Top Banner
Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014
28

Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Dec 23, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Bali Dream

Gde PutraPaean LeeLilith ShoemakerLoida Vasquez

Sustainability, Buildings, and the Built Environment

Spring 2014

Page 2: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Design Team

Gde Putra ~ Sketchup Artist Visionary

Lilith Shoemaker ~ Water & Waste Specialist

Loida Vasquez ~ Solar Energy Master

Paean Lee ~ Napkin Drawing Inspiration

Page 3: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Mission Environmental ~ Natural Building

Social ~ Vastu Principles

Financial ~ Cost Benefit

Self Sustaining

LEED (Leadership in Energy and Environmental Design)

Guidelines

Family of 4

Page 4: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Map & Climate

Page 5: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Top View

34 ft.

50 ft.

14 ft.

Page 6: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Front View

Candi Bentar ~ Tower Gate

Page 7: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Southeast View

Shading Trees

Longan

Page 8: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

West View

Family Pavillion

Page 9: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

North View

Solar Panels

Page 10: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Northwest View

Upper Ventilation Windows

Page 11: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Roof Design

Create Maximum Circulation

Hot AirHot Air

Page 12: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Inner North Wall

Ventilation

Cool Air Cool Air

Page 13: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Inner Walls

Entrance

Meditation Room

KitchenDining Room

Master Bedroom

Living Room

Children’s Bedroom

Office Space

Courtyard

Vastu Room Placements

Page 14: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Inner Entrance

Bamboo Partition

Page 15: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

$7000$2300$0$1000$3000$50$500$2200

Adobe Walls Clay Roof Tiles Stone Foundation Authentic Wood Windows Parquet Wood Flooring Bamboo Entrance Wood Solar Pavillion Man power

Building Materials

Total: $16050= $13.88 per ft2

Page 16: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Water Logic

Page 17: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Water holding Options

Purchased Cistern: $23,000

Site-made Fiber reinforced concrete: $3000 + Labor

Page 18: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Water Storage

Cistern

Pump

Pressure Tank PEX System(manifold)

50 gal Water TankSubmersible Pump

Septic

Garden Outlet

Toilet Outlet

KitchenShower & Sink

Laundry

Page 19: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Off-Gridish

Solar Power System

Page 20: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

kWh/m^2/day

Denpasar, Indonesia

Jan Feb Mar April May June

4.84 4.96 5.36 5.33 5.14 4.80

July Aug Sep Oct Nov Dev

4.74 5.27 5.88 6.10 5.57 5.18

Solar Irradiance

Page 21: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

1. 1000 kWh per month needed2. Chose lowest productive month3. 4.84 kWh X 31 days = 150 kWh/month4. 1000 kWh/150 kWh (per panel) = 6.66 panels or

7 panels5. Increase to 8 panels for good measure

Solar Panel Array

Page 22: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

If each panel outputs 250 watts, then… 250w X 8 panels = 2000 total watts If we choose a 24 V charge controller, then… 2000w/24V = 83.33 or 90 amps 100 amp charge controller needed

Charge Controller

Page 23: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

1000 kWh/30 days = 33 kWh X 3 = 99 kWh

99 kWh = 99,000 wh99,000wh/24V = 4,125 AHWe need (4) 24V, 1100 AH forklift batteries

Battery Bank

3 day back-up

Page 24: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Hourly Watt Usage

Peek Hour Wattage Use

Page 25: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

The maximum load at any given time is 3,500 watts

An inverter has a 95% efficiencyTherefore, 3,700 watts must be fed into

the inverter in order for a 3,500-w output because 3,500/.95 = 3,685-w

(2) 2,500 watt inverters = 5,000 watts

DC to AC Inverter

Page 26: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

8 (250-w) solar panels @ $1.50/watt = $3,000 1 (100 A) charge controller = $300 4 (1,100 AH) forklift batteries = $ 14,000 2 (2,500-w) Inverters = $3,000 Accessories (cables) = $ 4,000 Total Estimated Cost = $24,300 (40yr payoff) Estimated Cost Grid-Tied = $10,000 (17yr

payoff)

Estimated Expense

Page 27: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

Cost Analysis

Item Bali Dream Conventional

Building $16,050 $40,000

Solar $24,300 ($10,000)

$0

Water $3,000 (23,000) $0

Total $43,350 $40,000

Yearly Water $0 $120

Yearly Electricity $0 $600

ROI 5 years

Page 28: Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.

“Naturalness is the basis of effectiveness.” ~  Maharishi Mahesh Yogi

Thank you!