AWSD Waterline and Rio Grande Directional Drill Crossing Client AWSD Scope of Work Water, Grants/Funding, Construction Observation/Administration AWSD sought Molzen Corbin’s assistance with providing potable water for an area of Dona Ana County that was being served by both an aging, inadequate water system and wells that had gone dry. Many residents had resorted to hauling potable water to their homes. The challenge in bringing water to this area of the county was crossing the Rio Grande River. The Molzen Corbin team installed nearly 2.5 miles of PVC waterline for this project. To cross under the river, the team employed a horizontal directional drill of approximately 895 linear feet of fusible PVC waterline. Ultimately, the water service was extended to Gadsden High School and 30 residential customers, including five hydrants and connections for future growth. Completion 2019 Size 2.5 Miles of Water Lines 895 LF Horizontal Directional Drill Cost $892,689
1

AWSD Waterline and Rio Grande Directional Drill Crossing

Nov 19, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: AWSD Waterline and Rio Grande Directional Drill Crossing

AWSD Waterline and Rio Grande Directional Drill Crossing

ClientAWSD

Scope of WorkWater, Grants/Funding, Construction Observation/Administration

AWSD sought Molzen Corbin’s assistance with providing potable water for an area of Dona Ana County

that was being served by both an aging, inadequate water system and wells that had gone dry. Many

residents had resorted to hauling potable water to their homes. The challenge in bringing water to

this area of the county was crossing the Rio Grande River. The Molzen Corbin team installed nearly

2.5 miles of PVC waterline for this project. To cross under the river, the team employed a horizontal

directional drill of approximately 895 linear feet of fusible PVC waterline. Ultimately, the water service

was extended to Gadsden High School and 30 residential customers, including five hydrants and

connections for future growth.

Completion2019

Size2.5 Miles of Water Lines895 LF Horizontal Directional Drill

Cost$892,689