Gold in Brazil Contact : Lars Pearl, CEO and Director C/- Coresco AG Level 3 Gotthardstrasse 20 6300 Zug Switzerland +41 41 711 02 81 www.aurora-gold.com 1
Jul 10, 2015
Gold in Brazil
Contact : Lars Pearl, CEO and Director
C/- Coresco AGLevel 3Gotthardstrasse 206300 ZugSwitzerland+41 41 711 02 81
www.aurora-gold.com
1
Disclaimer
The statements made in this presentation which are not historical factscontain certain forward-looking statements concerning potentialdevelopments affecting the business, prospects, financial condition andother aspects of the company to which this presentation pertains. The actualresults of the specific items described in this presentation, and thecompany’s operations generally, may differ materially from what is projectedin such forward-looking statements. Although such statements are basedupon the best judgments of management of the company as of the date ofthis presentation, significant deviations in magnitude, timing and otherfactors may result from business risks and uncertainties including, withoutlimitation, the company’s dependence on third parties, general market andeconomic conditions, technical factors, the availability of outside capital,receipt of revenues and other factors, many of which are beyond the controlof the company.
Such risks and uncertainties are described in periodic filings made by AuroraGold Corporation with United States and Canadian Securities regulators andauthorities. The company disclaims any obligation to update informationcontained in any forward-looking statement.
2
Brazil – project Location map
Brazil, Para State
Tapajós River Basin, a tributary of the Amazon
240 km from Itaituba, the regional centre
110 km from Novo Progresso city
70 km from BR163 federal highway
Trans Garimpeiros improved unsealed road
3
Management
Lars Pearl – President, Executive Director & CEO Geologist with extensive experience in mining and exploration around the world.
Vladimir Bernstein – Executive Director Has been project director in various Alltech’s projects for Oil & Gas exploration in West
Siberia, Sakhalin Island and Kamchatka and Gold exploration in Kyrgyzstan
Augustin Gomez de Segura – Non Executive Director Extensive scientific experience, training and education with over 30 years working and
advising in the mining industry.
Andrey Ratsko – Non Executive Director Successfully explored and produced alluvial gold in West Africa, currently is also chief
geologist with TK Geo Resource based out of Bishkek, in Kyrgyzstan.
Gorden Glenn, B.Sc. – Non Executive Director Corporate director and senior mining executive with over 25 years of experience in
mining sector
4
Corporate
Trading on OTC-BB : ARXG
Frankfurt : WKN 904846
Shares issued : 50,000,000: 55,000,000 fully diluted
Market cap : US$2.5 million
Auditors:Peterson Sullivan LLP
601 Union Street, Suite 2300Seattle, Washington,USA,98101Telephone: +1 206 382 7777Fax: +1 206 382 7700http://www.pscpa.com/
Legal representation:Joseph Sierchio, Esq.
Sierchio & Company, LLP450 Park Avenue, Suite702New York, New York 10022Tel. : +1 (212) 246-3030Fax.: +1 (212) 486-0208
5
Regional Infrastructure
Over 16,500 hectares in the
Tapajos gold Province,
Para State, Brazil.
250 km from Itaituba office.
Serviced by light aircraft &
Trans Garimpiero Highway.
Exploration office and camp established on Sao Domingos.
6
Local Infrastructure7
To Fofoca 5km
To Transgarimpeiro
highway
To Toucano and camp 3km
Aurora Office
New Camp Construction8
•The new camp is located within the Toucano projectarea.
•The new camp has been completed and is fullyoperational.
•Areas for the workshops, heavy vehicle parking baysand future expansion have been cleared.
•The camp land was purchased by Aurora.
Located in a Proven region for gold
The Tapajos : World’s Third Largest Placer Gold Belt
Site of the world’s largest ever gold rush from 1970’s to 1990’s
Largest alluvial gold province in Brazil, third largest in world – previous production from streams estimated at 20-30 Moz of gold
Geology is similar to other prolific gold belts (e.g. Eastern Canada, Western Australia).
9
Key Position in Known trend
Eldorado Gold
Serabi Gold
Magellan minerals
Eldorado Gold
Brazilian Gold Corp
Magellan minerals
10
Deposit Company
Cuiu Cuiu Magellan Minerals Ltd
Ouro Roxo privately owned
Tocantinzinho El Dorado Gold Corp
Sao Domingos Aurora Gold Corp
Sao Chico Kenai Resources Ltd
Palito Serabi Gold Plc
Sao Jorge Brazilian Gold Corp
Coringa Magellan Minerals Ltd
Known Mineralisation and Targets Areas11
Primary Gold Targets Outline
12
Sao Domingo – Fofoca Resource Target
outcrop
0.5m @ 6.3g/t
1.0m @ 3.6g/t
Fofoca Trend
Cachoeirinha Trend
Fofoca Mine area
Cachoeirinha vein
13.4 g/t, 8.2g/t, 8.0g/t, 7.8g/t
JORC Inferred resource estimateprepared by Geosure (Australia) forFofoca2.1 million tonnes grading 2.0 g/t Aufor 130,000 ounces of contained gold
at a cut-off grade of 0.5 g/t Au.
• Plans to extend resource intoCachoeirinha based on magneticsand coincident gold results.
•Application for renewal in withDNPM
13
Fofoca geochem sample lines14
Fofoca grid geochem results15
Fofoca resource area
Toucano Ore trend16
Area targeted for trial mining.
Drill targets for hard rock mineralisation
50,000 tons per year, renewable for 4 years.
Lead up to full blown mining license
Toucano Grid geochem results17
?
500 m
Toucano trend18
ToucanoAurora camp
Sao Domingos
Relationship to Camp and Sao Domingo township.
Raimundo drill tested previously with numerous mineralised intersections
Raimundo (Atacadau)
Toucano Ore Zone – trial mining target19
3 Stage Exploration Plan
Stage 1. Total meters drilled will be a maximum of 1,000. BUDGET US$300,000
Stage 2. Total meters drilled will be a maximum of 2,000. BUDGET US$600,000
Stage 3. Combined with stage 2 and includes tenement wide Auger program to comply with DNPM resource determination. Budget US$1,000,000
Drill Lines locality plan
Drill Lines locality plan - Soils
Auger drill Locality Plan
Oxide and Alluvial Gold targets on applications
Space ImagePrevious alluvial works
Previous oxide works
10 km
24
Alluvial concentrator test plant25
Aurora – a staged program
Near-Term Q2- 2014
Medium-TermQ4 - 2014
Longer Term Value Creation
Exploration
New Ventures
Appraisal
Target definition
Resource expansion
CurrentMedium-Term
Q3- 2014
Results to date indicate numerous anomalies extending beyond of current grid configuration.
Complete migration and Canada Listing
Completed Geochem Sampling and follow up to the highly prospective results from Q2 to Q4 2013.
Drilling Toucano
Apply geochem and geophysics on other gold occurrences on Sao Domingo
Expand and follow up other gold occurrences and acquisitions.
Toucano and Colibri Resource estimation.
Commencescoping studies.
26
Initiate Resource definition for filing with the DNPM
Aurora - Plan Summary
Located in prime position in known gold belt.
Infrastructure in place to support prolonged field
activities.
Large geochem anomalies and drill ready targets.
Bulk sampling initiated with custom built concentrators.
Trial mining license application in place.
Drill targets for Toucano and Colibri
27
Expected Near term Deliverables
Advance on the large geochem targets generated during 2013.
Prepare for trial mining in the Toucano resource area.
Establish a drill targets along the Toucano and Colibri grid.
Enhance shareholder value.
Quality and regular news flow and updates.
Migration to Canadian Stock exchange.
Target to reach 1,000,000+ ounces
28