B027 402.04.04 Cassettes James Strait (L3 Manager 402.04.04) Zoltan Gecse (Deputy L3 Manager) February 3, 2016 1 Director's Review Endcap Calorimetry Cassettes 2016 February 3
32

B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+

Jun 23, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

B02-­7    402.04.04  Cassettes

James  Strait  (L3  Manager  402.04.04)Zoltan Gecse (Deputy  L3  Manager)February  3,  2016

1Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes2016  February  3

Page 2: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

§ WBS  definition

§ R&D  Status  and  Plans  for  Construction

§ Basis  of  Estimate

§ Schedule

§ Cost  and  Labor  Profiles

§ Risk  and  Contingency

§ ES&H  and  QA

§ Summary

2

Outline

Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

Page 3: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

§ Jim  Strait  – Fermilab  Scientist  III§ LBNE/F  Project  Director  2010-­2015§ Fermilab  Particle  Physics  Division  Head  2004-­2008§ US  LHC  Accelerator  Project  Manager  1996-­2004§ CDF  End  Plug  Upgrade  1992-­1996

§ Zoltan  Gecse  – Fermilab Associate  Scientist§ ATLAS  TRT  DAQ  Upgrade  2014-­2015§ ATLAS  Electroweak  SUSY  Co-­convenor 2012-­2013§ CMS  Muon HLT  Coordinator  2009-­2010

3

Who  Are  We?

Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

Page 4: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

4

402.04  Organization  Chart

Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

402.04Endcap Calorimetry

Jeremiah  Mans  (UMN)

402.04.03Sensors  and  ModulesNural Ackchurin (TTU)Manfred  Paulini (CMU)

402.04.04Cassettes

Jim  Strait (FNAL)Deputy:  Zoltan  Gecse  

(FNAL)

402.04.05Backing  Calorimeter

402.04.06Electronics  and  ServicesMarkus Klute (MIT)

Institutions  currently  involved  in  the  Cassette  project:• Fermilab• University  of   Iowa• University  of  Minnesota• Northwestern  University

Page 5: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

WBS  Definition

5Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

Page 6: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

6

Cassettes  of  Forward  Hadronic Calorimeter

Director's  Review  -­‐-­‐ Endcap Calorimetry Cassettes 2016  February  3

Alveolar

§ 12  sampling  layers  of  silicon   in  brass  absorber§ Silicon  modules  assembled  into  cassettes§ Brass  absorber  forms  mechanical  structure

§ 12    wedges  of  30  degrees  each

§ 12  x  12  =  144  cassettes  in  each  EC

Cassette  dimensions:  length  2.0  mwidth  0.5  -­‐-­‐ 1.5  mthickness  1cm  Weight: ~100  kg

Page 7: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

7

Cassette  Components

§ ~34  modules  assembled   into  each  cassette

§ Compact  design  achieved  by  integrating  services  efficiently§ CO2-­based  cooling  including  “flow-­restrictors”  required  for  system  stability  imbedded  in  copper  cooling  plate  by  means  of  milling  and  brazing  two  planes

§ Thin  PCBs  for  low  voltage§ Small-­diameter  cables  for  high  voltage§ Thin  Twinax cables  for  data  links

Power  and  data  links Sensor  modules Cooling  plate

Director's  Review  -­‐-­‐ Endcap Calorimetry Cassettes 2016  February  3

Page 8: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

Module  Installation  on  Cassettes

8

• M1.2  socket  head  cap  screws  (for  now)• 1.5  mm  locating  pins• 4.5  mm  mouse  bites• Lost  area  due  to  mouse  bites:  ~0.5  %  

§ Sensors  and  PCBs  will  have  corner  ‘mouse  bites’  to  access  the  baseplates  allowing  pinning/screwing   for  kinematic  mounting  to  Cu  cooling  plate.

Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

Page 9: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

9

402.04.04  Cassettes  Summary

Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

§ Second-­stage   unit  of  complexity  in  the  EC  design:  copper  cooling  plate  onto  which  are  mounted   the  modules  O(34)/cassette§ US  is  responsible  for  the  FH  calorimeter  cassettes  (288  units)

Page 10: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

R&D  Status  and  Construction  Plans

10Director's  Review  -­‐-­‐ Endcap Calorimetry Cassettes 2016  February  3

Page 11: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

11

R&D:  Electrical  Services

§ Extraction  of  data  and  supplying  power  to  the  electronics  in  the  narrow  gap§ Default  or  “baseline  scope”

o Twinax cables  for  the  signals  and  PCB  for  the  low  voltage

§ “Opportunity  scope”:o Combine  functionality:  embed  transmission  lines  in  PCBs

§ R&D  will  continue  over  the  next  2  years  leading  to  TDR  (end  of  2017)  

1.05  m  at  6.4  Gbpswith  passive  equalizer

2016  February  3Director's  Review  -­‐-­‐ Endcap Calorimetry Cassettes

Page 12: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

12

R&D:  Cooling  

§ Cooling  will  be  CO2 evaporative  cooling.§ Viscosity  of  liquid  CO2 is  100  times  less  than  water.

§ CO2 leaves  plate  colder  than  when  it  entered,  due  to  decrease  in  pressure.

§ Pressure  drop  increases  inversely  to  tube  radius  to  the  power  of  4.7.

§ Three  full-­scale  test  structures  follow  predicted  temperature  behavior§ Planning  test  with  fourth  structure that  embeds  capillary  for  pressure  regulation  

Director's  Review  -­‐-­‐ Endcap Calorimetry Cassettes 2016  February  3

Page 13: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

§ Building  small  ECAL  Testbeam Prototype

§ The  prototype  will  have  fully  functional  two-­sided  cassettes.  (14  cassettes  of  2  sensor)

§ Learn  issues  of  building  cassettes  (especially  brazing  of  cooling  plates)

13

Prototype  for  Test  Beam

Director's  Review  -­‐-­‐ Endcap Calorimetry Cassettes 2016  February  3

Page 14: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

§ The  cassettes  are  made  from  three  major  subassemblies:§ Cooling  plates,  which  will  be  made  or  procured  by  a  university  group

§ Sensor  modules,  which  will  be  delivered  by  the  Sensors  and  Modules  (WBS  402.04.03)  subproject

§ PCBs  and  cables  to  provide  HV  and  LV  and  extract  the  signals,  which  will  be  made  or  procured  by  a  university  group.

§ All  three  subassemblies  will  be  delivered  to  Fermilab  (SiDet)  where  they  will  be  assembled  into  complete  Cassettes,  tested,  and  shipped  to  CERN

14

Cassette  Assembly

Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

Page 15: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

§ Cassettes  will  be  assembled  at  SiDet in  Fermilab

15

Construction  Site  Setup

Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

Page 16: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

§ Cassette  Assembly  :  crane,  electrical  connectivity  tools  

§ Cassette  Test  Stand  :  simplified  readout  in  a  mobile  readout  rack;  2  test  stands  for  two  assembly  lines  

§ Multi-­‐cassette  testing  : Dedicated  insulated  enclosure  with  mounting  points  and  dry  gas  ;  Cooling  plant

§ Cassette  Repairs  :  access  to  crane  ;  simple  electrical  connectivity  checkout  ;  optical  inspection  of  modules  

§ Repair  modules  :  electrical  equipment,  optical  inspection  

16

Construction  Site  Specialized  Equipment

Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

Page 17: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

• Cassette  production  site  ready  for  pilot  cassette  assembly:  Q2  2018

• Cassette  production  site  and  procedures  set  up:  Q1  2019

• Cassette  production  site  and  procedures  qualified:    Q1  2020

• 10%  preproduction:  Q1  – Q3  2021

• Full  production:    Q4  2021  – Q2  2023

Schedule  Milestones

Director's  Review  -­‐-­‐ Endcap Calorimetry Cassettes 2016  February  3

Page 18: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

§ Cassette  WBS  is  dominated  by  labor  costs§ Technician  labor  for  mounting  and  major  steps  in  QC§ Labor  estimate  is  based  on  similar  projects  such  as  the  assembly  of  pixel  endcaps for  CMS  and  megatile construction  for  the  barrel  hadron  calorimeter  

§ M&S  costs§ Cassette  cost  estimated  based  on  material  cost  and  machining  costs  from  thermal  prototypes

§ LV/data  PCB  costs  are  based  on  vendor  quotes  for  preliminary  designs

18

Basis  of  Estimate

Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

Page 19: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

Cost  and  Labor  Profiles

19Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

Page 20: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

20

Cost

Cost  =  AY  $k(No  Contingency)

L4 Area M&S Labor Total R&D+OPC

Cooling  Plates 288 186 474 325

Data/LV PCBs 295 285 580 350

Cassette  Assembly 787 2669 3457 704

Total  (402.04.04) 1371 3140 4510 1379

Director's  Review  -­‐-­‐ Endcap Calorimetry Cassettes 2016  February  3

Page 21: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

0

200

400

600

800

1000

1200

1400

FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24

AY  k$

R&D Construction

21

Cost  Profile

Director's  Review  -­‐-­‐ Endcap Calorimetry Cassettes 2016  February  3

Page 22: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

0

0.5

1

1.5

2

2.5

3

FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24

FNAL  Engineer FNAL  Tech University  Engineer University  Tech

22

Labor  FTE  Profile

Director's  Review  -­‐-­‐ Endcap Calorimetry Cassettes 2016  February  3

Page 23: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

Contingency  and  Risk

23Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

Page 24: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

§ The  project  is  at  a  conceptual   design  level,  hence  contingency  on  all  activities  is  considered  to  be  M5/L5  (40-­60%)    § Technical  design  choice  still  to  be  made  which  would  shift  from  30° cassettes  to  60° cassettes.    This  would  not  significantly  affect  cost  of  the  cassettes  in  total  or  the  labor  required  for  assembly  and  testing.    Shipping  costs  could  increase  somewhat  with  heavier  unit  items.

§ Risk  § Risk  analysis  will  be  done  within  the  next  few  months,  well  in  advance  of  CD-­1

§ Technology  of  cassettes  is  relatively  well  understood  =>  do  not  expect  major  risks  

24

Contingency  and  Risk

Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

Page 25: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

ES&H  and  QA

25Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

Page 26: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

§ Hazards  or  hazardous  work  environments§ Handling  of  heavy  objects  and  usage  of  cranes§ Operation  of  electrical  equipment  with  high  voltage§ Work  with  high  pressure  CO2  cooling  system

§ QA  and  QC  areas§ Mechanical  properties§ Electrical  functionality§ Compliance  with  thermal  cycling

26

ES&H  &  QA

Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

Page 27: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

Summary

27Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

Page 28: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

§ US-­CMS  deliverables  for  the  HGCal Cassettes  (as  described  in  the  Technical  Proposal)  builds  from  our  expertise  and  experience  from  original  CMS  and  Phase  1  upgrades§ Deliverables   led  by  institutes  with  previous  experience  and  strong  infrastructures

§ Labor  estimate  based  on  similar  projects  such  as  the  assembly  of  pixel  endcaps for  CMS  and  megatile construction  for  the  barrel  hadron  calorimeter  

28

Summary

Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

Page 29: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

Backup

29Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

Page 30: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

30Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

BOE

Page 31: B02$7&&402.04.04&Cassettes · 2016-01-30 · B02$7&&402.04.04&Cassettes JamesStrait&(L3&Manager&402.04.04) Zoltan Gecse (DeputyL3&Manager) February3,&2016 2016February+3 Director's+Review+//

31Director's  Review  -­‐-­‐ Endcap  Calorimetry   Cassettes 2016  February  3

Cost  Details