Top Banner
Back to Basics Duct Design. Drafting and Successful Downstream efficiency. Presenter : Christopher NyulQueensland Senior Draftsperson 13 th May 2013
34

Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Mar 20, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct Design.

Drafting and Successful

Downstream efficiency.

Presenter : Christopher Nyul– Queensland Senior Draftsperson

13th May 2013

Page 2: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct design

• Manufacturing and Installation principals.

• BIM, co-ordination of services.

Presentation Agenda

Page 3: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Manufacturing and Installation principals.

• Parameters can be applied within the intelligent software.

• Project Design Guide (AS 4254).

• Testing.

• Pressure Class, Air Flow and System Type.

• Duct Profiles.

• Accessibility, Egress and maintenance.

• Schematics and Layouts.

• Flue Expansion.

• Hangers and Supports.

• Prefabrication.

.

Back to Basics Duct design

Page 4: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct design

Deflection / Leakage Testing of duct.

Page 5: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct design

Deflection / Leakage Testing Rig.

Page 6: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct design

Deflection / Leakage Testing.

• Ascertain the amount of leakage and minimise, to reduce

operating costs.

• Improve manufacturing practices to reduce leakage.

• Limit the amount of deflection.

• Ensure that bracing and beading are sufficient.

Page 7: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

• Pressure Class,

• Air Flow

• System Type.

Back to Basics Duct design

Resizing Ductwork.

Page 8: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

• Rectangular

• Round

• Oval

Back to Basics Duct design

Duct Profiles

Page 9: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct design Duct Manufacturing Machinery

Page 10: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct design

Fitting Elimination

Page 11: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

What We See.

Item Information. Pattern Development.

Nest Layout.

Back to Basics Duct design

Page 12: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Product. Back to Basics Duct design

Page 13: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

TDF-35 TDF-35 Cap-End

Access Panel

Back to Basics Duct design

Page 14: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

INS Step-in TDF-35 Loose Mezz Frame

Back to Basics Duct design

Page 15: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct deign Access, Egress and Maintenance

Page 16: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct design Access, Egress and Maintenance

Page 17: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Access, Egress and Maintenance

Page 18: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

What is wrong with this picture?

Back to Basics Duct deign

Page 19: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Fleshing out the Schematic.

Back to Basics Duct deign

Page 20: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct design Fleshing out the Schematic.

Page 21: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Efficient hanging. Back to Basics Duct design

Page 22: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct design Prefabrication.

Page 23: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct design Prefabrication From the Drawing.

Page 24: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct design

Prefabrication To Site.

Page 25: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Flue Stack Prefabrication. Back to Basics Duct design

Page 26: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Flue Stack Prefabrication. Back to Basics Duct design

Page 27: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Thermal Expansion, with Bellows. Back to Basics Duct design

∆L = LX α x ∆T

Change in length, Length of Duct,

Thermal Coefficient and Temp difference

Between outer and inner.

Page 28: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Expansion without Bellows. Back to Basics Duct design

Page 29: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct Design

The Coordination Process.

• Service Contractors provide their 3D drawings to A.E Smith.

• A.E Smith Import these services along with the Mechanical Into

Navisworks and carry out floor by floor Clash detection.

• The Clashes are then Reviewed and assigned.

• The Navisworks Model CW Clash detection Reports is then

provided back to the relevant parties for review and drawing

revisions are carried out.

• The Process will then begin again.

BIM, Co-ordination of services

Page 30: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct Design

Drawing Revision

Drawing Revision

BIM 3D (Coordination) Workflow.

Page 31: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct design

End Result.

Page 32: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct Design

Clash Detection Report.

Page 33: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

Back to Basics Duct Design

Revit is BIM ???.

Page 34: Back to Basics Duct Design. Drafting and Successful ... · Back to Basics Duct Design The Coordination Process. •Service Contractors provide their 3D drawings to A.E Smith. •A.E

15th May 2013

THANK YOU

& Question Time