Page 1: B Structural Concept Design Report (TTW 2014)

  

 

©JBS&G Australia Pty Ltd | 52304/105953 Rev 1 

Appendix B Structural Concept Design Report (TTW 2014) 

Page 2: B Structural Concept Design Report (TTW 2014)

Walsh Bay arts Precinct 148

concept design report

Walsh Bay Arts Precinct 131646 Concept Structural Design Report

Taylor Thomson Whitting (NSW) Pty Ltd Page i © 2014 Taylor Thomson Whitting

TABLE OF CONTENTSSection Page

1.0  BACKGROUND .............................................................................................................. 1 

2.0  STRUCTURAL ASSESSMENT & MAINTENANCE ...................................................... 1 

3.0  SUB-STRUCTURE ......................................................................................................... 1 

4.0  PIER 2/3 LEVEL 1 & 3 .................................................................................................... 2 

5.0  PIER 2/3 LEVEL 2 PERFORMANCE SPACES ............................................................. 2 

6.0  WHARF 4/5 BANGARRA SPACE ................................................................................. 2 

7.0  INFORMATION PROVIDED FOR THE FINAL BUSINESS CASE ............................... 2 

APPENDIX A

APPENDIX B

© 2014 Taylor Thomson Whitting

Walsh Bay Arts Precinct Concept Structural Design Report

for Bates Smart

26th February 2014

Job No. 131646

Taylor Thomson Whitting (NSW) Pty Ltd Consulting Engineers ACN 113 578 377 48 Chandos Street St Leonards NSW 2065 PO Box 738 Crows Nest 1585 T 61 2 9439 7288 F 61 2 9439 3146 [email protected] www.ttw.com.au

This document is copyright and is the property of Taylor Thomson Whitting (NSW) Pty Ltd and must not be used without authorisation. © 2014 Taylor Thomson Whitting

Structural

SYDNEY CANBERRA MELBOURNE QEC 22375

Page 3: B Structural Concept Design Report (TTW 2014)

Walsh Bay arts Precinct 149

concept design report

Walsh Bay Arts Precinct 131646 Concept Structural Design Report

Taylor Thomson Whitting (NSW) Pty Ltd Page 2 © 2014 Taylor Thomson Whitting

and tanks could be below the water level.

4.0 PIER 2/3 LEVEL 1 & 3

The new mezzanine floor structures will need to be of lightweight construction to minimise the additional load applied to the existing columns and piles. The new mezzanine construction could be similar to those added to the Shore Sheds about 10 years ago which consisted of steel floor beams, steel joists and a topping slab. The drawings of the Shore Sheds mezzanine structure are enclosed in Appendix B.

5.0 PIER 2/3 LEVEL 2 PERFORMANCE SPACES

Acoustic requirements for the performance spaces will require new concrete jack-up slabs to be constructed over the existing L2 floor structure. The additional load from these concrete slabs will require additional jack-up piles to be installed. In addition where new mezzanines floors are being added resulting in increased column loads, additional jack-up piles will be required.The existing central row of columns in Pier 2/3 supporting the roof trusses will need to be removed in the performance spaces. The plans enclosed in Appendix A show the locations of the columns to be removed. For both the Bell Rehearsal space and ACO Auditorium it is proposed to retain the existing timber trusses. A new steel supporting beam will be provided above the Bell Rehearsal space and a new steel truss above the ACO Auditorium.

6.0 WHARF 4/5 BANGARRA SPACE

For Studio 2 it is proposed to remove an existing column at Ground level. A new steel beam and jack-up piles will be required as shown on the drawings in Appendix A.

7.0 INFORMATION PROVIDED FOR THE FINAL BUSINESS CASE

Information has been provided for costing of the structural items in the Final Business Case. This included advice regarding pile replacement; new mezzanine floor structure; performance space floor slab to achieve acoustic performance; typical truss design where columns are to be removed; and typical structure for waterfront square.

Authorised by: TAYLOR THOMSON WHITTING (NSW) PTY LTD

David Carolan Director

P:\2013\1316\131646\Reports\TTW\140226 Concept Design report for SSDA_DRAFT.doc

Walsh Bay Arts Precinct 131646 Concept Structural Design Report

Taylor Thomson Whitting (NSW) Pty Ltd Page 1 © 2014 Taylor Thomson Whitting

1.0 BACKGROUND

The existing structures in the Walsh Bay Arts Precinct, namely Pier 2/3, Pier 4/5 and the Shore Sheds are all timber structures originally constructed in the 1920’s as cargo wharfs and storage sheds. The original structures have undergone various alterations, upgrades and repairs. The original two-level structures were built entirely from hardwood timber. They consist of a sub-structure of piles, headstocks and girders supporting a concrete deck around the perimeter of the Piers and a timber deck inside the building, and a superstructure consisting of floor trusses and roof trusses.

2.0 STRUCTURAL ASSESSMENT & MAINTENANCE

Detailed condition surveys and structural assessments of both Pier 2/3 and Wharf 4/5 have been carried over the last decade. This work has been carried out for NSW Public Works with TTW acting as their consultant for Pier 2/3 and GHD for Wharf 4/5. TTW issued their final “Preliminary Structural Assessment” report for Pier 2/3 on 24th November 2010. For both Pier 2/3 and Wharf 4/5 the results of the condition surveys of the sub-structure and super-structure has been used to carry out a structural analysis of the piers for gravity and lateral loads (wind and earthquake) for compliance with current Australian Standards. The results of the analysis and design checks has enabled repair work to be specified and prioritised. Technical Specifications have been prepared by TTW for Pier 2/3 (issued May 2013) and by GHD for Wharf 4/5 (issued November 2010). The condition surveys consist of visual surveys plus termite monitoring and inspections. From 2011 until now detailed surveys of all of the piles, headstocks and storey posts have been carried out. Structural Maintenance specifications have been prepared for Pier 2/3 and Wharf 4/5 which detail the requirements for pile repair & replacement for piles, headstocks, girders, storey posts and other miscellaneous items. The structural maintenance work required for the piers has been documented by TTW and GHD including priorities on the importance of the repair work. A 10 year maintenance program is now in place which has both preventative and planned maintenance items. Preventative items include ongoing condition surveys (including pile surveys) every 4 years and termite control. Planned maintenance is the repair/replacement work documented by TTW and GHD. The majority of this work is the repair of timber piles and the replacement of timber piles with jack-up piles in cases where the pile has degraded beyond the point of being repairable. Other maintenance items in the 10 year program consist of repair/replacement of non-structural items such as drainage, doors & windows and weatherboards.

3.0 SUB-STRUCTURE

The original timber piles are set out on a 10ft by 10ft grid in the Piers. In the upgrades and repairs carried out on the Piers many of the piles have been regarded as redundant and not repaired as the live load for the recent use of the Piers is much less than the loads required for its original function as a cargo wharf. The opportunity now exists to add jack-up piles to in these redundant pile locations to provide extra footing capacity to support the additional loads intended for Pier 2/3 as described below. The proposed new lifts in Pier 2/3 will require pits below deck level. There may also be new water storage tanks located under the deck. Both the lift pits and water tanks could be reinforced concrete structures supported on the timber piles. If required the base of the pits

Page 4: B Structural Concept Design Report (TTW 2014)

Walsh Bay arts Precinct 150

concept design report

B

30

B

WAT

ERFR

ONT

SQU

ARE

NEW

STE

EL T

UBE

PILE

S W

ITH

HIGH

BUIL

D EP

OXY

PAI

NT D

RIVE

N TH

ROUG

HSE

ABED

TO

BE F

OUN

DED

ON S

ANDS

TONE

BED

ROCK

EXIS

TING

TUR

PENT

INE

PILE

S

APPR

OXIM

ATEL

Y 18

0 NE

W

JA

CK-U

P PI

LES

APPR

OXIM

ATEL

Y 4

NEW

JACK

-UP

PILE

S

APPROX 15m

TYPI

CAL

STEE

L JA

CK-U

P PI

LE D

ETAI

L

EXPO

SE E

XIST

ING

TIM

BER

PILE

.CU

T BA

CK T

O SO

UND

TIM

BER

STUM

PRE

MOV

ING

ALL

EVID

ENCE

OF

MAR

INE

BORE

R,SC

OUR,

ROT

AND

DAM

AGE.

REM

OVE

EXIS

TING

STE

EL O

R CO

NCRE

TECO

LLAR

WHE

RE V

ISIB

LE T

O EX

POSE

SPL

ICE.

EXIS

TING

PIL

E SE

GMEN

T AB

OVE

SPLI

CETO

BE

REM

OVED

STEE

L JA

CK-U

P PI

LEW

ITH

HIGH

BUI

LD E

POXY

PAIN

T

BACK

FILL

AS

REQU

IRED

EXIS

TING

HEA

DSTO

CK B

EAM

S

SEAB

ED L

EVEL

VAR

IES

MUDLINE

APPROX

Tayl

or T

hom

son

Whi

tting

(NS

W) P

ty L

td

A.C

.N. 1

13 5

78 3

77

Con

sulti

ng E

ngin

eers

A00

12

35

46

78

910

Arch

itect

Auth

oris

ed

Dra

win

g N

o

Scal

e : A

0

Job

No

Rev

isio

n

Shee

t Sub

ject

Proj

ect

Rev

Desc

riptio

nEn

gDa

teDr

aft

aylo

rTho

mso

nWhi

tting

Dra

wn

T

This

dra

win

g is

cop

yrig

ht a

nd is

the

prop

erty

of T

AYLO

R T

HO

MSO

NW

HIT

TIN

G (N

SW) P

ty L

td a

nd m

ust n

ot b

e us

ed w

ithou

t aut

horis

atio

n.

48 C

hand

os S

treet

St.L

eona

rds

NSW

206

5T:

+61

2 9

439

7288

F:

+61

2 9

439

3146

ttw

syd@

ttw.c

om.a

u

THIS

DR

AWIN

G T

O B

E R

EAD

IN C

ON

JUN

CTI

ON

WIT

HAL

L R

ELEV

ANT

NO

TES

ON

DR

AWIN

G N

O. S

001

WAL

SH B

AYAR

TS P

REC

INC

T

As indi

cate

d

27/0

2/20

14 9

:49:

55 A

M

27/02/2014 9:49:55 AM

P.S.

HD

.C

1316

46SK

1

PILE

LAY

OU

T PL

AN

P121

.02.

14IS

SUED

FO

R IN

FOR

MAT

ION

P.S.

HD

.C

P227

.02.

14FI

NAL

DR

AFT

ISSU

EP.

S.H

D.C

P2

PLOTTED BY: P.S.H ON

PREL

IMIN

ARY

PILI

NG

LAY

OU

T PL

ANSC

ALE

1:25

0

Walsh Bay Arts Precinct 131646 Concept Structural Design Report

Taylor Thomson Whitting (NSW) Pty Ltd Page 3 © 2014 Taylor Thomson Whitting

Appendix A Structure Plans

Page 5: B Structural Concept Design Report (TTW 2014)

Walsh Bay arts Precinct 151

concept design report

NEW

STE

EL F

RAM

ED S

TAIR

AND

BAL

CONY

.NE

W S

TEEL

COL

UMNS

LOC

ATED

OVER

EXI

STIN

G PI

LES

UNDE

R G

ROUN

D FL

OOR

NEW

CAN

TILV

ERED

STE

EL F

RAM

ED B

ALCO

NY.

NEW

800

DEE

P ST

EEL

BEAM

EXIS

TING

HAR

DWO

ODCO

LUM

N UN

DER

TO B

ERE

MOV

ED

200m

m T

OPPI

NG S

LAB

200m

m T

OPPI

NG S

LAB

+ 10

0mm

JACK

-UP

SLAB

250m

m T

OPPI

NG S

LAB

KEY

LEG

END

CONC

RETE

: 32

MPa

REIN

FORC

EMEN

T : 1

40 kg

/m3

AREA

- SH

ARED

REH

EAR

SAL

RAIS

ED A

CCES

S FL

OOR

ON R

ESIL

IENT

MOU

NTS

TOAC

OUST

IC E

NGIN

EERS

DET

AILS

200m

m T

OPPI

NG S

LAB

OF FLOOR BOARDS EXISTING DOUBLE LAYER

EXIS

TING

HAR

DWOO

D JO

ISTS

TYPI

CAL

SEC

TIO

NS

SCAL

E 1:

20

AREA

- AC

O A

UD

ITO

RIU

M

200m

m T

OPPI

NG S

LAB

OF FLOOR BOARDS EXISTING DOUBLE LAYER

EXIS

TING

HAR

DWOO

D JO

ISTS

AREA

250m

m T

OPPI

NG S

LAB

OF FLOOR BOARDS EXISTING DOUBLE LAYER

EXIS

TING

HAR

DWOO

D JO

ISTS

100m

m JA

CK U

P SL

AB

EMBE

LTON

JAC

K-UP

MOUN

TS O

R EQ

IVAL

ENT

Tayl

or T

hom

son

Whi

tting

(NS

W) P

ty L

td

A.C

.N. 1

13 5

78 3

77

Con

sulti

ng E

ngin

eers

A00

12

35

46

78

910

Arch

itect

Auth

oris

ed

Dra

win

g N

o

Scal

e : A

0

Job

No

Rev

isio

n

Shee

t Sub

ject

Proj

ect

Rev

Desc

riptio

nEn

gDa

teDr

aft

aylo

rTho

mso

nWhi

tting

Dra

wn

T

This

dra

win

g is

cop

yrig

ht a

nd is

the

prop

erty

of T

AYLO

R T

HO

MSO

NW

HIT

TIN

G (N

SW) P

ty L

td a

nd m

ust n

ot b

e us

ed w

ithou

t aut

horis

atio

n.

48 C

hand

os S

treet

St.L

eona

rds

NSW

206

5T:

+61

2 9

439

7288

F:

+61

2 9

439

3146

ttw

syd@

ttw.c

om.a

u

THIS

DR

AWIN

G T

O B

E R

EAD

IN C

ON

JUN

CTI

ON

WIT

HAL

L R

ELEV

ANT

NO

TES

ON

DR

AWIN

G N

O. S

001

WAL

SH B

AYAR

TS P

REC

INC

T

As indi

cate

d

27/0

2/20

14 9

:49:

56 A

M

27/02/2014 9:49:56 AM

P.S.

HD

.C

1316

46SK

3

LEVE

L 2

PLAN

P121

.02.

14IS

SUED

FO

R IN

FOR

MAT

ION

P.S.

HD

.C

P227

.02.

14FI

NAL

DR

AFT

ISSU

EP.

S.H

D.C

P2

PLOTTED BY: P.S.H ON

PREL

IMIN

ARY

LEVE

L 2

PLAN

SCAL

E 1:

250

B

30

B

WAT

ERFR

ONT

SQ

UARE

TYPI

CALL

Y HA

RDW

OOD

PLAN

KS O

N HA

RDW

OOD

JOIS

TSON

REI

NFOR

CED

CONC

RETE

HEA

DSTO

CK B

EAM

S ON

STEE

L TU

BE P

ILES

EXIS

TING

HAR

DWOO

D CO

LUM

NTO

BE

REM

OVED

NEW

GRI

LLAG

E OF

STE

EL B

EAM

STO

SUP

PORT

NEW

CON

CRET

E LI

FTPI

T UN

DER

DECK

Tayl

or T

hom

son

Whi

tting

(NS

W) P

ty L

td

A.C

.N. 1

13 5

78 3

77

Con

sulti

ng E

ngin

eers

A00

12

35

46

78

910

Arch

itect

Auth

oris

ed

Dra

win

g N

o

Scal

e : A

0

Job

No

Rev

isio

n

Shee

t Sub

ject

Proj

ect

Rev

Desc

riptio

nEn

gDa

teDr

aft

aylo

rTho

mso

nWhi

tting

Dra

wn

T

This

dra

win

g is

cop

yrig

ht a

nd is

the

prop

erty

of T

AYLO

R T

HO

MSO

NW

HIT

TIN

G (N

SW) P

ty L

td a

nd m

ust n

ot b

e us

ed w

ithou

t aut

horis

atio

n.

48 C

hand

os S

treet

St.L

eona

rds

NSW

206

5T:

+61

2 9

439

7288

F:

+61

2 9

439

3146

ttw

syd@

ttw.c

om.a

u

THIS

DR

AWIN

G T

O B

E R

EAD

IN C

ON

JUN

CTI

ON

WIT

HAL

L R

ELEV

ANT

NO

TES

ON

DR

AWIN

G N

O. S

001

WAL

SH B

AYAR

TS P

REC

INC

T

1 : 2

50

27/0

2/20

14 9

:49:

56 A

M

27/02/2014 9:49:56 AM

P.S.

HD

.C

1316

46SK

2

GR

OU

ND

FLO

OR

PLA

N

P121

.02.

14IS

SUED

FO

R IN

FOR

MAT

ION

P.S.

HD

.C

P227

.02.

14FI

NAL

DR

AFT

ISSU

EP.

S.H

D.C

P2

PLOTTED BY: P.S.H ON

PREL

IMIN

ARY

GR

OU

ND

FLO

OR

PLA

NSC

ALE

1:25

0

Page 6: B Structural Concept Design Report (TTW 2014)

Walsh Bay arts Precinct 152

concept design report

Walsh Bay Arts Precinct 131646 Concept Structural Design Report

Taylor Thomson Whitting (NSW) Pty Ltd Page 4 © 2014 Taylor Thomson Whitting

Appendix B Information for FBC

Existing Shore Shed mezzanine drawings

BEAM

SB1

TRUS

S T1

EXIS

TING

ROO

F LA

NTER

NSTO

REM

AIN

1 -

DUCT

ABO

VE R

OOF

NEW

STE

EL F

RAM

ING

FOR

PLAN

T PL

ATFO

RM IN

CEI

LING

SPAC

E

NEW

STE

EL F

RAM

ING

FOR

PLAN

T PL

ATFO

RM IN

CEI

LING

SPAC

E2 -

SCAL

E 1:

200

SECT

ION

1 - T

YPIC

AL S

ECTI

ON T

HROU

GH A

CO A

UDIT

ORIU

M

LEVE

L 2

GROU

ND

SCAL

E 1:

200

TRUS

S T1

ELE

VATI

ONSC

ALE

1:20

0

SECT

ION

2 - T

YPIC

AL S

ECTI

ON T

HROU

GH B

ELL

REHE

ARSA

L SP

ACE

NEW

HAR

DWOO

DPU

RLIN

SNE

W S

TEEL

TRU

SSNE

W S

TEEL

TRU

SS T

120

0 UC

46

TOP

& BO

TTOM

CHO

RDS

150

UC 3

0 W

EB M

EMBE

RS

EXIS

TING

HAR

DWOO

D CO

LUM

NSB

1NE

W 8

00 D

EEP

STEE

L BE

AM

Tayl

or T

hom

son

Whi

tting

(NS

W) P

ty L

td

A.C

.N. 1

13 5

78 3

77

Con

sulti

ng E

ngin

eers

A00

12

35

46

78

910

Arch

itect

Auth

oris

ed

Dra

win

g N

o

Scal

e : A

0

Job

No

Rev

isio

n

Shee

t Sub

ject

Proj

ect

Rev

Desc

riptio

nEn

gDa

teDr

aft

aylo

rTho

mso

nWhi

tting

Dra

wn

T

This

dra

win

g is

cop

yrig

ht a

nd is

the

prop

erty

of T

AYLO

R T

HO

MSO

NW

HIT

TIN

G (N

SW) P

ty L

td a

nd m

ust n

ot b

e us

ed w

ithou

t aut

horis

atio

n.

48 C

hand

os S

treet

St.L

eona

rds

NSW

206

5T:

+61

2 9

439

7288

F:

+61

2 9

439

3146

ttw

syd@

ttw.c

om.a

u

THIS

DR

AWIN

G T

O B

E R

EAD

IN C

ON

JUN

CTI

ON

WIT

HAL

L R

ELEV

ANT

NO

TES

ON

DR

AWIN

G N

O. S

001

WAL

SH B

AYAR

TS P

REC

INC

T

As indi

cate

d

27/0

2/20

14 9

:49:

56 A

M

27/02/2014 9:49:56 AM

P.S.

HD

.C

1316

46SK

4

RO

OF

MAR

KIN

G P

LAN

P121

.02.

14IS

SUED

FO

R IN

FOR

MAT

ION

P.S.

HD

.C

P227

.02.

14FI

NAL

DR

AFT

ISSU

EP.

S.H

D.C

P2

PLOTTED BY: P.S.H ON

PREL

IMIN

ARY

RO

OF

MAR

KIN

G P

LAN

SCAL

E 1:

250

Page 7: B Structural Concept Design Report (TTW 2014)

Walsh Bay arts Precinct 153

concept design report

Page 8: B Structural Concept Design Report (TTW 2014)

Walsh Bay arts Precinct 154

concept design report

Page 9: B Structural Concept Design Report (TTW 2014)

Walsh Bay arts Precinct 155

concept design report

Page 10: B Structural Concept Design Report (TTW 2014)

  

 

©JBS&G Australia Pty Ltd | 52304/105953 Rev 1 

Appendix C Historical Aerial Images 

Page 11: B Structural Concept Design Report (TTW 2014)

Source: Base Image - © Department of Lands

A4

Rev0

DescriptionOriginal Issue - Aerials

Drn.LL

Date:26-02-2014

Scale:

Client: ARTS NSWProject: Walsh Bay Preliminary Site AssessmentJob No: 43329 File Name: 43329_1930

© 2014 JBS&G0 50 10025

m

Datum: GDA 1994 MGA Zone 56 - AHD

Legend:Approximate Site Boundary1:2,500 Figure: Walsh Bay - 1930

Page 12: B Structural Concept Design Report (TTW 2014)

Source: Base Image - © Department of Lands

A4

Rev0

DescriptionOriginal Issue - Aerials

Drn.LL

Date:26-02-2014

Scale:

Client: ARTS NSWProject: Walsh Bay Preliminary Site AssessmentJob No: 43329 File Name: 43329_1951

© 2014 JBS&G0 50 10025

m

Datum: GDA 1994 MGA Zone 56 - AHD

Legend:Approximate Site Boundary1:2,500 Figure: Walsh Bay - 1951

Page 13: B Structural Concept Design Report (TTW 2014)

Source: Base Image - © Department of Lands

A4

Rev0

DescriptionOriginal Issue - Aerials

Drn.LL

Date:26-02-2014

Scale:

Client: ARTS NSWProject: Walsh Bay Preliminary Site AssessmentJob No: 43329 File Name: 43329_1961

© 2014 JBS&G0 50 10025

m

Datum: GDA 1994 MGA Zone 56 - AHD

Legend:Approximate Site Boundary1:2,500 Figure: Walsh Bay - 1961

Page 14: B Structural Concept Design Report (TTW 2014)

Source: Base Image - © Department of Lands

A4

Rev0

DescriptionOriginal Issue - Aerials

Drn.LL

Date:26-02-2014

Scale:

Client: ARTS NSWProject: Walsh Bay Preliminary Site AssessmentJob No: 43329 File Name: 43329_1970

© 2014 JBS&G0 50 10025

m

Datum: GDA 1994 MGA Zone 56 - AHD

Legend:Approximate Site Boundary1:2,500 Figure: Walsh Bay - 1970

Page 15: B Structural Concept Design Report (TTW 2014)

Source: Base Image - © Department of Lands

A4

Rev0

DescriptionOriginal Issue - Aerials

Drn.LL

Date:26-02-2014

Scale:

Client: ARTS NSWProject: Walsh Bay Preliminary Site AssessmentJob No: 43329 File Name: 43329_1986

© 2014 JBS&G0 50 10025

m

Datum: GDA 1994 MGA Zone 56 - AHD

Legend:Approximate Site Boundary1:2,500 Figure: Walsh Bay - 1986

Page 16: B Structural Concept Design Report (TTW 2014)

Source: Base Image - © Department of Lands

A4

Rev0

DescriptionOriginal Issue - Aerials

Drn.LL

Date:26-02-2014

Scale:

Client: ARTS NSWProject: Walsh Bay Preliminary Site AssessmentJob No: 43329 File Name: 43329_1999

© 2014 JBS&G0 50 10025

m

Datum: GDA 1994 MGA Zone 56 - AHD

Legend:Approximate Site Boundary1:2,500 Figure: Walsh Bay - 1999

Page 17: B Structural Concept Design Report (TTW 2014)

Source: Base Image - © SIX Maps www.maps.six.nsw.gov.au, Imagery Date: 13/04/2011, Accessed: 26/02/2014

A4

Rev0

DescriptionOriginal Issue - Aerials

Drn.LL

Date:26-02-2014

Scale:

Client: ARTS NSWProject: Walsh Bay Preliminary Site AssessmentJob No: 43329 File Name: 43329_2011

© 2014 JBS&G0 50 10025

m

Datum: GDA 1994 MGA Zone 56 - AHD

Legend:Approximate Site Boundary1:2,500 Figure: Walsh Bay - 2011