PLM… What does it “Do”?
Program Management• Project Management• Project Costing• New Product Introduction• Tasks• Requirements
Engineering• Items and BOMs• Change Request• Change Orders• Material Specifications• Design Review
Supply & Procurement• Suppliers• RFQ• RFQ Projects• Warranty Recovery
Quality• Inspections• Non Conformances• Corrective / Preventative Actions• Audits• Procedures, Guidelines, & Specs• Document Change Order
Operations• Accident Reports• Calibration• Equipment Maintenance
Sales & Marketing• Customers• Sales Quotes• Marketing Assets
Service & Support• Service Request• Return Merchandise Authorization
© 2012 Autodesk
You are “doing” PLM Today. So how is this different?
You are “doing” PLM Today.
© 2012 Autodesk
Instant PLM
Cloud-based, zero deployment
Accessible on any device
Up and running in minutes, not months
© 2012 Autodesk
The First Tour
© 2012 Autodesk
The Deep Dive
© 2012 Autodesk
PLM360 Architecture
Datacenter Infrastructure
Hardware Infrastructure
Software Infrastructure
PLM360 Web Application
Customer Tenants
© 2012 Autodesk
Tenant Architecture (customer.autodeskplm360.net)
Security (Users/Groups/Roles)
Services (API/Scripting/Reporting)
Workspaces
PLM360
© 2012 Autodesk
Workspace Architecture (Customer Workspace)
Configuration
Items
CUSTOMERTENANT
Item 1 – CIM-0001Item 2 – CIM-0002 - - -
Behaviors
© 2012 Autodesk
Workspace – Workflow
© 2012 Autodesk
Apps Overview
CUSTOMERTENANT
Workspace A Workspace B Workspace C
© 2012 Autodesk
Apps Overview
CUSTOMERTENANT
© 2012 Autodesk
New Product IntroductionPowered by Autodesk PLM 360
New
Pro
duct
Intr
oduc
tion
Project Management
Task Management
Project Costing
© 2012 Autodesk
Quality ManagementPowered by Autodesk PLM 360
Qua
lity
Man
agem
ent
Inspections
Non-Conformances
Corrective / Preventive Action
Inspection TypeInspected Item
Supplier
Description of Problem
Total Impact of NC
© 2012 Autodesk
Adopt Different Apps as Required
© 2012 Autodesk
Apps are Products Powered by PLM 360
PLM 360 App Guides Wiki Help for End Users & Administrators
© 2012 Autodesk
Out of the cloud solutions that customers are utilizing today.
PLM 360 Workflows & Processes
NPI Engineering Asset Management Quality
© 2012 Autodesk
Quality Management
InspectionsNon-Conformances
Corrective/Preventative Actions
© 2012 Autodesk
Quality Management Concept Map
© 2012 Autodesk
Inspections
Define an Inspection record to capture all relevant information
Captures the actions and results of the inspection
Links directly to the Item, and the supplier
Links spawn a Non-Conformance automatically is needed
MFG & ProductionQuality Management Asset Management NPI
© 2012 Autodesk
Non-Conformance
Determine the disposition based on inspection results
Captures the information of the Item, the Inspection and allows teams to collaborate on the next steps
Automatically spawns a Corrective Action
MFG & ProductionQuality Management Asset Management NPI
© 2012 Autodesk
Corrective and Preventative Actions
Defines the problem, possible causes and Action taken Can be spawned from a Non Conformance Can automatically spawn a Change Request for Engineering
MFG & ProductionQuality Management Asset Management NPI
© 2012 Autodesk
Asset & Equipment Management
Integrate Process, Equipment & Facility design Manage Assets & Facilities
Track & manage initiatives, programs & projects
© 2012 Autodesk
Manufacturing Asset Management Concept Map
© 2012 Autodesk
Reconcile design information from process, equipment & facility and commission into a single view
R&D, Engineering & Manufacturing can collaborate more closely than ever before
Track issues & drive resolution, before they become problems on site
Integrated with leading CAD data management
Integrate Process, Equipment & Facilities
MFG & ProductionQuality Management Asset Management NPI
© 2012 Autodesk
Manage Assets & Facilities
Define & specify operational requirements, procedures, calibration & maintenance
Track & manage corrective, scheduled & preventative maintenance
Track and maintain suppliers and parts lists… “As delivered”, “As maintained” and “As used”
MFG & ProductionQuality Management Asset Management NPI
© 2012 Autodesk
Program / Project Management
Stage Gate NPI ProcessManage & Track Efforts & Resource
Provide Visibility
© 2012 Autodesk
Program / Project Management Concept Map
© 2012 Autodesk
Drive Consensus & Manage Decisions
Create & share business plans everyone can follow to drive success across all key program phases
Record assumptions, justifications, plans, requirements, issues & stakeholders
Clearly drive commitment &
execution
MFG & ProductionQuality Management Asset Management NPI
© 2012 Autodesk
Define programs & projects as a team to track against milestones
Assign teams, tasks, owners, deadlines, and track status, costs, completion, and more
Project & program information instantly updated with task execution, when it happens, as it happens.
Manage & Track Resource & Effort
Programs
Projects
Tasks
MFG & ProductionQuality Management Asset Management NPI
© 2012 Autodesk
Easily build and share reports, graphs, dashboards that present the information you need, when you need it.
Provide a real time view into progress
Easily manipulate information & reports to gain the insight you need
Highlight & track key focus areas
Provide Visibility
MFG & ProductionQuality Management Asset Management NPI
© 2012 Autodesk
Engineering Process Management
Item and BOM ManagementChange RequestChange OrdersDesign Review
© 2012 Autodesk
Engineering Management Concept Map
© 2012 Autodesk
Item and BOM Management
Dramatically increase BOM accuracy through clear and concise data entry and relationship mapping
Easily assign item attributes using drag-and drop configuration and pick list classifications
Quickly build efficient item records and relationships using industry-standard templates
MFG & Production Quality Management Asset Management NPI
© 2012 Autodesk
Change Request
Ensure accuracy by cross-linking key information (e.g. cost) to the actual item source data
Quickly reveal the magnitude of a change by using tables that compute fields automatically
Reduce delay with workflows that directly assign stages and due dates to those responsible
MFG & Production Quality Management Asset Management NPI
© 2012 Autodesk
Change Orders
Quickly discover and assess the impact of changes by reviewing a tabulated list of affected items
Reduce delay with workflows that directly assign stages and due dates to those responsible
Learn the complete change history by reviewing the change owner, summary and log
MFG & Production Quality Management Asset Management NPI
© 2012 Autodesk
Design Review
Stay flexible with ad hoc or regular reviews based on multiple review schedule configurations
Accurately record review outcomes according to benchmarks configured and agreed beforehand
Resolve issues faster by automatically notifying owners of key tasks and due dates via email
MFG & Production Quality Management Asset Management NPI
© 2012 Autodesk
Customer Success
Cloud-based, zero deployment
Accessible on any device
Up and running in minutes, not months
© 2012 Autodesk
Q&A
Cloud-based, zero deployment
Accessible on any device
Up and running in minutes, not months
© 2012 Autodesk
The next generation, cloud based alternative