Top Banner
  1   1   1 Riskope International SA © 2009 www.riskope.com ISBN: 978-0-9784462-3-9 Using Risk as a Driving Parameter in the Design of the Environmental Rehabilitaton of an Asbestos Mine Dump F. & C. Oboni
19

Balangero Asbestos Tailings Dump Environmental Rehabilitation

Jul 08, 2015

Download

Health & Medicine

This presentation shows how Risk Based Decision Making was performed on a real project (which won an international call for bids), using Riskope's CDA/ESM project evaluation methodology.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    1    1    1Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

Using Risk as a Driving Parameterin the Design of the 

Environmental Rehabilitaton of an 

Asbestos Mine Dump

F. & C. Oboni

Page 2: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    2    2    2Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

Width 800 m

Height 200 – 250 m

Estimated Volume 50­60 Mm3

Slope 35 – 45 degrees

Page 3: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    3    3    3Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

Before...and after first phase. It looks simple...

Page 4: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    4    4    4Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

... but it is not!

Page 5: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    5    5    5Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

At each design step risk has been integrated in the decision making process:

Alternative 1 Alternative 2 Alternative 3Bla bla Bla Bla Bla Bla

By using the 

CDA/ESM (Comparative Decision Analysis/Economic Safety Margin) developed by Riskope International 

with CDA/ESM alternatives can be compared all along their life cycle, from cradle to grave

Page 6: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    6    6    6Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

Page 7: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    7    7    7

Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

Two code compliant alternatives can feature completely different risk profiles: 

EXAMPLE: using an aerial tramway to haul waste material, rather than trucks.

It is important to recognize that alternatives' risks may have very different time frames, which is taken into account by CDA/ESM

CDA/ESM includes a simplified risk analysis for each phase characterising the life of a project. 

Page 8: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    8    8    8Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

Page 9: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    9    9    9

Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

CDA/ESM has been successfully applied to a number of international projects and is taught in specific courses by Riskope International. 

Thanks to CDA/ESM cimparing alternatives becomes:

Clear and concrete,

Trasparent

Riproductible

Justifiable

Page 10: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    10    10    10

Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

When deploying CDA/ESM risk scenarios are expressed numerically and graphically. 

For each scenario the following has to be defined:

Max estimated Probability of event 

Max estimated cost of event

Min estimated Probability of event

Min estimated cost of event

Page 11: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    11    11    11Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

Page 12: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    12    12    12

Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

Risk can be displayed in a Probability­Cost plot as a “Risk Bubble”

Likelihood

0.00

1.00

Consequence

Probabilità

1/100 per year

1.00

Conseguenza35

,000

$

1/10 per year20

0$

Page 13: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    13    13    13

Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

It is intuitively easy to add to the Risk Bubble reputational/public opinion damages, converted in monetary values, see the red line.

Likelihood

0.00

1.00

Consequence

Probabilità

1/100 per year

1.00

Conseguenza35

,000

$

1/10 per year20

0$

Page 14: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    14    14    14

Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

This is an example of a Risk Analysis result. NB:  The Risk Bubbles are displayed only with their centers or to vertical segments to display their uncertainty

Pro

babi

lity

Consequence  in MUS$

1/10

1/100

1/1000

1

1 in a Million

.....

Page 15: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    15    15    15

Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

Can you see the difference? The left image shows risks (14).Right image displays the tolerability on top of risks.

The right plot clearly indicates that only 7 out of the 14 are intolerable; of those CDA/ESM will show that actually only 3are truly significant! This outcome generates huge economic returns

Page 16: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    16    16    16

Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

Page 17: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    17    17    17Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

Page 18: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    18    18    18Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

Page 19: Balangero Asbestos Tailings Dump Environmental Rehabilitation

    19    19    19

Riskope International SA © 2009 www.riskope.com

ISBN: 978-0-9784462-3-9

ConclusionsThanks to specific methodologies it is possible

to:

Select the riskiest scenarios and mitigate them at preliminary design level already,

Draw attention of all stakeholders to rational priorities,Define a mitigation masterplan of a project all along its

life.

This will enable to generate more rational and sustainable projects.