PNG LNG Project Marine Jetty PROJECT DETAILS: Location: Gulf of Papua, Northwest Port Moresby Contract Value: Confidential Contract Period: August 2010 - Current Safety Statistics: Manhours: 2,143,292 LTIFR: 0.44 (as at March 2013) OWNER: ExxonMobil CLIENT: Chiyoda JGC Joint Venture EPCM Joint Venture: BAM Clough Joint Venture is a 50 / 50 joint venture between BAM International bv and Clough Limited. Established in 1964, the joint venture has successfully delivered 13 major jetty projects for the energy and resources sectors. Scope of Work: In August 2010 the Chiyoda JGC Joint Venture (CJJV) awarded the contract to design and construct the LNG and condensate offloading jetty for the PNG LNG project to the BAM Clough Joint Venture. The award represents a third contract for Clough on the PNG LNG Project. The LNG and condensate jetty will be constructed adjacent to the planned LNG facility twenty kilometres northwest of Port Moresby on the coast of the Gulf of Papua, utilising an anticipated workforce of 500 people. The scope includes the design and construction of a 2.4 kilometre long trestle with substation platform, loading platform and single LNG load-out berth. www.bamclough.com BC012f Page 1 of 2 Key Aspects 9 Design and construct 9 Remote location 9 In-house developed special equipment 9 Pre-cast structure 9 Pre-assembled pipe rack modules Project Highlights 9 Integrated design and work preparation team 9 Supported by BAM and Clough’s inhouse facilities (pre-cast in Indonesia and topsides fabrication in Thailand) 9 Cantilever bridge construction method with limited environmental impact