Top Banner
1 Shore connection solutions Plug in to green power www.schneider-electric.com/shore-connection Baltic Port Organization Ystad, April 2015 Hugues Berthet Shore Connection Business Development Director
22

Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power Baltic Port Organization ... 2 MV Premset Cubicle

Apr 23, 2018

Download

Documents

LyDuong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

1

Shore connection solutions

Plug in to green power

www.schneider-electric.com/shore-connection

Baltic Port Organization

Ystad, April 2015

Hugues Berthet

Shore Connection

Business Development Director

Page 2: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

2

Such as

airports, there

are several

years, Ports are

currently their

revolution to

limit pollution

and the impact

on the

environment

Page 3: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

3

Up to

66%

Savings

3

ShoreBoxTM

Shore Hinterland

Existing or

New substation

Electrical

network

Cable dispenser

to ship connection

Frequency adaptation

And safety operation

Shore connection general overview

Energy provider Port Terminal Quay Ship Shore / Ship Interface

To

Emission

NoiseVibration

0

Container ship

Ship

Ship to supply

Page 4: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

4

Up to

66%

Savings

ShoreBoxTM

Shore Hinterland

Existing or

New substation

Electrical

network

Cable dispenser

to ship connection

Frequency adaptation

And safety operation

Shore connection general overview

Energy provider Port Terminal Quay Ship Shore / Ship Interface

To

Emission

NoiseVibration

0

Ship to supply

Ship

G

Ferry, RoRo

Cargo

Cruise

Page 5: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

5

HVSC Main Standard :

IEC / ISO / IEEE 80005-1, HVSC

IEC / ISO / IEEE 80005-2, Com. Protocol

IEC / ISO / IEEE 80005-3, LVSC

Plugs & Sockets outlets

IEC 62 613, Plugs & Sockets Outlets

Interface Voltage

MV : 6,6 / 11kV, (+ 6% / - 3,5%)

LV : 400 / 440V / 690V, (+ 6% / - 5%)

Basket of Ships Power Demand

MV : 1MVA up to 20MVA

LV : <1MVA, 350A maxi per plug

Frequency on Board: 50Hz / 60 Hz

Compensation Tide System : 9m

Distance between ShoreBoX to connection point :

LV / 300 m maxi & MV No limit

Main Interface Requirements

Container ship

Ferry, RoRo

Cargo

Cruise

Page 6: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

6

Plug in to

Green Power

Shore Connection Solution

Our Solution Offer

Page 7: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

7

1 Montbonnot

Platform GFC • 10 GFC //, 5 MVA

• Genset 1 MVA

• Network Synchronization

• General behaviour

Final test in Lab • Test at In, 3 MVA

• TVD

• Type tested

2 Eybens

3 Years of tests to learn the behaviour

of a global Solution in 3 test platforms

3 Volta Lab Simulation Platform • HVAC

• Fans

• LV Automation

Control Command • Safety loop

• Interface Shore / Ship

• Adaptation to Ship

Page 8: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

8 8

A complete platform to test & simulate

Ship Loads Ship generator

Test platform Energy management

5 MVA

10 GFC in //

1 MVA

Page 9: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

9

An Integrated System is prefabricated & industrialized

This is not a car

But spare parts

This is a car

performed entirely

by a manufacturer

with a guarantee of performance

over the duration of its life cycle

Page 10: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

10

Page 11: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

11

An Integrated System is

a prefabricated

electrical substation

RM6 SM6 Premset

Transformer

GFC Galaxy 7000

MV – 50 Hz

400V – 50 Hz

400V – 60 Hz

6,6 kV

Upstream

LV busbar

MV plug

To ship

6,6 kV – 60 Hz

Downstream

Busbar

GFC

7000

2 MVA

2,3 MVA

Standard

Product

Standards

compliant

Knowledge,

Return on Experience,

Port Context

Usage values

Page 12: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

12

Schneider Electric worldwide references

Kalibaru

Casablanca

Tanger

Riga

Bergen

Marseille

Los Angeles

Page 13: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

13

Page 14: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

14 Interface

Shore to Ship

Ship Gabriella

Mariella Viking Line Terminal Hinterland

Utility

G

Electrical

network

Ship to

supply

LV Cable dispenser Cable to ship

connection

ShoreBoxTM

Helsinki Viking Line ShoreBoX

overview

Safety operation

&

Energy Management

Page 15: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

15

OSV connection at Port of Bergen ● All in one ShoreBoX, 1 MVA

● Operational middle of 2015

ShoreBoX

9th March 2015

● Supply electricity to OSV

Offshore Supply Vessels at berth

Page 16: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

16

Containership terminal at Port of Riga

Berth under construction ShoreBoX shipped from France

● Port: Riga, Latvia

● Ship type: Containership

● Offer: 2x2MVA ShoreBoX

with frequency conversion

Page 17: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

17

Future Kalibaru Container Terminal • Existing port does not have the capacity

to host the increasing sea freight volumes

• Development of the new KCT (Kalibaru Container Terminal) started in March 2013

• Future capacity 13 M 20-foot containers / year

• First phase is scheduled for completion in late 2017

• When fully operational, it will be the country’s largest industrial port and the 3rd in South East Asia

● New green, modern port in South Asia

● First phase includes 9 berths equipped

with Schneider Electric 5-MVA shore

connection systems

● 2nd and 3rd phases will equip berths with

shore connection as well

Future Kalibaru

Container Terminal

Page 18: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

18

Navy ship connection at Port of Toulon

• Facility to provide 60hz to the base network

• First installation to be operational in 2015.

• 2x ShoreBoX MV-> MV 4MVA with frequency conversion

• 2 types of ships connected , BPC 2,2MVA & FREMM 1,2MVA ShoreBoXTM

Page 19: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

19

Moroccan Navy Port

The ShoreBoX leaving the factory

beginning of January 2014

During the commissioning,

end of January 2014

The ShoreBoX installed and

fully operational

The customer has passed another order

for an equivalent system for another

Moroccan Navy Port

FREMM French Frigate

Page 20: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

20

CMN Marseille south of France

● Customers need: Supply 3 Ferries

● 3 Berths : Poste 68, 70 & 74

● Voltage on Port : 20kV in substation

● Power per ship : 1,8MVA, 11kV

● 50hz (no frequency conversion)

Page 21: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

21

1

5

3

1

2 3

1

1

2

CMN Ship modification in Marseille France January 2015

3 3

1

2

3

4

5

1 Incomer

2 MV Premset Cubicle

3 Transformer if reauired

4 Main Switchboard

5 Bridge

Page 22: Baltic Port Organization Plug in to green power Ystad ... · Plug in to green power  Baltic Port Organization ... 2 MV Premset Cubicle

22

Plug in to

Green Power

Shore Connection Solution

Thank you for your attention

At your disposal

[email protected]

Mobile : +33 6 08 56 54 41