Top Banner
SIEMENS CONSORTIUM EZ-SE-01/2009 SIEMENS AG SIEMENS LIMITED FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA SAT Procedures and Test Forms for Transformer Differential protection relay Client : KAHRAMAA, QATAR Location : 66/11kV EZDAN-2 S/S Feeder No. : B11 Designation : F871 (87T) Make : SIEMENS Relay Version : V04.62.05 MLFB No. : 7UT6131-5EB92-1AA0 -OS Sr. No. : 1004062850 Aux. Volts : 110 V DC Nominal Current : 1 A 1.CT & Transformer Data Setting: CT rated primary current (Side 1) set as : 400A CT rated secondary current (Side 1) set as : 1A Rated primary voltage (Side 1) set as : 62.0kV CT Star point (Side 1) set as : Towards Transformer Transformer Winding Connection (Side 1) set as : D (Delta) Transformer Star point of side-1 is : Isolated CT rated primary current (Side 2) set as : 2500A CT rated secondary current (Side 2) set as : 1A Rated primary voltage (Side 2) set as : 11kV CT Star point (Side 2) set as : Towards Transformer Transformer Winding Connection (Side 2) set as : Y (Star) Transformer Star point of side-2 is : Grounded Vector Group Numeral (Side 2) set as : 1 Rated Apparent Power (Side 1) set as : 40MVA SIEMENS ENERGOPROJEKT KAHRAMAA. Signature Signature Signatu re Name Ashfaq Shaikh Name Sureshkumar T Name Date 11.04.2011 Date 11.04.2011 Date Doc.No. EZD-01-10-36- P014 Rev 0 Annex-1 Page 1 of 48
48
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Client : KAHRAMAA, QATAR

Location : 66/11kV EZDAN-2 S/S

Feeder No. : B11 Designation : F871 (87T)

Make : SIEMENS Relay Version : V04.62.05

MLFB No. : 7UT6131-5EB92-1AA0-OS Sr. No. : 1004062850

Aux. Volts : 110 V DC Nominal Current : 1 A

1. CT & Transformer Data Setting:

CT rated primary current (Side 1) set as : 400A

CT rated secondary current (Side 1) set as : 1A

Rated primary voltage (Side 1) set as : 62.0kV

CT Star point (Side 1) set as : Towards Transformer

Transformer Winding Connection (Side 1) set as : D (Delta)

Transformer Star point of side-1 is : Isolated

CT rated primary current (Side 2) set as : 2500A

CT rated secondary current (Side 2) set as : 1A

Rated primary voltage (Side 2) set as : 11kV

CT Star point (Side 2) set as : Towards Transformer

Transformer Winding Connection (Side 2) set as : Y (Star)

Transformer Star point of side-2 is : Grounded

Vector Group Numeral (Side 2) set as : 1

Rated Apparent Power (Side 1) set as : 40MVA

Rated current: Side 1, HV = 372.49 / 400 = 0.931

Rated current: Side 2, LV = 2099.52 / 2500 = 0.839

Type of FaultReference Winding

(High Voltage)

Even VG numeral(0,2,4,6,8,10)

Odd VG numeral(1,3,5,7,9,11)

3-Phase 1 1 12-Phase 1 1 √3/2=0.866

1-Phaes with Io Elimination 3/2 = 1.5 3/2 = 1.5 √3=1.731-Phaes without Io 1 1 3/1+√3 = 1.1

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 1 of 34

Page 2: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Elimination

2. MEASURED VALUE TEST: Inject current in the relay as per the table below. Observe the reading on the relay display in primary and secondary values on side-1 and side-2.

Side on

which Curren

t injecte

d

Phase in which current injected

Current injected(Amps)

Secondary current read on relay display in Amp

Primary current read on relay display in A / kA

IL1

(Amps)

IL2

(Amps)

IL3

(Amps)

3I0

(Amps)

IL1

(Amps)

IL2

(Amps)

IL3

(Amps)

3I0

(Amps)

Side 1 R-E 1.0 1.0 0.0 0.0 1.0 401 0.0 0.0 401

(HV) Y-E 1.0 0.0 1.0 0.0 1.0 0.0 399 0.0 400

B-E 1.0 0.0 0.0 1.0 1.0 0.0 0.0 400 399

R-Y 1.0 1.0 1.0 0.0 0.0 400 400 0.0 0.0

Y-B 1.0 0.0 1.0 1.0 0.0 0.0 400 400 0.0

B-R 1.0 1.0 0.0 1.0 0.0 400 0.0 400 0.0

R-Y-B 1.0 1.0 1.0 1.0 0.0 400 400 399 0.0

Side 2 R-E 1.0 1.0 0.0 0.0 1.0 2.49 0.0 0.0 2.49

(LV) Y-E 1.0 1.0 0.0 0.0 1.0 0.0 2.49 0.0 2.50

B-E 1.0 0.0 0.0 1.0 1.0 0.0 0.0 2.50 2.49

R-Y 1.0 1.0 1.0 0.0 0.0 2.50 2.50 0.0 0.0

Y-B 1.0 0.0 1.0 1.0 0.0 0.0 2.49 2.49 0.0

B-R 1.0 1.0 0.0 1.0 0.0 2.50 0.0 2.49 0.0

R-Y-B 1.0 1.0 1.0 1.0 0.0 2.50 2.50 2.50 0.0

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 2 of 34

Page 3: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

2. DIFFERENTIAL PROTECTION :3a. Setting for 87-1 Pick-Up = 0.20 x I/InO

T I-Diff> Time Delay setting = 0.00 sec

Expected Trip Current (HV, Phase – Neutral) = (87-2 setting) x 1.5Expected Trip Current (HV, Phase – Phase) = (87-2 setting) x 1.0Expected Trip Current (LV, Phase – Neutral) = (87-2 setting) x 1.732Expected Trip Current (LV, Phase – Phase) = (87-2 setting) x 0.866Expected Trip Current (LV Three Phase) = (87-2 setting) x 1.0Expected Pickup Current = 0.85 x Expected Trip CurrentExpected Dropout Current = 0.70 x Expected Trip CurrentIdiff Trip = Idiff>> set X Kvg X I tx rated / I ct primary

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 3 of 34

Side on which Current injected

Phase in which current injected

Expected Pickup Current

(mA)

Actual Pickup Current

(mA)

Expected Drop-

out Current

(mA)

Actual Drop-out Current

(mA)

Expected Trip

Current (mA)

Actual Trip

Current(mA)

Actual Trip

Time at 2xItrip

(msec)Side-1 R-E 158 158 130 130 186 185 33.50

(HV) Y-E 158 158 130 130 186 186 32.50

B-E 158 157 130 130 186 186 34.30

R-Y 158 158 130 131 186 186 36.50

Y-B 158 158 130 131 186 186 33.70

B-R 158 157 130 131 186 186 34.90

R-Y-B 158 157 130 131 186 185 37.10

Side-2 R-E 247 245 204 205 290 290 35.50

(LV) Y-E 247 246 204 204 290 290 34.70

B-E 247 246 204 204 290 290 32.50

R-Y 123 124 102 102 145 145 34.70

Y-B 123 123 102 102 145 145 34.70

B-R 123 123 102 102 145 145 34.70

R-Y-B 143 142 118 118 168 167 34.90

Page 4: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

3b. Setting for 87-2 Pick-Up = 1.00 x I/InO T I-Diff>> Time Delay setting = 0.00 sec

Side on which Current injected

Phase in which current injected

Expected Pickup Current

(A)

Actual Pickup Current

(A)

Expected Drop-out Current

(A)

Actual Drop-out Current

(A)

Expected Trip

Current (A)

Actual Trip

Current(A)

Actual Trip Time at 2xItrip (msec)

Side 1 R-E 0.792 0.791 0.652 0.652 2.796 2.80 24.10

(HV) Y-E 0.792 0.792 0.652 0.652 2.796 2.80 22.10

B-E 0.792 0.792 0.652 0.652 2.796 2.80 22.40

R-Y 0.792 0.790 0.652 0.652 1.864 1.87 22.30

Y-B 0.792 0.791 0.652 0.652 1.864 1.87 24.90

B-R 0.792 0.791 0.652 0.652 1.864 1.87 23.50

R-Y-B 0.792 0.791 0.652 0.652 1.864 1.87 23.50

Side 2 R-E 1.235 1.234 1.017 1.010 1.453 1.453 23.40

(LV) Y-E 1.235 1.234 1.017 1.010 1.453 1.452 22.30

B-E 1.235 1.235 1.017 1.010 1.453 1.452 22.20

R-Y 0.618 0.618 0.509 0.509 0.727 0.727 23.70

Y-B 0.618 0.618 0.509 0.509 0.727 0.728 23.50

B-R 0.618 0.618 0.509 0.509 0.727 0.728 22.30

R-Y-B 0.714 0.713 0.588 0.587 0.840 0.839 22.30

Expected Trip Current (HV, Phase – Neutral) = (87-2 setting) x 1.5Expected Trip Current (HV, Phase – Phase) = (87-2 setting) x 1.0Expected Trip Current (LV, Phase – Neutral) = (87-2 setting) x 1.732Expected Trip Current (LV, Phase – Phase) = (87-2 setting) x 0.866Expected Trip Current (LV Three Phase) = (87-2 setting) x 1.0Expected Pickup Current = 0.85 x Expected Trip CurrentExpected Dropout Current = 0.70 x Expected Trip Current

Idiff Trip = Idiff>> set X Kvg X I tx rated / I ct primary

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 4 of 34

Page 5: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 5 of 34

Page 6: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

3c. Settings for Bias Characteristics

Idiff>Set = 0.20I/InO Slope 1 Set = 0.25Base Point 1 Set = 0.00I/In Irest. Calculated Start Point of Slope 1 = 0.0 Idiff. Calculated Start Point of Slope 1 = 0.0

Slope 2 Set = 0.50 Base Point 2 Set = 2.00I/In Irest. Calculated Start Point of Slope 2 = 4.0 Idiff. Calculated Start Point of Slope 2 = 1.0

Idiff>>Set = 6.00I/InO

For test results please find omicron test kit results.

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 6 of 34

Page 7: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Differential Operating Characteristic:

Test Object - Differential ParametersProtected Object: Protected Object: Transformer Vector Group: DY1

Winding/Leg Name:

Primary Secondary

Voltage: 62.00 kV 11.00 kVPower: 40.00 MVA 40.00 MVAStar point Grounding:

No Yes

Delta-connected CT:

No No

CT:Winding/Leg Name:

Primary Secondary

CT Current Prim: 400.00 A 2500.00 ACT Current Sec: 1.00 A 1.00 ACT Grounding: tow. Prot. Obj. tow. Prot. Obj.Gnd CT Prim Current:

200.00 A 800.00 A

Gnd CT Sec Current:

1.00 A 1.00 A

Gnd CT Grounding:

n/a n/a

Protection device: Reference

Winding: Primary

Ibias Calculation: ( |Ip| + |Is| ) / K1 (K1 = 1.00)

Zero Seq. Elimination:

IL-I0

Reference Current:

PO nominal current

Ground CT Used:No Disable Comb.

char.:No

tdiff>: 0.03 s

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 7 of 34

Page 8: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Idiff>: 0.20 In tdiff>>: 0.03 s Idiff>>: 2.00 In ttol rel: 3.00 % Itol rel: 2.00 % ttol abs: 0.01 s Itol abs: 0.05 In

Test Module Name: OMICRON Diff Operating

CharacteristicVersion: 2.40

Test Start: 05-Dec-2010 15:03:55 Test End: 05-Dec-2010 15:05:35 User Name: Manager: Company:

Test Settings:.General Settings: Testing: Primary / Secondary Max. Test Time: 1.50 s Delay Time: 0.25 s Prefault: No Prefault current: 0.00 In Prefault time: 0.000 s Vout enabled: No Vout winding: Secondary GPS/IRIG-B enabled: No GPS/IRIG-B side: Primary

Test Results for Fault Location L1-E at Reference Side Primary

Ibias Idiff Nominal

Idiff Actual

Dev (rel) Dev (abs)

State Result

1.00 In 0.250 In 0.254 In 1.59 % 0.0040 In Tested Passed 2.00 In 0.500 In 0.496 In -0.84 % -0.0042

InTested Passed

3.00 In 0.750 In 0.754 In 0.59 % 0.0045 In Tested Passed 4.00 In 1.000 In 0.995 In -0.46 % -0.0046

InTested Passed

5.00 In 1.250 In 1.255 In 0.39 % 0.0049 In Tested Passed 6.00 In 1.500 In 1.503 In 0.17 % 0.0026 In Tested Passed 7.00 In 1.750 In 1.747 In -0.15 % -0.0027

InTested Passed

8.00 In 2.000 In 1.975 In -1.26 % -0.0251 In

Tested Passed

9.00 In 2.000 In 1.997 In -0.16 % -0.0031 In

Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 8 of 34

Page 9: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Operating Characteristic DiagramIbias [In]1 2 3 4 5 6 7 8 9Idiff [In]0.000.250.500.751.001.251.501.752.00

Test Results for Fault Location L2-E at Reference Side Primary

Ibias Idiff Nominal

Idiff Actual

Dev (rel) Dev (abs)

State Result

1.00 In 0.250 In 0.254 In 1.59 % 0.0040 In Tested Passed 2.00 In 0.500 In 0.496 In -0.84 % -0.0042

InTested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 9 of 34

Page 10: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

3.00 In 0.750 In 0.746 In -0.59 % -0.0044 In

Tested Passed

4.00 In 1.000 In 0.986 In -1.39 % -0.0139 In

Tested Passed

5.00 In 1.250 In 1.255 In 0.39 % 0.0049 In Tested Passed 6.00 In 1.500 In 1.492 In -0.51 % -0.0077

InTested Passed

7.00 In 1.750 In 1.753 In 0.15 % 0.0027 In Tested Passed 8.00 In 2.000 In 1.992 In -0.42 % -0.0084

InTested Passed

9.00 In 2.000 In 1.991 In -0.47 % -0.0094 In

Tested Passed

Operating Characteristic DiagramIbias [In]1 2 3 4 5 6 7 8 9Idiff [In]0.000.250.500.751.001.251.501.752.00 SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 10 of 34

Page 11: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Test Results for Fault Location L3-E at Reference Side Primary

Ibias Idiff Nominal

Idiff Actual

Dev (rel) Dev (abs)

State Result

1.00 In 0.250 In 0.246 In -1.58 % -0.0039 In

Tested Passed

2.00 In 0.500 In 0.496 In -0.84 % -0.0042 In

Tested Passed

3.00 In 0.750 In 0.754 In 0.59 % 0.0045 In Tested Passed 4.00 In 1.000 In 0.995 In -0.46 % -0.0046

InTested Passed

5.00 In 1.250 In 1.245 In -0.39 % -0.0049 In

Tested Passed

6.00 In 1.500 In 1.503 In 0.17 % 0.0026 In Tested Passed 7.00 In 1.750 In 1.747 In -0.15 % -0.0027

InTested Passed

8.00 In 2.000 In 1.997 In -0.14 % -0.0028 In

Tested Passed

9.00 In 2.000 In 1.997 In -0.16 % -0.0031 In

Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 11 of 34

Page 12: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Operating Characteristic DiagramIbias [In]1 2 3 4 5 6 7 8 9Idiff [In]0.000.250.500.751.001.251.501.752.00

Test Results for Fault Location L1-L2 at Reference Side Primary

Ibias Idiff Nominal

Idiff Actual

Dev (rel) Dev (abs)

State Result

1.00 In 0.250 In 0.254 In 1.58 % 0.0040 In Tested Passed 2.00 In 0.500 In 0.496 In -0.82 % -0.0041

InTested Passed

3.00 In 0.750 In 0.746 In -0.57 % -0.0043 In

Tested Passed

4.00 In 1.000 In 1.005 In 0.45 % 0.0045 In Tested Passed 5.00 In 1.250 In 1.245 In -0.37 % -0.0047

InTested Passed

6.00 In 1.500 In 1.760 In 0.60 % 0.0104 In Tested Passed 7.00 In 1.750 In 1.991 In -0.47 % -0.0094

InTested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 12 of 34

Page 13: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

8.00 In 2.000 In 1.991 In -0.47 % -0.0094 In

Tested Passed

9.00 In 2.000 In 1.991 In -0.47 % -0.0094 In

Tested Passed

Operating Characteristic DiagramIbias [In]1 2 3 4 5 6 7 8 9Idiff [In]0.000.250.500.751.001.251.501.752.00

Test Results for Fault Location L2-L3 at Reference Side Primary

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 13 of 34

Page 14: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Ibias Idiff Nominal

Idiff Actual

Dev (rel) Dev (abs)

State Result

1.00 In 0.250 In 0.254 In 1.58 % 0.0040 In Tested Passed 2.00 In 0.500 In 0.496 In -0.82 % -0.0041

InTested Passed

3.00 In 0.750 In 0.754 In 0.58 % 0.0043 In Tested Passed 4.00 In 1.000 In 0.996 In -0.45 % -0.0045

InTested Passed

5.00 In 1.250 In 1.259 In 0.76 % 0.0095 In Tested Passed 6.00 In 1.500 In 1.740 In -0.58 % -0.0102

InTested Passed

7.00 In 1.750 In 1.991 In -0.47 % -0.0094 In

Tested Passed

8.00 In 2.000 In 1.991 In -0.47 % -0.0094 In

Tested Passed

9.00 In 2.000 In 1.991 In -0.47 % -0.0094 In

Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 14 of 34

Page 15: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Operating Characteristic DiagramIbias [In]1 2 3 4 5 6 7 8 9Idiff [In]0.000.250.500.751.001.251.501.752.00

Test Results for Fault Location L3-L1 at Reference Side Primary

Ibias Idiff Nominal

Idiff Actual

Dev (rel) Dev (abs)

State Result

1.00 In 0.250 In 0.246 In -1.57 % -0.0039 In

Tested Passed

2.00 In 0.500 In 0.504 In 0.83 % 0.0041 In Tested Passed 3.00 In 0.750 In 0.746 In -0.57 % -0.0043

InTested Passed

4.00 In 1.000 In 0.996 In -0.45 % -0.0045 In

Tested Passed

5.00 In 1.250 In 1.245 In -0.37 % -0.0047 In

Tested Passed

6.00 In 1.500 In 1.767 In 0.99 % 0.0174 In Tested Passed 7.00 In 1.750 In 1.997 In -0.16 % -0.0031 Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 15 of 34

Page 16: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

In8.00 In 2.000 In 1.997 In -0.16 % -0.0031

InTested Passed

9.00 In 2.000 In 1.997 In -0.16 % -0.0031 In

Tested Passed

Operating Characteristic DiagramIbias [In]1 2 3 4 5 6 7 8 9Idiff [In]0.000.250.500.751.001.251.501.752.00

Test Results for Fault Location L1-L2-L3 at Reference Side Primary

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 16 of 34

Page 17: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Ibias Idiff Nominal

Idiff Actual

Dev (rel) Dev (abs)

State Result

1.00 In 0.250 In 0.246 In -1.57 % -0.0039 In

Tested Passed

2.00 In 0.500 In 0.496 In -0.82 % -0.0041 In

Tested Passed

3.00 In 0.750 In 0.746 In -0.57 % -0.0043 In

Tested Passed

4.00 In 1.000 In 0.996 In -0.45 % -0.0045 In

Tested Passed

5.00 In 1.250 In 1.236 In -1.12 % -0.0140 In

Tested Passed

6.00 In 1.500 In 1.719 In -1.75 % -0.0306 In

Tested Passed

7.00 In 1.750 In 1.991 In -0.47 % -0.0094 In

Tested Passed

8.00 In 2.000 In 1.997 In -0.16 % -0.0031 In

Tested Passed

9.00 In 2.000 In 1.997 In -0.16 % -0.0031 In

Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 17 of 34

Page 18: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Operating Characteristic DiagramIbias [In]1 2 3 4 5 6 7 8 9Idiff [In]0.000.250.500.751.001.251.501.752.00

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 18 of 34

Page 19: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

3d. HARMONIC RESTRAINT:

Setting of 87-2nd Harmonic Content in I-DIFF = 10 %Setting of 87-nth Harmonic Restraint = 5.HarmonicSetting of 87-nth Harmonic Content in I-DIFF = 30 %

Inject current greater than 87-1 setting; first with harmonic content less than setting, then with harmonic content greater than setting; verify 87-1 operation / blocking

2nd Harmonic Restraint:

Side on which Current injected

Phase in which current injected

Current injected(Amps)

2nd

Harmonic Content

(%)

TRIP / BLOCK

2nd

Harmonic Content

(%)

TRIP / BLOCK

Side 1 R-E 1.0 9.0 Trip 11.0 Block(HV) Y-E 1.0 9.0 Trip 11.0 Block

B-E 1.0 9.0 Trip 11.0 BlockR-Y-B 1.0 9.0 Trip 11.0 Block

5th Harmonic Restraint:

Side on which Current injected

Phase in which current injected

Current injected(Amps)

nth (5th) Harmonic Content

(%)

TRIP / BLOCK

nth (5th) Harmonic Content

(%)

TRIP / BLOCK

Side 1 R-E 1.0 29.0 Trip 31.0 Block(HV) Y-E 1.0 29.0 Trip 31.0 Block

B-E 1.0 29.0 Trip 31.0 BlockR-Y-B 1.0 29.0 Trip 31.0 Block

Differential Harmonics Restraint Test:

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 19 of 34

Page 20: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Test Object - Differential Parameters

Protected Object: Protected Object: Transformer Vector Group: DY1

Winding/Leg Name:

Primary Secondary

Voltage: 62.00 kV 11.00 kVPower: 40.00 MVA 40.00 MVAStarpoint Grounding:

No Yes

Delta-connected CT:

No No

CT:Winding/Leg Name:

Primary Secondary

CT Current Prim: 400.00 A 2500.00 ACT Current Sec: 1.00 A 1.00 ACT Grounding: tow. Prot. Obj. tow. Prot. Obj.Gnd CT Prim Current:

200.00 A 800.00 A

Gnd CT Sec Current:

1.00 A 1.00 A

Gnd CT Grounding:

n/a n/a

Protection device: Reference

Winding: Primary

Ibias Calculation: ( |Ip| + |Is| ) / K1 (K1 = 1.00)

Zero Seq. Elimination:

IL-I0

Reference Current:

PO nominal current

Ground CT Used:No Disable Comb.

char.:No

tdiff>: 0.03 s Idiff>: 0.20 In tdiff>>: 0.03 s Idiff>>: 2.00 In

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 20 of 34

Page 21: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

ttol rel: 3.00 % Itol rel: 2.00 % ttol abs: 0.01 s Itol abs: 0.05 In

Harmonic Settings: HR tol abs: 1.00 % HR tol rel: 3.00 %

Harmonic Order

Start point End point

Ixf/IdiffIdiff/In Ixf/IdiffIdiff/In5 30.00

%0.20 30.00

%2.00

2 10.00 %

0.20 10.00 %

2.00

Test Module Name: OMICRON Diff Harmonic

RestraintVersion: 2.40

Test Start: 05-Dec-2010 15:26:18 Test End: 05-Dec-2010 15:26:30 User Name: Manager: Company:

Test Settings: Testing: Primary Tested Harmonic: 2 Max. Test Time: 1.50 s Delay Time: 0.25 s Active Postfault: No Postfault Time: 0.04 s Vout enabled: No Vout winding: Primary

Test Results for Test phase L1-E at Reference Side Primary for 2. Harmonic

Idiff Ixf/Idiff Angle (Ixf,Idiff)

Trip State Result

1.00 I/In 9.00 % -120.0 ° Yes Tested Passed1.00 I/In 10.00 % -120.0 ° No Tested Passed1.00 I/In 11.00 % -120.0 ° No Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 21 of 34

Page 22: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Harmonic Restraint Test PlaneI2f/Idiff [%]1 2 3 4 5 6 7 8 9 10 11Idiff/In [In]0.000.250.500.751.001.251.501.752.00

Test Results for Test phase L2-E at Reference Side Primary for 2. Harmonic

Idiff Ixf/Idiff Angle (Ixf,Idiff)

Trip State Result

1.00 I/In 9.00 % -120.0 ° Yes Tested Passed1.00 I/In 10.00 % -120.0 ° No Tested Passed1.00 I/In 11.00 % -120.0 ° No Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 22 of 34

Page 23: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Harmonic Restraint Test PlaneI2f/Idiff [%]1 2 3 4 5 6 7 8 9 10 11Idiff/In [In]0.000.250.500.751.001.251.501.752.00

Test Results for Test phase L3-E at Reference Side Primary for 2. Harmonic

Idiff Ixf/Idiff Angle (Ixf,Idiff)

Trip State Result

1.00 I/In 9.00 % -120.0 ° Yes Tested Passed1.00 I/In 10.00 % -120.0 ° No Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 23 of 34

Page 24: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

1.00 I/In 11.00 % -120.0 ° No Tested Passed

Harmonic Restraint Test PlaneI2f/Idiff [%]1 2 3 4 5 6 7 8 9 10 11Idiff/In [In]0.000.250.500.751.001.251.501.752.00

Test Results for Test phase L1-L2-L3 at Reference Side Primary for 2. Harmonic

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 24 of 34

Page 25: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Idiff Ixf/Idiff Angle (Ixf,Idiff)

Trip State Result

1.00 I/In 9.00 % -120.0 ° Yes Tested Passed1.00 I/In 10.00 % -120.0 ° No Tested Passed1.00 I/In 11.00 % -120.0 ° No Tested Passed

Harmonic Restraint Test PlaneI2f/Idiff [%]1 2 3 4 5 6 7 8 9 10 11Idiff/In [In]0.000.250.500.751.001.251.501.752.00

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 25 of 34

Page 26: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Test Results for Test phase L1-E at Reference Side Primary for 5. Harmonic

Idiff Ixf/Idiff Angle (Ixf,Idiff)

Trip State Result

1.00 I/In 29.00 % -120.0 ° Yes Tested Passed1.00 I/In 30.00 % -120.0 ° No Tested Passed1.00 I/In 31.00 % -120.0 ° No Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 26 of 34

Page 27: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Harmonic Restraint Test PlaneI5f/Idiff [%]5 10 15 20 25 30 35Idiff/In [In]0.000.250.500.751.001.251.501.752.00

Test Results for Test phase L2-E at Reference Side Primary for 5. Harmonic

Idiff Ixf/Idiff Angle (Ixf,Idiff)

Trip State Result

1.00 I/In 29.00 % -120.0 ° Yes Tested Passed1.00 I/In 30.00 % -120.0 ° Yes Tested Passed1.00 I/In 31.00 % -120.0 ° No Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 27 of 34

Page 28: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Harmonic Restraint Test PlaneI5f/Idiff [%]5 10 15 20 25 30 35Idiff/In [In]0.000.250.500.751.001.251.501.752.00

Test Results for Test phase L3-E at Reference Side Primary for 5. Harmonic

Idiff Ixf/Idiff Angle (Ixf,Idiff)

Trip State Result

1.00 I/In 29.00 % -120.0 ° Yes Tested Passed1.00 I/In 30.00 % -120.0 ° Yes Tested Passed1.00 I/In 31.00 % -120.0 ° No Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 28 of 34

Page 29: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Harmonic Restraint Test PlaneI5f/Idiff [%]5 10 15 20 25 30 35Idiff/In [In]0.000.250.500.751.001.251.501.752.00

Test Results for Test phase L1-L2-L3 at Reference Side Primary for 5. Harmonic

Idiff Ixf/Idiff Angle (Ixf,Idiff)

Trip State Result

1.00 I/In 29.00 % -120.0 ° Yes Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 29 of 34

Page 30: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

1.00 I/In 30.00 % -120.0 ° Yes Tested Passed1.00 I/In 31.00 % -120.0 ° No Tested Passed

Harmonic Restraint Test PlaneI5f/Idiff [%]5 10 15 20 25 30 35Idiff/In [In]0.000.250.500.751.001.251.501.752.00

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 30 of 34

Page 31: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

4. OVERCURRENT PROTECTION (HV Side-1):

Definite Time:50-1 Pickup Setting : 1.50 x I/InS (I/InS = Rated current of the transformer) 50-1 Delay Setting : 0.50 sec 50-2 Pickup Setting : 2.00 x I/InS 50-2 Delay Setting (s) : 0.00 sec

Phase 50-1Actual Pickup current

(A)

50-1 ActualDrop Out current

(A)

50-1 Actual Trip Time @ 2 x setting

(msec)

50-2 Actual Pickup current

(A)

50-2 Actual Drop out current

(A)

50-2 Actual Trip Time @ 2x setting

(msec)

R 1.396 1.337 543.6 1.860 1.789 24.20

Y 1.395 1.335 538.9 1.859 1.785 28.00

B 1.396 1.336 533.7 1.860 1.799 23.60

Inverse Time:IEC Curve : Very Inverse51 Pickup Setting 1.00 x I/InS 51 Time Dial Setting : 0.60 sec

Phase Actual Pickup current

Actual Drop out current

(A)

Operating Time (s) @ 2 x Setting

Operating Time (s) @ 5 x Setting

Operating Time(s) @ 10 x Setting

(A) Calculated Measured Calculated Measured Calculated Measured

R

Y

B

5. BINARY INPUTS : Assignments

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 31 of 34

Page 32: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

BI 1 : Spare Tested : Ok

BI 2 : Diff Relay Test Block in Test Mode Tested : Ok

BI 3 : Spare Tested : Ok

BI 4 : Spare Tested : Ok

BI 5 : Protection BI DC Supply Fail Tested : Ok

6. BINARY OUTPUTS :- Assignments

BO 1 : 87 Trip / 50-1 Trip Tested : 0.2Ω

BO 2 : Spare Tested : 0.2Ω

BO 3 : Spare Tested : 0.3Ω

BO 4 : 87 Trip / 50-1 Trip Tested : 0.2Ω

BO 5 : 87 Trip / 50-1 Trip Tested : 0.2Ω

BO 6 : Spare Tested : 0.2Ω

BO 7 : 87 Trip / 50-1 Trip Tested : 0.2Ω

BO 8 : 87 Trip / 50-1 Trip Tested : 0.2Ω

Life contact Tested : 0.2Ω

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 32 of 34

Page 33: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

7. LED INDICATORS:- Assignments

LED 1 : Differential Trip stage-1 Tested : Ok

LED 2 : Differential Trip stage-2 Tested : Ok

LED 3 : Differential Phase L1 Trip Tested : Ok

LED 4 : Differential Phase L2 Trip Tested : Ok

LED 5 : Differential Phase L3 Trip Tested : Ok

LED 6 : Differential Pickup Tested : Ok

LED 7 : TX O/C trip Tested : Ok

LED 8 : Overload Alarm Tested : Ok

LED 9 : Spare Tested : Ok

LED 10 : Spare Tested : Ok

LED 11 : Spare Tested : Ok

LED 12 : Spare Tested : Ok

LED 13: Spare Tested : Ok

LED 14 : Spare Tested : Ok

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 33 of 34

Page 34: B11_7UT6 Relay Annex-1

SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED

FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

8. Tripping of CB / Lockout Relay (K86A) on Diff. Trip : __Ok___

9. Tripping of CB / Lockout Relay (K86A) on over current Trip : __Ok___

10. Final Settings downloaded to relay after test : __Ok___

11. Test Switch TS871 operation checked (Block K86A) : __Ok___

Relay found healthy: Yes / No

12. Instruments Used:

Sl No Description MakeEquipment

Sl No.Calibration date

Calibration due date

1. Secondary Injection Kit

OMICRON GK016P 27/06/2010 27/06/2011

2. Multimeter FLUKE 179 13150185 23/08/2010 23/08/2011

3. Laptop HP SGH016T1GP --- ---

SIEMENS ENERGOPROJEKT KAHRAMAA.Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name

Date 11.04.2011 Date 11.04.2011 Date

Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 34 of 34