Balancing Authority ACE Limit Proof-of-Concept Field Trial Project 2010-14 Eastern Interconnection Update Discussion August 30, 2011 DISCUSSION STARTING AT 2:30 PM EDT Bob Klueber – Midwest ISO Balancing Authority Reliability-based Control Standard Drafting Team (BARCSDT)
40

Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Jan 18, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Balancing Authority ACE Limit

Proof-of-Concept Field TrialProject 2010-14

Eastern Interconnection Update Discussion

August 30, 2011

DISCUSSION STARTING AT 2:30 PM EDT

Bob Klueber – Midwest ISO

Balancing Authority Reliability-based Control Standard Drafting Team (BARCSDT)

Page 2: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Balancing Authority ACE Limit

Proof-of-Concept Field Trial

Eastern Interconnection Field Trial ParticipationParticipation reflects approximately 67% of the projected 2010 peak load for the Eastern Interconnection

Page 3: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

The Balancing Authority ACE Limit (BAAL) shall not be

exceeded for more than 30 consecutive clock-minutes*

MinCtLow = Count of

consecutive clock-

minutes BAALLow was

exceeded

MinCtHigh = Count of

consecutive clock-

minutes BAALHigh was

exceeded

Balancing Authority ACE Limit

Proof-of-Concept Field Trial

*BAAL being exceeded for more than 30 consecutive clock-minutes would be a violation under the proposed BAL-007 standard.

**

Page 4: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Frequency Statistics Eastern Interconnection

Page 5: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Frequency Statistics Eastern Interconnection

Page 6: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Frequency Statistics- Low Eastern Interconnection

Page 7: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Frequency Statistics- High Eastern Interconnection

Page 8: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

This chart illustrates the monthly total minutes of FTLLow being

exceeded

**

**March 2007- change

to the new Daylight

Saving Time.

Eastern Interconnection

Page 9: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

This chart illustrates the monthly total minutes of

FTLLow plus FTLHigh being exceeded.**

**March 2007- change to

the new Daylight Saving

Time.

Eastern Interconnection

Page 10: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

All durations of the BAAL being

exceeded for more than 15 consecutive

clock-minutes noted on left.

Periods of the FTL being exceeded for

3 consecutive clock minutes or more:

Page 11: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

All durations of the BAAL being

exceeded for more than 15 consecutive

clock-minutes noted on left.

Page 12: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

All durations of the BAAL being

exceeded for more than 15 consecutive

clock-minutes noted on left.

Page 13: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

All durations of the BAAL being

exceeded for more than 15 consecutive

clock-minutes noted on left.

Page 14: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Dates In This Presentation

Page 15: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

EXAMPLE 1

Page 16: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Clock-minute Actual Frequency of Participants

07/19/2011 ending 06:57 EDT

3-minute duration above FTLHigh

Page 17: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

BAAL

Adjusted CPS1 of

individual BAs under the

Field Trial

-571.6

07/19/2011 ending 06:57 EDT

3-minute duration above FTLHigh

Page 18: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

BAAL shall not be exceeded for more

than 30 consecutive clock-minutes*

*BAAL being exceeded for more than 30 consecutive clock-

minutes would be a violation under the proposed standard.

BAAL Violation*

07/19/2011 ending 06:57 EDT

3-minute duration above FTLHigh

Page 19: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

EXAMPLE 2

Page 20: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Clock-minute Actual Frequency of Participants

07/30/2011 ending 09:44 EDT

3-minute duration below FTLLow

Page 21: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

BAAL

Adjusted CPS1 of

individual BAs under the

Field Trial

07/30/2011 ending 09:44 EDT

3-minute duration below FTLLow

-571.6

Page 22: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

BAAL shall not be exceeded for more

than 30 consecutive clock-minutes*

BAAL Violation*

*BAAL being exceeded for more than 30 consecutive clock-

minutes would be a violation under the proposed standard.

07/30/2011 ending 09:44 EDT

3-minute duration below FTLLow

Page 23: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

EXAMPLE 3

Page 24: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Clock-minute Actual Frequency of Participants

07/02/2011 ending 09:49 CDT

21-minute duration below BAALLow

07/02/2011 ending 10:19 CDT

19-minute duration below BAALLow

07/02/2011 ending 10:37 EST

19-minute duration below BAALLow

Page 25: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

BAAL

Adjusted CPS1 of

individual BAs under the

Field Trial

07/02/2011 ending 09:49 CDT

21-minute duration below BAALLow

07/02/2011 ending 10:19 CDT

19-minute duration below BAALLow

07/02/2011 ending 10:37 EST

19-minute duration below BAALLow

Page 26: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

BAAL shall not be exceeded for more

than 30 consecutive clock-minutes*

*BAAL being exceeded for more than 30 consecutive clock-

minutes would be a violation under the proposed standard.

BAAL Violation*

07/02/2011 ending 09:49 CDT

21-minute duration below BAALLow

07/02/2011 ending 10:19 CDT

19-minute duration below BAALLow

07/02/2011 ending 10:37 EST

19-minute duration below BAALLow

Page 27: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

EXAMPLE 4

Page 28: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Clock-minute Actual Frequency of Participants

07/04/2011 ending 10:32 CDT

23-minute duration below BAALLow

07/04/2011 ending 10:32 EST

20-minute duration below BAALLow

Page 29: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

BAAL

Adjusted CPS1 of

individual BAs under

the Field Trial

07/04/2011 ending 10:32 CDT

23-minute duration below BAALLow

07/04/2011 ending 10:32 EST

20-minute duration below BAALLow

Page 30: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

BAAL shall not be exceeded for more

than 30 consecutive clock-minutes*

*BAAL being exceeded for more than 30 consecutive clock-

minutes would be a violation under the proposed standard.

BAAL Violation*

07/04/2011 ending 10:32 CDT

23-minute duration below BAALLow

07/04/2011 ending 10:32 EST

20-minute duration below BAALLow

Page 31: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

EXAMPLE 5

Page 32: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Clock-minute Actual Frequency of Participants

07/09/2011 ending 21:54 EST

20-minute duration above BAALHigh60.02 Scheduled Frequency TEC

Page 33: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

BAAL

Adjusted CPS1 of

individual BAs under the

Field Trial

07/09/2011 ending 21:54 EST

20-minute duration above BAALHigh60.02 Scheduled Frequency TEC

Page 34: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

BAAL shall not be exceeded for more

than 30 consecutive clock-minutes*

*BAAL being exceeded for more than 30 consecutive clock-

minutes would be a violation under the proposed standard.

BAAL Violation*

07/09/2011 ending 21:54 EST

20-minute duration above BAALHigh60.02 Scheduled Frequency TEC

Page 35: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Examples of circumstances when BAAL was

exceeded and actions taken if appropriate

Balancing Authority ACE Limit

Proof-of-Concept Field Trial

Page 36: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Examples of circumstances when BAAL was

exceeded and actions taken if appropriate

Balancing Authority ACE Limit

Proof-of-Concept Field Trial

Page 37: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Examples of circumstances when BAAL was

exceeded and actions taken if appropriate

Balancing Authority ACE Limit

Proof-of-Concept Field Trial

Page 38: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Examples of circumstances when BAAL was

exceeded and actions taken if appropriate

Balancing Authority ACE Limit

Proof-of-Concept Field Trial

Page 39: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Examples of circumstances when BAAL was

exceeded and actions taken if appropriate

Balancing Authority ACE Limit

Proof-of-Concept Field Trial

Page 40: Balancing Authority ACE Limit Proof-of-Concept Field Trial 18 Reliability...07/02/2011 ending 10:37 EST 19-minute duration below BAAL Low. EXAMPLE 4. Clock-minute Actual Frequency

Balancing Authority ACE Limit Proof-of-Concept Field Trial

Discussion

Bob Klueber

Balancing Authority Reliability-based Control Standard Drafting Team (BARCSDT)

[email protected]