Page 5
###
Basement Flooding Protection Program Summary
Ward 5 - York South-Weston
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
45 Underway (Began in 2017)
31646
Completed (2011)Completed (2012)Completed (2014)Completed (2014)
51 EA to Begin in 201944 EA to Begin in 2019
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 1.86 M $ 1.58 M
Subsidized by City Cost to Property Owners
1535 14027
Properties with FPD Properties without FPD
54.1%
30%
16%
$ 37.1 M, 12%
$ 175.1 M, 56%
$ 49.8 M, 16%
$ 52.2 M, 16%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
Study isUnderway
Area Studied
Area to be Studied
TOTAL$314.3M
• Maple Leaf Park,Gracefield Park and Rustic Park Stormwater Ponds
• 4.8 km of stormsewers and 1.4 km of sanitary sewers upgraded
Page 6
###
Basement Flooding Protection Program Summary
Ward 6 - York Centre
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
EA to Begin in 201958
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
28 Completed (2008)14 Completed (2009)16 Completed (2012)15 Completed (2014)19 Completed (2014)24 Completed (2016)
66
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
65 EA to Begin in 2019Underway (Began in 2017)45
EA to Begin in 2019
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 2.16 M $ 1.78 M
Subsidized by City Cost to Property Owners
1801 12251
Properties with FPD Properties without FPD
44%
10%
47%
$ 16.3 M, 6%
$ 96.0 M, 37%
$ 15.2 M, 6%
$ 135.1 M, 51%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
Study isUnderway
Area Studied
Area to be Studied
TOTAL$262.6M
• 2.8 km of storm sewer upgrades installed
• 100 m of sanitarysewer upgrades installed
Page 7
###
Completed (2014)Completed (2010)
Completed (2014)EA to Begin in 2019EA to Begin in 2019
1215135161
Basement Flooding Protection Program Summary
Ward 7 - Humber River-Black Creek
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
Completed (2009)14
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Underway (Began in 2017)45
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 0.69 M $ 0.52 M
Subsidized by City Cost to Property Owners
568 12498
Properties with FPD Properties without FPD
39%
21%
40%
$ 53.9 M, 46%
$ 8.4 M, 7%
$ 28.3 M, 24%
$ 26.6 M, 23%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
TOTAL$ 117.2 M
Study isUnderway
Area Studied
Area to be Studied
• 10.5 km of storm sewer upgrades installed
• 2.8 km of sanitarysewer upgrades installed
Page 8
###
Underway (Began in 2015)
Basement Flooding Protection Program Summary
Ward 8 - Eglinton-Lawrence
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Completed (2018)
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
3 Completed (2011)16 Completed (2012)17 Completed (2014)18 Completed (2014)37
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
58 EA to Begin in 2019
40
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 3.73 M $ 3.09 M
Subsidized by City Cost to Property Owners
3111 16013
Properties with FPD Properties without FPD
51%41%
8%
TOTAL$ 444.2 M
Study isUnderway
Area Studied
Area to be Studied
• 1.1 km of storm sewer upgrades installed
• 600 m of sanitarysewer upgrades installed
$ 9.4 M, 2%
$ 11.5 M, 3%
$ 97.8 M, 22%
$ 49.8 M, 11%
$ 275.7 M, 62%Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
Page 9
###
Basement Flooding Protection Program Summary
Ward 9 - Davenport
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
3 Completed (2011)37 Completed (2018)42 EA to Begin in 201944 EA to Begin in 201962 EA to Begin in 2019
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 2.59 M $ 2.19 M
Subsidized by City Cost to Property Owners
2150 12656
Properties with FPD Properties without FPD
15%
85%
$ 15.5 M
$ 52.3 MDesign Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
TOTAL$ 67.9M
Study isUnderway
Area Studied
Area to be Studied
• Charles Caccia Park Combined Sewer Overflow Tank
• 1. 0 km of storm sewer upgradesinstalled
• 200 m of combined sewer upgrades installed
Page 10
###
42 EA to Begin in 201944
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
62 EA to Begin in 2019
EA to Begin in 2019
Basement Flooding Protection Program Summary
Ward 10 - Spadina-Fort York
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 0.45 M $ 0.40 M
Subsidized by City Cost to Property Owners
379 3498
Properties with FPD Properties without FPD
100%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
Study isUnderway
Area Studied
Area to be Studied
Implementation will proceed followingcompletion of the next Environmental
Assessment Study in this ward
Page 11
###
Basement Flooding Protection Program Summary
Ward 11 - University-Rosedale
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
444246
EA to Begin in 2019EA to Begin in 2019EA to Begin in 2019
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 2.00 M $ 1.64 M
Subsidized by City Cost to Property Owners
1680 9558
Properties with FPD Properties without FPD
100%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
Study isUnderway
Area Studied
Area to be Studied
Implementation will proceed followingcompletion of the next Environmental
Assessment Study in this ward
Page 12
###
Basement Flooding Protection Program Summary
Ward 12 - Toronto-St. Paul's
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
3 Completed (2011)44 EA to Begin in 201937 Completed (2018)40 Underway (Began in 2017)
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 2.50 M $ 2.08 M
Subsidized by City Cost to Property Owners
2091 10752
Properties with FPD Properties without FPD
24%
34%
42%
$ 52.3 M, 20%
$ 210.7 M, 80%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
Study isUnderway
Area Studied
Area to be Studied
TOTAL$ 263.0 M
Page 13
###
Basement Flooding Protection Program Summary
Ward 13 - Toronto Centre
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
44 EA to Begin in 201942 EA to Begin in 201962 EA to Begin in 2019
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 0.29 M $ 0.22 M
Subsidized by City Cost to Property Owners
229 3170
Properties with FPD Properties without FPD
100%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
Study isUnderway
Area Studied
Area to be Studied
Implementation will proceed followingcompletion of the next Environmental
Assessment Study in this ward
Page 14
###
Basement Flooding Protection Program Summary
Ward 14 - Toronto-Danforth
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
32 Completed (2012)62 EA to Begin in 201946 EA to Begin in 2019
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 4.43 M $ 3.64 M
Subsidized by City Cost to Property Owners
3648 17563
Properties with FPD Properties without FPD
48%52%
$ 2.0 M, 15%
$ 11.6 M, 85%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
Study isUnderway
Area Studied
Area to be Studied
TOTAL$ 13.6 M
• 150 m of storm sewer upgradesinstalled
Page 15
###
58 EA to Begin in 2019
Underway (Began in 2015)
Basement Flooding Protection Program Summary
Ward 15 - Don Valley West
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
21 Completed (2016)46 EA to Begin in 201944 EA to Begin in 2019
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
2 Completed (2015)
40
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
20 Underway ( Began in 2012)
55 EA to Begin in 2019
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 2.34 M $ 2.00 M
Subsidized by City Cost to Property Owners
1995 14811
Properties with FPD Properties without FPD
18%
43%
39%
$ 13.1 M, 20%
$ 51.9 M, 80% Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
TOTAL$ 65.0 M
Study isUnderway
Area Studied
Area to be Studied
Page 16
###
Basement Flooding Protection Program Summary
Ward 16 - Don Valley East
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
30 Completed (2008)
EA to Begin in 2019
22 Completed (2014)23 Completed (2016)21 Completed (2016)
47 EA to Begin in 201955 EA to Begin in 2019
43 Underway (Began in 2017)Basement Flooding Protection Program Implementation Summary - to end of 2018
Project Implementation Progress Project Highlights
58
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 0.82 M $ 0.69 M
Subsidized by City Cost to Property Owners
695 8213
Properties with FPD Properties without FPD
37%
6%
57%
$ 47.0 M, 34%$ 92.2 M, 66%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
TOTAL$139.2 M
Study isUnderway
Area Studied
Area to be Studied
Page 17
###
Basement Flooding Protection Program Summary
Ward 17 - Don Valley North
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
29 Completed (2008)30 Completed (2008)17 Completed (2014)28 Completed (2008)55 EA to Begin in 2019
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 0.63 M $ 0.50 M
Subsidized by City Cost to Property Owners
513 14715
Properties with FPD Properties without FPD
91%
9%
$ 34.5 M, 13%
$ 8.9 M, 3%
$ 223.0 M, 84%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
TOTAL$ 266.4 M
Study isUnderway
Area Studied
Area to be Studied
• Muirhead Park Stormwater Pond
• Old Sheppard Stormwater Storage Tank
• 6.2 km of storm sewers upgradesinstalled
• 1.2 km of sanitary sewer upgrades installed
Page 18
###
Basement Flooding Protection Program Summary
Ward 18 - Willowdale
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
28 Completed (2008)
43 Underway (Began in 2017)
18 Completed (2014)26 Completed (2016)25 Completed (2016)27 Completed (2017)58 EA to Begin in 2019
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 1.28 M $ 1.09 M
Subsidized by City Cost to Property Owners
1083 14271
Properties with FPD Properties without FPD
93%
1% 6%
$ 50.7 M, 29%
$ 26.6 M, 16%
$ 95.5 M, 55%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
Study isUnderway
Area Studied
Area to be Studied
TOTAL$172.9M
• Moore Park Stormwater Pond
• 11.7 km of stormsewer upgrades installed
• 150 m of sanitary sewer upgrades installed
Page 19
###
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
55 EA to Begin in 2019
1 Completed (2014)46 EA to Begin in 201947 EA to Begin in 2019
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
32 Completed (2012)
Basement Flooding Protection Program Summary
Ward 19 - Beaches-East York
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
$ 0.89 M $ 0.67 M
Subsidized by City Cost to Property Owners
506 4645
Properties with FPD Properties without FPD
59%
41%
$ 22.35 M, 71%
$ 2.68 M, 8%
$ 6.55 M, 21%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
Study isUnderway
Area Studied
Area to be Studied
TOTAL$31.6M
Page 20
###
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
34 Underway (Began in 2015)
47 EA to Begin in 201952 EA to Begin in 201959 EA to Begin in 2019
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
33 Completed (2011)
Basement Flooding Protection Program Summary
Ward 20 - Scarborough Southwest
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
$ 0.42 M $ 0.31 M
Subsidized by City Cost to Property Owners
242 2681
Properties with FPD Properties without FPD
24%
48%
28%
$ 6.40 M, 65%
$ 3.50 M, 35%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
Study isUnderway
Area Studied
Area to be Studied
TOTAL$9.9M
Page 21
###
3047
Completed (2008)EA to Begin in 2019
Basement Flooding Protection Program Summary
Ward 21 - Scarborough Centre
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
52 EA to Begin in 2019
60 EA to Begin in 201934 Underway (Began in 2015)
59 EA to Begin in 2019
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 1.02 M $ 0.83 M
Subsidized by City Cost to Property Owners
861 16695
Properties with FPD Properties without FPD
25%
1%
75%
Constructed
Under Construction
Study isUnderway
Area Studied
Area to be Studied
TOTAL$24.7M
$ 24.7 M, 100%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Page 22
###
30 Completed (2008)
Basement Flooding Protection Program Summary
Ward 22 - Scarborough-Agincourt
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
31 Completed (2011)
59 EA to Begin in 201960 EA to Begin in 2019
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 0.29 M $ 0.24 M
Subsidized by City Cost to Property Owners
233 15131
Properties with FPD Properties without FPD
74%
26%
$ 12.1 M, 54%
$ 10.4 M, 46%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
Study isUnderway
Area Studied
Area to be Studied
TOTAL$22.4M
• 1.7 km of storm sewer upgrades installed
• 300 m of sanitarysewer upgrades installed
Page 23
###
Basement Flooding Protection Program Summary
Ward 23 - Scarborough North
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
59 EA to Begin in 201960 EA to Begin in 201963 EA to Begin in 201964 EA to Begin in 2019
0
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 0.16 M $ 0.13 M
Subsidized by City Cost to Property Owners
126 17665
Properties with FPD Properties without FPD
100%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
Study isUnderway
Area Studied
Area to be Studied
Implementation will proceed followingcompletion of the next Environmental
Assessment Study in this ward
Page 24
###
Basement Flooding Protection Program Summary
Ward 24 - Scarborough-Guildwood
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
605957
EA to Begin in 2019EA to Begin in 2019EA to Begin in 2019
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 0.57 M $ 0.49 M
Subsidized by City Cost to Property Owners
483 14871
Properties with FPD Properties without FPD
100%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
Study isUnderway
Area Studied
Area to be Studied
Implementation will proceed followingcompletion of the next Environmental
Assessment Study in this ward
Page 25
###
Basement Flooding Protection Program Summary
Ward 25 - Scarborough-Rouge Park
Properties With Installed Flooding Protection Device(s) (FPD), 2006 to Q2 2018
Completed Environmental Assessment (EA) Study Area
Ongoing Environmental Assessment (EA) Study Area
Future Environmental Assessment (EA) Study Area
Basement Flooding Environmental Assessment (EA) Studies Summary - to end of 2018
Study Areas in Ward Status of EA Studies EA Study Progress in Ward
67 EA to Begin in 2019
5657596364
EA to Begin in 2019EA to Begin in 2019EA to Begin in 2019EA to Begin in 2019EA to Begin in 2019
Basement Flooding Protection Program Implementation Summary - to end of 2018Project Implementation Progress Project Highlights
Basement Flooding Protection Subsidy Program Summary - 2006 to Q2 2018Program Participation Program Expenditures
$ 0.48 M $ 0.41 M
Subsidized by City Cost to Property Owners
406 21452
Properties with FPD Properties without FPD
100%
Design Process Initiated
Planned for Design Initiation
Deferred (>$32,000 per benefitting property)
Constructed
Under Construction
Study isUnderway
Area Studied
Area to be Studied
Implementation will proceed followingcompletion of the next Environmental
Assessment Study in this ward