Top Banner
Back End Preliminary Design Review, 2002 April 24- 25, Granada, Spain Atacama Atacama Large Large Millimeter Millimeter Array Array DTS FO Hardware DTS FO Hardware Design Design Bryan Anderson Bryan Anderson Jodrell Bank Jodrell Bank Observatory Observatory Co-authors: D.C. Brown, M. Bentley & R. McCool
12

Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain AtacamaLargeMillimeterArray DTS FO Hardware Design Bryan Anderson Jodrell Bank Observatory.

Jan 14, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain AtacamaLargeMillimeterArray DTS FO Hardware Design Bryan Anderson Jodrell Bank Observatory.

Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain

AtacamaAtacama

LargeLarge

MillimeterMillimeter

ArrayArray

DTS FO Hardware DTS FO Hardware DesignDesignBryan AndersonBryan AndersonJodrell Bank Jodrell Bank Observatory Observatory

Co-authors: D.C. Brown, M. Bentley & R. McCool

Page 2: Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain AtacamaLargeMillimeterArray DTS FO Hardware Design Bryan Anderson Jodrell Bank Observatory.

DTS FO Hardware Design04/21/23

Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain

2

ALMA Project

Contents of Talk

• Fibre Interconnects (everywhere)• Optical Receiver (correlator, AOS or OSF)• Optical Transmitter (antenna)• Optical Multiplexer-Monitor Module (antenna)• Optical-Fibre Amplifier Module (AOS)• Optical Demultiplexer-Switch Module (AOS/OSF)• Monitor, Control and Safety

Page 3: Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain AtacamaLargeMillimeterArray DTS FO Hardware Design Bryan Anderson Jodrell Bank Observatory.

DTS FO Hardware Design04/21/23

Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain

3

ALMA Project

OLA

OLA

Patch

Panel

8 fibres

250wide

8 fibres

64wide

Fibre

Manage

64 fibres

OtherServices

64 wide

1:12demuxswitch

1:12demuxswitch

64:1switch OSA

3 wide 192 wide

To

correlator

quadrants

7 wide

Page 4: Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain AtacamaLargeMillimeterArray DTS FO Hardware Design Bryan Anderson Jodrell Bank Observatory.

DTS FO Hardware Design04/21/23

Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain

4

ALMA Project

switching

regulator

regulator

regulator

switching

linear

48 V

+3.3 V

-2.0 V

+8 V

+12 V

MTRX192L

one of three

PIC

16F877

compensation

ADC12-bit

DAC12-bit

powermonitor

keep-alive

M&C bus

Page 5: Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain AtacamaLargeMillimeterArray DTS FO Hardware Design Bryan Anderson Jodrell Bank Observatory.

DTS FO Hardware Design04/21/23

Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain

5

ALMA Project

Optical Receiver

Page 6: Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain AtacamaLargeMillimeterArray DTS FO Hardware Design Bryan Anderson Jodrell Bank Observatory.

DTS FO Hardware Design04/21/23

Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain

6

ALMA Project PIC

16F877

switching

regulator

regulator

regulator

switching

switching

48 V

+5.0 V

+5.0 V

-5.2 V

TECTH

mod

driver

EAM

MD

LD

current

temp

current

power

Agere E2580

switching

TECdriver

LDdriver

duty cycle

drive

offset

temp

power

TECs

LDs

driversEAM

10 Gbps

light

12-bitADC

12-bitDAC

12-bitDAC

12-bitDAC

12-bitDAC

12-bitDAC

keep-alive

M&C bus

Page 7: Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain AtacamaLargeMillimeterArray DTS FO Hardware Design Bryan Anderson Jodrell Bank Observatory.

DTS FO Hardware Design04/21/23

Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain

7

ALMA Project

optical

mux

12:1

wide12

overpower

detector

alives

keep

-20 dB

Page 8: Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain AtacamaLargeMillimeterArray DTS FO Hardware Design Bryan Anderson Jodrell Bank Observatory.

DTS FO Hardware Design04/21/23

Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain

8

ALMA Project

Optical-Fibre Amplifier Module

• Uses an oem EDFA module– 20 dB gain, +17 dBm output power– Size: 100 x 100 x 15 mm– Interface: RS232, 25-pin connector, +5V @ 6 -

8W off 48V bus

• Plug-in with PIC controller, 8 per crate, 64 OFAM in 2 racks

• Keep-alive feedback from 4 sets of receivers

Page 9: Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain AtacamaLargeMillimeterArray DTS FO Hardware Design Bryan Anderson Jodrell Bank Observatory.

DTS FO Hardware Design04/21/23

Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain

9

ALMA Project

Optical Demux-Switch Module

WDM

demux

optical

4 x 4

switch

optical

4 x 4

switch

optical

4 x 4

switch

quadrants

correlator

To

ganged control

Page 10: Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain AtacamaLargeMillimeterArray DTS FO Hardware Design Bryan Anderson Jodrell Bank Observatory.

DTS FO Hardware Design04/21/23

Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain

10

ALMA Project

Optical Demux-Switch Module

• Integrate demux-switch functions: hide 12 interconnects

• Make as plug-ins with PIC controller and power supply off 48V bus

• 4 ODSMs per crate • 4 - 6 crates per rack• Requires total of 3 - 4 racks

Page 11: Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain AtacamaLargeMillimeterArray DTS FO Hardware Design Bryan Anderson Jodrell Bank Observatory.

DTS FO Hardware Design04/21/23

Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain

11

ALMA Project

Monitor and Control

• Slaves: answer only• Report the truth• Remember calibrations and exceptions• Parameters in non-volatile memory• Monitor and control everything: no

potentiometers• Set/trip out philosophy for safety

Page 12: Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain AtacamaLargeMillimeterArray DTS FO Hardware Design Bryan Anderson Jodrell Bank Observatory.

DTS FO Hardware Design04/21/23

Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain

12

ALMA Project

Safety

• By design– Physical access restricted– Switch on under software control– Switch off via hardware or software

• Soft switching for transmitters?– Hardware keep-alives:

• OMMM to transmitters• Receivers to optical amplifiers (256 twisted

pairs!)