Top Banner
Baghouse Maintenance for NESHAP Baghouse Maintenance for NESHAP Compliance BWF America Inc. | USA Date | Project Designation | 1
22

Baghouse Maintenance for NESHAP Compliance

Mar 14, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Baghouse Maintenance for NESHAP Compliance

Baghouse Maintenance for NESHAPBaghouse Maintenance for NESHAP Compliance

BWF America Inc. | USA Date | Project Designation | 1

Page 2: Baghouse Maintenance for NESHAP Compliance

Baghouse CleaningBaghouse Cleaning

Time vs On-demand

BWF America Inc. | USA Date | Project Designation | 2

Page 3: Baghouse Maintenance for NESHAP Compliance

Baghouse Cleaning ControlsBaghouse Cleaning Controls

BWF America Inc. | USA Date | Project Designation | 3

Page 4: Baghouse Maintenance for NESHAP Compliance

Start-Up / Shut-DownStart Up / Shut Down

•Avoid prolonged dew point exposure

•Avoid over-cleaning the filter bags

•Start with a clean take away system

BWF America Inc. | USA Date | Project Designation | 4

Page 5: Baghouse Maintenance for NESHAP Compliance

Baghouse MonitoringBaghouse MonitoringThe Average Plant

Emissions

Differential Pressure

BWF America Inc. | USA Date | Project Designation | 5

Page 6: Baghouse Maintenance for NESHAP Compliance

Baghouse MonitoringBaghouse MonitoringWhat we should monitor:

•Differential pressure•EmissionsEmissions•Cleaning cycles•Cleaning air pressure•Cleaning system operation•TemperatureM t i l h dli i t ( i l k )•Material handling equipment (airlocks)

•Hopper levels

BWF America Inc. | USA Date | Project Designation | 6

Page 7: Baghouse Maintenance for NESHAP Compliance

MaintenanceMaintenance•Reaction time

•Documentation

•Root Cause

C ti ti•Corrective action

BWF America Inc. | USA Date | Project Designation | 7

Page 8: Baghouse Maintenance for NESHAP Compliance

MaintenanceMaintenance

Reaction TimeReaction Time

Emissions = Clean side contaminationEmissions = Clean side contamination

Hopper levels, cleaning system, differential pressure, pp , g y , p ,temperature = Bag failure

BWF America Inc. | USA Date | Project Designation | 8

Page 9: Baghouse Maintenance for NESHAP Compliance

MaintenanceMaintenance

DocumentationDocumentation

What and Where?What and Where?

BWF America Inc. | USA Date | Project Designation | 9

Page 10: Baghouse Maintenance for NESHAP Compliance

DocumentationDocumentation

BWF America Inc. | USA Date | Project Designation | 10

Page 11: Baghouse Maintenance for NESHAP Compliance

MaintenanceMaintenance

Root Cause

WHY?

BWF America Inc. | USA Date | Project Designation | 11

Page 12: Baghouse Maintenance for NESHAP Compliance

MaintenanceMaintenance

Corrective ActionCorrective Action

So it doesn’t happen again !! pp g

BWF America Inc. | USA Date | Project Designation | 12

Page 13: Baghouse Maintenance for NESHAP Compliance

Filter Bag ReplacementFilter Bag Replacement

•Predictability

•On-line vs off-line

•Partial vs Full replacement•Partial vs Full replacement

BWF America Inc. | USA Date | Project Designation | 13

Page 14: Baghouse Maintenance for NESHAP Compliance

Filter Bag ReplacementFilter Bag Replacement

Predictability

• Record keeping

• Monitoring• Monitoring

• Filter bag testingg g

BWF America Inc. | USA Date | Project Designation | 14

Page 15: Baghouse Maintenance for NESHAP Compliance

Filter Bag SelectionFilter Bag Selection

•Bag Lifeg

•Differential Pressure (energy consumption)

•Efficiency

BWF America Inc. | USA Date | Project Designation | 15

Page 16: Baghouse Maintenance for NESHAP Compliance

Filter Bag and Cage OptionsFilter Bag and Cage Options

K it i l S b d b i ith b iltKeep it simple – Snap band bag, one piece cage with built-in venturi.

Avoid multiple piece cages (If you don’t believe me, ask any plant that has them)

BWF America Inc. | USA Date | Project Designation | 16

Page 17: Baghouse Maintenance for NESHAP Compliance

System DesignSystem DesignBag operation

mpered greatly Baghouse operationhampered greatly by the

duct duct design.duct duct design.

BWF America Inc. | USA Date | Project Designation | 17

Page 18: Baghouse Maintenance for NESHAP Compliance

Filter Bag Installation – Reverse AirStep Top Installer Bottom Installer

1 Place box on floor beside thimblethimble.

2 Drop fishing line down from top.

3 Open box take out bag3 Open box, take out bag, attach fishing line hook to the cap.

4 Pull bag up to top by g p p yfishing line, attach to tensioning assembly orienting seams 45 deg.to walkwayg y

5 Attach bottom of filter bag to thimble, orienting seams 45 deg. To walkway

BWF America Inc. | USA Date | Project Designation | 18

6 Tension the filter bag to appropriate #tension

Page 19: Baghouse Maintenance for NESHAP Compliance

Clamp-to-bag assemblyBag over bead

Clamp

ThimbleBag cord

BWF America Inc. | USA Date | Project Designation | 19

Page 20: Baghouse Maintenance for NESHAP Compliance

Filter Bag Install – Pulse Jetg

•Do not take the filter bags out of the boxes until you are ready to install them in the tube sheet.•Installation sleeves must be used•Installation sleeves must be used. •Once the filter bag is in the tube sheet, follow standard snap band installation instructions.•Do not force snap bands into the tubesheet (NO HAMMERS) If the snapbandDo not force snap bands into the tubesheet (NO HAMMERS). If the snapbanddoes not fit contact BWF. Once bags are snapped in the tubesheet DO NOT walk on the snap band tops.•When installing the cages, make sure a vertical wire is in the crease of the g g ,bag.•DO NOT force cages into the bags by standing on them.

BWF America Inc. | USA Date | Project Designation | 20

Page 21: Baghouse Maintenance for NESHAP Compliance

Filter Bag Installation – Pulse jetFilter Bag Installation Pulse jet

BWF America Inc. | USA Date | Project Designation | 21

Page 22: Baghouse Maintenance for NESHAP Compliance

Thanks for Your Attention

BWF America Inc. | USA Date | Project Designation | 22