AUSTRANS The SMART People Mover – for Today Piers Brogan Commercialisation Manager Bishop Austrans Pty Ltd
Mar 31, 2015
AUSTRANSAUSTRANSThe SMART People Mover – for TodayThe SMART People Mover – for Today
Piers BroganCommercialisation Manager
Bishop Austrans Pty Ltd
PRESENTATION OVERVIEW
Introduction to Austrans
Benefits of Austrans
Case Study One – Brisbane Airport
Case Study Two – Gold Coast CBD
Case Study Three – Parramatta -
Strathfield
Call to Action
The SMART People MoverThe SMART People Mover
VALUE FOR MONEY
The SMART People MoverThe SMART People Mover
Capital Costs Light, small vehicles Narrow corridor Small stations
Operating Costs No crew Minimal energy
Financial Outcomes No operating subsidies Capital cost contribution
Gross Mass 532t 53t
Gross Mass 4t 16t
Gross Mass/Axle 2t 8t
Gross Mass/Axle 16t 9t
IMPROVED PASSENGER BENEFITS
The SMART People MoverThe SMART People Mover
Frequent Services
No Timetables
Comfortable, Fast, Convenient
Simple and Transparent Operation
Adaptable Feeder /Distributor Line haul
Network
ENVIRONMENTALLY FRIENDLY
The SMART People MoverThe SMART People Mover
Environmentally
Sustainable Emission Free Energy Miser Greenhouse friendly Minimal Visual Intrusion
and Severence Fits Urban Fabric
COMPETITIVE ADVANTAGES
Less Passengers per Vehicle
Greater Frequency of Vehicles
Shorter Wait Times
Lower Mass and Smaller Dimensions
Lower Guideway Costs
Lower Operating and Energy Costs
Tighter Corners and Steeper Grades
Expandability and Modularity
The SMART People MoverThe SMART People Mover
POSSIBLE SYDNEY APPLICATIONS
The SMART People MoverThe SMART People Mover
POSSIBLE EXTENSIONS
The SMART People MoverThe SMART People Mover
To Cronulla & Sunderland
To Mona Vale
To Bringelly
Toombul Rail Station
ShopCommercial
International Terminal
Domestic Terminal
Case Study 1 - BRISBANE AIRPORT
The SMART People MoverThe SMART People Mover
AL
IGN
ME
NT
8.2 km
Case Study 1 - BRISBANE AIRPORT
The SMART People MoverThe SMART People MoverPE
AK
OP
ER
AT
ION
S 9 Seated (+9 standing)
31 Vehicles
All Stop Operation, On Line Stations
30 secs Minimum Headway
2168/hr Passengers
8 mins Travel, 30 secs Wait
Speed 56 kph av., 70 kph max.
21 secs av. Station Dwell
Case Study 1 - BRISBANE AIRPORT
The SMART People MoverThe SMART People Mover
FIN
AN
CIA
LS
Capital Cost Retrofit - 44% Heavy Rail
Operating Cost $0.80 per trip - 67% of Heavy Rail
NPV of Costs 35% of Heavy Rail
Revenue $5.00 av. per trip
Outcomes $4.20 per trip - Operating Profit Pays off Capital - 10 years Positive NPV
Capital Cost Retrofit - 44% Heavy Rail
Operating Cost $0.80 per trip - 67% of Heavy Rail
NPV of Costs 35% of Heavy Rail
Revenue $5.00 av. per trip
Outcomes $4.20 per trip - Operating Profit Pays off Capital - 10 years Positive NPV
Case Study 1 - BRISBANE AIRPORT
The SMART People MoverThe SMART People Mover
AD
VA
NT
AG
ES
Value for Money More profitable than Heavy Rail
Less risk to Government of project failure
Passenger Benefits Higher Frequency
No Waiting
No Timetables
Better Inter-terminal Link
Environmentally friendly
Enhance the Airport’s image
Case Study 1 - BRISBANE AIRPORT
The SMART People MoverThe SMART People Mover
OP
TIO
NS
System Increase Vehicles Intermediate Turnarounds Off Line Stations Reduce Headways Increase Max Speed Linked Vehicles All Passengers Seated/Belted
Network Loop around Commercial Centre Link to CBD Connect Future Terminals Links to Airport Workforce Nodes
Southport
Paradise Waters
Surfers N
Surfers S
Cascade Gardens
Pacfic Fair
Broadbeach
AL
IGN
ME
NT
Case Study 2 – GOLD COAST CBD
7.7 km
The SMART People Mover
The SMART People Mover
Case Study 2 – GOLD COAST CBD
The SMART People MoverThe SMART People MoverPE
AK
OP
ER
AT
ION
S 9 Seated (+9 standing)
32 Vehicles
All Stop Operation
30 secs Minimum Headway
4650/hr Passengers
6 mins Travel, 1.1 mins av. Wait
Speed 50 kph av., 70 kph max.
25 secs av. Station Dwell Time
Case Study 2 – GOLD COAST CBD
The SMART People MoverThe SMART People Mover
FIN
AN
CIA
LS
Capital Cost 62% of Light Rail
Operating Cost $0.35 per trip - 83% of Light Rail
NPV of Costs 50% of Light Rail
Revenue $1.85 av. per trip
Outcomes $1.50 per trip - Operating Profit Pays off Capital - 10 years Positive NPV
Capital Cost 62% of Light Rail
Operating Cost $0.35 per trip - 83% of Light Rail
NPV of Costs 50% of Light Rail
Revenue $1.85 av. per trip
Outcomes $1.50 per trip - Operating Profit Pays off Capital - 10 years Positive NPV
Case Study 2 – GOLD COAST CBD
The SMART People MoverThe SMART People Mover
AD
VA
NT
AG
ES
Value for Money More profitable than Light Rail Private finance option
Passenger Benefits Higher frequency No effective waiting No need for timetable
Environmentally friendly Low greenhouse emmissions Reduced road congestion Reduced road accidents
Enhance the City’s image
Case Study 2 – GOLD COAST CBD O
PT
ION
SSystem Increase Vehicle Numbers Intermediate Turnarounds Off Line Stations Reduce Headways Increase Speeds Linked Vehicles All Passengers Seated/Belted
Network Links to Heavy Rail
Robina (Sth), Nerang (Cntr), Helensvale (Nth) Feeder Loops to Suburbs
The SMART People MoverThe SMART People Mover
AL
IGN
ME
NT
Case Study 3 – PARRAMATTA STRATHFIELD
The SMART People MoverThe SMART People Mover
Parramatta Rail Station
Strathfield
Paramatta East
Camellia Rail Station
Silverwater
Newington
Olympic Plaza
Aquatic Centre
Tennis CentreHomebush
Underwood Rd11.3 km
The SMART People MoverThe SMART People MoverPE
AK
OP
ER
AT
ION
S 9 Seated (+9 standing) 55 Vehicles On Line Stations Conditional all Stop Operation 30 secs Minimum Headway 5000/hr Passengers 45 secs av. Wait 8 mins Travel 60 kph max. speed
Case Study 3 – PARRAMATTA STRATHFIELD
The SMART People MoverThe SMART People Mover
FIN
AN
CIA
LS
Capital Cost 90% of Busway option
Operating Cost $0.70 per passenger - 70% of Busway option
NPV of Costs 55% of Busway option
Revenue $2.05 av. per trip
Outcomes $1.35 per trip - Operating Profit Break even - 40 years
Capital Cost 90% of Busway option
Operating Cost $0.70 per passenger - 70% of Busway option
NPV of Costs 55% of Busway option
Revenue $2.05 av. per trip
Outcomes $1.35 per trip - Operating Profit Break even - 40 years
Case Study 3 – PARRAMATTA STRATHFIELD
The SMART People MoverThe SMART People Mover
AD
VA
NT
AG
ES
Value for Money Less expensive than transitway Better return from the fare box
Passenger Benefits Higher frequency No effective waiting No need for timetable Supplements bus/rail services to Olympic Park
Environmentally friendly Reduced surface congestion
Enhance image Parramatta & Olympic Park
Case Study 3 – PARRAMATTA STRATHFIELD
The SMART People MoverThe SMART People Mover
SY
ST
EM
OP
TIO
NS
Increase vehicle numbers Intermediate turnarounds Reduce headways Off line stations Increase speeds Linked Vehicles All Passengers Seated/Belted
Case Study 3 – PARRAMATTA STRATHFIELD
NE
TW
OR
K O
PT
ION
SCase Study 3 – PARRAMATTA STRATHFIELD
Strathfield
E Parramatta
Carlingford Court
Carlingford Rail Station
Telopea Rail Station
Dundas Rail Station
Rydalmere Rail Station
Westmead Hosptial
EppingMacquarie
Centre
Epping Rail Station
Parramatta Rail Station
To Burwood
Silverwater
Newington
Olympic PlazaAquatic Centre
Tennis Centre Homebush
Underwood
Camellia Rail Station
To Concord West Rail Station
The SMART People MoverThe SMART People Mover
SUMMARY
Transport Solutions Value for Money Passenger Attractive Environmentally Sustainable and
Greenhouse Friendly
First Commercial System in 2008
Transport Solutions Value for Money Passenger Attractive Environmentally Sustainable and
Greenhouse Friendly
First Commercial System in 2008
The SMART People Mover - for Today
The SMART People Mover - for Today
Call to Action
Concept now proven
Future Developments Application Specific
What we want from you:
Champion an Application
Claims Verified
Commission Feasibility Study
Application Specific Collaborators
The SMART People MoverThe SMART People Mover
6 min video attached over this page