AYGÜN ÖZEN · 2020. 12. 10. · Trafo Gücü / The Power Of Transformer : (3*1250) kvA Jeneratör Gücü / The Power Of Generator : (3*1100) kvA Oda Sayısı / The Number Of Room

Feb 10, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • AYGÜN ÖZEN ELEKTRİK MÜHENDİSLİK MÜŞAVİRLİK

    ELECTRICAL / ENGINEERING / CONSULTANCY

  • AYGÜN ÖZEN ELEKTRİK MÜHENDİSLİK MÜŞAVİRLİK ELECTRICAL / ENGINEERING / CONSULTANCY

    www.aygunozen.com

  • 4 5www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    HAKKIMIZDA

    ABOUT US

    Aygün Özen Engineering was established by Electrical Engineer Aygün Özen and Electrical technician Zekeriya Demir in Antalya in 2004. In 2008, the electrical engineer Mustafa Topcu with the participation continues to service. In the early years, The company focused electrical engineering Projects and undertaking. In subsequent years, company widened its interests in consultancy. The company gradually extends its business volume and number of employees.

    The company has started working actively with the implementation of Doktor Tarsa Tarım, in the following years, the firm has continued with undertaking Rezidence,Business centers, University, Factory, Power plants, Medical establishments, Hotels.

    Aygün Özen Electrical Engineering ProjectContracting firms , as well as a partnership with the company in 2008, Antalya Technical Electricity Board ( Atep Board ) was established with the company Aygün Özen and Mehmet Cebeci. ATEP Panel Company was established to meet the needs of Antalya Area. Currently for international projects included in the panel production on an area of 6500 m², 3600 m² closed factory continues to operate in Antalya Organized Industrial Zone.

    As of january 2019 Aygün Özen Engineering has 129 employees.

    Aygün Özen Elektrik Mühendislik Firması, Elektrik Mühendisi Aygün Özen ile Elektrik Teknikeri Zekariya Demir Tarafından 2004 yılında Antalya’ da kurulmuştur. 2008 yılında Elektrik Mühendisi Mustafa Topcu’ nun da katılımıyla hizmete devam etmektedir. İlk yıllarda mühendislik proje ve taahhüt faaliyetlerinde hizmet vermiş olup, takip eden yıllarda ise müşa-virlik alanında da faaliyette bulunmaya başlamıştır. İş hacmini ve çalışan sayısını giderek genişleten şirketimiz Antalya çevresinde ve Türkiye’ de büyük projelere imza atmıştır.

    Aygün Özen Elektrik Mühendislik, çalışma hayatına Doktor Tarsa Tarım Uygulamasıyla başlamış olup, takip eden yıl-larda Konut, İş merkezleri, Üniversite, Fabrika, Elektrik santralleri, Sağlık kurumları, Otel gibi yapıların taahhütüyle devam etmiştir.

    Aygün Özen Elektrik Mühendislik Proje Taahhüt firmasının yanı sıra 2008 yılında bir ortaklık şirketi olan Antalya Teknik Elektrik Pano(Atep Pano) firmasını Aygün Özen ve Mehmet Cebeci ile kurmuştur. Antalya bölgesinin pano ihtiyacını karşılamak için kurulan Atep Pano şu an yurtiçi ve yurtdışı projeleri dahil pano üretimine 6.500 m2 alan üzerinde 3.600 m2 kapalı fabrikasıyla Antalya organize sanayi bölgesinde faaliyetlerine devam etmektedir.

    Aygün Özen Mühendislik, 2019 yılı ocZak ayı itibariyle 129 çalışanıyla iş hayatına devam etmektedir.

  • 6 7www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    neden Aygün öZen ?

    AYGÜN ÖZEN; bünyesinde bulunan uzman teknik kadrosu ile elektrik ve elektronik sistemler konularında proje, mühendislik, müşavirlik ve taahhüt hizmetleri sunmaktadır.

    Kurulduğu günden bu güne güvenilir, deneyimli, güçlü bir teknik partner ve çözüm ortağı olmak ve en ileri tekno-lojiyi kullanarak yatırımcılarının sürekli gelişen ve değişen ihtiyaçları için uygulanabilir çözümler sunmak AYGÜN

    ÖZEN' in temel ilkeleridir. Yatırımcılarımızın istekleri ve beklentileri bizim için belirleyici unsurdur. Bu istekler ve beklentiler doğrultusun-

    da sınırsız müşteri memnuniyetine ulaşmayı amaçlarız. Uzman kadromuz ile müşterilerimizin isteklerine doğru ve katılımcı çözümler sunmaktayız.

    Yatırımcılarımız ile olan ilişkilerimiz, projelerin her aşamasında güvene dayanmaktadır. Geliştird-iğimiz ve önerdiğimiz net çözümlerle ve profes- yonel ekiplerimiz tarafından uygulanan sistemlerle, yatırımcılarımızla olan güven ilişkisini her zaman ön planda tutmaktayız.

    AYGÜN ÖZEN; with an on-site expert technical staff electrical and electronic systems in project, engineering, consulting and contracting services. Since its inception, to this day a reliable, experienced, to be a strong technical partner and solution provider using advanced technology and investors to present workable solutions for the changing needs of a constantly evolving and AYGÜN ÖZEN' s basic principals.

    Demands and expectations of our investors for us, the decisive factor. In line with this request and we aim to reach an unlimited customer satisfaction expectations. With our experlenced staff, we offer the right solutions to our customers.

    Relations with our investors, each phase of the projects is based on trust. We develop and propose clear solutions and systems implemented by our professional team, we reserve the forefront of investors confidence in the relationship at any time. • Honest and Reliable Service, • Experienced Technical Staff, • High Quality, • Advanced Technology,

    Why Aygun Ozen ?

  • 8 9www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    • ElEKTRİK PROJE TASARıM • ElEKTRİK PROJE BÜTçElENDİRME • MÜşAvİRlİK HİZMETlERİ

    PROJE, TAAHHÜT vE MÜşAvİRlİK

    OUR SOLUTIOnS

    ÇÖZÜMLERİMİZ

    • ElECTRıCAl PROJECT DESıGN

    • ElECTRıCAl PROJECT BUDGETıNG

    • CONSUlTıNG SERvıCES

    PROJECTS, COMMıTMENT AND CONSUlTANCY

  • 10 11www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    • Data ve telefon sistemleri • Konvansiyonel ve adresli yangın ihbar sistemleri • Müzik yayın ses ve anons sistemleri • Kamera izleme (CCTv) sistemleri • Hırsız alarm sistemleri • Kartlı giriş ( Acces kontrol) sistemleri • Personel devam kontrol sistemleri • Otopark sistemleri • Uydu yayın, dijital yayın, plazma sistemleri • Konferans salonu seslendirme ve görüntü sistemleri • Hemşire çağrı sistemleri • Görüntülü kapı sistemleri

    Zayıf Akım Weak CurrentLow Voltage

    Alçak Gerilim

    • Özel, genel, dekoratif fiber optik sistem aydınlatmalar • çevre ve cephe aydınlatma sistemleri

    • Yol, otoyol, stadyum aydınlatmaları • Dağıtım hatları şebeke ve UPS priz sistemleri

    • Kablolu ve parapet plastik kanallı taşıma sisteleri • Busbar kanal taşıma sistemleri

    • Ana panolar, tali panolar ve kompanzasyon panoları • Jenaratör - şebeke transfer sistemleri

    • Ana ve tali topraklama sistemleri, temel topraklamaları • Paratoner ve yıldırımdan korunma sistemleri

    • Kesintisiz güç kaynağı (UPS) ve regülasyon sistemleri • İzolasyon güç sistemleri

    • Motor hız kontrol ve kuvvet otomasyonları

    • Private, public, decorative fiber optic lighting system • Environment and facade lighting systems

    • Road, highway, stadium lighting • Distribution lines, mains and UPS socket systems

    • Cable and parapet plastic c hannel transport systems • Busbar transport systems

    • The main panels, sub-panels, boards and compensation, panels • Generator - network transfer systems

    • Primary and secondary grounding systems, the basic groundings

    • lightning protection and lightning protection systems • Uninterruptible power supply (UPS) and regulation

    sytems • ınsulation power systems

    • Engine speed control and force automation

    • Data and telephone systems • Conventional and addressable fire alarm systems • Music broadcast sound and public address systems • Camera surveillance (CCTv) systems • Burglar alarm systems • Card input (Acces control) systems • Employee attendance control systems • Parking systems • Satellite broadcasting, digital broadcasting plasma systems • Conference room audio and video systems • Nurse call systems • video door systems

  • 12 13www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    High VoltageYüksek Gerilim

    • Açık ve Modüler (Kompakt) Orta gerilim trafo ve şalt merkezleri • Enerji nakil hatları

    • Direk tipi trafo merkezleri • Kent, toplu konut, organize sanayi bölgeleri planlama ve dağıtım

    hatları uygulamaları.

    • Open and Modular (Compact) Medium voltage transformer and switching centers

    • Power transmission lines • Pole type transformer substations

    • City, public housing, planing and distribution lines practices organized industrial zones

  • 14 15www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    OTeL ReFeRAnSLARIMIZ HOTeL ReFeRenCeS

  • 16 17www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    Yatırımcı Firma / Investor Company : Ersoy Otelcilik A.ş.

    Yapım Tarihi / Construction Date : 2013 - 2014

    Yapım Süresi / Construction Duration : 7 Ay / 7 Months

    Trafo Gücü / The Power Of Transformer : (4*1250) kvA

    Jeneratör Gücü / The Power Of Generator : (4*1250) kvA

    Oda Sayısı / The Number Of Room : 295

    Yapının Özelliği / Construction Property : 5 Yıldızlı Otel 5 Stars Hotels

    Hizmet Türü / Service Type : AG, OG Taahhüt lv, Mv Commitment

  • 18 19www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    Yatırımcı Firma / Investor Company : Kaya Holding A.ş.

    Yapım Tarihi / Construction Date : 2017 - 2018

    Yapım Süresi / Construction Duration : 18 Ay / 18 Months

    Trafo Gücü / The Power Of Transformer : 1250 kvA+1250 kvA+800 kvA

    Oda Sayısı / The Number Of Room : 400

    Yapının Özelliği / Construction Property : 5 Yıldızlı Otel / 5 Stars Hotels

    Hizmet Türü / Service Type : AG, OG Proje ve Taahhüt / lv, Mv Project and Commitment

  • 20 21www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    Yatırımcı Firma / Investor Company : Fine Otelcilik A.ş.

    Yapım Tarihi / Construction Date : 2013 - 2014

    Yapım Süresi / Construction Duration : 5 Ay / 5 Months

    Oda Sayısı / The Number Of Room : 740

    Yapının Özelliği / Construction Property : 5 Yıldızlı Otel / 5 Stars Hotels

    Hizmet Türü / Service Type : Taahhüt ve Tadilat Commitments and Modifications

  • 22 23www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    Yatırımcı Firma/ Investor Company : Cömertoğlu Otelcilik A.ş.

    Yapım Tarihi / Construction Date : 2011 - 2012

    Yapım Süresi /Construction Duration : 15 Ay / 15 Months

    Trafo Gücü / The Power Of Transformer : (3*1250) kvA

    Jeneratör Gücü / The Power Of Generator : (3*1100) kvA

    Oda Sayısı / The Number Of Room : 780

    Yapının Özelliği / Construction Property : 5 Yıldızlı Otel 5 Stars Hotels

    Hizmet Türü / Service Type : AG, OG Proje ve Taahhüt / lv, Mv Project and Commitment

  • 24 25www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    Yatırımcı Firma/ Investor Company : Cömertoğlu Otelcilik A.ş.

    Yapım Tarihi / Construction Date : 2015 - 2016

    Yapım Süresi /Construction Duration : 12 Ay / 12 Months

    Trafo Gücü / The Power Of Transformer : 2000 kvA+ 2000 kvA

    Jeneratör Gücü / 4* 1100 kvA

    Oda Sayısı / The Number Of Room : 950

    Yapının Özelliği / Construction Property : 5 Yıldızlı Otel 5 Stars Hotels

    Hizmet Türü / Service Type : AG, OG Proje ve Taahhüt / lv, Mv Project and Commitment

  • 26 27www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    Yatırımcı Firma/ Investor Company : şener Gıda İnş. Turizm A.ş.

    Yapım Tarihi / Construction Date : 2018

    Yapım Süresi /Construction Duration : 10 Ay / 10 Months

    Trafo Gücü / The Power Of Transformer : (1*1250) kvA

    Jeneratör Gücü / The Power Of Generator : (2*515) kvA

    Oda Sayısı / The Number Of Room : 150

    Yapının Özelliği / Construction Property : 5 Yıldızlı Otel 5 Stars Hotels

    Hizmet Türü / Service Type : AG, OG Taahhüt / lv, Mv and Commitment

  • 28 29www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    Yatırımcı Firma/ Investor Company : Etit Emiroğlu Turizm A.ş.

    Yapım Tarihi / Construction Date : 2015 - 2016

    Yapım Süresi /Construction Duration : 12 Ay / 12 Months

    Trafo Gücü / The Power Of Transformer : (2*1000) kvA

    Jeneratör Gücü / The Power Of Generator : 3*(630 kvA)

    Oda Sayısı / The Number Of Room : 550

    Yapının Özelliği / Construction Property : 5 Yıldızlı Otel 5 Stars Hotels

    Hizmet Türü / Service Type : AG, OG Proje ve Taahhüt / lv, Mv Project and Commitment

  • 30 31www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    Yatırımcı Firma/ Investor Company : Kayalar Grup

    Yapım Tarihi / Construction Date : 2015 - 2016

    Yapım Süresi /Construction Duration : 6 Ay / 6 Months

    Trafo Gücü / The Power Of Transformer : (2*1000) kvA

    Jeneratör Gücü / The Power Of Generator : (2*1000) kvA

    Oda Sayısı / The Number Of Room : 402

    Yapının Özelliği / Construction Property : 5 Yıldızlı Otel 5 Stars Hotels

    Hizmet Türü / Service Type : AG, OG Proje ve Taahhüt / lv, Mv Project and Commitment

  • 32 33www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    Yatırımcı Firma/ Investor Company : Korcan A.ş.

    Yapım Tarihi / Construction Date : 2013 - 2014

    Yapım Süresi /Construction Duration : 18 Ay / 18 Months

    Trafo Gücü / The Power Of Transformer : (2*1000) kvA

    Jeneratör Gücü / The Power Of Generator : (3*1100) kvA

    Oda Sayısı / The Number Of Room : 210

    Yapının Özelliği / Construction Property : 5 Yıldızlı Otel 5 Stars Hotels

    Hizmet Türü / Service Type : AG, OG Taahhüt / lv, Mv and Commitment

    STEIGENBERGER A I R P O R T H O T E L

  • 34 35www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    Yatırımcı Firma/ Investor Company: Öge Turizm A.ş.

    Yapım Tarihi / Construction Date : 2013 - 2014

    Yapım Süresi /Construction Duration : 9 Ay / 9 Months

    Trafo Gücü / The Power Of Transformer : (3*1250) kvA

    Jeneratör Gücü / The Power Of Generator : (3*1100) kvA

    Oda Sayısı / The Number Of Room : 774

    Yapının Özelliği / Construction Property : 5 Yıldızlı Otel 5 Stars Hotels

    Hizmet Türü / Service Type : AG, OG Taahhüt / lv, Mv Project and Commitment

  • 36 37www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    Yatırımcı Firma/ Investor Company : Güncem Tur. Tic. A.ş.

    Yapım Tarihi / Construction Date : 2016- 2017

    Yapım Süresi /Construction Duration : 6 Ay / 6 Months

    Trafo Gücü / The Power Of Transformer : (3*1250) kvA (OSB)

    Jeneratör Gücü / The Power Of Generator : (3*1100) kvA (OSB)Oda Sayısı / The Number Of Room : 30

    Yapının Özelliği / Construction Property : 5 Yıldızlı Otel 5 Stars Hotels

    Hizmet Türü / Service Type : AG, OG Taahhüt / lv, Mv Project and Commitment

  • 38 39www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    Yatırımcı Firma/ Investor Company: Ceylan İşler-meleri A.ş.

    Yapım Tarihi / Construction Date : 2013 - 2014

    Yapım Süresi /Construction Duration : 7 Ay / 7 Months

    Trafo Gücü / The Power Of Transformer : (1600+630) kvA

    Jeneratör Gücü / The Power Of Generator : (800+800+550) kvA

    Oda Sayısı / The Number Of Room : 406

    Yapının Özelliği / Construction Property : Tatil Köyü / Resort

    Hizmet Türü / Service Type : AG, OG, TadilatTaahhüt / lv, Mv, Modification Commitment

    Yatırımcı Firma/ Investor Company: Ceylan İşler-meleri A.ş.

    Yapım Tarihi / Construction Date : 2013 - 2014

    Yapım Süresi /Construction Duration : 8 Ay / 8 Months

    Trafo Gücü / The Power Of Transformer : (1600+630) kvA

    Jeneratör Gücü / The Power Of Generator : (1600+630) kvA

    Oda Sayısı / The Number Of Room : 515

    Yapının Özelliği / Construction Property : Tatil Köyü / Resort

    Hizmet Türü / Service Type : AG, OG Taahhüt / lv, Mv Commitment

  • 40 41www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    Yatırımcı Firma/ Investor Company: Ceylan İşler-meleri A.ş.

    Yapım Tarihi / Construction Date : 2010 - 2011

    Yapım Süresi /Construction Duration : 8 Ay / 8 Months

    Trafo Gücü / The Power Of Transformer : (2*1100) + 800 kvA

    Jeneratör Gücü / The Power Of Generator : (2*900) + 650 kvA

    Oda Sayısı / The Number Of Room : 304

    Yapının Özelliği / Construction Property : 5 Yıldızlı Otel / 5 Stars Hotels

    Hizmet Türü / Service Type : AG, OG Taahhüt / lv, Mv and Commitment

    Yatırımcı Firma/ Investor Company: Sahil M. İnşaat A.ş.

    Yapım Tarihi / Construction Date : 2013

    Yapım Süresi /Construction Duration : 7 Ay / 7 Months

    Oda Sayısı / The Number Of Room : 300

    Yapının Özelliği / Construction Property : 5 Yıldızlı Otel / 5 Stars Hotels

    Hizmet Türü / Service Type : AG Proje ve Taahhüt / lv, Project and Commitment

  • 42 43www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    Yatırımcı Firma/ Investor Company: Cömertoğlu Otelcilik A.ş.

    Yapım Tarihi / Construction Date : 2013- 2014

    Yapım Süresi /Construction Duration : 14 Ay / 14 Months

    Trafo Gücü / The Power Of Transformer : (2*1250)

    Jeneratör Gücü / The Power Of Generator : (2*1100) kvA

    Oda Sayısı / The Number Of Room : 445

    Yapının Özelliği / Construction Property : 5 Yıldızlı Otel / 5 Stars Hotels

    Hizmet Türü / Service Type : AG, OG Proje / lv, Mv Project

    Yatırımcı Firma/ Investor Company: SBA BAş Tur-izm A.ş

    Yapım Tarihi / Construction Date : 2008 - 2009

    Yapım Süresi /Construction Duration : 1 Yıl / 1 Years

    Trafo Gücü / The Power Of Transformer : (2*1250)kvA

    Jeneratör Gücü / The Power Of Generator : (4*550) kvA

    Oda Sayısı / The Number Of Room : 650

    Yapının Özelliği / Construction Property : 5 Yıldızlı Otel / 5 Stars Hotels

    Hizmet Türü / Service Type : AG Proje ve Taahhüt / lv Project and Commitment

  • 44 45www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    Yatırımcı Firma/ Investor Company: Reges TurizmA.ş.

    Yapım Tarihi / Construction Date : 2018

    Yapım Süresi /Construction Duration : 18 Ay / 18 Months

    Oda Sayısı / The Number Of Room : 100

    Yapının Özelliği / Construction Property : 5 Yıldızlı Otel / 5 Stars Hotels

    Hizmet Türü / Service Type : AG, OG Proje ve Taahhüt / lv, Mv Project and Commitment

    Yatırımcı Firma/ Investor Company: Bultur A.ş.

    Yapım Tarihi / Construction Date : 2012-2013

    Yapım Süresi /Construction Duration : 11 Ay / 11 Months

    Oda Sayısı / The Number Of Room : 350

    Yapının Özelliği / Construction Property : 5 Yıldızlı Otel / 5 Stars Hotels

    Hizmet Türü / Service Type : AG, OG Proje ve Taahhüt / lv, Mv Project and Commit-ment

    REGES ÇEŞME HOTEL

  • 46 47www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    DİĞER OTEL REFERANSLARIMIZ

    OTHeR HOTeLS ReFeRenCeS• CROWN HOTELS SERENITY

    • SENSIMAR HOTELS & RESORT

    • DEFNE HOTELS

    • SIAM ELEGANCE HOTELS & SPA

    • NEILSON BEACH CLUP HOTEL

    • SIDE CROWN RELAX HOTEL

    • RUI KAYA BELEK HOTEL

    • BEST WESTERN KHAN

    • RAMADA LARA FAMILY RESORT HOTEL

    • ŞAH INN PARADISE TATİL KÖYÜ

    • DELPHİNE DELUXE FAMILY HOTEL

    • KENTIA APART HOTEL

    • BAŞARAN BUSINESS HOTEL

    • SİDE CROWN OTEL CHARM

    • ROBINSON CLUP MASMAVİ

    • ASKA RIVER SUITE HOTEL

    • THE LAND OF LEGENDS ( PROJE )

  • 48 49www.aygunozen.com

    HYDROElECTRıC POWER PlANT MEDıUM vOlTAGE vPOWER CENTERS Mv SOlAR POWER PlANTS AND PlANT POWER TRANSMıSSıON lıNES

    ENERJİ TESİSLERİ GÜNEŞ ENERJİ SANTRALLERİ

    Referanslarımız Referanslarımız

    References References

    POWER PLANTS SOLAR POWER PLANTS

    HİDROElEKTRİK SANTRAlİ ORTA GERİlİM GÜç MERKEZlERİ GÜNEş ENERJİ SANTRAllERİ OG TESİSİ vE ENERJİ NAKİl HATlARı

    • GÜNAYŞE HES 2009 • MURSAL HES 2009

    • FIRTINA HES 2010

    • ADO ENERJİ TOÇAK HES 2010 • ADO ENERJİ KARACAÖREN-1 HES 2012

    • ADO ENERJİ KARACAÖREN-2 HES 2012

    • ADO ENERJİ KARACAÖREN- 3 HES 2012

    • ADO ENERJİ KARACAÖREN- 4 HES 2012

    •AYTUN GES ENH 2016

    • HNT KOÇTEFE GES ENH 2017

    • FİOTEK GÖNEN GES ENH 2017

    • ABALIOĞLU ÇELTİKÇİ ENH 2018

    • AOSB OG ALT YAPI İŞLERİ 2016

    • ADO ENERJİ ENH 2013

    • DARIVEREN HES 2013

    • YURT ENERJİ HES 2011

    • YEDEK GÜç MERKEZlERİ • METAl - ClOSED vE METAl ENClOSED HÜCRElER • RMU HÜCRElER • MONO BlOK BETON KÖşKlER • KABlO TAşıMA SİSTEMlERİ • ENEJİ NAKİl HATTı GİBİ

    İş KAlEMlERİNİN TAAHHÜT, SAHA HİZMETlERİ, TEST vE DEvREYE AlıNMASı.

    • OTO PRODÜKTÖR HÜCRE • ORTA GERılıM TRAFO TESıSlERı • ENERJı ılETıM HATlARı • TRAFO BAKıMı • ışlETME SORUMlUlUğU

    İş KAlEMlERİNİN TAAHHÜT, SAHA HİZMETlERİ, TEST vE DEvREYE AlıNMASı.

    • AUTO PROCESSOR CEll • MEDıUM vOlTAGE TRANSFORMER FACılıTıES • ENERGY TRANSMıSSıON lıNES • TRANSFORMER MAıNTENANCE • BUSıNESS RESPONSıBılıTY

    JOB OF CONTRACTıNG, FıElD SER vıCES TESTıNG AND COMMıSSıONıNG.

    • AUxılıARY POWER CENTERS • METAl-ClOSED AND METAl EN ClOSED CEllES • RMU CEllS • MONO BlOCK CONCRETE PAvılıONS • CABlE SUPPORT SYSTEMS • ENERGY TRANSMıSSıON lıNE, AS JOB OF CONTRACTıNG, FıElD SER vıCES TESTıNG AND COMMıSSıONıNG.

  • 50 51www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    ENDÜSTRİYEL TESİS REFERANSLARIMIZ InDUSTRIAL PLAnT ReFeRenCeS

    • FORAKS PREFABRİK

    • ESLİ ENDÜSTRİYEL

    • BAHAR TAVUKÇULUK

    • AGT

    • ÇAĞLAR PLASTİK A.Ş.

    • ADOPEN PLASTİK SANAYİ A.Ş.

    • YÖRÜKOĞLU A.Ş.

    • DR TARSA A.Ş

    • DK TEKSTİL

    • ATAÇ İNŞAAT A.Ş.

    • DSİ TAHİR OVA SULAMA A.Ş.

    • ANTEKS TEKSTİL A.Ş.

    • ACCADO A.Ş.

    • FASDAT GIDA

    • ANTCAM A.Ş.

    • BOTANIK ÇAMAŞIRHANE

    • YOLMAK. MAKİNA

  • 52 53www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    EĞİTİM KURUMLARI REFERANSLARIMIZ eDUCATIOnAL InSTITUTIOnS ReFeRenCeS

  • 54 55www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    Yatırımcı Firma/ Investor Company : Esay Otomtiv

    Yapım Tarihi / Construction Date : 2015-2016

    Yapım Süresi /Construction Duration : 8 ay / 8 Months

    Trafo Gücü / The Power Of Transformer : 1000 kvA

    Jeneratör Gücü / The Power Of Generator : 1000 kvA

    Yapının Özelliği / Construction Property : Eğitim Kurumu / Educational ınstitutions

    Hizmet Türü / Service Type : AG, OG Proje ve Taahhüt / lv, Mv Project and Commit-ment

    FİNAL OKULLARI ANTALYA FıNAl SCHOOl ANTAlYA

  • 56 57www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    •AYşE şAHİN EğİTİM KURUMlARı (AOSB MESlEK lİSESİ ) 2017

    • YEDİTEPE İSTEK vAKFı lARA KAMPÜSÜ 2009 • BERAT CÖMERTOğlU İlKÖğRETİM OKUlU 2012

    • BERAT CÖMERTOğlU PRıMARY SCHOOl2012

    • KARAMANlı İlKÖğRETİM OKUlU 2011

    • ERGÜN ERÜNAl SOSYAl BİlİMlER lİSESİ 2008

    • A. ÜNİvERSİTESİ DEMRE MYO 2018

    • UlUSlARARASı ANTAlYA BİlİM ÜNİvERSİTESİ 2011-2012

    • YEDİTEPE İSTEK vAKFı MANAvGAT KAMPÜSÜ2015

    DİĞER EĞİTİM KURUMLARI REFERANSLARIMIZ EDUCATıONAl ıNSTıTUTONS REFERENCES

  • 58 59www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    BÖLGESEL İŞ YERLERİ OFİSLER & SAĞLIK KURUMLARI ReFeRAnSLARIMIZ

    REGıONAl WORK PlACES OFFıCES & HEAlTH ıNSTıTUTıONS REFERENCES

    • ANTALYA ORGANİZE SANAYİ BÖLGE MÜDÜRLÜĞÜ VE ÇARŞISI

    • EHA PARK SİTESİ

    • GATEWAY VİZE OFİSLERİ ( Ankara, İstanbul, Antalya)

    •TOYOTA SHOWROOM & SERVİS ESAY OTO

    • HONDA SHOWROOM & SERVİS ESAY OTO

    • VOLKSVAGEN SHOWROOM & SERVİS ALVİN OTO

    • YILDIZLI OTOMOTİV SHOWROOM & SERVİS

    • PEUGEOT SHOWROOM & SERVİS ESAY OTO

    • ÇINAR HALICILIK A.Ş. SHOWROOM

    • HADRİAN KUYUMCULUK SHOWROOM

    • HADRİAN & CERES SHOWROOM

    • ANTALYA BÜYÜKŞEHİR BELEDİYESİ ( Atatürk Parkı Antalya Led Armatür Dönüşümleri / Güneş Panelleri )

    • ANTALYA MARKET İŞLETMECİLİĞİ ALTA MARKETLER ( Lara, Bülent Ecevit, Perge Bulvarı, Sanayi, Memurevleri, Uncalı Marketleri )

    • 1E1 MARKETLER ( Genel Müdürlük ofisleri, Etiler, Karatay, Konyaaltı Marketleri ) • ANAMUR ÖZEL ANAMED HASTANESİ

  • 60 61www.aygunozen.com

    AYGÜN ÖZENELEKTRİK / MÜHENDİSLİK / MÜŞAVİRLİK

    • VİKİNGEN INFINITY SPA & RESORT HOTEL 2012

    • RAMADA LARA FAMILY RESORT HOTEL 2012

    • ORANGE PALACE SPA & RESORT HOTEL 2013

    • DREAM WORLD SPA & RESORT HOTEL 2013

    • MARDAN PALACE SPA COMPLEKS 2007

    YURT DIŞI REFERANSLARIMIZ MÜŞAVİRLİK REFERANSLARIMIZ ıNTERNATıONAl REFERENCES CONSUlTıNG REFERENCES

    • GUYANA CASINO ( PAŞA GLOBAL, GÜNEY AMERİKA) 2016

    • GATEWAY VIZE OFİSLERİ ( BAĞDAT) 2016

    • DUBAİ BAB AL BAHR HOTEL 2012 Proje / Project

    • KAZAGİSTAN HADİŞAH HOTEL 2013 Proje / Project

    • DAVOS FULUELA HOTEL 2013 Proje / Project

  • 62www.aygunozen.com

    AYGÜN ÖZEN ELEKTRİK MÜHENDİSLİK MÜŞAVİRLİK ELECTRICAL / ENGINEERING / CONSULTANCY

    www.aygunozen.com

  • AYGÜN ÖZEN ELEKTRİK MÜHENDİSLİK MÜŞAVİRLİK

    MERKEZ: Meydan Kavağı Mh. Avni Tolunay Cad. Abdullah Yıldırım Sitesi B blok Kat: 1 Daire: 3 şUBE: Demircikara Mah. A. Tolunay Cad. Yıldız Apt. No: 24/A ANTAlYA/ TÜRKİYE Tel: 0.242 311 62 59 Fax: 0.242.321 14 53 [email protected] www.aygunozen.com

    ELECTRICAL / ENGINEERING / CONSULTANCY